1. OFFSHORE SUPPORT & PRODUCTION FACILITY
BUSINESS UNIT
RADIANT UTAMA GROUP
PRESENTATION
2015
2. List of Projects
Newly Awarded and Current
Projects
• CNOOC SES LTD. – FSO Widuri
Terminal
• SANTOS (SAMPANG) PTY. LTD. –
FPSO Sea Good 101
• TOTAL E&P INDONESIE – Dredging
Package No.2
• TOTAL E&P INDONESIE – Dredging
Package No.9
• TOTAL E&P INDONESIE – River
Crossing and River Banks
Potential Projects
• TOTAL E&P INDONESIE –
Dredging Package No.1
• SANTOS INDONESIA – Ande-Ande
Lumut Development Project
• HUSKY-CNOOC MADURA LTD. –
Floating Production Unit for the
MDA-MBH Field Development
• TOTAL E&P INDONESIE – Charter
of AHT, Tugboat, Crewboat,
Seabus
• TOTAL E&P INDONESIE –
Production Facility Maintenance
3. MOPU
Current Project
Project Name
MOPU Conversion and Operating Services
Duration of the Project
10 years + 5 years
Project Duration
April 2006 – April 2017
Contract Value
USD xxx
Daily Rate : xxx
X-Brace per day: USD xxx
Peluang per day: USD xxx
Booster Compressor per day : USD xxx
Brief Description of the Project
This project is intended for the installation of MOPU in Maleo Area for
Santos Indonesia. The facility supplies over 40% of gas to the industry
located in East Java. Due to that reason, MOPU has become one of the
most important asset of Local Government in East Java.
PT. Supraco Lines together with its Parent Company, PT. Radiant Utama
Interinsco, Tbk. has provided full services for this project, starting from
Engineers and Crews, installation of MOPU on site, Gas Production and
MOPU maintenance.
4. Charter FSO for Widuri Terminal
Project Name
Charter for One (1) Unit
Floating Storage Offloading (FSO)
for Widuri Terminal
Duration of the Project
5 years fixed + 5 add. Years
Project Type
Consortium (fee-based)
Commencement Date
December 2014 – May 2019
Contract Value
USD XXX
Daily Rate XXX FSO Federal II
Brief Description of the Project
This project is to replace existing FPSO, Lentera Bangsa, owned and operated by Trada Maritim
Tbk. Due to explosion, the project is suspended & terminated.
The converted FSO will be dedicated to accommodate oil production from Charterer oilfield
concessions offshore North West Java.
The FSO is now on mooring process in Widuri Terminal.
Current Project
5. Provision of Oyong Production Barge Services
Project Name
Provision of Oyong Production Barge
Services
Duration of the Project
1 year fixed + 1 additional year
Project Type
Consortium with RUI and Apexindo (fee-based)
Commencement Date
September 2013 – September 2014
Contract Value
USD xxx
Daily Rate USD xxx
Brief Description of the Project
This project is dedicated to support Santos by providing FPSO in Oyong Area.
FPSO Seagood 101
Current Project
6. Dredging & Lifting Services – Package No. 2
• Project Name
Provision of 1 Unit 150 T Crane Barge
and its Package for Dredging and
Lifting/Add. Works (Package-2)
• Duration of the Project
3 years
• Project Type
Asset Based
• Estimated Commencement Date
June 2014 – June 2017
• Estimated Contract Value
USD 8 millions
• Brief Description of the Project
This project main intention is to perform
dredging activities in shallow waters and
coastal sea of the Mahakam Contract area in
East Kalimantan.
This project is just recently commenced on
October 2014.
•
Current Project
7. Dredging & Lifting Services – Package No. 9
• Project Name
Provision of 1 Unit Crane Barge
and its Package for Dredging and
Lifting/Add. Works (Package-9)
• Duration of the Project
3 years
• Project Type
Asset Based
• Estimated Commencement Date
January 2014 – January 2017
• Contract Value
USD 9 millions
• Brief Description of the Project
This project main intention is to perform
dredging activities in shallow waters and
coastal sea of the Mahakam Contract area in
East Kalimantan.
This project starts on May 2014
•
Current Project
8. PRODUCED WATER TREATMENT RENTAL
Future Project
Hi-Flow Test Skid Project Name
Produced Water Treatment Rental
Services
Duration of the Project
6 months
Project Type
Rental
Duration of Projecy
November 2014 – May 2015
Contract Value
USD xxx
Sales xxx
Project Information
The Produced Water Treatment (PWT) to maintain quality of produced and effluent water
prior to disposal overboard. The quality of produced formation water disposed overboard
will be in accordance with Indonesian environmental regulation as a minimum.
For offshore installations, the maximum oil content in waste water is 50 mg/L. The
facilities will be designed by the Contractor to meet an environmental target of 25 mg/L.
Continuous on-line oil-in-water monitoring equipment shall be installed for continuous
monitoring and recording of effluent oil levels.