2Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
RCMRCM
ReactiveReactive Time-BasedTime-Based Condition-BasedCondition-Based ProactiveProactive
•Small items
•Non-critical
•Inconsequential
•Unlikely to fail
•Redundant
•RCFA identified
•Age exploration
•FMEA identified
•Acceptance
testing
•Failure pattern
known
•Subject to wear
out
•Consumable
replacement
Time Based Failures Cover 8% to 23% of failures.
•Random failure
pattern
•Not subject to
wear
•PM will not
prevent these
failures!
Condition Based Failures Cover 77% to 92% of failures
5% of
work
35% of
work
50% of
work
10% of
workGoals:
3Restricted Confidential – Business Information
What is Reliability?
Good Design
Quality Construction
Excellence in Operations
Excellence in Maintenance
Inspections and Analysis
Reliability is the sum of these 5 elements.
Therefore, we all own reliability!
4Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
RCMRCM
Condition-BasedCondition-Based
50% of
work
Starting place for this decision moment:
• Critical rotating equipment and engines
• Gear boxes
• Lubrication
• Related motors
5Restricted Confidential – Business Information
RCM Technologies Provided
 Vibration Data Collection
• Pipelines (460+ Most Critical Assets)
• Terminals (20 – 40 Most Critical Assets)
 Oil Sample Collection
• Monthly (Engines)
• Quarterly (Gearboxes and Large Oil Systems)
 Repair and Installation Standards and Specifications
• Must go out in 2012 to all facilities.
 Other Technologies
• Ultrasonic
• Electrical Testing
• IR Thermography
6Restricted Confidential – Business Information
Analysis and Reporting Details
 Vibration Analysis & Oil Analysis, Reporting w/recommendations
 Website Dashboard Available for all Assets
• Quickly Monitor & Review Asset Status
• High Level
• Technical Detailed Reports
• Vibration Analogs -> SCADA-> PI-> Reliability Team
7Restricted Confidential – Business Information
SCADA + Cloud Technology
8Restricted Confidential – Business Information
Mobile Diagnostic System
 EASY INSTALLATION
 RAPID CONFIGURATION
 CLEAR DIAGNOSTICS
NEAR REAL-TIME ONLINE ACTIONABLE
DIAGNOSTICS
9Restricted Confidential – Business Information
Network and Communications Flexibility
Communications with SAP/CMMS
SCADA / PI 2010
Reliability Team
10Restricted Confidential – Business Information
RCM – Phased Approach
Outsourced Data
Collection, Analysis &
Recommendations
Eng. Services
Review and
Work Request
Rotating
Equip. Leads
Plan &
Perform Work
Phase I
Outsourced &
Auto Data
Collection
Eng. Services Analysis,
Recommendations &
Request (add RE in year
three)
Planners &
Schedulers (will have to
identify resources –team
working this)
Rotating Equip
Leads Perform
Work
Phase II
Auto Data Collection
& Lubricants
Program
Planners &
Schedulers
Rotating Equip
Leads Assess
Data &
Perform Work
Phase III
Eng Services Analysis,
System Maintenance
and Program Evolution
11Restricted Confidential – Business Information
Reliability Centered Maintenance in CPPL
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
$3.0
$3.5
$4.0
Millions
Instrum
entation
Pipes
Rotating
Equip
Unknow
n
TanksLighting
ElectricalSafety
Buildings
FacilitiesBoilers
M
iscM
arine
Maint $/YR
A portion is electric motors
for rotating equipment
A portion is critical rotating equipment and engines
Numbers have
some amount of
uncertainty
App.
$3.2MM/yr
12Restricted Confidential – Business Information
Economic Drivers
Rotating Equipment et al $3.2MM/YR
Electrical Motors $1.2MM/YR
Actual Yearly Breakdown
Maintenance Costs
• 60% of the spend is Pipelines
• 40% of the spend is Terminals
• East GC Terminals has already put
in place a contract program to
stabilize their spend or it would be
higher
13Restricted Confidential – Business Information
Goals and Assumptions
 Goal: Reduce spend by 65% over a five year period and sustain
• Fully expect a $2 MM/year reduction in spend when mature
 Assumptions
P10 case: 20% reduction in cost per year
P50 case: 30% reduction in cost per year
P90 case: 35% reduction in cost per year
13% Discount rate used
 Program Costs
• Contractor Costs: $1.2MM +/- 20%
• Additional Reliability Eng. in year 3
14Restricted Confidential – Business Information
Impact to Operations
 CFR pricing came in at 1.25MM versus .5MM
 Great Idea  Poor Business Case
 Discussion with Todd Tullio
• Condition Based Monitoring Technicians - Does not meet 4 part qualifications for O/Q
qualification.
• Pipeline and Hazardous Materials Safety Administration – Subpart G –Qualification of
Pipeline Personnel 195.501 (a) (b) 1,2,3,and 4.
15Restricted Confidential – Business Information
NPV & Tangible Benefits
Free-up resources for
more value added
condition driven
maintenance(↓$)
Optimized PdM
Technologies &
Frequency(↓$)
Reduce Non- Value Added
time driven
maintenance(↓$)
SAP/CMMS Structure:
Optimum Data, PM
Optimization 40%,
Awareness Training,
Source & Failure Codes
ID
Criticality Assessments Improved
Improved
Operator Safety
Operator Safety
One size does not fit all
due to criticality
ratings (↓$)
Maintenance &
Reliability Manual –
Unity, Governance &
Accountability w/RACI
allocations to each job
function.
16Restricted Confidential – Business Information
East Gulf Coast Terminals Division
 2010 experienced a Equipment Breakdown Cost of $1MM – $1.2MM in one
year.
 Implemented Vibration Program in Early 2011.
 Experienced no unscheduled breakdowns after vibration program was
implemented.
 Able to perform acceptance testing.
 Repaired old equipment to expected standards (w/o new replacement) to
insure optimum operation.
 End Results – Alvin Brass and Olvice Greenwood are very happy with the
success of their new vibration program.
17Restricted Confidential – Business Information
Cost Distribution
Pipeline and Terminal Divisions
Pipeline Division (June 2012 –Dec. 2012 $180,000 =
TOTAL
PIPELINE
BUSINESS
$36,000 =
EACH PIPELINE
DIVISION
Terminals Division (June 2012-Dec. 2012) $120,000
TOTAL
TERMINAL
BUSINESS
$24,000 =
EACH
TERMINAL
DIVISION
Pipeline Division 2013 $360,000/YR. $72,000
YR./DIV.
Terminals Division 2013 $240,000/YR. $28,800/DIV.
Note: The pricing could change by +/- 20% as we are currently going through final negotiations with CBM service provider.
18Restricted Confidential – Business Information
Questions, Comments and Discussions

Weitere ähnliche Inhalte

Was ist angesagt?

Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
SHIVAJI CHOUDHURY
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
Pankaj Singh
 

Was ist angesagt? (20)

Rcm
RcmRcm
Rcm
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance Management
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Reliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made SimpleReliability Centered Maintenance Made Simple
Reliability Centered Maintenance Made Simple
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
 
Demystifying the Common Misconceptions about Reliability Centered Maintenance...
Demystifying the Common Misconceptions about Reliability Centered Maintenance...Demystifying the Common Misconceptions about Reliability Centered Maintenance...
Demystifying the Common Misconceptions about Reliability Centered Maintenance...
 
Reliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul IslamReliability Centred Maintenance - RCM by Aminul Islam
Reliability Centred Maintenance - RCM by Aminul Islam
 
Maintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking DataMaintenance and Reliability Case Studies and Bench-marking Data
Maintenance and Reliability Case Studies and Bench-marking Data
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Maturity Matrix   2013 versionPreventive Maintenance Maturity Matrix   2013 version
Preventive Maintenance Maturity Matrix 2013 version
 
Risk Solutions for the Manager
Risk Solutions for the ManagerRisk Solutions for the Manager
Risk Solutions for the Manager
 
Rcm training
Rcm trainingRcm training
Rcm training
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Precision Maintenance Presentation
Precision Maintenance PresentationPrecision Maintenance Presentation
Precision Maintenance Presentation
 
Reliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBMReliability-Centered Maintenance. An introduction to by JBM
Reliability-Centered Maintenance. An introduction to by JBM
 
20160704 rv presentation rca versus rcm
20160704 rv presentation rca versus rcm20160704 rv presentation rca versus rcm
20160704 rv presentation rca versus rcm
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 

Andere mochten auch

Legal and judicial reform in cambodia
Legal and judicial reform in cambodiaLegal and judicial reform in cambodia
Legal and judicial reform in cambodia
malypopa
 
SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAV
Ricky Smith CMRP, CMRT
 
Performance Management an Introduction to KPI
Performance Management an Introduction to KPIPerformance Management an Introduction to KPI
Performance Management an Introduction to KPI
callummacallister
 
Water Infrastructure Business - Cambodia, Feb 2012
Water Infrastructure Business - Cambodia, Feb 2012Water Infrastructure Business - Cambodia, Feb 2012
Water Infrastructure Business - Cambodia, Feb 2012
Eric Stryson
 

Andere mochten auch (20)

Design for reliability
Design for reliabilityDesign for reliability
Design for reliability
 
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopRashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
Nisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce CountyNisqually River Basin Plan Update - Pierce County
Nisqually River Basin Plan Update - Pierce County
 
IDB - Financing Opportunities for Water and Sanitation in the Caribbean
IDB - Financing Opportunities for Water and Sanitation in the Caribbean IDB - Financing Opportunities for Water and Sanitation in the Caribbean
IDB - Financing Opportunities for Water and Sanitation in the Caribbean
 
Financing Water and Sanitation Project - Antigua Public Utilities Authority
Financing Water and Sanitation Project  - Antigua Public Utilities Authority Financing Water and Sanitation Project  - Antigua Public Utilities Authority
Financing Water and Sanitation Project - Antigua Public Utilities Authority
 
Water Management Financing in the Caribbean - Part 1
Water Management Financing in the Caribbean - Part 1Water Management Financing in the Caribbean - Part 1
Water Management Financing in the Caribbean - Part 1
 
South africa-water partnerships
South africa-water partnershipsSouth africa-water partnerships
South africa-water partnerships
 
Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation F...
Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation F...Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation F...
Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation F...
 
EAM Continuum
EAM ContinuumEAM Continuum
EAM Continuum
 
OSIsoft PI System Presentation
OSIsoft PI System PresentationOSIsoft PI System Presentation
OSIsoft PI System Presentation
 
Legal and judicial reform in cambodia
Legal and judicial reform in cambodiaLegal and judicial reform in cambodia
Legal and judicial reform in cambodia
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
 
SMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAVSMRP - Maintenance Cost as a Percent of RAV
SMRP - Maintenance Cost as a Percent of RAV
 
Performance Management an Introduction to KPI
Performance Management an Introduction to KPIPerformance Management an Introduction to KPI
Performance Management an Introduction to KPI
 
DFR a case study using a physics of failure
DFR a case study using a physics of failure DFR a case study using a physics of failure
DFR a case study using a physics of failure
 
KPI SMRP Presentation
KPI SMRP PresentationKPI SMRP Presentation
KPI SMRP Presentation
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Water Infrastructure Business - Cambodia, Feb 2012
Water Infrastructure Business - Cambodia, Feb 2012Water Infrastructure Business - Cambodia, Feb 2012
Water Infrastructure Business - Cambodia, Feb 2012
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best PracticesCondition Monitoring (PdM) Maturity Matrix - Know Best Practices
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
 

Ähnlich wie Reliability Program Approval Presentation_

asset management system as defined by uptime elements John Reeve.pptx
asset management system as defined by uptime elements John Reeve.pptxasset management system as defined by uptime elements John Reeve.pptx
asset management system as defined by uptime elements John Reeve.pptx
ElvisDiaz32
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
Pieter van Asten
 
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Lloyd's Register Renewables
 

Ähnlich wie Reliability Program Approval Presentation_ (20)

Banff-DuPont_presentation.pdf
Banff-DuPont_presentation.pdfBanff-DuPont_presentation.pdf
Banff-DuPont_presentation.pdf
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
 
Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009Business Continuity Awareness Week 2009
Business Continuity Awareness Week 2009
 
Technical Performance Measures
Technical Performance MeasuresTechnical Performance Measures
Technical Performance Measures
 
asset management system as defined by uptime elements John Reeve.pptx
asset management system as defined by uptime elements John Reeve.pptxasset management system as defined by uptime elements John Reeve.pptx
asset management system as defined by uptime elements John Reeve.pptx
 
IADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDFIADC Sept 2015 -RCM-Print PDF
IADC Sept 2015 -RCM-Print PDF
 
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
An Oversight or a New Customer Phenomenon, Getting the Most of your Contact C...
 
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)Andrew martin - Knowledge Based Asset Integrity (KBAI™)
Andrew martin - Knowledge Based Asset Integrity (KBAI™)
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Technology Challenges of the new Regulatory Environment
Technology Challenges of the new Regulatory EnvironmentTechnology Challenges of the new Regulatory Environment
Technology Challenges of the new Regulatory Environment
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
Bi reporting final
Bi reporting finalBi reporting final
Bi reporting final
 
Ecosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic InsightEcosystems - Drive improvement from Holistic Insight
Ecosystems - Drive improvement from Holistic Insight
 
The Path to Confident Compliance and the Transition to NERC CIP Version 5 – A...
The Path to Confident Compliance and the Transition to NERC CIP Version 5 – A...The Path to Confident Compliance and the Transition to NERC CIP Version 5 – A...
The Path to Confident Compliance and the Transition to NERC CIP Version 5 – A...
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
The Cost of Downtime
The Cost of DowntimeThe Cost of Downtime
The Cost of Downtime
 
The Cost of Downtime
The Cost of DowntimeThe Cost of Downtime
The Cost of Downtime
 
20200429 PMI NYC Meetup Agile Governance Ariel Partners for Distribution
20200429 PMI NYC Meetup Agile Governance Ariel Partners for Distribution20200429 PMI NYC Meetup Agile Governance Ariel Partners for Distribution
20200429 PMI NYC Meetup Agile Governance Ariel Partners for Distribution
 
Managing Service Providers for Today’s Digital Business
Managing Service Providers for Today’s Digital BusinessManaging Service Providers for Today’s Digital Business
Managing Service Providers for Today’s Digital Business
 
Industrial asset optimization overview slideshare
Industrial asset optimization   overview slideshareIndustrial asset optimization   overview slideshare
Industrial asset optimization overview slideshare
 

Reliability Program Approval Presentation_

  • 1. Chad Broussard Sr. Staff Engineer, Reliability March 2012
  • 2. 2Restricted Confidential – Business Information Reliability Centered Maintenance in CPPL RCMRCM ReactiveReactive Time-BasedTime-Based Condition-BasedCondition-Based ProactiveProactive •Small items •Non-critical •Inconsequential •Unlikely to fail •Redundant •RCFA identified •Age exploration •FMEA identified •Acceptance testing •Failure pattern known •Subject to wear out •Consumable replacement Time Based Failures Cover 8% to 23% of failures. •Random failure pattern •Not subject to wear •PM will not prevent these failures! Condition Based Failures Cover 77% to 92% of failures 5% of work 35% of work 50% of work 10% of workGoals:
  • 3. 3Restricted Confidential – Business Information What is Reliability? Good Design Quality Construction Excellence in Operations Excellence in Maintenance Inspections and Analysis Reliability is the sum of these 5 elements. Therefore, we all own reliability!
  • 4. 4Restricted Confidential – Business Information Reliability Centered Maintenance in CPPL RCMRCM Condition-BasedCondition-Based 50% of work Starting place for this decision moment: • Critical rotating equipment and engines • Gear boxes • Lubrication • Related motors
  • 5. 5Restricted Confidential – Business Information RCM Technologies Provided  Vibration Data Collection • Pipelines (460+ Most Critical Assets) • Terminals (20 – 40 Most Critical Assets)  Oil Sample Collection • Monthly (Engines) • Quarterly (Gearboxes and Large Oil Systems)  Repair and Installation Standards and Specifications • Must go out in 2012 to all facilities.  Other Technologies • Ultrasonic • Electrical Testing • IR Thermography
  • 6. 6Restricted Confidential – Business Information Analysis and Reporting Details  Vibration Analysis & Oil Analysis, Reporting w/recommendations  Website Dashboard Available for all Assets • Quickly Monitor & Review Asset Status • High Level • Technical Detailed Reports • Vibration Analogs -> SCADA-> PI-> Reliability Team
  • 7. 7Restricted Confidential – Business Information SCADA + Cloud Technology
  • 8. 8Restricted Confidential – Business Information Mobile Diagnostic System  EASY INSTALLATION  RAPID CONFIGURATION  CLEAR DIAGNOSTICS NEAR REAL-TIME ONLINE ACTIONABLE DIAGNOSTICS
  • 9. 9Restricted Confidential – Business Information Network and Communications Flexibility Communications with SAP/CMMS SCADA / PI 2010 Reliability Team
  • 10. 10Restricted Confidential – Business Information RCM – Phased Approach Outsourced Data Collection, Analysis & Recommendations Eng. Services Review and Work Request Rotating Equip. Leads Plan & Perform Work Phase I Outsourced & Auto Data Collection Eng. Services Analysis, Recommendations & Request (add RE in year three) Planners & Schedulers (will have to identify resources –team working this) Rotating Equip Leads Perform Work Phase II Auto Data Collection & Lubricants Program Planners & Schedulers Rotating Equip Leads Assess Data & Perform Work Phase III Eng Services Analysis, System Maintenance and Program Evolution
  • 11. 11Restricted Confidential – Business Information Reliability Centered Maintenance in CPPL $0.0 $0.5 $1.0 $1.5 $2.0 $2.5 $3.0 $3.5 $4.0 Millions Instrum entation Pipes Rotating Equip Unknow n TanksLighting ElectricalSafety Buildings FacilitiesBoilers M iscM arine Maint $/YR A portion is electric motors for rotating equipment A portion is critical rotating equipment and engines Numbers have some amount of uncertainty App. $3.2MM/yr
  • 12. 12Restricted Confidential – Business Information Economic Drivers Rotating Equipment et al $3.2MM/YR Electrical Motors $1.2MM/YR Actual Yearly Breakdown Maintenance Costs • 60% of the spend is Pipelines • 40% of the spend is Terminals • East GC Terminals has already put in place a contract program to stabilize their spend or it would be higher
  • 13. 13Restricted Confidential – Business Information Goals and Assumptions  Goal: Reduce spend by 65% over a five year period and sustain • Fully expect a $2 MM/year reduction in spend when mature  Assumptions P10 case: 20% reduction in cost per year P50 case: 30% reduction in cost per year P90 case: 35% reduction in cost per year 13% Discount rate used  Program Costs • Contractor Costs: $1.2MM +/- 20% • Additional Reliability Eng. in year 3
  • 14. 14Restricted Confidential – Business Information Impact to Operations  CFR pricing came in at 1.25MM versus .5MM  Great Idea  Poor Business Case  Discussion with Todd Tullio • Condition Based Monitoring Technicians - Does not meet 4 part qualifications for O/Q qualification. • Pipeline and Hazardous Materials Safety Administration – Subpart G –Qualification of Pipeline Personnel 195.501 (a) (b) 1,2,3,and 4.
  • 15. 15Restricted Confidential – Business Information NPV & Tangible Benefits Free-up resources for more value added condition driven maintenance(↓$) Optimized PdM Technologies & Frequency(↓$) Reduce Non- Value Added time driven maintenance(↓$) SAP/CMMS Structure: Optimum Data, PM Optimization 40%, Awareness Training, Source & Failure Codes ID Criticality Assessments Improved Improved Operator Safety Operator Safety One size does not fit all due to criticality ratings (↓$) Maintenance & Reliability Manual – Unity, Governance & Accountability w/RACI allocations to each job function.
  • 16. 16Restricted Confidential – Business Information East Gulf Coast Terminals Division  2010 experienced a Equipment Breakdown Cost of $1MM – $1.2MM in one year.  Implemented Vibration Program in Early 2011.  Experienced no unscheduled breakdowns after vibration program was implemented.  Able to perform acceptance testing.  Repaired old equipment to expected standards (w/o new replacement) to insure optimum operation.  End Results – Alvin Brass and Olvice Greenwood are very happy with the success of their new vibration program.
  • 17. 17Restricted Confidential – Business Information Cost Distribution Pipeline and Terminal Divisions Pipeline Division (June 2012 –Dec. 2012 $180,000 = TOTAL PIPELINE BUSINESS $36,000 = EACH PIPELINE DIVISION Terminals Division (June 2012-Dec. 2012) $120,000 TOTAL TERMINAL BUSINESS $24,000 = EACH TERMINAL DIVISION Pipeline Division 2013 $360,000/YR. $72,000 YR./DIV. Terminals Division 2013 $240,000/YR. $28,800/DIV. Note: The pricing could change by +/- 20% as we are currently going through final negotiations with CBM service provider.
  • 18. 18Restricted Confidential – Business Information Questions, Comments and Discussions

Hinweis der Redaktion

  1. I would like to thank everyone for allowing me to have a piece of your valuable time today. This has been a wonderful journey and learning experience for me. It was very important for me to learn the pipeline and terminals business prior to designing a sustainable reliability program. Now the time has come for me to give all of you what you have been waiting for. A robust and sustainable reliability program.
  2. Get the Reliability Culture in place with a small foot print. SAP Work Processes – Planning , Scheduling, Work Execution Vibration Acceptance Testing (Field & Repair Shop) Now we can advance our House of Reliability Properly Trained Culture in place
  3. Baseline all critical equipment build analyst software database. Vibration and Oil Analysis and Reporting. Phase 1 – Quick wins and building maturity in Asset Health Management (i.e. criticality, failure analysis, and CBM) Phase 2 – Building maturity in Work Execution Management Phase 3 – Building maturity in Reliability Engineering disciplines