SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
Christopher A. Lucas, Architect, AIA
3929 Arizona Ave • Kenner, LA 70065
Cell: (910) 520.3698 • Email: cal97tj@gmail.com
Professional Certifications
• Tulane University, 1993 (BARCH), 2004 (MARCH)
• Louisiana State Architecture License (2002) #5828 (Lapsed)
• Mississippi State Architecture License (2003) #3653 (Lapsed)
• North Carolina State Architecture License (2005) #10181
• NCARB Certification (2002) #56651 (Lapsed)
• LEED AP
Professional Experience
LS3P Associates, LTD, Project Architect, Construction Contract Administrator October 2005 - Present
o Project Architect for the Oak Island Police Headquarters, NC (schematic design thru construction administration).
o Project Architect for the Oak Island Town Hall, NC (schematic design thru construction administration).
o Project Architect for a new DMV and New Hanover County Sherriff’s Office in Castle Hayne, NC (not built).
o Contract Document production and provided full-time on-site Construction Administration: Wilmington
Convention Center: $40 million facility with a 30,000 SF Exhibit Hall, 12,000 SF Grand Ballroom divisible into
six salons, meeting spaces, and full catering kitchen.
o Full-time Construction Administration: Union Station Building for Cape Fear Community College: $40 million,
five story, 250,000 SF facility including student services, administrative offices, laboratories, classrooms, nursing
lab and mock operating room, President’s suite, board room, full catering kitchen, and multi-purpose/ ballroom.
o Full-time Construction Administration: Fine Arts and Humanities Building for Cape Fear Community College:
$40 million, 150,000 SF facility including a 1,500 seat theater, three story prefunction/ Lobby space, and
classroom and office wing.
o Full-time Construction Administration: Multiple 52,000 SF psychiatric facilities for Strategic Behavioral Health;
projects located in Harlingen, TX; Green Bay, WI; and Colorado Springs, CO.
N-Y Associates, Project Architect September 1997-August 2005
o Prepared Construction Documents, bid, and performed Construction Administration for Orleans Parish and St.
Tammany Parish School Board Projects (Renovation and new construction).
o Part-time on-site resident inspector services for the Wagner Library, Metairie, LA.
o Project Architect for Renovations to New Orleans Home and Rehabilitation Center.
o Prepared Construction Documents for Renovations to The Mahalia Jackson Theater for the Performing Arts, New
Orleans, LA.
o Prepared Construction Documents for the Guste High Rise Window Replacement for HANO.
o Existing condition documentation, code review, consultant coordination, and construction administration on
various projects.
Haynes and Associates, Intern Architect August 1996-September 1997
o Worked in Mac platform model for the conversion of New Orleans Municipal Auditorium into the Arena for the
New Orleans Brass Hockey Team.
o Produced computer model exhibits for a Children’s Museum in Kalamazoo, Michigan, using Mac platform.
William Sonner Architect, Intern Architect June 1995–August 1996
o Provided schematic design through construction documents for various custom houses.
Waring Architects, Intern Architect May 1994 – June 1995
o Provided schematic design through construction documents for custom houses and light commercial projects.
Projects included coordination with City, Parish, and Louisiana State Fire Marshal code review.
Computer Skills
Autodesk Revit Sketchup Microsoft Office Suite
Autocad Adobe Acrobat Pro

Weitere ähnliche Inhalte

Ähnlich wie ChrisLucas Resume - Sept 2016

Ähnlich wie ChrisLucas Resume - Sept 2016 (20)

Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
C-McCray Resume 2013
C-McCray Resume 2013C-McCray Resume 2013
C-McCray Resume 2013
 
patrick-albright-resume1
patrick-albright-resume1patrick-albright-resume1
patrick-albright-resume1
 
Js Resume 2010font
Js Resume 2010fontJs Resume 2010font
Js Resume 2010font
 
2015-Resume of John Turner
2015-Resume of John Turner2015-Resume of John Turner
2015-Resume of John Turner
 
rwl-resume- 2016-long-H-F
rwl-resume- 2016-long-H-Frwl-resume- 2016-long-H-F
rwl-resume- 2016-long-H-F
 
J.Christopher Faulkner
J.Christopher FaulknerJ.Christopher Faulkner
J.Christopher Faulkner
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
ima resume 2015 linkedin
ima resume 2015 linkedinima resume 2015 linkedin
ima resume 2015 linkedin
 
My Resume
My ResumeMy Resume
My Resume
 
Resume & Portfolio
Resume & PortfolioResume & Portfolio
Resume & Portfolio
 
I-3 Correctional Work
I-3 Correctional WorkI-3 Correctional Work
I-3 Correctional Work
 
Michael Sackler AIA_ Resume
Michael Sackler AIA_ ResumeMichael Sackler AIA_ Resume
Michael Sackler AIA_ Resume
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
Brian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich's Resume & Portfolio
Brian Rich's Resume & Portfolio
 
Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)Richard Gerdes Resume 2016 (1)
Richard Gerdes Resume 2016 (1)
 
Liam Ream CV_Blum
Liam Ream CV_BlumLiam Ream CV_Blum
Liam Ream CV_Blum
 

ChrisLucas Resume - Sept 2016

  • 1. Christopher A. Lucas, Architect, AIA 3929 Arizona Ave • Kenner, LA 70065 Cell: (910) 520.3698 • Email: cal97tj@gmail.com Professional Certifications • Tulane University, 1993 (BARCH), 2004 (MARCH) • Louisiana State Architecture License (2002) #5828 (Lapsed) • Mississippi State Architecture License (2003) #3653 (Lapsed) • North Carolina State Architecture License (2005) #10181 • NCARB Certification (2002) #56651 (Lapsed) • LEED AP Professional Experience LS3P Associates, LTD, Project Architect, Construction Contract Administrator October 2005 - Present o Project Architect for the Oak Island Police Headquarters, NC (schematic design thru construction administration). o Project Architect for the Oak Island Town Hall, NC (schematic design thru construction administration). o Project Architect for a new DMV and New Hanover County Sherriff’s Office in Castle Hayne, NC (not built). o Contract Document production and provided full-time on-site Construction Administration: Wilmington Convention Center: $40 million facility with a 30,000 SF Exhibit Hall, 12,000 SF Grand Ballroom divisible into six salons, meeting spaces, and full catering kitchen. o Full-time Construction Administration: Union Station Building for Cape Fear Community College: $40 million, five story, 250,000 SF facility including student services, administrative offices, laboratories, classrooms, nursing lab and mock operating room, President’s suite, board room, full catering kitchen, and multi-purpose/ ballroom. o Full-time Construction Administration: Fine Arts and Humanities Building for Cape Fear Community College: $40 million, 150,000 SF facility including a 1,500 seat theater, three story prefunction/ Lobby space, and classroom and office wing. o Full-time Construction Administration: Multiple 52,000 SF psychiatric facilities for Strategic Behavioral Health; projects located in Harlingen, TX; Green Bay, WI; and Colorado Springs, CO. N-Y Associates, Project Architect September 1997-August 2005 o Prepared Construction Documents, bid, and performed Construction Administration for Orleans Parish and St. Tammany Parish School Board Projects (Renovation and new construction). o Part-time on-site resident inspector services for the Wagner Library, Metairie, LA. o Project Architect for Renovations to New Orleans Home and Rehabilitation Center. o Prepared Construction Documents for Renovations to The Mahalia Jackson Theater for the Performing Arts, New Orleans, LA. o Prepared Construction Documents for the Guste High Rise Window Replacement for HANO. o Existing condition documentation, code review, consultant coordination, and construction administration on various projects. Haynes and Associates, Intern Architect August 1996-September 1997 o Worked in Mac platform model for the conversion of New Orleans Municipal Auditorium into the Arena for the New Orleans Brass Hockey Team. o Produced computer model exhibits for a Children’s Museum in Kalamazoo, Michigan, using Mac platform. William Sonner Architect, Intern Architect June 1995–August 1996 o Provided schematic design through construction documents for various custom houses. Waring Architects, Intern Architect May 1994 – June 1995 o Provided schematic design through construction documents for custom houses and light commercial projects. Projects included coordination with City, Parish, and Louisiana State Fire Marshal code review. Computer Skills Autodesk Revit Sketchup Microsoft Office Suite Autocad Adobe Acrobat Pro