FLOATING SOLAR POWER PLANT
BY
ABHAY OCEAN INDIA PVT LTD
PREPARED BY
PROF. V. BHOSALE
Why Floating PV?
Ever increasing power demand & depletion of fossil
fuels.
 Leads to shift our focus to renewable energy sources.
 Wind & Hydro RE sources are area specific.
 PV can be installed at any place.
 Major issue of Solar PV is requirement of land.
 But floating solar can be installed on any water
bodies.
 Floating solar PV results in decrease in cost and will
increase amount of generation due to cooling effect of
water.
CONCEPT
Floating Solar Power is innovative concept in energy
technology to meet the needs of our time.
Fig: PV floating plant outline
Components of Floating PV
 Floating System: A floating body (Structure +
Floater) that allows installation of PV module.
 Mooring System: This allows to adjust water level
fluctuations while maintaining its position.
 PV System: PV Generation equipment, similar to
electric junction boxes, that are installed on top of
floating system.
 Underwater Cable: To transfer generated power to
substation.
K-water 100 kW
 K- water installed 100 kW floating PV on the water
surface of Hapcheon water reservoir in 2011.
K- water 500 k W
 After successful installation of 100 kW system K-
water installed 500 kW PV system on another location
at same dam.
Performance Analysis
 100 kW PV at Hapcheon is forming 33 degree tilt &
its installed capacity is 99.36 kW, composed of 414
240W modules
Performance Analysis
 Data is collected from Jan 2012 to Dec 2012.
Monthly average generated quantity 10,852 kWh
Fig : Performance Analysis graph
Performance Analysis
 500 kW PV system forming 33 degree tilt, installed
capacity 496.8 kW composed of 2070 240 modules.
 Monthly generated Avg. quantity form Oct. 2012 to
Mar. 2013 was 55208 kWh.
Comparison Floating PV & Overland PV
 Floating solar panels( Blue) having 10.3 % more
efficient than overland system.

Fig.: Comparison Graph
Stability of floating sturcture
 Graph Floating PV stability against winds.
STATE WISE INSTALLED CAPACITY
Ever increasing power demand & depletion of fossil
fuels.
 Leads to shift our focus to renewable energy sources.
 Wind & Hydro RE sources are area specific.
 PV can be installed at any place.
 Major issue of Solar PV is requirement of land.
 But floating solar can be installed on any water
bodies.
 Floating solar PV results in decrease in cost and will
increase amount of generation due to cooling effect of
water.
GOVT. OF INDIA INITIATIVES
Policy & Regulatory framework
ELECTRICITY ACT 2003 : Most transformational & dynamic act till
date includes laid guidelines for Renewable energy.
SECTION 61(h): While specifying terms and condition for tariff
determination the commission shall consider the promotion of
generation from renewable energy sources.
SECTION 86(1) (e): State commission shall promote generation of
Electricity from renewable energy sources. It shall be done by providing
grid connectivity & sale of Electricity to anyone.
NATIONAL ELECTRICITY POLICY 2005 :
 SECTION 6.4 : This section states that in present stage non
conventional and conventional energy cannot compete at same similar
tariff and hence power shall be procured from non-conventional sources
at preferential tariff as determined by appropriate commission.
GOVT. OF INDIA INITIATIVES
Policy & Regulatory framework
 Amendment of National tariff policy for Solar
specific RPO’s.
 Solar specific RPO’s – 025 % in 2013 to 3 % by 2022.
 REC mechanism .
 Encourage state specific solar policies.
 State wise RPO orders by Regulators.
 Exemption for Environmental clearance for Solar
Power Projects.
Jawaharlal Nehru National Solar Mission (JNNSM)
Launched by Govt. of India in January 2011.
One of the major initiative at global level in
promotion of Solar energy technologies.
Mission aims to achieve grid tariff parity by 2022.
Large scale utilization, rapid diffusion and
deployment at a scale which leads to cost reduction.
R&D pilot projects and Technology Demonstration.
JNNSM Batch I Bidding Result Summary
Average tariff for selected projects was 1216
paisa/kWh which was 32% lower than CERC approved
benchmark tariff 1791 paisa/kWh.
In a Batch I a total of 204 MW capacity grid
connected solar power projects have been
commissioned.
Maharashtra Model Solar Policy
Maharashtra has reasonably high solar insolation 4-5
kWh/sq. meter with 280-300 clear sunny days.
Eastern Maharashtra considered to be most suitable
region for solar power projects
OBJECTIVE
 To generate 1000 MW of Solar energy by 2016.
To achieve grid parity by 2016 .
 Promotion of R&D and facilitation of technology
transfer.
Promotion of local manufacturing facilities.
Maharashtra Model Solar Policy
Financial outlay of Subsidy Scheme
Maharashtra Model Solar Policy
Subsidy under each project will be distributed into
three installments by state government.
Maharashtra Model Solar Policy
Criteria to avail benefits under the policy
 Project developer should not procure any
incentives/ subsidy from central government.
PPA’s should be singed with MAHADISCOM.
 Capacity Utilization Factor of Solar PV should be
more than 19% for initial two years of installation.
 An audited detailed report and energy generation
report should be submitted to MEDA.
Financial Modeling of Solar PV
 Capital Cost: Normative Capital cost INR 700 Lakhs/MW for
2014-15 as per MERC.
Annual Energy Yield: There are number of factors(e.g. Air
pollution, Shading, Soiling, Ambient temperature, Downtime
etc.) Which affect annual yield of Solar PV.
For 1 MWp Plant annual yield would averaged around 1.4
million kWh units. Yield prediction are assumed for next 25
years.
Certified Emission Reductions: As India is non Annex 1 party
under UN Clean Development Mechanism (CDM) qualifying
solar projects could generate Certified Emission
Reductions(CERs)
 Energy Price :
 Solar PV Plant under REC mechanism can earn its revenue from selling grey.
 In the financial model it is assumed that grey component of energy sold to
State discom at MSEDCL.
 Operation and Maintenance cost: One of the major benefit of Solar PV plant is
less O & M cost as compared to other renewable energy technologies.
 Financing Assumptions: General financial assumptions for a project in India
as follows
 Financial Structure: Equity 30 % and debt 70 % as assumed in MERC tariff
order.
 Debt repayment is taken over as 10 years. Interest rate on term loan and work
capital is taken as 12.87% and 13.37% respectively.
Floating solar PV Indian Context
 Great potential for floating PV.
 Availability of water bodies and land issues are main
accelerators for floating PV solar Panels.
 Increased efficiency of Floating PV over Land PV
installed will attract more investment due to better
returns.
 Availability of trained manpower and Govt. Policies
have boosts the confidence of investors.
Stable floating PV platforms results in minimum
operation & maintenance cost.
Thank You.
For Any Query Please Contact :
CAPT. JAGDISH KHOKHAR
Cell: +91 99 2030 9055
E-mail: jk@abhay-ocean.com
www.abhay-ocean.com

Weitere ähnliche Inhalte

Was ist angesagt?

India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
Pasu Kumar
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
Md Shahabuddin
 
Wind power plant
Wind power plantWind power plant
Wind power plant
shrey1993
 
1. Solar Power Plant Technologies
1. Solar Power Plant Technologies1. Solar Power Plant Technologies
1. Solar Power Plant Technologies
Nageswar Rao
 
Solar energy
Solar energySolar energy
Solar energy
eddie0697
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
Shoeb Ali Khan
 

Was ist angesagt? (20)

Solar energy
Solar energySolar energy
Solar energy
 
On Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own ElectricityOn Grid Solar System to Create your own Electricity
On Grid Solar System to Create your own Electricity
 
Floating Solar
Floating SolarFloating Solar
Floating Solar
 
Floating solar power plant converted
Floating solar power plant convertedFloating solar power plant converted
Floating solar power plant converted
 
Solar energy(Renewable source)
Solar energy(Renewable source)Solar energy(Renewable source)
Solar energy(Renewable source)
 
Solar photovoltaic systems
Solar photovoltaic systemsSolar photovoltaic systems
Solar photovoltaic systems
 
Solar PV manufacturing
Solar PV manufacturingSolar PV manufacturing
Solar PV manufacturing
 
Solar photovoltaic system
Solar photovoltaic systemSolar photovoltaic system
Solar photovoltaic system
 
solar photovolatic power system
solar photovolatic power systemsolar photovolatic power system
solar photovolatic power system
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
 
Rooftop solar power plant components
Rooftop solar power plant   componentsRooftop solar power plant   components
Rooftop solar power plant components
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 
History of Solar Energy
History of Solar EnergyHistory of Solar Energy
History of Solar Energy
 
Solar power.ppt
Solar power.pptSolar power.ppt
Solar power.ppt
 
Wind power plant
Wind power plantWind power plant
Wind power plant
 
Solar canal and floating power plants.
Solar canal  and floating power plants.Solar canal  and floating power plants.
Solar canal and floating power plants.
 
1. Solar Power Plant Technologies
1. Solar Power Plant Technologies1. Solar Power Plant Technologies
1. Solar Power Plant Technologies
 
Solar energy
Solar energySolar energy
Solar energy
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
A Hybrid Wind and Solar Energy System with Battery Energy Storage for an Isol...
 

Andere mochten auch

On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
Luis Ram Rojas-Sol
 

Andere mochten auch (8)

Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
OHMS Energy Pvt. Ltd
OHMS Energy Pvt. LtdOHMS Energy Pvt. Ltd
OHMS Energy Pvt. Ltd
 
Graphical Analysis of PV Plant Data
Graphical Analysis of PV Plant DataGraphical Analysis of PV Plant Data
Graphical Analysis of PV Plant Data
 
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
On-grid PV Opportunities in University Campuses: A case study at Nazarbayev U...
 
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18Solitis electrical solutions pvt ltd consultancy electrical_2017-18
Solitis electrical solutions pvt ltd consultancy electrical_2017-18
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 

Ähnlich wie Aoil floating solar power plant ppt 2015

Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
Sanman Rajput
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
Nilesh Dayalapwar
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship report
Dharmveer kumar
 

Ähnlich wie Aoil floating solar power plant ppt 2015 (20)

Solar power plant Opportunity and Costing
Solar power plant Opportunity and CostingSolar power plant Opportunity and Costing
Solar power plant Opportunity and Costing
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
I010326469
I010326469I010326469
I010326469
 
India’s solar policies
India’s solar policiesIndia’s solar policies
India’s solar policies
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Techno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMERTechno economic analysis of SPV-DG hybrid model using HOMER
Techno economic analysis of SPV-DG hybrid model using HOMER
 
Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar Solar Power Technology in India by S Kumar
Solar Power Technology in India by S Kumar
 
pptajay-180629114156.pptx
pptajay-180629114156.pptxpptajay-180629114156.pptx
pptajay-180629114156.pptx
 
Solar policys in india and state comparison
Solar policys in india and state comparison Solar policys in india and state comparison
Solar policys in india and state comparison
 
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic ApplicationsDesign a Highly Efficient Push-Pull converter for Photovoltaic Applications
Design a Highly Efficient Push-Pull converter for Photovoltaic Applications
 
Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
Cashing on the sun
Cashing on the sunCashing on the sun
Cashing on the sun
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Country report
Country reportCountry report
Country report
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
A new Clean technology for Electricity Generation
A new Clean technology for Electricity GenerationA new Clean technology for Electricity Generation
A new Clean technology for Electricity Generation
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
A Summer Internship report
A Summer Internship reportA Summer Internship report
A Summer Internship report
 

Mehr von Abhay Ocean India ltd. (13)

Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
 
Proposed subsea power grid AOIL
Proposed subsea power grid AOILProposed subsea power grid AOIL
Proposed subsea power grid AOIL
 
Aoil Tidal energy ppt
Aoil Tidal energy pptAoil Tidal energy ppt
Aoil Tidal energy ppt
 
Aoil wind power ppt 2015
Aoil wind power ppt 2015Aoil wind power ppt 2015
Aoil wind power ppt 2015
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Technical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipesTechnical catalogue submarine installations of pipes
Technical catalogue submarine installations of pipes
 
Aoil diving code,& standards 2016
Aoil diving code,& standards 2016 Aoil diving code,& standards 2016
Aoil diving code,& standards 2016
 
Floating resorts Project in India
Floating resorts Project in  IndiaFloating resorts Project in  India
Floating resorts Project in India
 
Funicular railways Proposal ppt
Funicular railways Proposal pptFunicular railways Proposal ppt
Funicular railways Proposal ppt
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
Aoil survey presentation
Aoil survey presentation Aoil survey presentation
Aoil survey presentation
 
Aoil dredging ppt
Aoil dredging ppt Aoil dredging ppt
Aoil dredging ppt
 
Aoil diving
Aoil diving Aoil diving
Aoil diving
 

Kürzlich hochgeladen

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Kürzlich hochgeladen (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

Aoil floating solar power plant ppt 2015

  • 1. FLOATING SOLAR POWER PLANT BY ABHAY OCEAN INDIA PVT LTD PREPARED BY PROF. V. BHOSALE
  • 2. Why Floating PV? Ever increasing power demand & depletion of fossil fuels.  Leads to shift our focus to renewable energy sources.  Wind & Hydro RE sources are area specific.  PV can be installed at any place.  Major issue of Solar PV is requirement of land.  But floating solar can be installed on any water bodies.  Floating solar PV results in decrease in cost and will increase amount of generation due to cooling effect of water.
  • 3. CONCEPT Floating Solar Power is innovative concept in energy technology to meet the needs of our time. Fig: PV floating plant outline
  • 4. Components of Floating PV  Floating System: A floating body (Structure + Floater) that allows installation of PV module.  Mooring System: This allows to adjust water level fluctuations while maintaining its position.  PV System: PV Generation equipment, similar to electric junction boxes, that are installed on top of floating system.  Underwater Cable: To transfer generated power to substation.
  • 5. K-water 100 kW  K- water installed 100 kW floating PV on the water surface of Hapcheon water reservoir in 2011.
  • 6. K- water 500 k W  After successful installation of 100 kW system K- water installed 500 kW PV system on another location at same dam.
  • 7. Performance Analysis  100 kW PV at Hapcheon is forming 33 degree tilt & its installed capacity is 99.36 kW, composed of 414 240W modules
  • 8. Performance Analysis  Data is collected from Jan 2012 to Dec 2012. Monthly average generated quantity 10,852 kWh Fig : Performance Analysis graph
  • 9. Performance Analysis  500 kW PV system forming 33 degree tilt, installed capacity 496.8 kW composed of 2070 240 modules.  Monthly generated Avg. quantity form Oct. 2012 to Mar. 2013 was 55208 kWh.
  • 10. Comparison Floating PV & Overland PV  Floating solar panels( Blue) having 10.3 % more efficient than overland system.  Fig.: Comparison Graph
  • 11. Stability of floating sturcture  Graph Floating PV stability against winds.
  • 12. STATE WISE INSTALLED CAPACITY Ever increasing power demand & depletion of fossil fuels.  Leads to shift our focus to renewable energy sources.  Wind & Hydro RE sources are area specific.  PV can be installed at any place.  Major issue of Solar PV is requirement of land.  But floating solar can be installed on any water bodies.  Floating solar PV results in decrease in cost and will increase amount of generation due to cooling effect of water.
  • 13. GOVT. OF INDIA INITIATIVES Policy & Regulatory framework ELECTRICITY ACT 2003 : Most transformational & dynamic act till date includes laid guidelines for Renewable energy. SECTION 61(h): While specifying terms and condition for tariff determination the commission shall consider the promotion of generation from renewable energy sources. SECTION 86(1) (e): State commission shall promote generation of Electricity from renewable energy sources. It shall be done by providing grid connectivity & sale of Electricity to anyone. NATIONAL ELECTRICITY POLICY 2005 :  SECTION 6.4 : This section states that in present stage non conventional and conventional energy cannot compete at same similar tariff and hence power shall be procured from non-conventional sources at preferential tariff as determined by appropriate commission.
  • 14. GOVT. OF INDIA INITIATIVES Policy & Regulatory framework  Amendment of National tariff policy for Solar specific RPO’s.  Solar specific RPO’s – 025 % in 2013 to 3 % by 2022.  REC mechanism .  Encourage state specific solar policies.  State wise RPO orders by Regulators.  Exemption for Environmental clearance for Solar Power Projects.
  • 15. Jawaharlal Nehru National Solar Mission (JNNSM) Launched by Govt. of India in January 2011. One of the major initiative at global level in promotion of Solar energy technologies. Mission aims to achieve grid tariff parity by 2022. Large scale utilization, rapid diffusion and deployment at a scale which leads to cost reduction. R&D pilot projects and Technology Demonstration.
  • 16. JNNSM Batch I Bidding Result Summary Average tariff for selected projects was 1216 paisa/kWh which was 32% lower than CERC approved benchmark tariff 1791 paisa/kWh. In a Batch I a total of 204 MW capacity grid connected solar power projects have been commissioned.
  • 17. Maharashtra Model Solar Policy Maharashtra has reasonably high solar insolation 4-5 kWh/sq. meter with 280-300 clear sunny days. Eastern Maharashtra considered to be most suitable region for solar power projects OBJECTIVE  To generate 1000 MW of Solar energy by 2016. To achieve grid parity by 2016 .  Promotion of R&D and facilitation of technology transfer. Promotion of local manufacturing facilities.
  • 18. Maharashtra Model Solar Policy Financial outlay of Subsidy Scheme
  • 19. Maharashtra Model Solar Policy Subsidy under each project will be distributed into three installments by state government.
  • 20. Maharashtra Model Solar Policy Criteria to avail benefits under the policy  Project developer should not procure any incentives/ subsidy from central government. PPA’s should be singed with MAHADISCOM.  Capacity Utilization Factor of Solar PV should be more than 19% for initial two years of installation.  An audited detailed report and energy generation report should be submitted to MEDA.
  • 21. Financial Modeling of Solar PV  Capital Cost: Normative Capital cost INR 700 Lakhs/MW for 2014-15 as per MERC. Annual Energy Yield: There are number of factors(e.g. Air pollution, Shading, Soiling, Ambient temperature, Downtime etc.) Which affect annual yield of Solar PV. For 1 MWp Plant annual yield would averaged around 1.4 million kWh units. Yield prediction are assumed for next 25 years. Certified Emission Reductions: As India is non Annex 1 party under UN Clean Development Mechanism (CDM) qualifying solar projects could generate Certified Emission Reductions(CERs)
  • 22.  Energy Price :  Solar PV Plant under REC mechanism can earn its revenue from selling grey.  In the financial model it is assumed that grey component of energy sold to State discom at MSEDCL.  Operation and Maintenance cost: One of the major benefit of Solar PV plant is less O & M cost as compared to other renewable energy technologies.  Financing Assumptions: General financial assumptions for a project in India as follows  Financial Structure: Equity 30 % and debt 70 % as assumed in MERC tariff order.  Debt repayment is taken over as 10 years. Interest rate on term loan and work capital is taken as 12.87% and 13.37% respectively.
  • 23. Floating solar PV Indian Context  Great potential for floating PV.  Availability of water bodies and land issues are main accelerators for floating PV solar Panels.  Increased efficiency of Floating PV over Land PV installed will attract more investment due to better returns.  Availability of trained manpower and Govt. Policies have boosts the confidence of investors. Stable floating PV platforms results in minimum operation & maintenance cost.
  • 24. Thank You. For Any Query Please Contact : CAPT. JAGDISH KHOKHAR Cell: +91 99 2030 9055 E-mail: jk@abhay-ocean.com www.abhay-ocean.com