SlideShare ist ein Scribd-Unternehmen logo
1 von 17
Downloaden Sie, um offline zu lesen
The WeldNet
CONSULTANT ENGINEERS - METALLURGY AND WELDING
THE WELDNET PTY LTD - ABN 74 009 408 226
UNIT 3/52 WELD STREET, NEDLANDS, WESTERN AUSTRALIA, 6009.
Website: www.weldnet.com.au Email: info@weldnet.com.au
Curriculum Vitae
NAME Christopher Paul Cobain
DATE OF BIRTH 1966
NATIONALITY Australian Citizen
QUALIFICATIONS
Masters Degree in Welding Engineering (University of Wollongong - UOW)
Post Graduate Diploma Materials Welding and Joining (UOW)
Advanced Diploma of Engineering Metallurgy (AMTC)
IMEA: Certified Materials Professional (CMatP)
WTIA: Certified Comprehensive Welding Inspector (CCWI)
WTIA: Welding Supervisor (AS 1796)
TWI: Senior Welding Inspector Level 3 (CSWIP)
TWI: Radiograph Interpreter Level 2 (CSWIP)
IIW: International Welding Inspector – Comprehensive
IIW: International Welding Specialist
DOL: Boilermaker / Welder 1st
Class
AFFILIATIONS / MEMBERSHIPS
Member Welding Technology Institute Australia
Member Institute of Materials Engineering Australia
Member of the Australian Welding Institute
POSITION
Senior Welding & Materials Engineer (2005 to Present). Providing materials, welding, project
engineering consulting services to the petrochemical, mining, construction and fabrication industry.
COMPETENCIES
Standards and Specifications
Project Documentation Development
Construction Management and Planning
All Fabrication, Welding and NDE Methods
QA / QC Procedure Review / Approval
Material Properties and Metallurgy
Third Party Verification
Client Representative
Safe Work Practice
Failure Analysis
Computer Skills
Leadership
The WeldNet
CONSULTANT ENGINEERS - METALLURGY AND WELDING
THE WELDNET PTY LTD - ABN 74 009 408 226
UNIT 3/52 WELD STREET, NEDLANDS, WESTERN AUSTRALIA, 6009.
Web: www.weldnet.com
MAJOR CLIENT LIST AND DETAILS OF EXPERIENCE FOR CHRISTOPHER COBAIN
WOODSIDE ENERGY LIMITED
1. North Rankin A Jacket Life Extension - 2010
 Advise on jacket node weld blending to increase fatigue life.
 Advise on pre / post weld NDE and crack rectification methods.
 Review / approve WPS/PQR packages and NDE reports.
 Materials: Heavy wall C-Mn steel structural tubing
 Standards: AWS D1.1 / API RP documents / ECA assessment reports
2. North Rankin 2 Jacket Construction – 2010 / 2011
 Review / approve fabrication and QC procedures.
 Review / approve WPS/PQR packages.
 Witness welding procedure operations, recording, NDE and mechanical
assessments including CTOD.
 Review AUT procedures / advise on seeded defect weld requirements
 Overseas site surveillance and monitoring during jacket manufacture / welding
 Investigate DSS defect rate and advise / implement improvement program.
 Support client QC management and work front team members
 Materials: Heavy wall C-Mn steel structural tubing and manufactured sections,
Large and small bore C-Mn steel and DSS UNS S31803 piping systems
 Standards: AWS D1.1 / ASME B31.3 / Client specifications
3. Woodside Office Welding Engineer Support – 2010 / 2011 / 2012
 Attend Woodside offices, (ad hoc basis), and issue approved WPS packages
for offshore brownfield equipment and gas plant maintenance programs.
 Assist Woodside QA / QC group on materials, welding and NDE.
 Standards: AWS D1.1 / ASME B31.3 / Client specifications
Page 2 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
BHP BILLITON
1. Macedon Project - 2010
 Specification development for welding, NDE to subsea structures and pipe
spools
 Review / approval of welding procedures.
 Materials: Structural Steel, C-Mn / SDSS UNS S32750 Linepipe and fittings
 Standards: AWS D1.1, DNV OS F101
2. Worsley Alumina in service welding / Calciner expansion – 2011 / 2013
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X52 linepipe and Split Tee
 Standards: AS 2885-2
TECHNIP OCEANIA
1. Vincent Stage 2 / Enfield Subsea Rigid Spools - 2010
 Specification and QC / ITP document development for welding, NDE, coating,
pressure testing of subsea pipe spools
 Preparation of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document compilation
 Surveillance and inspection – welds / NDE / dimensions
 Review / approval release certification / MDR data
 Materials: DSS UNS S31803 Linepipe and fittings
 Standards: DNV OS F101 and client specifications
2. Wheatstone Upstream- 2010
 Review / approval WPS/PQR/WPQ documents
 Surveillance and inspection – welds / NDE / dimensions
 Materials: DSS UNS S31803 / C-Mn steel Linepipe and fittings
 Standards: ASME B31.3 / DNV OS F101 and client specifications
Page 3 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
3. Vincent Stage 3 Subsea Rigid Spools - 2011
 Specification and QC / ITP document development for welding, NDE, coating,
pressure testing of subsea pipe spools
 Preparation of WPS proposals
 Witness WPS and welder qualification / mechanical testing
 WPS/PQR/WPQ document compilation / approval
 Surveillance and inspection – welds / NDE / dimensions
 Review / approval release certification / MDR data
 Materials: DSS UNS S31803 Linepipe and fittings
 Standards: ASME B31.8 / DNV OS F101 and client specifications
4. Vincent Stage 3B Subsea Rigid Spools – 2011 / 2012
 Stock material survey and report
 Preparation of WPS proposals
 Witness WPS and welder qualification / mechanical testing
 WPS/PQR/WPQ document compilation / approval
 Surveillance and inspection – welds / NDE / dimensions
 Review / approval release certification / MDR data
 Materials: DSS UNS S31803 Linepipe and fittings
 Standards: ASME B31.8 / DNV OS F101 and client specifications
5. Fletcher Funicane Project – 2012
 WPS/PQR/WPQ document compilation / approval
 Advise on NDE methods and application
 Materials: ASTM A694 F65 forgings – Bend Restrictor
 Standards: AWS D1.1 and client specifications
6. Macedon Gas Plant Project – 2012 / 2013
 WPS/PQR/WPQ document compilation / approval
 Witness welder qualifications / training / sign off
 Guidance on pipe spool angular misalignment issues
 Guidance on CVN requirement for base materials
 Radiograph review
 Offshore hook up activity, audit, inspection items report
 Site inspection, surveillance and monitoring
 Materials: C-Mn steel / DSS pipe and fittings
 Standards: DNV OS-F101, ASME B31.3 and client specifications
Page 4 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
7. Gorgon Upstream – 2013
 Specification review
 NDE procedure review
 Review / approval of WPS/PQR/WPQ documentation
 Site production weld surveillance and inspection
 Materials: Large bore C-Mn steel linepipe and fittings
 Standards: ASME B31.3, AS 4041 and client specifications
8. Wheatstone Subsea Structure Fabrication – 2013 / 2014
 Specification review
 Contractor QC procedures development
 Material certification review and approval
 Review / approve WPS/PQR/WPQ documentation
 Review NDE procedures / scope of work
 Overseas site monitoring and recording of WPS/PQR/WPQ
 Overseas site production weld surveillance and inspection
 Materials: C-Mn structural steel
 Standards: AWS D1.1 and client specifications
9. Wheatstone Subsea Post Metrology Spool Fabrication – 2014 / 2015
 Specification review
 Contractor QC procedures development
 Material certification review and approval
 Development of welding processes and automation
 Supervise trial welding program
 Site monitoring and recording of WPS/PQR/WPQ
 Review NDE procedures / scope of work
 Advise CTOD scope of work / Witness mechanical testing
 Review / approve WPS/PQR/WPQ documentation
 Site production weld surveillance and inspection
 Materials: Large bore C-Mn steel linepipe and fittings
 Materials: Large bore C-Mn steel Clad UNS N06625 linepipe and fittings
 Standards: DNV OS-F101, ASME B31.8 and client specifications
Page 5 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
EPIC ENERGY / ORIGIN ENERGY / OSD PIPELINES
1. All - Onshore gas transmission pipelines – 2010 / 2011
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 Surveillance and inspection – welds / NDE
 Materials: C-Mn steel Linepipe / fittings API 5L F-X65 / F-X70
 Standards: AS 2885-2 and client specifications
APACHE ENERGY / SUBSEA 7 / PTTEP
1. All - Offshore gas transmission trunklines – 2010 / 2011 / 2012
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 Barge lay vessel surveillance and inspection – welds / NDE
 Materials: C-Mn steel Linepipe API 5L X65 / X70 / DNV 450
 Standards: AS 2885-4 / DNV OS-F101and client specifications
2. PTTEP – West Atlas Wreck Salvage - Removal / Montara Well head Platform
reinstatement – 2010 / 2011 / 2102
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 Heat damaged material assessments and conduct replicas
 Compile report for base material condition.
 Advise on material damage and suitability for salvage equipment placement
 Advise import / export riser / jacket cut lines for platform removal.
 Review / approve Montara platform WPS/PQR packages
 Review of MDR documentation package / sign off
 Materials: C-Mn steel / Low alloy steels / DSS linepipe and structural steel
 Standards: AWS D1.1 / ASME B31.3 / DNV OS-F101 and client specifications
Page 6 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
3. PTTEP – BHP Macedon Subsea Pipeline - 2011
 WPS/PQR/WPQ document review and approval
 MDR Review / Approval
 Feedback to Lloyds / DNV review comments / close outs.
 Provide report to close out Lloyds / DNV queries
 Materials: C-Mn steel linepipe DNV 450
 Standards: DNV OS-F101 and client specifications
4. Apache Energy – Devil Creek HDD Pipeline - 2011
 WPS/PQR/WPQ document review and approval
 Material substitutions and material suitability
 Materials: C-Mn steel linepipe and fittings API 5L X65 / ASTM A694 F65
 Standards: AS 2885-2 / DNV OS-F101 and client specifications
5. Apache Energy – Julimar / Balnaves project - 2012
 WPS/PQR/WPQ document review and approval
 Materials: C-Mn, Austenitic steels. Vessels and pipe spools
 Standards: ASME IX, ASME B31.3 and client specifications
6. Apache Energy – Varanus island In service weld - 2012
 Thermal analysis modelling and WPS proposal development.
 Compilation of in service welding package
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
7. Apache Energy – Ningaloo Vision FPSO Upgrade - 2013
 Keppel Shipyard WPS/PQR/WPQ document review and approval
 Review / approve QC procedures
 Materials: C-Mn, Austenitic steels. Vessels and pipe spools
 Standards: GL, ASME IX, ASME B31.3 and client specifications
Page 7 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
VERVE ENERGY
1. HP Rotor Turbine Shaft Refurbishment - 2010
 Development and qualification of re-build WPS / PQR
 Development of PWHT procedure
 Surveillance and inspection – welds / NDE
 Materials: AISI 4330 forged turbine shaft
 Standards: Client specifications
SKM RIO TINTO
1. Port Hedland / Cape Lambert Port Facility – 2010 / 2011 / 2012 / 2013
 Review / Approval of WPS / PQR / WPQ documentation
 Advise on material substitutions (Chinese / Thai steels)
 Review of site reports for portable hardness testing
 Advise NDE methods / Review NDE procedures
 Materials: C-Mn / Low alloy structural steels and forgings
 Standards: AS/NZS:1554 Series and client specifications
2. Port Hedland / Cape Lambert Port B In service welds – 2012
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
MAERSK FPSO
1. Nguima-Yin FPSO turbine Fuel Lines - 2011
 Review radiographs – Advise rectification and repair
 Review / Approval of WPS / PQR / WPQ documentation
 Offshore site surveillance and inspection welds / NDE
 Sign off / approve turbine fuel line system
 Materials: UNS S31803 DSS Linepipe and fittings
 Standards: ASME B31.3 and client specifications
Page 8 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
ICON ENGINEERING
1. Offshore lifting Equipment / Heave Compensator – 2011 / 2012
 Review / Approval of WPS / PQR / WPQ documentation
 Site surveillance and inspection welds / NDE
 Sign off / approve equipment
 Materials: AISI 4130 / 4140 / Low Alloy Steels
 Standards: ASME B31.3 / AWS D1.1 and client specifications
JOHN HOLLAND
1. IMPEX LNG Storage Tanks - 2011
 Provide report for construction / weldability of LNG tanks
 Materials: ASTM A553 Type 1 9% nickel
 Standards: API 620 and client specifications
P & A WELDING
1. In service welding onshore gas transmission pipeline - 2011
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
2. Relocation onshore gas transmission pipeline - 2013
 Develop and qualify onshore girth seam WPS/PQR/WPQ
 Compilation of girth seam welding package
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
Page 9 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
NACAP PIPELINES
1. In service welding onshore gas transmission pipeline - 2011
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
AUSCLAD GROUP
1. Karara Iron Ore Processing Plant – 2011 / 2012
 Review / Approval of WPS / PQR / WPQ documentation
 Site inspector correspondences
 Materials: C-Mn / Low alloy structural steels and piping
 Standards: AS/NZS:1554 Series, ASME B31.3 and client specifications
2. Apache In service welding onshore gas transmission pipeline – 2012
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
3. Gorgon Subsea Post Metrology Spool Fabrication – 2012 / 2013
 Specification review
 Contractor QC procedures development
 Material certification review and approval
 Supervise trial welding program
 Develop WPS proposals
 Review NDE procedures / scope of work
 Advise CTOD scope of work
 Site monitoring and recording of WPS/PQR/WPQ
Page 10 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
 Compilation of WPS/PQR/WPQ documentation
 Site production weld surveillance and inspection
 Training / mentoring Contractor QC team
 Materials: Large bore C-Mn steel linepipe and fittings
 Materials: Large bore C-Mn steel Clad UNS N06625 linepipe and fittings
 Standards: DNV OS-F101, ASME B31.8 and client specifications
GORGON UPSTREAM JOINT VENTURE
1. Oil & Gas Processing Plant - 2011
 Review / Approval of WPS / PQR / WPQ documentation
 Review radiography and report
 Materials: C-Mn piping and fittings ASTM A333 / ASTM A350
 Standards: ASME B31.3 and client specifications
CLOUGH
1. Flange failure Investigation - 2012
 Remove samples and expedite metallurgical assessment
 Review NDE operations
 Compile report and issue
 Materials: ASTM A350
 Standards: ASME B31.3 and client specifications
FUGRO TSM
1. Greater Western Flank Project – 2012 / 2013
 Specification review
 Contractor QC procedure review / approval
 Material certification review and approval
 Site monitoring and recording of WPS/PQR/WPQ
 Review / approval of WPS/PQR/WPQ documentation
 Site production weld surveillance and inspection
 Training / mentoring Contractor QC team
 Materials: Heavy wall UNS S31803 linepipe and fittings
 Standards: DNV OS-F101 and client specifications
Page 11 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
KT PIPELINES
1. In service welding onshore gas transmission pipeline - 2013
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
APA PIPELINES
1. In service welding onshore gas transmission pipeline South Hedland - 2013
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
2. In service welding onshore gas transmission pipeline Boodarie - 2014
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
3. In service welding onshore gas transmission pipeline Murrin - 2015
 Thermal analysis modelling and WPS proposal development.
 Witness simulation weld qualification.
 Compilation of in service welding package
 Site surveillance and monitoring welds / NDE
 Site report and acceptance
 Materials: API 5L X65 linepipe and Split Tee.
 Standards: AS 2885-2
Page 12 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
CHEVRON
1. Heat Exchanger fabrication rework - 2014
 Radiograph review
 Compile rectification report and QC procedures
 Overseas site monitoring and recording of WPS/PQR/WPQ
 Compilation of WPS/PQR/WPQ documentation
 Site surveillance and monitoring fabrication, welds / NDE
 Site report and acceptance
 Materials: 90/10 and 70/30 Copper Nickel
 Standards: ASME B31.3
NEPTUNE
1. Wandoo A Platform Conductor repair - 2014
 Compile rectification report and QC procedures
 Site monitoring and recording of WPS/PQR/WPQ
 Compilation of WPS/PQR/WPQ documentation
 Materials: C-Mn steel structural sections
 Standards: AWS D1.1 and client specifications
MONODELPHOUS
1. Ichthys shore crossing gas transmission trunklines – 2014
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 Materials: C-Mn steel Linepipe DNV 450
 Standards: AS 2885-4 / DNV OS-F101and client specifications
REGAL ENGINEERING
1. Offshore tension / spreader beam manufacture and re-certification – 2014 / 2015
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 PWHT procedure development and approval
 Compile Re-certification scope of work
 NDE procedure review
 Site surveillance, monitoring and inspection
 Materials: Low alloy steel and forgings
 Standards: AWS D1.1, DNV OS C401 and client specifications
Page 13 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
CIVMEC
1. Buckle Trigger – 2014
 Specification review
 Contractor QC procedure development
 Site monitoring and recording of WPS/PQR/WPQ
 Review / approval of WPS/PQR/WPQ documentation
 Site production weld surveillance and inspection
 Training / mentoring Contractor QC team
 Materials: C-Mn structural sections
 Standards: AWS D1.1 client specifications
2. Prelude Modules Quote Assistance – 2014
 Specification review
 Contractor QC procedure development
 Welding and NDE statement
 Materials: Structural: C-Mn steel
 Materials: Piping C-Mn clad UNS N06625 linepipe and fittings
 Standards: AWS D1.1, ASME B31.8 and client specifications
BAE
1. ANZAC Frigate mast replacement – 2014
 Contractor QC procedure development
 WPS/PQR data base rationalisation
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 NDE procedure review
 Site surveillance, monitoring and inspection
 Materials: C-Mn structural sections, C-Mn bonded Aluminium, Aluminium
 Standards: Germanischer Lloyds and client specifications
Page 14 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
FMC TECHNOLOGIES
1. XENA subsea manifolds – 2014 / 2015
 Contractor QC procedure development
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 NDE procedure review
 Site surveillance, monitoring and inspection
 Materials: C-Mn structural sections, UNS S31803 linepipe and fittings
 Standards: AWS D1.1, DNV OS-F101, ASME B31.3 and client specifications
DEACON ENGINEERS
1. Neerabup Replacement Digesters – 2014 / 2015
 Contractor QC procedure review approval
 Review / approval of WPS proposals
 Witness WPS and welder qualification
 WPS/PQR/WPQ document review and approval
 NDE procedure review
 Site surveillance, monitoring and inspection
 Materials: C-Mn structural sections
 Standards: AS/NZS:1554 series and client specifications
TUTT BRYANT
1. Crane boom repair – 2015
 Review OEM rectification manual
 Compile WPS qualification statement
 WPS/PQR/WPQ document review and approval
 Site surveillance, monitoring and inspection
 Materials: LAS structural sections
 Standards: AS/NZS:1554 series, AWS D1.1 and client specifications
Page 15 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
OTHER AREAS OF INVOLVEMENT
Over the previous 5 years, Chris has provided senior level consultative support within an
engineering and inspection role to several smaller fabricators not covered in the above list
of major clients. Details below however are also pertinent to larger project work scopes.
1. Transportation vessels
 Design improvement with supports to reduce incidence of cracking
2. Mining equipment
 Cost effective refurbishment of crushing, excavation, track pad equipment
3. Pipeline components
 Well head spools, difficult to weld materials, 4140, NACE etc and development
of PWHT procedures for such components.
 Compressor station pipework and equipment, pig launchers pig traps etc.
4. Lifting Equipment
 Involving high yield materials within brittle fracture risk. Welding, NDE, PWHT
5. WeldNet database
 Installation and training of WeldNet, and in house developed WPS/PQR/WPQ
database management system.
6. Welding / NDE Method Statements
 Development of project Welding Method Statements encompassing all welding
and NDE related activities for each project.
7. Portable Hardness testing
 The provision of portable hardness testing expertise on site using ultrasonic and
rebound test equipment.
8. Material Substitutions
 Review of substitution material chemistry, processing and properties for
suitability as substitution materials specified in project documentation.,
9. Troubleshooting / Problem solving
 Site based inspection and rectification of weld cracking problems, difficult to
qualify welding procedures, restricted NDE scenarios, fabrication sequences to
avoid weldability issues.
10. Failure Analysis
 Involvement with NDE failures, establishing spurious indications with
radiography and UT equipment.
 Material failure / brittle fracture and strain age embrittlement issues with high
fibre strain conditions.
Page 16 of 16
CONSULTANT ENGINEERS - METALLURGY AND WELDING
11. Specification development / Rationalisation
 Development of project specifications and recommendations to rationalise /
update specifications.
 Remove undue complexity and focus on simplicity.
12. Inspection and Test Plan development
 Development of ITP’s covering all critical aspects of the project from contract
review to final sign off.
13. Technical Queries / Concession Requests
 Compilation of technical queries and concession requests within client
specifications with focus on cost reduction without compromising project
integrity and serviceability.
14. Code queries
 Correspondences with DNV and other code committees regarding code
interpretations and NDE acceptance criteria / NDE methodologies.
 These correspondences have resulted in significant cost savings in preventing
unnecessary weld cut outs where interpretations have been incorrect by NDE
contractors.
15. QA / QC procedure development and review / approval
 The development of QC procedures encompassing material receival, handling
and inspection, consumable control and storage, weld monitoring and
traceability, NDE methodologies, visual inspections, PWHT.
16. Training / Mentoring
 Supervision of Contractor and Client QC teams, inspectors. Provide career
development options and CPD to inspectors, and QC personnel

Weitere ähnliche Inhalte

Was ist angesagt?

Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - CopyKumar ramalingam
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha Ramisetti
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Project tailor welding blanks crack analysis & cm
Project   tailor welding blanks  crack analysis & cmProject   tailor welding blanks  crack analysis & cm
Project tailor welding blanks crack analysis & cmHarshVardhan856629
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )Ganesan Sivam
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CVMuhammad Nouman
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFChandra Battu
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)Muhammad Ullah
 

Was ist angesagt? (20)

Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015Tasha ramisetti new resume 2015
Tasha ramisetti new resume 2015
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Faizal CV Rev 1
Faizal CV Rev 1Faizal CV Rev 1
Faizal CV Rev 1
 
Updated cv
Updated cvUpdated cv
Updated cv
 
Project tailor welding blanks crack analysis & cm
Project   tailor welding blanks  crack analysis & cmProject   tailor welding blanks  crack analysis & cm
Project tailor welding blanks crack analysis & cm
 
LINGAM
LINGAMLINGAM
LINGAM
 
cv
cvcv
cv
 
Phairat-CV(2015)
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
 
Shafiq CV
Shafiq CVShafiq CV
Shafiq CV
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )
 
M.Nouman Aramco Format CV
M.Nouman Aramco Format CVM.Nouman Aramco Format CV
M.Nouman Aramco Format CV
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
abc
abcabc
abc
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
THINAKARAN.R
THINAKARAN.RTHINAKARAN.R
THINAKARAN.R
 
MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)MUHAMMAD KALEEM U LLAH (2)
MUHAMMAD KALEEM U LLAH (2)
 

Andere mochten auch

家鄉走透透
家鄉走透透家鄉走透透
家鄉走透透awcc
 
Com4 a
Com4 aCom4 a
Com4 aawcc
 
Yönetim Danışmanının Bağımsızlığı
Yönetim Danışmanının BağımsızlığıYönetim Danışmanının Bağımsızlığı
Yönetim Danışmanının BağımsızlığıDr. Ayşe Kocabacak
 
家鄉的節慶與節日
家鄉的節慶與節日家鄉的節慶與節日
家鄉的節慶與節日awcc
 
100fall
100fall100fall
100fallawcc
 
10 Mandamentos - Aula 08 - 7º mandamento
10 Mandamentos - Aula 08 - 7º mandamento10 Mandamentos - Aula 08 - 7º mandamento
10 Mandamentos - Aula 08 - 7º mandamentoElder Moraes
 
IPC Overview
IPC  OverviewIPC  Overview
IPC Overviewpicksa
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceSimon Lawrence
 
PPT_GHF_HO_CPSP_v1.1
PPT_GHF_HO_CPSP_v1.1PPT_GHF_HO_CPSP_v1.1
PPT_GHF_HO_CPSP_v1.1Natasha Singh
 
Lição 2 - Relacionamentos em Família - EBD Jovens - 4 Trimestre 2015 - CPAD
Lição 2 - Relacionamentos em Família -  EBD Jovens - 4 Trimestre 2015 - CPAD Lição 2 - Relacionamentos em Família -  EBD Jovens - 4 Trimestre 2015 - CPAD
Lição 2 - Relacionamentos em Família - EBD Jovens - 4 Trimestre 2015 - CPAD ProCarreira
 

Andere mochten auch (15)

CV
CVCV
CV
 
家鄉走透透
家鄉走透透家鄉走透透
家鄉走透透
 
Com4 a
Com4 aCom4 a
Com4 a
 
CV Callum Diligent
CV Callum DiligentCV Callum Diligent
CV Callum Diligent
 
Yönetim Danışmanının Bağımsızlığı
Yönetim Danışmanının BağımsızlığıYönetim Danışmanının Bağımsızlığı
Yönetim Danışmanının Bağımsızlığı
 
家鄉的節慶與節日
家鄉的節慶與節日家鄉的節慶與節日
家鄉的節慶與節日
 
100fall
100fall100fall
100fall
 
10 Mandamentos - Aula 08 - 7º mandamento
10 Mandamentos - Aula 08 - 7º mandamento10 Mandamentos - Aula 08 - 7º mandamento
10 Mandamentos - Aula 08 - 7º mandamento
 
IPC Overview
IPC  OverviewIPC  Overview
IPC Overview
 
TIAD 2016 : Making things come alive - IoT
TIAD 2016 : Making things come alive - IoTTIAD 2016 : Making things come alive - IoT
TIAD 2016 : Making things come alive - IoT
 
QA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrenceQA/QC Engineer - simon lawrence
QA/QC Engineer - simon lawrence
 
PPT_GHF_HO_CPSP_v1.1
PPT_GHF_HO_CPSP_v1.1PPT_GHF_HO_CPSP_v1.1
PPT_GHF_HO_CPSP_v1.1
 
Lição 2 - Relacionamentos em Família - EBD Jovens - 4 Trimestre 2015 - CPAD
Lição 2 - Relacionamentos em Família -  EBD Jovens - 4 Trimestre 2015 - CPAD Lição 2 - Relacionamentos em Família -  EBD Jovens - 4 Trimestre 2015 - CPAD
Lição 2 - Relacionamentos em Família - EBD Jovens - 4 Trimestre 2015 - CPAD
 
Profesyonel yönetici kimdir?
Profesyonel yönetici kimdir?Profesyonel yönetici kimdir?
Profesyonel yönetici kimdir?
 
Polisemia
PolisemiaPolisemia
Polisemia
 

Ähnlich wie Christopher Cobain - The WeldNet - CV 2015 Rev 0

QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updatedSantosh Gurajada
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneAssignment Help
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDP. Balaji
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insVuong Huy Hai
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfSugunaSrinivasan2
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000daniel cobar
 

Ähnlich wie Christopher Cobain - The WeldNet - CV 2015 Rev 0 (20)

QA-QC WELDING & NDT Inspector for poland updated
QA-QC WELDING &  NDT Inspector for poland updatedQA-QC WELDING &  NDT Inspector for poland updated
QA-QC WELDING & NDT Inspector for poland updated
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
Santhosh-CV
Santhosh-CVSanthosh-CV
Santhosh-CV
 
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
AZMY CV 2016
AZMY CV 2016AZMY CV 2016
AZMY CV 2016
 
Resume' history
Resume' historyResume' history
Resume' history
 
presentation
presentationpresentation
presentation
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
BALAJI RESUME. UPDATED
BALAJI RESUME. UPDATEDBALAJI RESUME. UPDATED
BALAJI RESUME. UPDATED
 
Hai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_insHai_Vuong Huy_CV_ins
Hai_Vuong Huy_CV_ins
 
HOSS. C.V.
HOSS.  C.V.HOSS.  C.V.
HOSS. C.V.
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 
CB CV 2015
CB CV 2015CB CV 2015
CB CV 2015
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Vuong Tatthang
Vuong TatthangVuong Tatthang
Vuong Tatthang
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdf
 
QA QC Inspector.doc 1
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
 
CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000CV MECHANICAL ENGR-2000
CV MECHANICAL ENGR-2000
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 

Christopher Cobain - The WeldNet - CV 2015 Rev 0

  • 1. The WeldNet CONSULTANT ENGINEERS - METALLURGY AND WELDING THE WELDNET PTY LTD - ABN 74 009 408 226 UNIT 3/52 WELD STREET, NEDLANDS, WESTERN AUSTRALIA, 6009. Website: www.weldnet.com.au Email: info@weldnet.com.au Curriculum Vitae NAME Christopher Paul Cobain DATE OF BIRTH 1966 NATIONALITY Australian Citizen QUALIFICATIONS Masters Degree in Welding Engineering (University of Wollongong - UOW) Post Graduate Diploma Materials Welding and Joining (UOW) Advanced Diploma of Engineering Metallurgy (AMTC) IMEA: Certified Materials Professional (CMatP) WTIA: Certified Comprehensive Welding Inspector (CCWI) WTIA: Welding Supervisor (AS 1796) TWI: Senior Welding Inspector Level 3 (CSWIP) TWI: Radiograph Interpreter Level 2 (CSWIP) IIW: International Welding Inspector – Comprehensive IIW: International Welding Specialist DOL: Boilermaker / Welder 1st Class AFFILIATIONS / MEMBERSHIPS Member Welding Technology Institute Australia Member Institute of Materials Engineering Australia Member of the Australian Welding Institute POSITION Senior Welding & Materials Engineer (2005 to Present). Providing materials, welding, project engineering consulting services to the petrochemical, mining, construction and fabrication industry. COMPETENCIES Standards and Specifications Project Documentation Development Construction Management and Planning All Fabrication, Welding and NDE Methods QA / QC Procedure Review / Approval Material Properties and Metallurgy Third Party Verification Client Representative Safe Work Practice Failure Analysis Computer Skills Leadership
  • 2. The WeldNet CONSULTANT ENGINEERS - METALLURGY AND WELDING THE WELDNET PTY LTD - ABN 74 009 408 226 UNIT 3/52 WELD STREET, NEDLANDS, WESTERN AUSTRALIA, 6009. Web: www.weldnet.com MAJOR CLIENT LIST AND DETAILS OF EXPERIENCE FOR CHRISTOPHER COBAIN WOODSIDE ENERGY LIMITED 1. North Rankin A Jacket Life Extension - 2010  Advise on jacket node weld blending to increase fatigue life.  Advise on pre / post weld NDE and crack rectification methods.  Review / approve WPS/PQR packages and NDE reports.  Materials: Heavy wall C-Mn steel structural tubing  Standards: AWS D1.1 / API RP documents / ECA assessment reports 2. North Rankin 2 Jacket Construction – 2010 / 2011  Review / approve fabrication and QC procedures.  Review / approve WPS/PQR packages.  Witness welding procedure operations, recording, NDE and mechanical assessments including CTOD.  Review AUT procedures / advise on seeded defect weld requirements  Overseas site surveillance and monitoring during jacket manufacture / welding  Investigate DSS defect rate and advise / implement improvement program.  Support client QC management and work front team members  Materials: Heavy wall C-Mn steel structural tubing and manufactured sections, Large and small bore C-Mn steel and DSS UNS S31803 piping systems  Standards: AWS D1.1 / ASME B31.3 / Client specifications 3. Woodside Office Welding Engineer Support – 2010 / 2011 / 2012  Attend Woodside offices, (ad hoc basis), and issue approved WPS packages for offshore brownfield equipment and gas plant maintenance programs.  Assist Woodside QA / QC group on materials, welding and NDE.  Standards: AWS D1.1 / ASME B31.3 / Client specifications
  • 3. Page 2 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING BHP BILLITON 1. Macedon Project - 2010  Specification development for welding, NDE to subsea structures and pipe spools  Review / approval of welding procedures.  Materials: Structural Steel, C-Mn / SDSS UNS S32750 Linepipe and fittings  Standards: AWS D1.1, DNV OS F101 2. Worsley Alumina in service welding / Calciner expansion – 2011 / 2013  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X52 linepipe and Split Tee  Standards: AS 2885-2 TECHNIP OCEANIA 1. Vincent Stage 2 / Enfield Subsea Rigid Spools - 2010  Specification and QC / ITP document development for welding, NDE, coating, pressure testing of subsea pipe spools  Preparation of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document compilation  Surveillance and inspection – welds / NDE / dimensions  Review / approval release certification / MDR data  Materials: DSS UNS S31803 Linepipe and fittings  Standards: DNV OS F101 and client specifications 2. Wheatstone Upstream- 2010  Review / approval WPS/PQR/WPQ documents  Surveillance and inspection – welds / NDE / dimensions  Materials: DSS UNS S31803 / C-Mn steel Linepipe and fittings  Standards: ASME B31.3 / DNV OS F101 and client specifications
  • 4. Page 3 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING 3. Vincent Stage 3 Subsea Rigid Spools - 2011  Specification and QC / ITP document development for welding, NDE, coating, pressure testing of subsea pipe spools  Preparation of WPS proposals  Witness WPS and welder qualification / mechanical testing  WPS/PQR/WPQ document compilation / approval  Surveillance and inspection – welds / NDE / dimensions  Review / approval release certification / MDR data  Materials: DSS UNS S31803 Linepipe and fittings  Standards: ASME B31.8 / DNV OS F101 and client specifications 4. Vincent Stage 3B Subsea Rigid Spools – 2011 / 2012  Stock material survey and report  Preparation of WPS proposals  Witness WPS and welder qualification / mechanical testing  WPS/PQR/WPQ document compilation / approval  Surveillance and inspection – welds / NDE / dimensions  Review / approval release certification / MDR data  Materials: DSS UNS S31803 Linepipe and fittings  Standards: ASME B31.8 / DNV OS F101 and client specifications 5. Fletcher Funicane Project – 2012  WPS/PQR/WPQ document compilation / approval  Advise on NDE methods and application  Materials: ASTM A694 F65 forgings – Bend Restrictor  Standards: AWS D1.1 and client specifications 6. Macedon Gas Plant Project – 2012 / 2013  WPS/PQR/WPQ document compilation / approval  Witness welder qualifications / training / sign off  Guidance on pipe spool angular misalignment issues  Guidance on CVN requirement for base materials  Radiograph review  Offshore hook up activity, audit, inspection items report  Site inspection, surveillance and monitoring  Materials: C-Mn steel / DSS pipe and fittings  Standards: DNV OS-F101, ASME B31.3 and client specifications
  • 5. Page 4 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING 7. Gorgon Upstream – 2013  Specification review  NDE procedure review  Review / approval of WPS/PQR/WPQ documentation  Site production weld surveillance and inspection  Materials: Large bore C-Mn steel linepipe and fittings  Standards: ASME B31.3, AS 4041 and client specifications 8. Wheatstone Subsea Structure Fabrication – 2013 / 2014  Specification review  Contractor QC procedures development  Material certification review and approval  Review / approve WPS/PQR/WPQ documentation  Review NDE procedures / scope of work  Overseas site monitoring and recording of WPS/PQR/WPQ  Overseas site production weld surveillance and inspection  Materials: C-Mn structural steel  Standards: AWS D1.1 and client specifications 9. Wheatstone Subsea Post Metrology Spool Fabrication – 2014 / 2015  Specification review  Contractor QC procedures development  Material certification review and approval  Development of welding processes and automation  Supervise trial welding program  Site monitoring and recording of WPS/PQR/WPQ  Review NDE procedures / scope of work  Advise CTOD scope of work / Witness mechanical testing  Review / approve WPS/PQR/WPQ documentation  Site production weld surveillance and inspection  Materials: Large bore C-Mn steel linepipe and fittings  Materials: Large bore C-Mn steel Clad UNS N06625 linepipe and fittings  Standards: DNV OS-F101, ASME B31.8 and client specifications
  • 6. Page 5 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING EPIC ENERGY / ORIGIN ENERGY / OSD PIPELINES 1. All - Onshore gas transmission pipelines – 2010 / 2011  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  Surveillance and inspection – welds / NDE  Materials: C-Mn steel Linepipe / fittings API 5L F-X65 / F-X70  Standards: AS 2885-2 and client specifications APACHE ENERGY / SUBSEA 7 / PTTEP 1. All - Offshore gas transmission trunklines – 2010 / 2011 / 2012  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  Barge lay vessel surveillance and inspection – welds / NDE  Materials: C-Mn steel Linepipe API 5L X65 / X70 / DNV 450  Standards: AS 2885-4 / DNV OS-F101and client specifications 2. PTTEP – West Atlas Wreck Salvage - Removal / Montara Well head Platform reinstatement – 2010 / 2011 / 2102  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  Heat damaged material assessments and conduct replicas  Compile report for base material condition.  Advise on material damage and suitability for salvage equipment placement  Advise import / export riser / jacket cut lines for platform removal.  Review / approve Montara platform WPS/PQR packages  Review of MDR documentation package / sign off  Materials: C-Mn steel / Low alloy steels / DSS linepipe and structural steel  Standards: AWS D1.1 / ASME B31.3 / DNV OS-F101 and client specifications
  • 7. Page 6 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING 3. PTTEP – BHP Macedon Subsea Pipeline - 2011  WPS/PQR/WPQ document review and approval  MDR Review / Approval  Feedback to Lloyds / DNV review comments / close outs.  Provide report to close out Lloyds / DNV queries  Materials: C-Mn steel linepipe DNV 450  Standards: DNV OS-F101 and client specifications 4. Apache Energy – Devil Creek HDD Pipeline - 2011  WPS/PQR/WPQ document review and approval  Material substitutions and material suitability  Materials: C-Mn steel linepipe and fittings API 5L X65 / ASTM A694 F65  Standards: AS 2885-2 / DNV OS-F101 and client specifications 5. Apache Energy – Julimar / Balnaves project - 2012  WPS/PQR/WPQ document review and approval  Materials: C-Mn, Austenitic steels. Vessels and pipe spools  Standards: ASME IX, ASME B31.3 and client specifications 6. Apache Energy – Varanus island In service weld - 2012  Thermal analysis modelling and WPS proposal development.  Compilation of in service welding package  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 7. Apache Energy – Ningaloo Vision FPSO Upgrade - 2013  Keppel Shipyard WPS/PQR/WPQ document review and approval  Review / approve QC procedures  Materials: C-Mn, Austenitic steels. Vessels and pipe spools  Standards: GL, ASME IX, ASME B31.3 and client specifications
  • 8. Page 7 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING VERVE ENERGY 1. HP Rotor Turbine Shaft Refurbishment - 2010  Development and qualification of re-build WPS / PQR  Development of PWHT procedure  Surveillance and inspection – welds / NDE  Materials: AISI 4330 forged turbine shaft  Standards: Client specifications SKM RIO TINTO 1. Port Hedland / Cape Lambert Port Facility – 2010 / 2011 / 2012 / 2013  Review / Approval of WPS / PQR / WPQ documentation  Advise on material substitutions (Chinese / Thai steels)  Review of site reports for portable hardness testing  Advise NDE methods / Review NDE procedures  Materials: C-Mn / Low alloy structural steels and forgings  Standards: AS/NZS:1554 Series and client specifications 2. Port Hedland / Cape Lambert Port B In service welds – 2012  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 MAERSK FPSO 1. Nguima-Yin FPSO turbine Fuel Lines - 2011  Review radiographs – Advise rectification and repair  Review / Approval of WPS / PQR / WPQ documentation  Offshore site surveillance and inspection welds / NDE  Sign off / approve turbine fuel line system  Materials: UNS S31803 DSS Linepipe and fittings  Standards: ASME B31.3 and client specifications
  • 9. Page 8 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING ICON ENGINEERING 1. Offshore lifting Equipment / Heave Compensator – 2011 / 2012  Review / Approval of WPS / PQR / WPQ documentation  Site surveillance and inspection welds / NDE  Sign off / approve equipment  Materials: AISI 4130 / 4140 / Low Alloy Steels  Standards: ASME B31.3 / AWS D1.1 and client specifications JOHN HOLLAND 1. IMPEX LNG Storage Tanks - 2011  Provide report for construction / weldability of LNG tanks  Materials: ASTM A553 Type 1 9% nickel  Standards: API 620 and client specifications P & A WELDING 1. In service welding onshore gas transmission pipeline - 2011  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 2. Relocation onshore gas transmission pipeline - 2013  Develop and qualify onshore girth seam WPS/PQR/WPQ  Compilation of girth seam welding package  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2
  • 10. Page 9 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING NACAP PIPELINES 1. In service welding onshore gas transmission pipeline - 2011  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 AUSCLAD GROUP 1. Karara Iron Ore Processing Plant – 2011 / 2012  Review / Approval of WPS / PQR / WPQ documentation  Site inspector correspondences  Materials: C-Mn / Low alloy structural steels and piping  Standards: AS/NZS:1554 Series, ASME B31.3 and client specifications 2. Apache In service welding onshore gas transmission pipeline – 2012  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 3. Gorgon Subsea Post Metrology Spool Fabrication – 2012 / 2013  Specification review  Contractor QC procedures development  Material certification review and approval  Supervise trial welding program  Develop WPS proposals  Review NDE procedures / scope of work  Advise CTOD scope of work  Site monitoring and recording of WPS/PQR/WPQ
  • 11. Page 10 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING  Compilation of WPS/PQR/WPQ documentation  Site production weld surveillance and inspection  Training / mentoring Contractor QC team  Materials: Large bore C-Mn steel linepipe and fittings  Materials: Large bore C-Mn steel Clad UNS N06625 linepipe and fittings  Standards: DNV OS-F101, ASME B31.8 and client specifications GORGON UPSTREAM JOINT VENTURE 1. Oil & Gas Processing Plant - 2011  Review / Approval of WPS / PQR / WPQ documentation  Review radiography and report  Materials: C-Mn piping and fittings ASTM A333 / ASTM A350  Standards: ASME B31.3 and client specifications CLOUGH 1. Flange failure Investigation - 2012  Remove samples and expedite metallurgical assessment  Review NDE operations  Compile report and issue  Materials: ASTM A350  Standards: ASME B31.3 and client specifications FUGRO TSM 1. Greater Western Flank Project – 2012 / 2013  Specification review  Contractor QC procedure review / approval  Material certification review and approval  Site monitoring and recording of WPS/PQR/WPQ  Review / approval of WPS/PQR/WPQ documentation  Site production weld surveillance and inspection  Training / mentoring Contractor QC team  Materials: Heavy wall UNS S31803 linepipe and fittings  Standards: DNV OS-F101 and client specifications
  • 12. Page 11 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING KT PIPELINES 1. In service welding onshore gas transmission pipeline - 2013  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 APA PIPELINES 1. In service welding onshore gas transmission pipeline South Hedland - 2013  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 2. In service welding onshore gas transmission pipeline Boodarie - 2014  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2 3. In service welding onshore gas transmission pipeline Murrin - 2015  Thermal analysis modelling and WPS proposal development.  Witness simulation weld qualification.  Compilation of in service welding package  Site surveillance and monitoring welds / NDE  Site report and acceptance  Materials: API 5L X65 linepipe and Split Tee.  Standards: AS 2885-2
  • 13. Page 12 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING CHEVRON 1. Heat Exchanger fabrication rework - 2014  Radiograph review  Compile rectification report and QC procedures  Overseas site monitoring and recording of WPS/PQR/WPQ  Compilation of WPS/PQR/WPQ documentation  Site surveillance and monitoring fabrication, welds / NDE  Site report and acceptance  Materials: 90/10 and 70/30 Copper Nickel  Standards: ASME B31.3 NEPTUNE 1. Wandoo A Platform Conductor repair - 2014  Compile rectification report and QC procedures  Site monitoring and recording of WPS/PQR/WPQ  Compilation of WPS/PQR/WPQ documentation  Materials: C-Mn steel structural sections  Standards: AWS D1.1 and client specifications MONODELPHOUS 1. Ichthys shore crossing gas transmission trunklines – 2014  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  Materials: C-Mn steel Linepipe DNV 450  Standards: AS 2885-4 / DNV OS-F101and client specifications REGAL ENGINEERING 1. Offshore tension / spreader beam manufacture and re-certification – 2014 / 2015  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  PWHT procedure development and approval  Compile Re-certification scope of work  NDE procedure review  Site surveillance, monitoring and inspection  Materials: Low alloy steel and forgings  Standards: AWS D1.1, DNV OS C401 and client specifications
  • 14. Page 13 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING CIVMEC 1. Buckle Trigger – 2014  Specification review  Contractor QC procedure development  Site monitoring and recording of WPS/PQR/WPQ  Review / approval of WPS/PQR/WPQ documentation  Site production weld surveillance and inspection  Training / mentoring Contractor QC team  Materials: C-Mn structural sections  Standards: AWS D1.1 client specifications 2. Prelude Modules Quote Assistance – 2014  Specification review  Contractor QC procedure development  Welding and NDE statement  Materials: Structural: C-Mn steel  Materials: Piping C-Mn clad UNS N06625 linepipe and fittings  Standards: AWS D1.1, ASME B31.8 and client specifications BAE 1. ANZAC Frigate mast replacement – 2014  Contractor QC procedure development  WPS/PQR data base rationalisation  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  NDE procedure review  Site surveillance, monitoring and inspection  Materials: C-Mn structural sections, C-Mn bonded Aluminium, Aluminium  Standards: Germanischer Lloyds and client specifications
  • 15. Page 14 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING FMC TECHNOLOGIES 1. XENA subsea manifolds – 2014 / 2015  Contractor QC procedure development  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  NDE procedure review  Site surveillance, monitoring and inspection  Materials: C-Mn structural sections, UNS S31803 linepipe and fittings  Standards: AWS D1.1, DNV OS-F101, ASME B31.3 and client specifications DEACON ENGINEERS 1. Neerabup Replacement Digesters – 2014 / 2015  Contractor QC procedure review approval  Review / approval of WPS proposals  Witness WPS and welder qualification  WPS/PQR/WPQ document review and approval  NDE procedure review  Site surveillance, monitoring and inspection  Materials: C-Mn structural sections  Standards: AS/NZS:1554 series and client specifications TUTT BRYANT 1. Crane boom repair – 2015  Review OEM rectification manual  Compile WPS qualification statement  WPS/PQR/WPQ document review and approval  Site surveillance, monitoring and inspection  Materials: LAS structural sections  Standards: AS/NZS:1554 series, AWS D1.1 and client specifications
  • 16. Page 15 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING OTHER AREAS OF INVOLVEMENT Over the previous 5 years, Chris has provided senior level consultative support within an engineering and inspection role to several smaller fabricators not covered in the above list of major clients. Details below however are also pertinent to larger project work scopes. 1. Transportation vessels  Design improvement with supports to reduce incidence of cracking 2. Mining equipment  Cost effective refurbishment of crushing, excavation, track pad equipment 3. Pipeline components  Well head spools, difficult to weld materials, 4140, NACE etc and development of PWHT procedures for such components.  Compressor station pipework and equipment, pig launchers pig traps etc. 4. Lifting Equipment  Involving high yield materials within brittle fracture risk. Welding, NDE, PWHT 5. WeldNet database  Installation and training of WeldNet, and in house developed WPS/PQR/WPQ database management system. 6. Welding / NDE Method Statements  Development of project Welding Method Statements encompassing all welding and NDE related activities for each project. 7. Portable Hardness testing  The provision of portable hardness testing expertise on site using ultrasonic and rebound test equipment. 8. Material Substitutions  Review of substitution material chemistry, processing and properties for suitability as substitution materials specified in project documentation., 9. Troubleshooting / Problem solving  Site based inspection and rectification of weld cracking problems, difficult to qualify welding procedures, restricted NDE scenarios, fabrication sequences to avoid weldability issues. 10. Failure Analysis  Involvement with NDE failures, establishing spurious indications with radiography and UT equipment.  Material failure / brittle fracture and strain age embrittlement issues with high fibre strain conditions.
  • 17. Page 16 of 16 CONSULTANT ENGINEERS - METALLURGY AND WELDING 11. Specification development / Rationalisation  Development of project specifications and recommendations to rationalise / update specifications.  Remove undue complexity and focus on simplicity. 12. Inspection and Test Plan development  Development of ITP’s covering all critical aspects of the project from contract review to final sign off. 13. Technical Queries / Concession Requests  Compilation of technical queries and concession requests within client specifications with focus on cost reduction without compromising project integrity and serviceability. 14. Code queries  Correspondences with DNV and other code committees regarding code interpretations and NDE acceptance criteria / NDE methodologies.  These correspondences have resulted in significant cost savings in preventing unnecessary weld cut outs where interpretations have been incorrect by NDE contractors. 15. QA / QC procedure development and review / approval  The development of QC procedures encompassing material receival, handling and inspection, consumable control and storage, weld monitoring and traceability, NDE methodologies, visual inspections, PWHT. 16. Training / Mentoring  Supervision of Contractor and Client QC teams, inspectors. Provide career development options and CPD to inspectors, and QC personnel