[object Object],[object Object],[object Object],* Based on Hourly Average Spot Market Prices from April 23 to April 30, 2011
INTERIM AGREEMENT CUSTOMER TO BE CONTRACTED AGREEMENT Philphos 9.4 MW May – December 2011 = 0 MW  January 2012  onwards= 9.7 MW Century 6.7 MW Incremental power demand from May to December 2011  (from 2.4223 to 6.7 MW)
PHILPHOS Scenario 1  To maximize nomination of contracted capacity equivalent to  9.4 MW Expected Result: Amount MEI's Payable to KSPC (252,689,146) MEI's Collectible from Philphos 0  MEI's Collectible from Market Operations 122,673,821  Total Payable in PhP (130,015,324)
PHILPHOS Scenario 2  To nominate zero (0) and pay the 75% of the Unnominated Quantity at the end of the year Expected Result: Amount MEI's Payable to KSPC 0  MEI's Collectible from Philphos 0 MEI's Payable to KSPC for UQ (193,137,739) Total Payable in PhP (193,137,739)
PHILPHOS Strategy in the Nomination of Hourly Contracted Quantity *If Forecasted Market Price is higher than 1.4017 P/kWh, Adopt Scenario 1: Maximize Nomination of Philphos @ 9.4 MW *If Forecasted Market Price is equal or lower than 1.4017 P/kWh, Adopt Scenario 2: Nominate Zero (0) and Pay the 75% of the Unlifted Quantity at the end of the year *To get the Break-even Spot Market Price of 5.9477 P/kWh the prevailing latest Average Spot Market Price must increase by 32% Expected Result: Amount MEI's Payable to KSPC (247,726,528)  MEI's Collectible from Philphos 0 MEI's Collectible from M.O. 118,343,892 Total Payable in PhP (129,382,636)
PHILPHOS Hour 1 Hour 2 Hour 3 Hour 4 Hour 5 Hour 6 Hour 7 Hour 8 Hour 9 Hour 10 Hour 11 Hour 12 1.59  1.65  1.97  1.27  2.05  3.83  3.90  1.56  0.67  0.51  0.55  0.90  2.2975  2.2475  2.0041  2.6227  1.9521  1.2323  1.2137  2.3243  3.5636  3.9421  3.8375  3.1309  59% 65% 97% 27% 105% 283% 290% 56% -33% -49% -45% -10% Hour 13 Hour 14 Hour 15 Hour 16 Hour 17 Hour 18 Hour 19 Hour 20 Hour 21 Hour 22 Hour 23 Hour 24 Ave. 0.92  0.27  0.40  0.65  1.15  1.39  0.29  0.91  1.44  1.36  1.09  1.37  3.0952  4.6823  4.2571  3.6039  2.7710  2.4918  4.6032  3.1132  2.4353  2.5195  2.8520  2.5063  -8% -73% -60% -35% 15% 39% -71% -9% 44% 36% 9% 37% 32%
CENTURY Scenario 1 To maximize nomination of contracted capacity equivalent to  6.7 MW Expected Result: Amount MEI's Payable to KSPC (180,108,221) MEI's Collectible from Century 130,025,851  MEI's Collectible from Market Operations 23,309,018  Total Payable in Php (26,773,352)
CENTURY Scenario 2  To nominate the scheduled incremental consumption and pay the 75% of the Unnominated Quantity at the end of the year. Expected Result: Amount MEI's Payable to KSPC 0  MEI's Collectible from Century 0  MEI's Payable to KSPC for UQ (40,353,844)  Total Payable in PhP (40,353,844)
CENTURY Strategy in the Nomination of Hourly Contracted Quantity *If Forecasted Market Price is higher than 1.5313 P/kWh, Adopt Scenario 1: Maximize Nomination of Century @ 6.7 MW *If Forecasted Market Price is equal or lower than 1.5313 P/kWh, Adopt Scenario 2: Nominate Zero (0) and Pay the 75% of the Unlifted Quantity at the end of the year *To get the Break-even Spot Market Price of 5.9329 P/kWh the prevailing latest Average Spot Market Price must increase by 32% Expected Result: Amount MEI's Payable to KSPC (168,462,023)  MEI's Collectible from Philphos 130,025,851 MEI's Collectible from M.O. 20,222,792 Total Payable in PhP (18,213,380)
Comparison of Payables Philphos vs Century 9.4 MW Philphos Estimated Payable = 129,382,636 PhP (Scenario 1*) 6.7 MW Century Estimated Payable =  18,213,380 PhP (Scenario 1*) * - Trade in full with due consideration of the threshold price
Expenses for PHILPHOS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Other Expenses to be Incurred
Expenses for CENTURY PEAK ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Other Expenses to be Incurred
Other Expenses to be Incurred 2.) KSPC Security Deposit (June – December 2011): =  10% of Contracted Monthly Energy x KSPC Contract Price with VAT =  0.10 x 21,090,000 kWh/mo x 5.334 P/kWh      Security Deposit = P 11,249,406 per month Commitment Fee : = ¼ of 1% of Security Deposit    = P 28,124 Commission Fee: 1/8 of 1% of Security Deposit  = P 14,062    Total Commitment Fee & Commission Fee = P 42,186 per month   Total =  P 79,041,144 (for 7 months)
END OF PRESENTATION Thank you!
Century – Market Price & Threshold Comparison
Century – Needed Increase to meet price threshold
PHILPHOS – Market Price & Threshold Comparison
PHILPHOS – Needed Increase to meet price threshold

Weitere ähnliche Inhalte

Ähnlich wie Ppt presentation on contracting with philphos & century with graph

PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
mza.arifin
 
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
Egyptian Engineers Association
 
Finance and Market Presentation 02.01.2012
Finance and Market Presentation 02.01.2012Finance and Market Presentation 02.01.2012
Finance and Market Presentation 02.01.2012
Ronald Moore
 
"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius
Sustainable Business Partnership
 

Ähnlich wie Ppt presentation on contracting with philphos & century with graph (20)

Wind Power Project Appraisal.pptx
Wind Power Project Appraisal.pptxWind Power Project Appraisal.pptx
Wind Power Project Appraisal.pptx
 
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdfPLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
PLN - Renewable Energy Development Strategy RUPTL 2021-2030 (MKI).pdf
 
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان... الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
الدكتور / علي المراكبي استشاري الهندسة الميكانيكية وخبير ترشيد الطاقة بعنوان...
 
Corporate presentation 2 q 14 vf wa
Corporate presentation 2 q 14 vf  waCorporate presentation 2 q 14 vf  wa
Corporate presentation 2 q 14 vf wa
 
Finance and Market Presentation 02.01.2012
Finance and Market Presentation 02.01.2012Finance and Market Presentation 02.01.2012
Finance and Market Presentation 02.01.2012
 
Solar rooftop market analysis
Solar rooftop market analysisSolar rooftop market analysis
Solar rooftop market analysis
 
Corporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff saCorporate presentation 2 q 14 v ff sa
Corporate presentation 2 q 14 v ff sa
 
Corporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 waCorporate presentation 2 q 14 vf1 wa
Corporate presentation 2 q 14 vf1 wa
 
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
The Computable General Equilibrium Analysis of Electricity Subsidies: The Per...
 
Repowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchRepowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic Research
 
Session 12 project costing & economics
Session 12   project costing & economicsSession 12   project costing & economics
Session 12 project costing & economics
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
The economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesThe economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenues
 
"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius"Overview of Renewable Technologies" Laurie Tennant, Engenius
"Overview of Renewable Technologies" Laurie Tennant, Engenius
 
Energy Analysis of Nigeria
Energy Analysis of NigeriaEnergy Analysis of Nigeria
Energy Analysis of Nigeria
 
Financing the water sector
Financing the water sectorFinancing the water sector
Financing the water sector
 
Power procurement strategy--Mr. rohit bajaj
Power procurement strategy--Mr. rohit bajaj  Power procurement strategy--Mr. rohit bajaj
Power procurement strategy--Mr. rohit bajaj
 
Power procurement strategy-- Mr. Rohit Bajaj
Power procurement strategy-- Mr. Rohit BajajPower procurement strategy-- Mr. Rohit Bajaj
Power procurement strategy-- Mr. Rohit Bajaj
 
TPDDL Excellence Journey
TPDDL Excellence JourneyTPDDL Excellence Journey
TPDDL Excellence Journey
 
CSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicCSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - Infographic
 

Kürzlich hochgeladen

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Kürzlich hochgeladen (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 

Ppt presentation on contracting with philphos & century with graph

  • 1.
  • 2. INTERIM AGREEMENT CUSTOMER TO BE CONTRACTED AGREEMENT Philphos 9.4 MW May – December 2011 = 0 MW January 2012 onwards= 9.7 MW Century 6.7 MW Incremental power demand from May to December 2011 (from 2.4223 to 6.7 MW)
  • 3. PHILPHOS Scenario 1 To maximize nomination of contracted capacity equivalent to 9.4 MW Expected Result: Amount MEI's Payable to KSPC (252,689,146) MEI's Collectible from Philphos 0 MEI's Collectible from Market Operations 122,673,821 Total Payable in PhP (130,015,324)
  • 4. PHILPHOS Scenario 2 To nominate zero (0) and pay the 75% of the Unnominated Quantity at the end of the year Expected Result: Amount MEI's Payable to KSPC 0 MEI's Collectible from Philphos 0 MEI's Payable to KSPC for UQ (193,137,739) Total Payable in PhP (193,137,739)
  • 5. PHILPHOS Strategy in the Nomination of Hourly Contracted Quantity *If Forecasted Market Price is higher than 1.4017 P/kWh, Adopt Scenario 1: Maximize Nomination of Philphos @ 9.4 MW *If Forecasted Market Price is equal or lower than 1.4017 P/kWh, Adopt Scenario 2: Nominate Zero (0) and Pay the 75% of the Unlifted Quantity at the end of the year *To get the Break-even Spot Market Price of 5.9477 P/kWh the prevailing latest Average Spot Market Price must increase by 32% Expected Result: Amount MEI's Payable to KSPC (247,726,528) MEI's Collectible from Philphos 0 MEI's Collectible from M.O. 118,343,892 Total Payable in PhP (129,382,636)
  • 6. PHILPHOS Hour 1 Hour 2 Hour 3 Hour 4 Hour 5 Hour 6 Hour 7 Hour 8 Hour 9 Hour 10 Hour 11 Hour 12 1.59 1.65 1.97 1.27 2.05 3.83 3.90 1.56 0.67 0.51 0.55 0.90 2.2975 2.2475 2.0041 2.6227 1.9521 1.2323 1.2137 2.3243 3.5636 3.9421 3.8375 3.1309 59% 65% 97% 27% 105% 283% 290% 56% -33% -49% -45% -10% Hour 13 Hour 14 Hour 15 Hour 16 Hour 17 Hour 18 Hour 19 Hour 20 Hour 21 Hour 22 Hour 23 Hour 24 Ave. 0.92 0.27 0.40 0.65 1.15 1.39 0.29 0.91 1.44 1.36 1.09 1.37 3.0952 4.6823 4.2571 3.6039 2.7710 2.4918 4.6032 3.1132 2.4353 2.5195 2.8520 2.5063 -8% -73% -60% -35% 15% 39% -71% -9% 44% 36% 9% 37% 32%
  • 7. CENTURY Scenario 1 To maximize nomination of contracted capacity equivalent to 6.7 MW Expected Result: Amount MEI's Payable to KSPC (180,108,221) MEI's Collectible from Century 130,025,851 MEI's Collectible from Market Operations 23,309,018 Total Payable in Php (26,773,352)
  • 8. CENTURY Scenario 2 To nominate the scheduled incremental consumption and pay the 75% of the Unnominated Quantity at the end of the year. Expected Result: Amount MEI's Payable to KSPC 0 MEI's Collectible from Century 0 MEI's Payable to KSPC for UQ (40,353,844) Total Payable in PhP (40,353,844)
  • 9. CENTURY Strategy in the Nomination of Hourly Contracted Quantity *If Forecasted Market Price is higher than 1.5313 P/kWh, Adopt Scenario 1: Maximize Nomination of Century @ 6.7 MW *If Forecasted Market Price is equal or lower than 1.5313 P/kWh, Adopt Scenario 2: Nominate Zero (0) and Pay the 75% of the Unlifted Quantity at the end of the year *To get the Break-even Spot Market Price of 5.9329 P/kWh the prevailing latest Average Spot Market Price must increase by 32% Expected Result: Amount MEI's Payable to KSPC (168,462,023) MEI's Collectible from Philphos 130,025,851 MEI's Collectible from M.O. 20,222,792 Total Payable in PhP (18,213,380)
  • 10. Comparison of Payables Philphos vs Century 9.4 MW Philphos Estimated Payable = 129,382,636 PhP (Scenario 1*) 6.7 MW Century Estimated Payable = 18,213,380 PhP (Scenario 1*) * - Trade in full with due consideration of the threshold price
  • 11.
  • 12.
  • 13. Other Expenses to be Incurred 2.) KSPC Security Deposit (June – December 2011): = 10% of Contracted Monthly Energy x KSPC Contract Price with VAT = 0.10 x 21,090,000 kWh/mo x 5.334 P/kWh Security Deposit = P 11,249,406 per month Commitment Fee : = ¼ of 1% of Security Deposit = P 28,124 Commission Fee: 1/8 of 1% of Security Deposit = P 14,062 Total Commitment Fee & Commission Fee = P 42,186 per month Total = P 79,041,144 (for 7 months)
  • 14. END OF PRESENTATION Thank you!
  • 15. Century – Market Price & Threshold Comparison
  • 16. Century – Needed Increase to meet price threshold
  • 17. PHILPHOS – Market Price & Threshold Comparison
  • 18. PHILPHOS – Needed Increase to meet price threshold