The ASE can help Outsourcing in winning projects and shortening the
time to break even on existing engagements
Objectives of this document


   • Gain general understanding about the ASE – what it is and what we do

   • Get acquainted with the different ASE event types and their role in the
     context of outsourcing projects

   • Explain the integration of an ASE event into an outsourcing project plan
     and how mutual preparation works out

   • Understand the critical success factors to plan and conduct ASE
     events


 The ASE adds value by increasing quality & productivity to complex projects and by building trust
 and alignment amongst the key stakeholder

     CE v5.6                                                                        © 2010 Capgemini - All rights reserved
                                                                                                                             1
                                                                                Capgemini ASE-AND-OUTSOURCING.PPT
The ASE is an innovative method to solve complex problems faster and
achieve sustainable implementation
ASE solution approach

  Dilemma of complex problems                              Solutions with an ASE

  The complexity of the issues that must be resolved has   The ASE approach represents the synthesis of a
  strongly increased and demands experts‟ involvement in   creative environment, extensive content prepara-
  ever more specialized disciplines                        tion and an effective working process for large
                                                           groups of up to 65 participants1

                                                           • The extraordinary environment of the ASE cen-
                                                             ters encourages creativity and open constructive
  The consequence is: there are only two choices for         teamwork among all participants. To break new
  resolving the issues ...                                   ground when finding solutions, we deliberately
                                                             avoid the traditional office and workshop
  • Fast (top management) decisions, risking spurious        atmosphere
    compromises, gaps, and a lack of agreement during
    implementation                                         • Any information needed for solution finding as
    = speed at the expense of decision quality               well as the knowledge and experience of all
                                                             relevant decision makers, experts and multipliers
  • Intensive sequential involvement of many parties and     come together in an ASE event. This ensures
    long coordination cycles with a risk of losing           high decision quality
    momentum during implementation
    = decision quality at the expense of speed             • Within the scope of the ASE Scan-Focus-Act
                                                             method, solutions are developed iteratively and
                                                             simultaneously. In addition to mobilising all par-
                                                             ties, speed is significantly increased – both in
                                                             the planning phase and during implementation
  In both cases the people involved and concerned
  get lost


 1   Internationally up to 120 participants


       CE v5.6                                                                              © 2010 Capgemini - All rights reserved
                                                                                                                                     2
                                                                                        Capgemini ASE-AND-OUTSOURCING.PPT
The unique concept and infrastructure of the ASE Center stimulate
creativity and team spirit
ASE environment
                              Characteristics of the ASE environment

                              • Spaces that can be used flexibly with two
                                large areas:
                                – Plenum (results presentations for all
                                  participants)
                                – Break-out spaces (small teams work on
                                  specific assignments)

                              • Immediate access to prepared information
                                and real-time research

                              • Constructive and collaborative work in teams
                                on large walls with writable surfaces

                              • The facilitation team takes on the task of
                                documenting all the results

                              • The technical equipment enables effective
                                use of all media

                              • Efficient work with up to 65 participants (ASE
                                Berlin)




   The ASE Center is neither a seminar nor a conference space but rather a working environment!

    CE v5.6                                                                          © 2010 Capgemini - All rights reserved
                                                                                                                              3
                                                                                 Capgemini ASE-AND-OUTSOURCING.PPT
All relevant information is available at an ASE event to make sound
decisions
ASE – ‘secret of success’
                                  Partici-   • Executive decision makers, experts, influencers
                                  pants’
                                  know-      • Knowledge „in people‟s brains‟, experience
                                  ledge      • All participants are present „full time‟

                                                   Level of
                                                                                       Knowledge
 • Analysis, data                                  Insight
                                                                                        Objects
 • Objectives, key questions
 • Factbook preparation                                                 Factbook

                                                     Participants

 All knowledge that is
 available in written format


                                                                                                                          Time

                                                  Preparation                      Scan         Focus           Act

  • Customised event design
  • Iteration and parallel work
  • Alternating between plenary
    and break-out                                               • Alignment
  • Changing team compositions                                  • Good decisions
                                  ASE
  • Working results available                                   • Commitment to implementation
                                  process
    immediately

    CE v5.6                                                                            © 2010 Capgemini - All rights reserved
                                                                                                                                 4
                                                                                   Capgemini ASE-AND-OUTSOURCING.PPT
All participants go jointly through the same proven process in the ASE
center
ASE method




 What MUST we KNOW?                       What CAN we DO?                     What WILL we DO?

     • Team building                           • Simulation / scenarios,          • Selecting and prioritising
     • Common understanding of                   playing “what if”                  alternatives
       problems                                • Simultaneous processing to       • Developing short-term and
     • Industry trends, best practices,          manage complexity                  mid-term activity plans
       expert exchange of experience           • Finding solutions through        • Making joint decisions
     • Ideas and solutions from other            iteration                        • Commitment to
       industries – “out-of-the-box            • First draft / test ideas           implementation
       thinking”                               • Evaluating / eliminating
     • Uncovering critical                       hypotheses and options
       assumptions and issues




  The overarching alignment on the solutions ensures strong motivation during the implementation.

    CE v5.6                                                                                    © 2010 Capgemini - All rights reserved
                                                                                                                                        5
                                                                                           Capgemini ASE-AND-OUTSOURCING.PPT
As soon as we are in charge of service the ASE reduces in the classical
way the time to break even
ASE Opportunities during Frozen Zone and Implementing Phase
                                               FROZEN ZONE                                                                             IMPLEMENTING
                                                                                                                                                                                            Run the
     3: Preparation                4: Transition                                                                             5: Delivery                                                    Business
     “Get it exact and
                                   “Let’s get started”                                                                       “Let’s make it efficient”                                      “Let‟s make
     in writing”
                                                                                                                                                                                            profit”


                  Contract                                                    Start Implementation                                                                       Benchmark


                                         Service-Level Agreements                                                                    Service Reporting


                                                  Integration                                                                              Collaboration
                                                    Event                                                                                     Station

                         • Integrate organization, processes and systems                                               • Shorten the time to benefit through collaborative
  Objective
                         • Align all stakeholders on way forward                                                         working day by day (on site on client premises)
                                                                                                                       • Increase speed and quality of decision making

 Participants              30 – 70 employees (decision                                                                 All project team members (IT, business, Capgemini
                           makers, experts, end users, Capgemini project                                               project team, supplier, customer)
                         • team)
                            Detailed analysis on requirements
                                                                                                                       • Analysis and facts
    Input                • Detailed analysis on assets and capabilities
                         • Contractual framework (services, draft SLA‟s …)
                         •   Detailed definition of services and SLAs
                                                                                                                       Continually:
   Output                •   Decision on to be applications, infrastructure
                                                                                                                       • Accelerated solution finding
                         •   Detailed implementation plans (transition)
                                                                      Client                  Capgemini
                                                                                                                       • Robust and qualified decisions
                         •   Organization, roles and responsibilities       Company A                Company A



                                                                                                                       • Change to collaborative mindset
                         •
                                                                      xxx     xxx       xxx    xxx     xxx       xxx


                             Detailed communication strategy            y       y         y     y        y         y




                                                                                                                       • Knowledge transfer on ASE-methodology
                                                                        y       y         y     y        y         y
                                                                        y       y         y     y        y         y
                                                                        y       y         y     y        y         y




       CE v5.6                                                                                                                                                      © 2010 Capgemini - All rights reserved
                                                                                                                                                                                                             6
                                                                                                                                                                Capgemini ASE-AND-OUTSOURCING.PPT
The Integration Event creates alignment among a large number of people
concerned and lets them create the solutions
Example detailed View: ASE Integration Event

                                                                     BUILD
                                                                      FROZEN ZONE                                                                           IMPLEMENTING
                                                                                                                                                               RUN

                                   4: Transition                                                                                                              5: Delivery
                                   “Let`s get started”                                                                                                        “Let`s make it efficient”
approach
Classical
 project




                      Contract                                                                                                       Start Implementation                      Benchmark
                                                                                                                              Implementation        Implemen-
                                Analysis                                    Synthesis
                             Analyse                                                                                             planning           tation
                                                 SC I                                                       SCII - SC n                    SC n+1
Deliverables




                                                         ASE                                                                       Implemen-
                                                                                                        Implementati
 of project




                                 Analysis
                             Analyse                  Preparatio
  Tasks /




                                                                                                         on planning               tation
                                                 SC I     n                                                               SC III



                                                                                                                                               ASE Planning Meeting
                                                                         Integration                                                           Define…
                                                                      Event
                                                                                                                                               • Scope of ASE event
  Deliverables
  Joint tasks /




                                                                                         „SC2“
                  Planning             Sponsor                                                                                                 • Event objectives
                                                    Fact Book              SCAN
                  Meeting              Meeting                                    FOCUS
                                                                    Pr
                                                                    ep                 ACT
                                                                                               Po
                                                                                               st
                                                                                                                                               • Key questions to be
                                                                                                                                                 addressed
                                                                                                                                               • Inputs, required knowledge
Deliverables




                                                                                                                                               • Deliverables
  Tasks /

  of ASE




                              ASE            ASE-preparation &
                             Scoping             Design                                                                                        • Sponsors / participants
                                                                                                                                               • Logistics
                             10 days             20 days           1 day      3 days         1-2 days       5 days

                   CE v5.6                                                                                                                           © 2010 Capgemini - All rights reserved
                                                                                                                                                                                              7
                                                                                                                                                 Capgemini ASE-AND-OUTSOURCING.PPT
An ASE delivers fast but also realistic solutions based on broad alignment
among all participants
Results of an ASE event
Speed                                     Quotes
• Significantly shortened co-ordina-       “We have accomplished more in three
  tion cycles and accelerated imple-       days than I would have thought our                   “Spending 18 months wasn‟t
  mentation                                company could have accomplished in                   smart; we did in 3 days what we
• Accelerated decision making              five to six months”                                  couldn‟t do in 18 months”
  process saving months compared to                                                             Ron Chambers, Chief Information Officer Ansett
                                           Tom Knowlton, President
                                                                                                Airlines
                                           Kellogg‟s North America
  conventional processes

                                             “Using the ASE as a Design
Quality                                      Shop helped us to achieve 6
• Realistic solutions based on broad
                                             months worth of work in 3                   “I have never experienced such a work-
                                             days”                                       shop before. This is the first time that we
  alignment ensure implementation later
                                             Charlie Golden, CFO                         have achieved this level of consen-sus
  on                                         Eli Lilly & Company                         on our future activities in just 3 days”
• Best possible decision quality
  through profound analysis and           “I never imagined                              Hermann Eidel, CEO
                                                                                         Freudenberg Nonwovens
  involvement of all relevant             how liberating the
  deciders, experts, and stakeholders     environment and
                                          process could be”
                                          Doug Ivester, President
                                          Coca Cola Company

Commitment and enthusiasm
                                           “The ASE allowed us to achieve
• "Buy-in" of all decision makers and      conceptual designs four times                    The participants of the ASE will
  stakeholders                             faster than the previous phase                   become the most important com-
• Broad enthusiasm of all participants     of this work”                                    municators in their company
  and willingness to change and            Nina Grove, Director of Operational Systems
  implement                                Genentech Inc.



     CE v5.6                                                                                                  © 2010 Capgemini - All rights reserved
                                                                                                                                                       8
                                                                                                          Capgemini ASE-AND-OUTSOURCING.PPT
Many renowned corporations are among the clients of the ASE centers




   CE v5.6                                                © 2010 Capgemini - All rights reserved
                                                                                                   9
                                                      Capgemini ASE-AND-OUTSOURCING.PPT

Weitere ähnliche Inhalte

Was ist angesagt?

Le roy ward
Le roy wardLe roy ward
Le roy ward
NASAPMC
 
Agile developers create their own identity by Ajay Danait
Agile developers create their own identity by Ajay DanaitAgile developers create their own identity by Ajay Danait
Agile developers create their own identity by Ajay Danait
Xebia IT Architects
 
Bradshaw.myron
Bradshaw.myronBradshaw.myron
Bradshaw.myron
NASAPMC
 
Cierre del proyecto
Cierre del proyectoCierre del proyecto
Cierre del proyecto
ProColombia
 
Gaining Maximum Control: Managing Multiple Projects Effectively
Gaining Maximum Control: Managing Multiple Projects EffectivelyGaining Maximum Control: Managing Multiple Projects Effectively
Gaining Maximum Control: Managing Multiple Projects Effectively
Zulkefle Idris
 
Pinck.pascal
Pinck.pascalPinck.pascal
Pinck.pascal
NASAPMC
 
IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?
Mark Roman
 
NJ IABC Chapter Ultimate Engagement 110811
NJ IABC Chapter Ultimate Engagement 110811NJ IABC Chapter Ultimate Engagement 110811
NJ IABC Chapter Ultimate Engagement 110811
Dulye
 
Bingham.alph
Bingham.alphBingham.alph
Bingham.alph
NASAPMC
 
Millis.marc
Millis.marcMillis.marc
Millis.marc
NASAPMC
 
Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811
Dulye
 
End Solutions Ltd CIO presentation
End Solutions Ltd CIO presentationEnd Solutions Ltd CIO presentation
End Solutions Ltd CIO presentation
Bluehusker
 

Was ist angesagt? (20)

Ocean Action Learning
Ocean Action LearningOcean Action Learning
Ocean Action Learning
 
Le roy ward
Le roy wardLe roy ward
Le roy ward
 
Setting up IT Communities of Practice SFIA Nov 2007
Setting up IT Communities of Practice SFIA Nov 2007Setting up IT Communities of Practice SFIA Nov 2007
Setting up IT Communities of Practice SFIA Nov 2007
 
Agile developers create their own identity by Ajay Danait
Agile developers create their own identity by Ajay DanaitAgile developers create their own identity by Ajay Danait
Agile developers create their own identity by Ajay Danait
 
Bradshaw.myron
Bradshaw.myronBradshaw.myron
Bradshaw.myron
 
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
ALN-Bengaluru - Agile Management - Driving Leadership & Complexity of …
 
Cierre del proyecto
Cierre del proyectoCierre del proyecto
Cierre del proyecto
 
Gaining Maximum Control: Managing Multiple Projects Effectively
Gaining Maximum Control: Managing Multiple Projects EffectivelyGaining Maximum Control: Managing Multiple Projects Effectively
Gaining Maximum Control: Managing Multiple Projects Effectively
 
Pinck.pascal
Pinck.pascalPinck.pascal
Pinck.pascal
 
IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?IT and Higher Education: Where are We Headed?
IT and Higher Education: Where are We Headed?
 
NJ IABC Chapter Ultimate Engagement 110811
NJ IABC Chapter Ultimate Engagement 110811NJ IABC Chapter Ultimate Engagement 110811
NJ IABC Chapter Ultimate Engagement 110811
 
The Stream Process™ for Defining Projects
The Stream Process™ for Defining ProjectsThe Stream Process™ for Defining Projects
The Stream Process™ for Defining Projects
 
Bingham.alph
Bingham.alphBingham.alph
Bingham.alph
 
Millis.marc
Millis.marcMillis.marc
Millis.marc
 
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
 
Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811Final linda dulye nj iabc chapter ultimate engagement 110811
Final linda dulye nj iabc chapter ultimate engagement 110811
 
Aligned Strategy
Aligned StrategyAligned Strategy
Aligned Strategy
 
End Solutions Ltd CIO presentation
End Solutions Ltd CIO presentationEnd Solutions Ltd CIO presentation
End Solutions Ltd CIO presentation
 
The Digital Age: How to get the most out of mobile devices in the legal envir...
The Digital Age: How to get the most out of mobile devices in the legal envir...The Digital Age: How to get the most out of mobile devices in the legal envir...
The Digital Age: How to get the most out of mobile devices in the legal envir...
 
IHIC 2012 - Key note - HL7 Italia - S.Lotti - Is it really useful to have a f...
IHIC 2012 - Key note - HL7 Italia - S.Lotti - Is it really useful to have a f...IHIC 2012 - Key note - HL7 Italia - S.Lotti - Is it really useful to have a f...
IHIC 2012 - Key note - HL7 Italia - S.Lotti - Is it really useful to have a f...
 

Andere mochten auch (9)

Dcdc sept11th mm
Dcdc sept11th mmDcdc sept11th mm
Dcdc sept11th mm
 
Psycolingustic 2
Psycolingustic 2Psycolingustic 2
Psycolingustic 2
 
Lipreading in hearing impaired
Lipreading in hearing impairedLipreading in hearing impaired
Lipreading in hearing impaired
 
Speechreading
SpeechreadingSpeechreading
Speechreading
 
Apperture - personas
Apperture - personasApperture - personas
Apperture - personas
 
Desgin preso
Desgin presoDesgin preso
Desgin preso
 
Basic Vocabulary & Listening skills program for Vietnamese speakers
Basic Vocabulary & Listening skills program for Vietnamese speakersBasic Vocabulary & Listening skills program for Vietnamese speakers
Basic Vocabulary & Listening skills program for Vietnamese speakers
 
Hearing Aids | Orlando FL
Hearing Aids | Orlando FLHearing Aids | Orlando FL
Hearing Aids | Orlando FL
 
Hearing aids
Hearing aidsHearing aids
Hearing aids
 

Ähnlich wie About us groupaccelerators_ase

Bush.stewart
Bush.stewartBush.stewart
Bush.stewart
NASAPMC
 
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
InSync Conference
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
NASAPMC
 
Presentation 20111102
Presentation 20111102Presentation 20111102
Presentation 20111102
dgarlough
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
Alithya
 

Ähnlich wie About us groupaccelerators_ase (20)

Bush.stewart
Bush.stewartBush.stewart
Bush.stewart
 
Agile Webinar: Managing Distributed Teams
Agile Webinar: Managing Distributed TeamsAgile Webinar: Managing Distributed Teams
Agile Webinar: Managing Distributed Teams
 
Intro Of Agile
Intro Of AgileIntro Of Agile
Intro Of Agile
 
Agile101 Small Batches
Agile101 Small BatchesAgile101 Small Batches
Agile101 Small Batches
 
The Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governanceThe Agile PMO: Ensuring visibility and governance
The Agile PMO: Ensuring visibility and governance
 
Communities of practice
Communities of practice Communities of practice
Communities of practice
 
Dec model gsw
Dec model gswDec model gsw
Dec model gsw
 
OSSCube - Zend Webinar
OSSCube - Zend WebinarOSSCube - Zend Webinar
OSSCube - Zend Webinar
 
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...Achieving a common goal creating a center of excellence e roske in-sync10 ora...
Achieving a common goal creating a center of excellence e roske in-sync10 ora...
 
It's the organisation, Stupid
It's the organisation, StupidIt's the organisation, Stupid
It's the organisation, Stupid
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
Managing meetings effectively with activities
Managing meetings effectively with activitiesManaging meetings effectively with activities
Managing meetings effectively with activities
 
Flexility POV - Managing Virtual Teams
Flexility POV - Managing Virtual TeamsFlexility POV - Managing Virtual Teams
Flexility POV - Managing Virtual Teams
 
Agile software development for startups
Agile software development for startupsAgile software development for startups
Agile software development for startups
 
Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!Top 7 Myths of Agile Testing - Busted!
Top 7 Myths of Agile Testing - Busted!
 
module I.pptx
module I.pptxmodule I.pptx
module I.pptx
 
kaizen (mba bf)
kaizen (mba bf)kaizen (mba bf)
kaizen (mba bf)
 
Agile Development Product Delivery For Successful Organizations
Agile Development Product Delivery For Successful OrganizationsAgile Development Product Delivery For Successful Organizations
Agile Development Product Delivery For Successful Organizations
 
Presentation 20111102
Presentation 20111102Presentation 20111102
Presentation 20111102
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 

Kürzlich hochgeladen

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Kürzlich hochgeladen (20)

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

About us groupaccelerators_ase

  • 1. The ASE can help Outsourcing in winning projects and shortening the time to break even on existing engagements Objectives of this document • Gain general understanding about the ASE – what it is and what we do • Get acquainted with the different ASE event types and their role in the context of outsourcing projects • Explain the integration of an ASE event into an outsourcing project plan and how mutual preparation works out • Understand the critical success factors to plan and conduct ASE events The ASE adds value by increasing quality & productivity to complex projects and by building trust and alignment amongst the key stakeholder CE v5.6 © 2010 Capgemini - All rights reserved 1 Capgemini ASE-AND-OUTSOURCING.PPT
  • 2. The ASE is an innovative method to solve complex problems faster and achieve sustainable implementation ASE solution approach Dilemma of complex problems Solutions with an ASE The complexity of the issues that must be resolved has The ASE approach represents the synthesis of a strongly increased and demands experts‟ involvement in creative environment, extensive content prepara- ever more specialized disciplines tion and an effective working process for large groups of up to 65 participants1 • The extraordinary environment of the ASE cen- ters encourages creativity and open constructive The consequence is: there are only two choices for teamwork among all participants. To break new resolving the issues ... ground when finding solutions, we deliberately avoid the traditional office and workshop • Fast (top management) decisions, risking spurious atmosphere compromises, gaps, and a lack of agreement during implementation • Any information needed for solution finding as = speed at the expense of decision quality well as the knowledge and experience of all relevant decision makers, experts and multipliers • Intensive sequential involvement of many parties and come together in an ASE event. This ensures long coordination cycles with a risk of losing high decision quality momentum during implementation = decision quality at the expense of speed • Within the scope of the ASE Scan-Focus-Act method, solutions are developed iteratively and simultaneously. In addition to mobilising all par- ties, speed is significantly increased – both in the planning phase and during implementation In both cases the people involved and concerned get lost 1 Internationally up to 120 participants CE v5.6 © 2010 Capgemini - All rights reserved 2 Capgemini ASE-AND-OUTSOURCING.PPT
  • 3. The unique concept and infrastructure of the ASE Center stimulate creativity and team spirit ASE environment Characteristics of the ASE environment • Spaces that can be used flexibly with two large areas: – Plenum (results presentations for all participants) – Break-out spaces (small teams work on specific assignments) • Immediate access to prepared information and real-time research • Constructive and collaborative work in teams on large walls with writable surfaces • The facilitation team takes on the task of documenting all the results • The technical equipment enables effective use of all media • Efficient work with up to 65 participants (ASE Berlin) The ASE Center is neither a seminar nor a conference space but rather a working environment! CE v5.6 © 2010 Capgemini - All rights reserved 3 Capgemini ASE-AND-OUTSOURCING.PPT
  • 4. All relevant information is available at an ASE event to make sound decisions ASE – ‘secret of success’ Partici- • Executive decision makers, experts, influencers pants’ know- • Knowledge „in people‟s brains‟, experience ledge • All participants are present „full time‟ Level of Knowledge • Analysis, data Insight Objects • Objectives, key questions • Factbook preparation Factbook Participants All knowledge that is available in written format Time Preparation Scan Focus Act • Customised event design • Iteration and parallel work • Alternating between plenary and break-out • Alignment • Changing team compositions • Good decisions ASE • Working results available • Commitment to implementation process immediately CE v5.6 © 2010 Capgemini - All rights reserved 4 Capgemini ASE-AND-OUTSOURCING.PPT
  • 5. All participants go jointly through the same proven process in the ASE center ASE method What MUST we KNOW? What CAN we DO? What WILL we DO? • Team building • Simulation / scenarios, • Selecting and prioritising • Common understanding of playing “what if” alternatives problems • Simultaneous processing to • Developing short-term and • Industry trends, best practices, manage complexity mid-term activity plans expert exchange of experience • Finding solutions through • Making joint decisions • Ideas and solutions from other iteration • Commitment to industries – “out-of-the-box • First draft / test ideas implementation thinking” • Evaluating / eliminating • Uncovering critical hypotheses and options assumptions and issues The overarching alignment on the solutions ensures strong motivation during the implementation. CE v5.6 © 2010 Capgemini - All rights reserved 5 Capgemini ASE-AND-OUTSOURCING.PPT
  • 6. As soon as we are in charge of service the ASE reduces in the classical way the time to break even ASE Opportunities during Frozen Zone and Implementing Phase FROZEN ZONE IMPLEMENTING Run the 3: Preparation 4: Transition 5: Delivery Business “Get it exact and “Let’s get started” “Let’s make it efficient” “Let‟s make in writing” profit” Contract Start Implementation Benchmark Service-Level Agreements Service Reporting Integration Collaboration Event Station • Integrate organization, processes and systems • Shorten the time to benefit through collaborative Objective • Align all stakeholders on way forward working day by day (on site on client premises) • Increase speed and quality of decision making Participants 30 – 70 employees (decision All project team members (IT, business, Capgemini makers, experts, end users, Capgemini project project team, supplier, customer) • team) Detailed analysis on requirements • Analysis and facts Input • Detailed analysis on assets and capabilities • Contractual framework (services, draft SLA‟s …) • Detailed definition of services and SLAs Continually: Output • Decision on to be applications, infrastructure • Accelerated solution finding • Detailed implementation plans (transition) Client Capgemini • Robust and qualified decisions • Organization, roles and responsibilities Company A Company A • Change to collaborative mindset • xxx xxx xxx xxx xxx xxx Detailed communication strategy y y y y y y • Knowledge transfer on ASE-methodology y y y y y y y y y y y y y y y y y y CE v5.6 © 2010 Capgemini - All rights reserved 6 Capgemini ASE-AND-OUTSOURCING.PPT
  • 7. The Integration Event creates alignment among a large number of people concerned and lets them create the solutions Example detailed View: ASE Integration Event BUILD FROZEN ZONE IMPLEMENTING RUN 4: Transition 5: Delivery “Let`s get started” “Let`s make it efficient” approach Classical project Contract Start Implementation Benchmark Implementation Implemen- Analysis Synthesis Analyse planning tation SC I SCII - SC n SC n+1 Deliverables ASE Implemen- Implementati of project Analysis Analyse Preparatio Tasks / on planning tation SC I n SC III ASE Planning Meeting Integration Define… Event • Scope of ASE event Deliverables Joint tasks / „SC2“ Planning Sponsor • Event objectives Fact Book SCAN Meeting Meeting FOCUS Pr ep ACT Po st • Key questions to be addressed • Inputs, required knowledge Deliverables • Deliverables Tasks / of ASE ASE ASE-preparation & Scoping Design • Sponsors / participants • Logistics 10 days 20 days 1 day 3 days 1-2 days 5 days CE v5.6 © 2010 Capgemini - All rights reserved 7 Capgemini ASE-AND-OUTSOURCING.PPT
  • 8. An ASE delivers fast but also realistic solutions based on broad alignment among all participants Results of an ASE event Speed Quotes • Significantly shortened co-ordina- “We have accomplished more in three tion cycles and accelerated imple- days than I would have thought our “Spending 18 months wasn‟t mentation company could have accomplished in smart; we did in 3 days what we • Accelerated decision making five to six months” couldn‟t do in 18 months” process saving months compared to Ron Chambers, Chief Information Officer Ansett Tom Knowlton, President Airlines Kellogg‟s North America conventional processes “Using the ASE as a Design Quality Shop helped us to achieve 6 • Realistic solutions based on broad months worth of work in 3 “I have never experienced such a work- days” shop before. This is the first time that we alignment ensure implementation later Charlie Golden, CFO have achieved this level of consen-sus on Eli Lilly & Company on our future activities in just 3 days” • Best possible decision quality through profound analysis and “I never imagined Hermann Eidel, CEO Freudenberg Nonwovens involvement of all relevant how liberating the deciders, experts, and stakeholders environment and process could be” Doug Ivester, President Coca Cola Company Commitment and enthusiasm “The ASE allowed us to achieve • "Buy-in" of all decision makers and conceptual designs four times The participants of the ASE will stakeholders faster than the previous phase become the most important com- • Broad enthusiasm of all participants of this work” municators in their company and willingness to change and Nina Grove, Director of Operational Systems implement Genentech Inc. CE v5.6 © 2010 Capgemini - All rights reserved 8 Capgemini ASE-AND-OUTSOURCING.PPT
  • 9. Many renowned corporations are among the clients of the ASE centers CE v5.6 © 2010 Capgemini - All rights reserved 9 Capgemini ASE-AND-OUTSOURCING.PPT