SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Argonne Windows 7 Migration Project 2013
June 21st, 2013
Argonne National Laboratory
2013 PC Refresh Project Close Out
Argonne Windows 7 Migration Project 2013
 Staff of 3 Kemtah Resources
• Chad Karkos - Project Lead
• Pete Felonk - Technician
• Imran Mohuiddin – Technician
 Greg Podoba – Project Manager
– Chris Waterman – Desktop Support Technician
– Denice DiGiacomo--Desktop Support
– Other CIS members assisted with specialized software installations
when needed
 Karl Schmidt – Section Lead, Windows Infrastructure
– Matt Knor—IT solutions associate
– Chris Coglianese—Computer System Solutions Architect
Argonne Windows 7 Migration Project 2013
Communication invite sent to user needs to be rearranged to have “You must be present for the delivery and
installation of your new computer” in the 1st paragraph
This did help users understand they needed to be
present and improved communication and attendance
2nd communication may need to be revisited as it
received largely mediocre satisfaction ratings
A centralized location for media and installation instructions would help streamline the installation of legacy
software
We have added to the unique software list on
SharePoint
Information should be assigned to a central location
where it could be updated and maintained for accuracy
Pre-migration/strategy meeting should be held with division contacts and SME prior to start of deployments.
This assists with mitigation of any risks associated with culture, legacy software, hardware, and peripherals.
This was performed with limited success. SMEs
knowledge was largely tribal and not always complete
Include multiple divisions in pilot program. Enhance
recording of instructions for unique applications
Argonne Windows 7 Migration Project 2013
 Early on users had various RDP problems
 TDC users were in the process of moving locations
 Energy Hub conference took place W/E 2-9 and had an impact on scheduling and
user availability in the weeks prior, during and after.
 CEP had many part time employees that also made scheduling a challenge
 NWM and ESQ employees move around quite a bit and property reps made many
last minute changes
 Robot arm printers in CEP were encountered and took extra time to configure
properly
 Dosimetery PCs were excluded from refresh due to special configuration
requirement for their instrumentation
 Several weather events cause employees to cancel last minute on a few occasions
 Some software collections with task sequences had to be installed manually
– Adobe Acrobat Pro/Standard, Entrust
 Legacy printers in OCF
 ADP had no instructions and we could not get support from vendor
 Trusted sites issue had to be corrected for access to MBfinacial.com (OCF)
 Presidential visit on 3-15 had a major impact on site/ user availability
 Could not image for 3 days W/E 5-18
Argonne Windows 7 Migration Project 2013
 Achieved stated goal of exceeding previous projects CSAT rating
 Worked with Infrastructure to advance their tools:
– USMT
– SCCM
– OSD
 Spent additional time when we encountered unique equipment or software
to ensure users were transitioned successfully
– Lock shop
– Joseph Kirts
– Print shop
– Robot arm printers
 Highly cooperative atmosphere between Kemtah, ANL service desk and
management team
 Imran Mohiuddin created new installation instructions for ADP application
used by OCF
 Pete Felonk was a standout with regards to customer service
 We went back and installed new printers for users impacted by loss of
legacy parallel machines
 Matured reporting metrics in cooperation with Argonne management
Argonne Windows 7 Migration Project 2013
 330 total machines migrated lab wide
– Completed on 6-5-13
– Primarily Legacy equipment running Windows XP
– Secondary, Kiosk, and Windows 7 PCs were pulled in at the end
– Total machines migrated by Kemtah is now 810 lab wide
 Delivered a high level of customer service
– Exceeded previous project’s CSAT%
 Revamped Deployment Checklist
 Performed Burn in process and upgraded BIOS
– Identified 6 failures that were fixed before deployment
– All failure happened after BIOS upgrade (appendix)
 Migrated many unique applications across several divisions
– ADP, ProComm, ReportSmith are just a few of the 26 encountered
– Documented and revised instructions where necessary
 Worked with Argonne Infrastructure team to advance their tools
– USMT
– SCCM
– OSD
 Conducted a Bi-weekly Windows7/ Office 2010 class
– 4 total users attended
• Desk side tutorial is highly effective
• Most people have Windows 7/Office 2010 exposure
Argonne Windows 7 Migration Project 2013
– Kick-off on 1/14/13
– 10% complete (33 machines) on 2/6/13
– 15% complete (50 machines) on 2/12/13
– 30% complete (99 machines) on 3/1/13
– 45% complete (149 machines) on 3/21/13
– 60% complete (198 machines) on 4/12/13
– 75% complete (248machines) on 5/1/13
– 90% complete (297machines) on 5/16/13
– 100% complete (330 machines) on 6/5/13
– Project complete (Post-Mortem Presentation)
Argonne Windows 7 Migration Project 2013
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%
55.00%
60.00%
65.00%
70.00%
75.00%
80.00%
85.00%
90.00%
95.00%
100.00%
0
50
100
150
200
250
300
350
01/26/13
02/02/13
02/09/13
02/16/13
02/23/13
03/02/13
03/09/13
03/16/13
03/23/13
03/30/13
04/06/13
04/13/13
04/20/13
04/27/13
05/04/13
05/11/13
05/18/13
05/25/13
06/01/13
06/08/13
Actual # of Machines
Completed
Forecasted # of Machines
Completed
Percentage Complete
Milestone
Milestone
Milestone
Milestone
Milestone
Milestone
Milestone
Argonne Windows 7 Migration Project 2013
30
5 3
12
5 3 1
30
35
53 54
99
0
30
5 3
12
5 3 1
30
35
53 54
99
0
20
40
60
80
100
120
projected
Completed
Argonne Windows 7 Migration Project 2013
6.7%
16.7%
13.3%
26.7%
36.6%
3.9% 3.9%
6.9%
18.6%
66.7%
0.0%
3.5% 3.5%
17.4%
75.6%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Very Dissatisfied Somewhat Dissatisfied Neutral Somewhat Satisfied Very Satified
2011
2012
2013
• Total Number of Survey Responses
• 2011 – 30 Users (80 Refreshes,38% RR)
• 2012 – 102 Users (400 Refreshes, 26% RR)
• 2013 – 86 Users (330 Refreshes, 26% RR)
• Total Number of Satisfied Users
• 2011 – 76.6%
• 2012 - 92.2%
• 2013 – 96.5%
Argonne Windows 7 Migration Project 2013
Argonne Windows 7 Migration Project 2013
Argonne Windows 7 Migration Project 2013
Appendix
Argonne Windows 7 Migration Project 2013
1st Shipment Hardware Failures
CSI TAG# FAILURE
RESOLUTION
CSI348375
8Y8CPW1 Will not turn on after BIOS update Dell replaced MOBO
CSI348387
8WW9PW1 Will not turn on after BIOS update Dell replaced MOBO
CSI348413
8WBCPW1 Will not turn on after BIOS update Dell replaced MOBO
CSI0348427 8XZ9PW1 Will not turn on after BIOS update Dell replaced MOBO
CSI0348430
8YBDPW1 Will not turn on after BIOS update Dell replaced MOBO
CSI0348431 8WTCPW1 Will not turn on after BIOS update Dell replaced MOBO
CSI348454 8WTDPW1 Hard Drive False positive Chris ran test again and it passed
Argonne Windows 7 Migration Project 2013
Go to Survey!

Weitere ähnliche Inhalte

Andere mochten auch

Bose: The Sound of Summer 2k15
Bose: The Sound of Summer 2k15Bose: The Sound of Summer 2k15
Bose: The Sound of Summer 2k15
Eddy Madera
 
We are-the-world-and-lucky191
We are-the-world-and-lucky191We are-the-world-and-lucky191
We are-the-world-and-lucky191
Amit Garg
 
FINAL_Cybersecurity Project (1)
FINAL_Cybersecurity Project (1)FINAL_Cybersecurity Project (1)
FINAL_Cybersecurity Project (1)
Lulu Chang
 

Andere mochten auch (20)

CEE_Fund_SPRING_2015
CEE_Fund_SPRING_2015 CEE_Fund_SPRING_2015
CEE_Fund_SPRING_2015
 
Craft House IMC Campaign
Craft House IMC CampaignCraft House IMC Campaign
Craft House IMC Campaign
 
Eκτέλεση προϋπολογισμού Oκτ.2016
Eκτέλεση προϋπολογισμού Oκτ.2016Eκτέλεση προϋπολογισμού Oκτ.2016
Eκτέλεση προϋπολογισμού Oκτ.2016
 
Series de evaluación de estudio lingüístico del español
Series de evaluación de estudio lingüístico del español Series de evaluación de estudio lingüístico del español
Series de evaluación de estudio lingüístico del español
 
3474 torno
3474 torno3474 torno
3474 torno
 
Curso INTEL de servidores Alaska
Curso INTEL de servidores AlaskaCurso INTEL de servidores Alaska
Curso INTEL de servidores Alaska
 
FMCSA DataQ Challenges-FTA-Blitch
FMCSA DataQ Challenges-FTA-BlitchFMCSA DataQ Challenges-FTA-Blitch
FMCSA DataQ Challenges-FTA-Blitch
 
ΙΚΑ 41/18-11-16
ΙΚΑ 41/18-11-16ΙΚΑ 41/18-11-16
ΙΚΑ 41/18-11-16
 
Vpn mreji 105227
Vpn mreji 105227Vpn mreji 105227
Vpn mreji 105227
 
جزيرة لغكاوي
جزيرة لغكاويجزيرة لغكاوي
جزيرة لغكاوي
 
Pp1
Pp1Pp1
Pp1
 
the_edge_completed
the_edge_completedthe_edge_completed
the_edge_completed
 
ΠΟΛ. 1143/16
ΠΟΛ. 1143/16ΠΟΛ. 1143/16
ΠΟΛ. 1143/16
 
Bose: The Sound of Summer 2k15
Bose: The Sound of Summer 2k15Bose: The Sound of Summer 2k15
Bose: The Sound of Summer 2k15
 
Chromatography
ChromatographyChromatography
Chromatography
 
Sejarah android
Sejarah androidSejarah android
Sejarah android
 
دليل تربية دجاج اللاحم روص 308
دليل تربية دجاج اللاحم روص 308دليل تربية دجاج اللاحم روص 308
دليل تربية دجاج اللاحم روص 308
 
We are-the-world-and-lucky191
We are-the-world-and-lucky191We are-the-world-and-lucky191
We are-the-world-and-lucky191
 
FINAL_Cybersecurity Project (1)
FINAL_Cybersecurity Project (1)FINAL_Cybersecurity Project (1)
FINAL_Cybersecurity Project (1)
 
Vectores giovanna teoria e.
Vectores giovanna teoria e.Vectores giovanna teoria e.
Vectores giovanna teoria e.
 

Ähnlich wie Argonne Win7 Closeout

Edson Silva EN 2014 CV
Edson Silva EN 2014 CVEdson Silva EN 2014 CV
Edson Silva EN 2014 CV
Edson Silva
 
Unit 1 final
Unit 1 finalUnit 1 final
Unit 1 final
sietkcse
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena
 
Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015
Timothy Knell
 
Migration & upgrades best practice upgrade pathways to emc documentum 7
Migration & upgrades   best practice upgrade pathways to emc documentum 7Migration & upgrades   best practice upgrade pathways to emc documentum 7
Migration & upgrades best practice upgrade pathways to emc documentum 7
Haytham Ghandour
 
Alfresco_eng_2009
Alfresco_eng_2009Alfresco_eng_2009
Alfresco_eng_2009
iopent
 
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
Erik Giles
 

Ähnlich wie Argonne Win7 Closeout (20)

The hourly network outage - Booking.com.pdf
The hourly network outage - Booking.com.pdfThe hourly network outage - Booking.com.pdf
The hourly network outage - Booking.com.pdf
 
Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
 
Migrating to Windows 7 or 8 with Lenovo's Deployment Optimization Solutions
Migrating to Windows 7 or 8 with Lenovo's Deployment Optimization SolutionsMigrating to Windows 7 or 8 with Lenovo's Deployment Optimization Solutions
Migrating to Windows 7 or 8 with Lenovo's Deployment Optimization Solutions
 
MOHAMMED RIDHA new
MOHAMMED RIDHA newMOHAMMED RIDHA new
MOHAMMED RIDHA new
 
Arjun Kumar
Arjun KumarArjun Kumar
Arjun Kumar
 
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Wer...
 
ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1
 
Edson Silva EN 2014 CV
Edson Silva EN 2014 CVEdson Silva EN 2014 CV
Edson Silva EN 2014 CV
 
Unit 1 final
Unit 1 finalUnit 1 final
Unit 1 final
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product Development
 
Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015Timothy Knell_CV_Oct2015
Timothy Knell_CV_Oct2015
 
Utsha Guha: Mac OS X/COCOA Developer in Xcode
Utsha Guha: Mac  OS X/COCOA Developer in XcodeUtsha Guha: Mac  OS X/COCOA Developer in Xcode
Utsha Guha: Mac OS X/COCOA Developer in Xcode
 
Migration & upgrades best practice upgrade pathways to emc documentum 7
Migration & upgrades   best practice upgrade pathways to emc documentum 7Migration & upgrades   best practice upgrade pathways to emc documentum 7
Migration & upgrades best practice upgrade pathways to emc documentum 7
 
Windows 10 Migration
Windows 10 MigrationWindows 10 Migration
Windows 10 Migration
 
Kairos aarohan
Kairos  aarohanKairos  aarohan
Kairos aarohan
 
Alfresco_eng_2009
Alfresco_eng_2009Alfresco_eng_2009
Alfresco_eng_2009
 
NCMS UberCloud Experiment Webinar .
NCMS UberCloud Experiment Webinar .NCMS UberCloud Experiment Webinar .
NCMS UberCloud Experiment Webinar .
 
IT Transformation and Puppet
IT Transformation and Puppet IT Transformation and Puppet
IT Transformation and Puppet
 
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
DO5T17S_T5 Thur 430 GilesE_BR_20151114_012422
 

Argonne Win7 Closeout

  • 1. Argonne Windows 7 Migration Project 2013 June 21st, 2013 Argonne National Laboratory 2013 PC Refresh Project Close Out
  • 2. Argonne Windows 7 Migration Project 2013  Staff of 3 Kemtah Resources • Chad Karkos - Project Lead • Pete Felonk - Technician • Imran Mohuiddin – Technician  Greg Podoba – Project Manager – Chris Waterman – Desktop Support Technician – Denice DiGiacomo--Desktop Support – Other CIS members assisted with specialized software installations when needed  Karl Schmidt – Section Lead, Windows Infrastructure – Matt Knor—IT solutions associate – Chris Coglianese—Computer System Solutions Architect
  • 3. Argonne Windows 7 Migration Project 2013 Communication invite sent to user needs to be rearranged to have “You must be present for the delivery and installation of your new computer” in the 1st paragraph This did help users understand they needed to be present and improved communication and attendance 2nd communication may need to be revisited as it received largely mediocre satisfaction ratings A centralized location for media and installation instructions would help streamline the installation of legacy software We have added to the unique software list on SharePoint Information should be assigned to a central location where it could be updated and maintained for accuracy Pre-migration/strategy meeting should be held with division contacts and SME prior to start of deployments. This assists with mitigation of any risks associated with culture, legacy software, hardware, and peripherals. This was performed with limited success. SMEs knowledge was largely tribal and not always complete Include multiple divisions in pilot program. Enhance recording of instructions for unique applications
  • 4. Argonne Windows 7 Migration Project 2013  Early on users had various RDP problems  TDC users were in the process of moving locations  Energy Hub conference took place W/E 2-9 and had an impact on scheduling and user availability in the weeks prior, during and after.  CEP had many part time employees that also made scheduling a challenge  NWM and ESQ employees move around quite a bit and property reps made many last minute changes  Robot arm printers in CEP were encountered and took extra time to configure properly  Dosimetery PCs were excluded from refresh due to special configuration requirement for their instrumentation  Several weather events cause employees to cancel last minute on a few occasions  Some software collections with task sequences had to be installed manually – Adobe Acrobat Pro/Standard, Entrust  Legacy printers in OCF  ADP had no instructions and we could not get support from vendor  Trusted sites issue had to be corrected for access to MBfinacial.com (OCF)  Presidential visit on 3-15 had a major impact on site/ user availability  Could not image for 3 days W/E 5-18
  • 5. Argonne Windows 7 Migration Project 2013  Achieved stated goal of exceeding previous projects CSAT rating  Worked with Infrastructure to advance their tools: – USMT – SCCM – OSD  Spent additional time when we encountered unique equipment or software to ensure users were transitioned successfully – Lock shop – Joseph Kirts – Print shop – Robot arm printers  Highly cooperative atmosphere between Kemtah, ANL service desk and management team  Imran Mohiuddin created new installation instructions for ADP application used by OCF  Pete Felonk was a standout with regards to customer service  We went back and installed new printers for users impacted by loss of legacy parallel machines  Matured reporting metrics in cooperation with Argonne management
  • 6. Argonne Windows 7 Migration Project 2013  330 total machines migrated lab wide – Completed on 6-5-13 – Primarily Legacy equipment running Windows XP – Secondary, Kiosk, and Windows 7 PCs were pulled in at the end – Total machines migrated by Kemtah is now 810 lab wide  Delivered a high level of customer service – Exceeded previous project’s CSAT%  Revamped Deployment Checklist  Performed Burn in process and upgraded BIOS – Identified 6 failures that were fixed before deployment – All failure happened after BIOS upgrade (appendix)  Migrated many unique applications across several divisions – ADP, ProComm, ReportSmith are just a few of the 26 encountered – Documented and revised instructions where necessary  Worked with Argonne Infrastructure team to advance their tools – USMT – SCCM – OSD  Conducted a Bi-weekly Windows7/ Office 2010 class – 4 total users attended • Desk side tutorial is highly effective • Most people have Windows 7/Office 2010 exposure
  • 7. Argonne Windows 7 Migration Project 2013 – Kick-off on 1/14/13 – 10% complete (33 machines) on 2/6/13 – 15% complete (50 machines) on 2/12/13 – 30% complete (99 machines) on 3/1/13 – 45% complete (149 machines) on 3/21/13 – 60% complete (198 machines) on 4/12/13 – 75% complete (248machines) on 5/1/13 – 90% complete (297machines) on 5/16/13 – 100% complete (330 machines) on 6/5/13 – Project complete (Post-Mortem Presentation)
  • 8. Argonne Windows 7 Migration Project 2013 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% 45.00% 50.00% 55.00% 60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 95.00% 100.00% 0 50 100 150 200 250 300 350 01/26/13 02/02/13 02/09/13 02/16/13 02/23/13 03/02/13 03/09/13 03/16/13 03/23/13 03/30/13 04/06/13 04/13/13 04/20/13 04/27/13 05/04/13 05/11/13 05/18/13 05/25/13 06/01/13 06/08/13 Actual # of Machines Completed Forecasted # of Machines Completed Percentage Complete Milestone Milestone Milestone Milestone Milestone Milestone Milestone
  • 9. Argonne Windows 7 Migration Project 2013 30 5 3 12 5 3 1 30 35 53 54 99 0 30 5 3 12 5 3 1 30 35 53 54 99 0 20 40 60 80 100 120 projected Completed
  • 10. Argonne Windows 7 Migration Project 2013 6.7% 16.7% 13.3% 26.7% 36.6% 3.9% 3.9% 6.9% 18.6% 66.7% 0.0% 3.5% 3.5% 17.4% 75.6% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% Very Dissatisfied Somewhat Dissatisfied Neutral Somewhat Satisfied Very Satified 2011 2012 2013 • Total Number of Survey Responses • 2011 – 30 Users (80 Refreshes,38% RR) • 2012 – 102 Users (400 Refreshes, 26% RR) • 2013 – 86 Users (330 Refreshes, 26% RR) • Total Number of Satisfied Users • 2011 – 76.6% • 2012 - 92.2% • 2013 – 96.5%
  • 11. Argonne Windows 7 Migration Project 2013
  • 12. Argonne Windows 7 Migration Project 2013
  • 13. Argonne Windows 7 Migration Project 2013 Appendix
  • 14. Argonne Windows 7 Migration Project 2013 1st Shipment Hardware Failures CSI TAG# FAILURE RESOLUTION CSI348375 8Y8CPW1 Will not turn on after BIOS update Dell replaced MOBO CSI348387 8WW9PW1 Will not turn on after BIOS update Dell replaced MOBO CSI348413 8WBCPW1 Will not turn on after BIOS update Dell replaced MOBO CSI0348427 8XZ9PW1 Will not turn on after BIOS update Dell replaced MOBO CSI0348430 8YBDPW1 Will not turn on after BIOS update Dell replaced MOBO CSI0348431 8WTCPW1 Will not turn on after BIOS update Dell replaced MOBO CSI348454 8WTDPW1 Hard Drive False positive Chris ran test again and it passed
  • 15. Argonne Windows 7 Migration Project 2013 Go to Survey!