Developing a Risk Architecture Framework that fits into your
risk management strategy
Carlos Villasmil
KPOC Interface Engineer
Risk Mind-set
and Culture
Identify and
assess your
major risks
Decide which
risks are
natural
Determines
your capacity
and appetite
for risk
Embed risk in
all decisions
and processes
Align governance
and organization
around risk
1. Determining your project risk appetite by analyzing your risk exposure
1. Determining your project risk appetite by analyzing your risk exposure
Definition:
“Risk appetite is the level of risk that management is willing to accept while
attempting to create value for the organization.”
Risk Exposure is also define as the “amount of risk you simply can’t avoid”.
Exposure may also be referred to as Threat
That means that the Risk management process should be able to determine
the risk exposure, which is the final outcome of the application of Contingency
and mitigation plans.
A good strategy to determine the risk exposure:
• focus on a few Top risks that can affect negatively the cash flow or the
completion date of your project.
• The residual risks after mitigation and the low probability – low impact risks
will be much likely the ones that will satisfy the risk appetite of the Project
management.
1. Determining your project risk appetite by analyzing your risk exposure
Project or companyThreats
Threats
Threats
Threats Threats
Threats Threats
Threats
Threats
RMS
Top Risks
Acceptable level of
risks exposure
Management
attention and
focus
2. Keeping an acceptable level of your risk exposure within your
project risk appetite
An acceptable level of the risk exposure will depend on issues as diverse
as size of the company, financial health, Management “risk” perception
( conservative or optimist).
A way to do this is select which ranks of risks can be acceptable for the
company using a proper top-down, holistic view of risk exposures that
will not affect the organization’s ability to achieve strategic, operation,
reporting, and compliance objectives.
Always have in mind that:
“Risk is dynamic and subject to constant change therefore required of
constant monitoring and communication among the project team
members”.
A healthy practice to “sense” the status of a risk is an open conversation
between the discipline leaders in the project team. This can be done
weekly or monthly as required. The open conversation helps to:
1. discuss the nature of a risk identified.
2. Determine if the risk is properly stated then understand by all team
members.
3. Evaluate the evolution of a risk and their mitigation or contingency plan
4. Evaluate the assessment and therefore the effectiveness of the action plan
5. Check for inconsistencies or changes in the circumstances or specific
situations of the project
3. Designing contingency plan to treat your project risks
• Contingency plans are only drawn upon when a risk occurs 
• The Contingency plan should limit the damage to the project.
•You should normally prepare contingency plans for any risk which      
 cannot be mitigated immediately   -  
in particular high probability, high impact risks, i.e. those of                  
high severity.
• Contingency plans should be ready before the risk occurs so that      
              you have resources agreed and are prepare to take action 
quickly. 
•  In preparing contingency plans some mitigation actions may be 
generated. 
•  Identify the trigger point at which the contingency plan needs to be 
implemented. 
•  Quantify the cost and time estimates for the contingency plan. 
Evaluate benefits for the project of implement this contingency plan. 
 4. Measuring the effectiveness and accuracy of your planning assumptions
• This is difficult since Risk planning is dealing with the 
intrinsically uncertain.
•  One way to measure the effectiveness of a risk planning 
assumption is with the prioritization of all the risks and then the 
reassessment of the risk. 
•  Assign numeric values to the probability ( % of occurrence) and the 
impact.( level of impact in cost, time, production) be as specific as 
possible in the consequence description  (i.e.  Project will be delayed 
by 13 days) in that case you can set a numeric value to a pre 
established range of impacts. 
• Once you determine your mitigation plan ( reduce the probability of 
occurrence) or the contingency plan ( to reduce the impact once the 
risk occurs) then you can check how this plan assumptions works 
and then you can determine the risk reduction. This can be done 
using a Risk Assessment Matrix. 
•  A Quantitative Risk Analysis (QRA) is also a good technique to 
measure how effective have been your planning assumptions and 
also to make the proper adjustment to this assumptions. 
 5. Exploring the impact and consequences of risks for your risk planning
Select and implement a Risk response strategy. (Treat, Take, Transfer or 
Terminate), this will allow to select those risks that can be influenced or not 
by the project organization therefore helps the management to select 
where to direct their effort. 
• Risks once identified, require to be prioritized assessing their probability 
of occurrence and the impact on the project objectives. 
• Investigate the nature of a risk. What are their cause, then you can 
determine the immediate consequence if the risk occurred and the 
consequence derives of the initial ones. 
• You can make your risk response plan based on this and of course 
combining it with the risk response strategy. This will help to select those 
risks that can really affect the project objectives. 
•Remember,  risk is dynamic therefore their consequence and impact also 
can change with time.
• Good conversation between team members is a good way to check the 
validity of the impact and also to make the proper adjustments to your risk 
planning. 
 
6. Re-evaluating your risk management plan after you complete each phase
of your project
•Brainstorming sessions or periodic team meetings to openly discuss the
actual risks and to identify new is also required right after the completion of
each phase.
• The change of stage in a project brings more definition. The risk
management plan document needs to be adapted to this higher level of
definition.
Q&A SECTION

Weitere ähnliche Inhalte

Was ist angesagt?

BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage Risk
Muna Haider
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa Ewees
Mostafa Ewees
 

Was ist angesagt? (20)

Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best Practices
 
BSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage RiskBSBRSK501 - Mapping 2015 Manage Risk
BSBRSK501 - Mapping 2015 Manage Risk
 
Project Risk Management_O2D
Project Risk Management_O2DProject Risk Management_O2D
Project Risk Management_O2D
 
Qualitative risk analysis
Qualitative risk analysisQualitative risk analysis
Qualitative risk analysis
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk ManagementKuala Lumpur - PMI Global Congress 2009 - Risk Management
Kuala Lumpur - PMI Global Congress 2009 - Risk Management
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Risk based thinking
Risk based thinkingRisk based thinking
Risk based thinking
 
Software testing - Risk management
Software testing - Risk managementSoftware testing - Risk management
Software testing - Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Advanced program management risk mitigation and management
Advanced program management   risk mitigation and managementAdvanced program management   risk mitigation and management
Advanced program management risk mitigation and management
 
What Is Project Risk Management?
What Is Project Risk Management?What Is Project Risk Management?
What Is Project Risk Management?
 
Risk management case study
Risk management case studyRisk management case study
Risk management case study
 
Risk guideline
Risk guidelineRisk guideline
Risk guideline
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa Ewees
 

Andere mochten auch

licencjat_jerzy_paszcz_23a
licencjat_jerzy_paszcz_23alicencjat_jerzy_paszcz_23a
licencjat_jerzy_paszcz_23a
Jerzy Paszcz
 
Duelo y cuidados de enfermeria
Duelo y cuidados de enfermeriaDuelo y cuidados de enfermeria
Duelo y cuidados de enfermeria
paolita14098
 
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
Putri Amanda Mardiatiwi
 

Andere mochten auch (12)

Solar pv rooftop_handbook
Solar pv rooftop_handbookSolar pv rooftop_handbook
Solar pv rooftop_handbook
 
Teclado
TecladoTeclado
Teclado
 
идея 2 клиенты
идея 2 клиентыидея 2 клиенты
идея 2 клиенты
 
licencjat_jerzy_paszcz_23a
licencjat_jerzy_paszcz_23alicencjat_jerzy_paszcz_23a
licencjat_jerzy_paszcz_23a
 
Duelo y cuidados de enfermeria
Duelo y cuidados de enfermeriaDuelo y cuidados de enfermeria
Duelo y cuidados de enfermeria
 
Resume
ResumeResume
Resume
 
Birdie MDaemon migrator
Birdie MDaemon migratorBirdie MDaemon migrator
Birdie MDaemon migrator
 
Mohamed salaheldin CV
Mohamed salaheldin CVMohamed salaheldin CV
Mohamed salaheldin CV
 
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
2015-PA-en-Lower down payment regulation to boost loan growth in exchange of ...
 
Catalog customers 2017
Catalog customers 2017 Catalog customers 2017
Catalog customers 2017
 
сагынтай еркебулан+игрушечный мир+решение
сагынтай еркебулан+игрушечный мир+решениесагынтай еркебулан+игрушечный мир+решение
сагынтай еркебулан+игрушечный мир+решение
 
Anteproyecto de investigacion influencia del temperamento y desarrollo
Anteproyecto de investigacion influencia del temperamento y desarrolloAnteproyecto de investigacion influencia del temperamento y desarrollo
Anteproyecto de investigacion influencia del temperamento y desarrollo
 

Ähnlich wie Singapore Risk management seminar presentation pack

2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
reddvise
 
Pm0016 set-1
Pm0016 set-1Pm0016 set-1
Pm0016 set-1
Paul Hunt
 
M09_Risk Assessment ebook
M09_Risk Assessment ebookM09_Risk Assessment ebook
M09_Risk Assessment ebook
Kanchana Bishop
 

Ähnlich wie Singapore Risk management seminar presentation pack (20)

Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Presentation Project managment
Presentation Project managmentPresentation Project managment
Presentation Project managment
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Risk Management Toolkit
Risk Management ToolkitRisk Management Toolkit
Risk Management Toolkit
 
Software Engineering Topic: Risk Management
Software Engineering Topic: Risk ManagementSoftware Engineering Topic: Risk Management
Software Engineering Topic: Risk Management
 
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
Who would ever fore see risk identification? by Dr.Mahboob ali khan Phd
 
2.11 risk management 1
2.11 risk management 12.11 risk management 1
2.11 risk management 1
 
Critical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_enCritical role of_risk_assessment_in_international_projects_en
Critical role of_risk_assessment_in_international_projects_en
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Pm0016 set-1
Pm0016 set-1Pm0016 set-1
Pm0016 set-1
 
An introduction to finance
An introduction to financeAn introduction to finance
An introduction to finance
 
Project/Program Risk management
Project/Program Risk managementProject/Program Risk management
Project/Program Risk management
 
M09_Risk Assessment ebook
M09_Risk Assessment ebookM09_Risk Assessment ebook
M09_Risk Assessment ebook
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit Corporate and Project Risk Management Toolkit
Corporate and Project Risk Management Toolkit
 
Ihor Pavlenko: PMO Risk Management (UA )
Ihor Pavlenko: PMO Risk Management (UA )Ihor Pavlenko: PMO Risk Management (UA )
Ihor Pavlenko: PMO Risk Management (UA )
 
Ch_1_PRM.pdf
Ch_1_PRM.pdfCh_1_PRM.pdf
Ch_1_PRM.pdf
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategies
 
Project Risk Management
Project  Risk ManagementProject  Risk Management
Project Risk Management
 

Singapore Risk management seminar presentation pack

  • 1. Developing a Risk Architecture Framework that fits into your risk management strategy Carlos Villasmil KPOC Interface Engineer
  • 2. Risk Mind-set and Culture Identify and assess your major risks Decide which risks are natural Determines your capacity and appetite for risk Embed risk in all decisions and processes Align governance and organization around risk 1. Determining your project risk appetite by analyzing your risk exposure
  • 3. 1. Determining your project risk appetite by analyzing your risk exposure Definition: “Risk appetite is the level of risk that management is willing to accept while attempting to create value for the organization.” Risk Exposure is also define as the “amount of risk you simply can’t avoid”. Exposure may also be referred to as Threat That means that the Risk management process should be able to determine the risk exposure, which is the final outcome of the application of Contingency and mitigation plans. A good strategy to determine the risk exposure: • focus on a few Top risks that can affect negatively the cash flow or the completion date of your project. • The residual risks after mitigation and the low probability – low impact risks will be much likely the ones that will satisfy the risk appetite of the Project management.
  • 4. 1. Determining your project risk appetite by analyzing your risk exposure Project or companyThreats Threats Threats Threats Threats Threats Threats Threats Threats RMS Top Risks Acceptable level of risks exposure Management attention and focus
  • 5. 2. Keeping an acceptable level of your risk exposure within your project risk appetite An acceptable level of the risk exposure will depend on issues as diverse as size of the company, financial health, Management “risk” perception ( conservative or optimist). A way to do this is select which ranks of risks can be acceptable for the company using a proper top-down, holistic view of risk exposures that will not affect the organization’s ability to achieve strategic, operation, reporting, and compliance objectives.
  • 6. Always have in mind that: “Risk is dynamic and subject to constant change therefore required of constant monitoring and communication among the project team members”. A healthy practice to “sense” the status of a risk is an open conversation between the discipline leaders in the project team. This can be done weekly or monthly as required. The open conversation helps to: 1. discuss the nature of a risk identified. 2. Determine if the risk is properly stated then understand by all team members. 3. Evaluate the evolution of a risk and their mitigation or contingency plan 4. Evaluate the assessment and therefore the effectiveness of the action plan 5. Check for inconsistencies or changes in the circumstances or specific situations of the project
  • 7. 3. Designing contingency plan to treat your project risks • Contingency plans are only drawn upon when a risk occurs  • The Contingency plan should limit the damage to the project. •You should normally prepare contingency plans for any risk which        cannot be mitigated immediately   -   in particular high probability, high impact risks, i.e. those of                   high severity. • Contingency plans should be ready before the risk occurs so that                     you have resources agreed and are prepare to take action  quickly.  •  In preparing contingency plans some mitigation actions may be  generated.  •  Identify the trigger point at which the contingency plan needs to be  implemented.  •  Quantify the cost and time estimates for the contingency plan.  Evaluate benefits for the project of implement this contingency plan. 
  • 8.  4. Measuring the effectiveness and accuracy of your planning assumptions • This is difficult since Risk planning is dealing with the  intrinsically uncertain. •  One way to measure the effectiveness of a risk planning  assumption is with the prioritization of all the risks and then the  reassessment of the risk.  •  Assign numeric values to the probability ( % of occurrence) and the  impact.( level of impact in cost, time, production) be as specific as  possible in the consequence description  (i.e.  Project will be delayed  by 13 days) in that case you can set a numeric value to a pre  established range of impacts.  • Once you determine your mitigation plan ( reduce the probability of  occurrence) or the contingency plan ( to reduce the impact once the  risk occurs) then you can check how this plan assumptions works  and then you can determine the risk reduction. This can be done  using a Risk Assessment Matrix.  •  A Quantitative Risk Analysis (QRA) is also a good technique to  measure how effective have been your planning assumptions and  also to make the proper adjustment to this assumptions. 
  • 9.  5. Exploring the impact and consequences of risks for your risk planning Select and implement a Risk response strategy. (Treat, Take, Transfer or  Terminate), this will allow to select those risks that can be influenced or not  by the project organization therefore helps the management to select  where to direct their effort.  • Risks once identified, require to be prioritized assessing their probability  of occurrence and the impact on the project objectives.  • Investigate the nature of a risk. What are their cause, then you can  determine the immediate consequence if the risk occurred and the  consequence derives of the initial ones.  • You can make your risk response plan based on this and of course  combining it with the risk response strategy. This will help to select those  risks that can really affect the project objectives.  •Remember,  risk is dynamic therefore their consequence and impact also  can change with time. • Good conversation between team members is a good way to check the  validity of the impact and also to make the proper adjustments to your risk  planning.   
  • 10. 6. Re-evaluating your risk management plan after you complete each phase of your project •Brainstorming sessions or periodic team meetings to openly discuss the actual risks and to identify new is also required right after the completion of each phase. • The change of stage in a project brings more definition. The risk management plan document needs to be adapted to this higher level of definition.