2. 2Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
RCMRCM
ReactiveReactive Time-BasedTime-Based Condition-BasedCondition-Based ProactiveProactive
•Small items
•Non-critical
•Inconsequential
•Unlikely to fail
•Redundant
•RCFA identified
•Age exploration
•FMEA identified
•Acceptance
testing
•Failure pattern
known
•Subject to wear
out
•Consumable
replacement
Time Based Failures Cover 8% to 23% of failures.
•Random failure
pattern
•Not subject to
wear
•PM will not
prevent these
failures!
Condition Based Failures Cover 77% to 92% of failures
5% of
work
35% of
work
50% of
work
10% of
workGoals:
3. 3Restricted Confidential – Business Information
What is Reliability?
Good Design
Quality Construction
Excellence in Operations
Excellence in Maintenance
Inspections and Analysis
Reliability is the sum of these 5 elements.
Therefore, we all own reliability!
4. 4Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
RCMRCM
Condition-BasedCondition-Based
50% of
work
Starting place for this decision moment:
• Critical rotating equipment and engines
• Gear boxes
• Lubrication
• Related motors
5. 5Restricted Confidential – Business Information
RCM Technologies Provided
Vibration Data Collection
• Pipelines (460+ Most Critical Assets)
• Terminals (20 – 40 Most Critical Assets)
Oil Sample Collection
• Monthly (Engines)
• Quarterly (Gearboxes and Large Oil Systems)
Repair and Installation Standards and Specifications
• Must go out in 2012 to all facilities.
Other Technologies
• Ultrasonic
• Electrical Testing
• IR Thermography
6. 6Restricted Confidential – Business Information
Analysis and Reporting Details
Vibration Analysis & Oil Analysis, Reporting w/recommendations
Website Dashboard Available for all Assets
• Quickly Monitor & Review Asset Status
• High Level
• Technical Detailed Reports
• Vibration Analogs -> SCADA-> PI-> Reliability Team
8. 8Restricted Confidential – Business Information
Mobile Diagnostic System
EASY INSTALLATION
RAPID CONFIGURATION
CLEAR DIAGNOSTICS
NEAR REAL-TIME ONLINE ACTIONABLE
DIAGNOSTICS
9. 9Restricted Confidential – Business Information
Network and Communications Flexibility
Communications with SAP/CMMS
SCADA / PI 2010
Reliability Team
10. 10Restricted Confidential – Business Information
RCM – Phased Approach
Outsourced Data
Collection, Analysis &
Recommendations
Eng. Services
Review and
Work Request
Rotating
Equip. Leads
Plan &
Perform Work
Phase I
Outsourced &
Auto Data
Collection
Eng. Services Analysis,
Recommendations &
Request (add RE in year
three)
Planners &
Schedulers (will have to
identify resources –team
working this)
Rotating Equip
Leads Perform
Work
Phase II
Auto Data Collection
& Lubricants
Program
Planners &
Schedulers
Rotating Equip
Leads Assess
Data &
Perform Work
Phase III
Eng Services Analysis,
System Maintenance
and Program Evolution
11. 11Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
$3.0
$3.5
$4.0
Millions
Instrum
entation
Pipes
Rotating
Equip
Unknow
n
TanksLighting
ElectricalSafety
Buildings
FacilitiesBoilers
M
iscM
arine
Maint $/YR
A portion is electric motors
for rotating equipment
A portion is critical rotating equipment and engines
Numbers have
some amount of
uncertainty
App.
$3.2MM/yr
12. 12Restricted Confidential – Business Information
Economic Drivers
Rotating Equipment et al $3.2MM/YR
Electrical Motors $1.2MM/YR
Actual Yearly Breakdown
Maintenance Costs
• 60% of the spend is Pipelines
• 40% of the spend is Terminals
• East GC Terminals has already put
in place a contract program to
stabilize their spend or it would be
higher
13. 13Restricted Confidential – Business Information
Goals and Assumptions
Goal: Reduce spend by 65% over a five year period and sustain
• Fully expect a $2 MM/year reduction in spend when mature
Assumptions
P10 case: 20% reduction in cost per year
P50 case: 30% reduction in cost per year
P90 case: 35% reduction in cost per year
13% Discount rate used
Program Costs
• Contractor Costs: $1.2MM +/- 20%
• Additional Reliability Eng. in year 3
14. 14Restricted Confidential – Business Information
Impact to Operations
CFR pricing came in at 1.25MM versus .5MM
Great Idea Poor Business Case
Discussion with Todd Tullio
• Condition Based Monitoring Technicians - Does not meet 4 part qualifications for O/Q
qualification.
• Pipeline and Hazardous Materials Safety Administration – Subpart G –Qualification of
Pipeline Personnel 195.501 (a) (b) 1,2,3,and 4.
15. 15Restricted Confidential – Business Information
NPV & Tangible Benefits
Free-up resources for
more value added
condition driven
maintenance(↓$)
Optimized PdM
Technologies &
Frequency(↓$)
Reduce Non- Value Added
time driven
maintenance(↓$)
SAP/CMMS Structure:
Optimum Data, PM
Optimization 40%,
Awareness Training,
Source & Failure Codes
ID
Criticality Assessments Improved
Improved
Operator Safety
Operator Safety
One size does not fit all
due to criticality
ratings (↓$)
Maintenance &
Reliability Manual –
Unity, Governance &
Accountability w/RACI
allocations to each job
function.
16. 16Restricted Confidential – Business Information
East Gulf Coast Terminals Division
2010 experienced a Equipment Breakdown Cost of $1MM – $1.2MM in one
year.
Implemented Vibration Program in Early 2011.
Experienced no unscheduled breakdowns after vibration program was
implemented.
Able to perform acceptance testing.
Repaired old equipment to expected standards (w/o new replacement) to
insure optimum operation.
End Results – Alvin Brass and Olvice Greenwood are very happy with the
success of their new vibration program.
17. 17Restricted Confidential – Business Information
Cost Distribution
Pipeline and Terminal Divisions
Pipeline Division (June 2012 –Dec. 2012 $180,000 =
TOTAL
PIPELINE
BUSINESS
$36,000 =
EACH PIPELINE
DIVISION
Terminals Division (June 2012-Dec. 2012) $120,000
TOTAL
TERMINAL
BUSINESS
$24,000 =
EACH
TERMINAL
DIVISION
Pipeline Division 2013 $360,000/YR. $72,000
YR./DIV.
Terminals Division 2013 $240,000/YR. $28,800/DIV.
Note: The pricing could change by +/- 20% as we are currently going through final negotiations with CBM service provider.
I would like to thank everyone for allowing me to have a piece of your valuable time today.
This has been a wonderful journey and learning experience for me. It was very important for me to learn the pipeline and terminals business prior to designing a sustainable reliability program.
Now the time has come for me to give all of you what you have been waiting for. A robust and sustainable reliability program.
Get the Reliability Culture in place with a small foot print.
SAP
Work Processes – Planning , Scheduling, Work Execution
Vibration Acceptance Testing (Field & Repair Shop)
Now we can advance our House of Reliability
Properly Trained
Culture in place
Baseline all critical equipment build analyst software database. Vibration and Oil Analysis and Reporting.
Phase 1 – Quick wins and building maturity in Asset Health Management (i.e. criticality, failure analysis, and CBM)
Phase 2 – Building maturity in Work Execution Management
Phase 3 – Building maturity in Reliability Engineering disciplines