Corrective Preventive CBM Proactive
§ Small Items
§ Non-critical
§ Unlikely to fail
§ Redundant
§ Predictable
Wear
§ Consumables
§ Known Failure
Patterns
§ ‘Random’
Failures
§ Minimal Wear
§ Critical Items
§ PM Induced
§ Inspection and
MMH drivers
§ Accurate Usage
Prognostics
§ Incipient Fault
Detection/Diagnos
is
§ Health & Adaptive
Prognostics
Evolving Maintenance Approach
Condition-Based
Corrective
Preventive
Percentage of Maintenance Actions
100%
Present Future
Eliminated
CBM+ Implementations
• Sustainment costs represent over 65% of the total Life Cycle Costs
• Sustainment is the largest and fastest growing segment in DoD Budget
• Sustainment can be most directly affected with CBM+ policies and
improved diagnostics, prognostics and IVHM technologies
PHM System Non-Recurring and Recurring Costs
• Non-recurring engineering costs incurred during the
development phase of the program.
• Recurring cost of PHM hardware added to each
operational unit
• Recurring engineering costs relative to operational units
(PHM software maintenance on and offboard) and
hardware engineering to provide product improvement
as new technology is developed.
• Recurring cost of maintaining the sensors providing a
PHM input (but not including the sensors that will be on
the system for control purposes).
• Recurring cost of potential false alarms and mis-detects
• Recurring cost of potential availability reduction due to
prognostics
Diagnostic Capability Impacting Unscheduled
Maintenance
• Reduce Unjustified Repair/Removal rates and
Increase Justified rates
• Reduced Can Not Duplicate (CND) rates
• Reduced O-level man-hours
• Reduced maintenance induced failures
• Reduced LRU repair costs
• Reduced numbers of tests to isolate failures
• Reduced repair times (enhanced availability)
Diagnostic Benefits Impacting Scheduled Maintenance
• Reduced O-level maintenance man-hours
• Reduced maintenance induced failures
• Elimination/reduction in the scheduled maintenance activities
resulting in increased availability and improved sortie generation
rate.
Prognostic Capabilities Impacting Operational Metrics
• Reduction in in-mission shutdowns, mission aborts and lost sorties
• Reductions in secondary damage.
• Opportunistic maintenance scheduling
• Advanced logistics triggering
• Decision support and contingency management
• Operational decision support (mission readiness, asset allocation)
• Reduced maintenance induced errors
• Increased effectiveness and responsiveness of logistics
• Reduction in logistics tail (ripple effect benefits)
• Reduction in weight and space requirements for parts and equipment
• Contribution to mandated maintenance/logistics shift
• Increased safety for operations and passengers
PHM Development Costs
• Includes software development, sensors, cables, data acquisition,
storage and processing for the 680 production vehicles.
• Installation costs are also included, based on 32 hours of installation
per vehicle at $50 per labor hour
• Initial training and life cycle repair cost for the PHM system included
Operational Benefits
• Reduction in catastrophic failures. 3 (15%) of 20 were determined by
failure analysis experts to be detectable early and entirely preventable
through PHM.
• Operational Availability Opportunity Benefit impacted by the predictive
time horizon provided by the prognostics
– Reduce MLDT by 50%, given its ability to detect failures early, order
supplies, and organize the maintenance activity before the component fails
– + 15% increase in MTBF, results in the ten-year LCC estimate increased in
operational availability from 91.08% to 95.29 % or a 4.21 %
Total Life Cycle Acq + Operations & Support Cost
Total Quantity of Vehicles Fielded
Maintenance Benefits
• Preventive (PM) task review revealed that 65% can be eliminated with
PHM system information and commensurate shift to Condition-based
Maintenance
• Cost avoidance of almost 2/3 of the labor hours normally required to
perform each PM. Benefit totaled nearly $6.8M over a 10 years.
Logistics/Spares Benefits
• Savings in initial spares totals $1.3M over the ten-year service life
• Same 15% reduction was used for operational corrective maintenance,
depot repair, and depot overhaul costs.
• Benefits were derived from parts and labor but not transportation costs,
since it was assumed that vehicle was shipped to and from Depot
regardless of prognostics
• $20M for each the corrective and depot overhaul costs accumulated for
the ten-year life cycle.
Banks, J., et al., “A Cost-Benefits Analysis of the Effect of Condition-Based Maintenance Strategies
for Military Ground Vehicles”, 2003 IEEE Aerospace Conference, Paper Z11-0601, March 2003.
680 Ground Vehicles over a 10 year period
Banks, J., et al., “A Cost-Benefits Analysis of the Effect of Condition-Based Maintenance
Strategies for Military Ground Vehicles” with permission granted on July 2004.
• 10-year service life
– OA Benefit = $27.9M
– Total Benefit = $83.9
– ROI = 3.7
• 15-year service life
– OA Benefit = $30.8M
– Total benefit = $278M
– ROI = 12.1
• 20-year service life
– OA Benefit is $40.0M
– Total Benefit = $327M
– ROI = 14.3
Remaining Years of Service
Return
on
Investment
CBM+ DoD
Guidebook,
available at:
https://acc.da
u.mil/cbm-
guidebook

Weitere ähnliche Inhalte

Was ist angesagt?

RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
kifayat ullah
 
Maintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introductionMaintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introduction
Smruti Ranjan Jena
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
Pankaj Singh
 
Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance Program
Robert Denk
 

Was ist angesagt? (20)

Basic Maintenance
Basic MaintenanceBasic Maintenance
Basic Maintenance
 
Predictive Maintenance Solution for Industries - Cyient
Predictive Maintenance Solution for Industries - CyientPredictive Maintenance Solution for Industries - Cyient
Predictive Maintenance Solution for Industries - Cyient
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance Management
 
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLCCondition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
Condition-Based Maintenance Basics by Carl Byington - PHM Design, LLC
 
Predictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure GaugesPredictive Maintenance: The Role of Your Pressure Gauges
Predictive Maintenance: The Role of Your Pressure Gauges
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
 
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
Webinar | Condition monitoring, continuous condition monitoring or APM4.0?
 
Electrical System
Electrical SystemElectrical System
Electrical System
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
Maintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introductionMaintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introduction
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance Program
 
Why predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effortWhy predictive maintenance should be a combined effort
Why predictive maintenance should be a combined effort
 
CONDITION-BASED MAINTENANCE USING SENSOR ARRAYS AND TELEMATICS
CONDITION-BASED MAINTENANCE USING SENSOR ARRAYS AND TELEMATICSCONDITION-BASED MAINTENANCE USING SENSOR ARRAYS AND TELEMATICS
CONDITION-BASED MAINTENANCE USING SENSOR ARRAYS AND TELEMATICS
 
CBM/PdM and the fit with RCM
CBM/PdM and the fit with RCMCBM/PdM and the fit with RCM
CBM/PdM and the fit with RCM
 
NSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short OverviewNSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short Overview
 
Beyond Predictive and Preventive Maintenance
Beyond Predictive and Preventive MaintenanceBeyond Predictive and Preventive Maintenance
Beyond Predictive and Preventive Maintenance
 
Modernizing complex MRO processes
Modernizing complex MRO processesModernizing complex MRO processes
Modernizing complex MRO processes
 
Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation Condition Based Monitoring Solution_Rockwell Automation
Condition Based Monitoring Solution_Rockwell Automation
 

Ähnlich wie CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC

Maintenance Strategies.ppt
Maintenance Strategies.pptMaintenance Strategies.ppt
Maintenance Strategies.ppt
Nazeeh11
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
kifayat ullah
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATION
Uttam Misra
 
Burant, Larry resume 01_2014
Burant, Larry resume 01_2014Burant, Larry resume 01_2014
Burant, Larry resume 01_2014
Lawrence F. Burant
 

Ähnlich wie CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC (20)

Condition-based Maintenance with sensor arrays and telematics
Condition-based Maintenance with sensor arrays and telematicsCondition-based Maintenance with sensor arrays and telematics
Condition-based Maintenance with sensor arrays and telematics
 
Reliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case StudyReliability Centered Maintenance Implementation and Case Study
Reliability Centered Maintenance Implementation and Case Study
 
Condition-based Maintenance for High-speed Fleet
Condition-based Maintenance for High-speed FleetCondition-based Maintenance for High-speed Fleet
Condition-based Maintenance for High-speed Fleet
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
 
Machinery Dignostic_Introduction pdf info
Machinery Dignostic_Introduction pdf infoMachinery Dignostic_Introduction pdf info
Machinery Dignostic_Introduction pdf info
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Maintenance Strategies.ppt
Maintenance Strategies.pptMaintenance Strategies.ppt
Maintenance Strategies.ppt
 
Condition Based Asset Management R K Gupta
Condition Based Asset Management R K GuptaCondition Based Asset Management R K Gupta
Condition Based Asset Management R K Gupta
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
Rcm
RcmRcm
Rcm
 
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptxMODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptx
 
CMMS
CMMSCMMS
CMMS
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
PDM IMPLIMENTATION
PDM IMPLIMENTATIONPDM IMPLIMENTATION
PDM IMPLIMENTATION
 
Burant, Larry resume 01_2014
Burant, Larry resume 01_2014Burant, Larry resume 01_2014
Burant, Larry resume 01_2014
 
Fleet Management of Lifecycle Costs
Fleet Management of Lifecycle Costs Fleet Management of Lifecycle Costs
Fleet Management of Lifecycle Costs
 

KĂźrzlich hochgeladen

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

KĂźrzlich hochgeladen (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC

  • 1.
  • 2. Corrective Preventive CBM Proactive § Small Items § Non-critical § Unlikely to fail § Redundant § Predictable Wear § Consumables § Known Failure Patterns § ‘Random’ Failures § Minimal Wear § Critical Items § PM Induced § Inspection and MMH drivers § Accurate Usage Prognostics § Incipient Fault Detection/Diagnos is § Health & Adaptive Prognostics Evolving Maintenance Approach Condition-Based Corrective Preventive Percentage of Maintenance Actions 100% Present Future Eliminated CBM+ Implementations
  • 3. • Sustainment costs represent over 65% of the total Life Cycle Costs • Sustainment is the largest and fastest growing segment in DoD Budget • Sustainment can be most directly affected with CBM+ policies and improved diagnostics, prognostics and IVHM technologies
  • 4. PHM System Non-Recurring and Recurring Costs • Non-recurring engineering costs incurred during the development phase of the program. • Recurring cost of PHM hardware added to each operational unit • Recurring engineering costs relative to operational units (PHM software maintenance on and offboard) and hardware engineering to provide product improvement as new technology is developed. • Recurring cost of maintaining the sensors providing a PHM input (but not including the sensors that will be on the system for control purposes). • Recurring cost of potential false alarms and mis-detects • Recurring cost of potential availability reduction due to prognostics
  • 5. Diagnostic Capability Impacting Unscheduled Maintenance • Reduce Unjustified Repair/Removal rates and Increase Justified rates • Reduced Can Not Duplicate (CND) rates • Reduced O-level man-hours • Reduced maintenance induced failures • Reduced LRU repair costs • Reduced numbers of tests to isolate failures • Reduced repair times (enhanced availability)
  • 6. Diagnostic Benefits Impacting Scheduled Maintenance • Reduced O-level maintenance man-hours • Reduced maintenance induced failures • Elimination/reduction in the scheduled maintenance activities resulting in increased availability and improved sortie generation rate. Prognostic Capabilities Impacting Operational Metrics • Reduction in in-mission shutdowns, mission aborts and lost sorties • Reductions in secondary damage. • Opportunistic maintenance scheduling • Advanced logistics triggering • Decision support and contingency management
  • 7. • Operational decision support (mission readiness, asset allocation) • Reduced maintenance induced errors • Increased effectiveness and responsiveness of logistics • Reduction in logistics tail (ripple effect benefits) • Reduction in weight and space requirements for parts and equipment • Contribution to mandated maintenance/logistics shift • Increased safety for operations and passengers
  • 8.
  • 9.
  • 10.
  • 11. PHM Development Costs • Includes software development, sensors, cables, data acquisition, storage and processing for the 680 production vehicles. • Installation costs are also included, based on 32 hours of installation per vehicle at $50 per labor hour • Initial training and life cycle repair cost for the PHM system included Operational Benefits • Reduction in catastrophic failures. 3 (15%) of 20 were determined by failure analysis experts to be detectable early and entirely preventable through PHM. • Operational Availability Opportunity Benefit impacted by the predictive time horizon provided by the prognostics – Reduce MLDT by 50%, given its ability to detect failures early, order supplies, and organize the maintenance activity before the component fails – + 15% increase in MTBF, results in the ten-year LCC estimate increased in operational availability from 91.08% to 95.29 % or a 4.21 % Total Life Cycle Acq + Operations & Support Cost Total Quantity of Vehicles Fielded
  • 12. Maintenance Benefits • Preventive (PM) task review revealed that 65% can be eliminated with PHM system information and commensurate shift to Condition-based Maintenance • Cost avoidance of almost 2/3 of the labor hours normally required to perform each PM. Benefit totaled nearly $6.8M over a 10 years. Logistics/Spares Benefits • Savings in initial spares totals $1.3M over the ten-year service life • Same 15% reduction was used for operational corrective maintenance, depot repair, and depot overhaul costs. • Benefits were derived from parts and labor but not transportation costs, since it was assumed that vehicle was shipped to and from Depot regardless of prognostics • $20M for each the corrective and depot overhaul costs accumulated for the ten-year life cycle. Banks, J., et al., “A Cost-Benefits Analysis of the Effect of Condition-Based Maintenance Strategies for Military Ground Vehicles”, 2003 IEEE Aerospace Conference, Paper Z11-0601, March 2003.
  • 13. 680 Ground Vehicles over a 10 year period Banks, J., et al., “A Cost-Benefits Analysis of the Effect of Condition-Based Maintenance Strategies for Military Ground Vehicles” with permission granted on July 2004.
  • 14. • 10-year service life – OA Benefit = $27.9M – Total Benefit = $83.9 – ROI = 3.7 • 15-year service life – OA Benefit = $30.8M – Total benefit = $278M – ROI = 12.1 • 20-year service life – OA Benefit is $40.0M – Total Benefit = $327M – ROI = 14.3 Remaining Years of Service Return on Investment