Construction Best
Management
Practices For CIR Success
DENNIS MCELROY
FMG DIVISION MANAGER
COLD IN-PLACE RECYCLING AND ASPHALT MILLING
www.FMGCoInc.com
Asphalt Recycling & Reclaiming Association
www.FMGCoInc.com
CIR Is Not Hot Mix Asphalt!
Its not AC and its not AB. It’s really in-between.
Material properties are different and expectations should be
different.
As an industry we all need to have an open mind with these
materials.
We need to utilize the hard work others have done so we can
learn faster and use technology like this in more and more
areas.
PARTNERING
www.FMGCoInc.com
Virginia Interstate 81 – CIR Project
www.FMGCoInc.com
CIR - Erasing Crack History in the
Pavement
www.FMGCoInc.com
Mill-and-Fill Example
www.FMGCoInc.com
Good CIR Candidates
Cracking, Oxidized Pavement, Potholes, etc.
Good CIR Candidates
Requires good drainage and stable
subgrade.
CIR does not solve poor subgrade
conditions!
Good CIR Candidates
Full Depth Reclamation (FDR)
- Solves poor subgrade conditions
Urban Based CIR
Best Management Practices Starts
With Picking The Right Road At The
Right Time
▪ Need to verify
existing pavement
thickness in advance
▪ Understand your traffic
count & subgrade info
▪ Do a pavement design
▪ UC DAVIS PRC is a
great resource!
Equipment Used In the
Industry
Multi Unit Recycler Or “Train”
www.FMGCoInc.com
Multi Unit Recycler Or “Train”
www.FMGCoInc.com
 Windrow of
CIR material to
paving
machine
Single Unit Recycler
www.FMGCoInc.com
 Rear conveyor
delivery of CIR
material to paving
machine
Single Unit Recycler
www.FMGCoInc.com
CIR Single Unit Recycler Material
Processing
www.FMGCoInc.com
Two Main Binder Types
Foamed Asphalt
www.FMGCoInc.com
Emulsions
www.FMGCoInc.com
IMPORTANT
Both binder types have similar long term performance
characteristics.
Each with their own specifications and specific test
methods.
DO NOT BLEND THE SPECS TOGETHER!
Caltrans NSSP’s (approved April 2018)
Section 30-5 CIR using Emulsified Asphalt
Section 30-6 CIR using Foamed Asphalt
www.FMGCoInc.com
Where Do I Get The Proper
Specification?
Caltrans CIR homepage online was last updated:
06/15/2011
Talk to the CIR contractors or agency’s that have
already completed a project.
- Most of the contractors who specialize in CIR will
provide lunch and learn opportunities or will be
willing to share lessons learned.
- www.RoadResource.org is also a great resource.
www.FMGCoInc.com
Critical! Before Starting A Project!
www.FMGCoInc.com
JITT Training – Just in time training
This can be after samples have been pulled and a mix design has
been developed.
1. JITT training needs to be done before the work within the
pavement section begins.
2. Have the conversations that you don’t want to have.
3. Staging areas, Traffic handling, mix design, contingency plan,
on site contacts, who is responsible for what, concerns from
all sides, etc.
4. This meeting, with all parties involved, will set the tone and
expectations of the project.
1. Lower Utilities
- Min. 3” below CIR depth
2. Do Your Milling First.
Key cut and conforms need to be done before CIR if they are
within the area to be recycled.
IF YOU DON’T HAVE TO, DON’T MILL THE CIR SURFACE.
Profile And Cross Slope Adjustments
Typical Cross Section Detail
www.FMGCoInc.com
Typical Cross Section Example
www.FMGCoInc.com
Fog Seal Application
www.FMGCoInc.com
Close-Up of Fog Seal
www.FMGCoInc.com
Fog Seal Curing
www.FMGCoInc.com
Close-Up of RAP Mat
www.FMGCoInc.com
Cold Material – Minimal cross traffic, emergency vehicles and driveway
access is ok.
www.FMGCoInc.com
Final CIR Surface Before The Overlay
Time between completion of
CIR and final surfacing:
Foamed Asphalt
Minimum: 2 to 3 days of
curing
Maximum: 15 days of
exposure to traffic
Emulsions
Minimum: Moisture 2% or
less.
Supplemental Compaction
Maximum: 15 days of
exposure to traffic
www.FMGCoInc.com
Final CIR Surface Before The Overlay
What is Supplemental Compaction?
◦ Re-Rolling the entire CIR Surface
prior to smoothness testing or
final surfacing.
◦ After moisture loss due to curing
there are more air voids in the
mixture. Re-rolling the surface
takes out those voids.
Foamed Asphalt doesn’t require
supplemental compaction.
www.FMGCoInc.com
Need to apply tack coat before the HMA
overlay is placed.
◦ A fog seal was applied on the final CIR
surface?
Overlay Install, Tack Coat applied
in front of paver & Final CIR Surface
www.FMGCoInc.com
Cul De Sac Example
www.FMGCoInc.com
Cul De Sac Example
www.FMGCoInc.com
Cul De Sacs Contd.
Paved exterior of cul de sac
CIR Ties into new paved exterior of the cul de sac
And directly to the lip of gutter.
AC Paving was left 2” low along lip of gutter. NO milling required later.
www.FMGCoInc.com
Point Reyes Petaluma Road – Marin
County
Shoulder widening
www.FMGCoInc.com
Shoulder Widening with CIR
www.FMGCoInc.com
Contact Info
Dennis McElroy
FMG Division Manager
Dmcelroy@Graniterock.com
Cell:408-639-8063
www.FMGCoInc.com

Weitere ähnliche Inhalte

Mehr von California Asphalt Pavement Association

Mehr von California Asphalt Pavement Association (20)

Pavement Maintenance tools and technology update
Pavement Maintenance tools and technology updatePavement Maintenance tools and technology update
Pavement Maintenance tools and technology update
 
Presentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiativePresentation by Caltrans on the department's eTicketing initiative
Presentation by Caltrans on the department's eTicketing initiative
 
Update on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industryUpdate on eTicketing technologies for the asphalt pavement industry
Update on eTicketing technologies for the asphalt pavement industry
 
Asphalt industry EPD benchmarking update 2024
Asphalt industry EPD benchmarking update  2024Asphalt industry EPD benchmarking update  2024
Asphalt industry EPD benchmarking update 2024
 
Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024Women of Asphalt California Branch update 2024
Women of Asphalt California Branch update 2024
 
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
CalAPA Spring Asphalt Pavement Conference presentation on the City & County P...
 
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial IntelligenceCalAPA Spring Conference 2024 presentation on Artificial Intelligence
CalAPA Spring Conference 2024 presentation on Artificial Intelligence
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
 
Joint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials techniciansJoint Training & Certification Program for construction materials technicians
Joint Training & Certification Program for construction materials technicians
 
EPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt PlantEPD Pointers at the Asphalt Plant
EPD Pointers at the Asphalt Plant
 
EPD Benchmarks and lessons learned
EPD Benchmarks and lessons learnedEPD Benchmarks and lessons learned
EPD Benchmarks and lessons learned
 
National perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD toolNational perspective on Environmental Product Declarations & the NAPA EPD tool
National perspective on Environmental Product Declarations & the NAPA EPD tool
 
Challenges for EPD implementation
Challenges for EPD implementationChallenges for EPD implementation
Challenges for EPD implementation
 
Asphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDsAsphalt Institute perspective on EPDs
Asphalt Institute perspective on EPDs
 
Caltrans EPD Implementation Roadmap
Caltrans EPD Implementation RoadmapCaltrans EPD Implementation Roadmap
Caltrans EPD Implementation Roadmap
 
Caltrans EPD implementation update
Caltrans EPD implementation updateCaltrans EPD implementation update
Caltrans EPD implementation update
 
Caltrans METS perspective on EPDs
Caltrans METS perspective on EPDsCaltrans METS perspective on EPDs
Caltrans METS perspective on EPDs
 
FHWA EPD Perspective
FHWA EPD PerspectiveFHWA EPD Perspective
FHWA EPD Perspective
 
2023-1025 Environmental Product Declarations - An Overview by the UCPRC
2023-1025 Environmental Product Declarations - An Overview by the UCPRC2023-1025 Environmental Product Declarations - An Overview by the UCPRC
2023-1025 Environmental Product Declarations - An Overview by the UCPRC
 
23PWX - APA Resilience PowerPoint MILAR.pdf
23PWX - APA Resilience PowerPoint MILAR.pdf23PWX - APA Resilience PowerPoint MILAR.pdf
23PWX - APA Resilience PowerPoint MILAR.pdf
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Kürzlich hochgeladen (20)

HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 

Construction Best Management Practices for CIR

  • 1. Construction Best Management Practices For CIR Success DENNIS MCELROY FMG DIVISION MANAGER COLD IN-PLACE RECYCLING AND ASPHALT MILLING www.FMGCoInc.com
  • 2. Asphalt Recycling & Reclaiming Association www.FMGCoInc.com
  • 3. CIR Is Not Hot Mix Asphalt! Its not AC and its not AB. It’s really in-between. Material properties are different and expectations should be different. As an industry we all need to have an open mind with these materials. We need to utilize the hard work others have done so we can learn faster and use technology like this in more and more areas. PARTNERING www.FMGCoInc.com
  • 4. Virginia Interstate 81 – CIR Project www.FMGCoInc.com
  • 5. CIR - Erasing Crack History in the Pavement www.FMGCoInc.com
  • 7. Good CIR Candidates Cracking, Oxidized Pavement, Potholes, etc.
  • 9. Requires good drainage and stable subgrade. CIR does not solve poor subgrade conditions! Good CIR Candidates
  • 10. Full Depth Reclamation (FDR) - Solves poor subgrade conditions
  • 12. Best Management Practices Starts With Picking The Right Road At The Right Time ▪ Need to verify existing pavement thickness in advance ▪ Understand your traffic count & subgrade info ▪ Do a pavement design ▪ UC DAVIS PRC is a great resource!
  • 13. Equipment Used In the Industry
  • 14. Multi Unit Recycler Or “Train” www.FMGCoInc.com
  • 15. Multi Unit Recycler Or “Train” www.FMGCoInc.com
  • 16.  Windrow of CIR material to paving machine Single Unit Recycler www.FMGCoInc.com
  • 17.  Rear conveyor delivery of CIR material to paving machine Single Unit Recycler www.FMGCoInc.com
  • 18. CIR Single Unit Recycler Material Processing www.FMGCoInc.com
  • 22. IMPORTANT Both binder types have similar long term performance characteristics. Each with their own specifications and specific test methods. DO NOT BLEND THE SPECS TOGETHER! Caltrans NSSP’s (approved April 2018) Section 30-5 CIR using Emulsified Asphalt Section 30-6 CIR using Foamed Asphalt www.FMGCoInc.com
  • 23. Where Do I Get The Proper Specification? Caltrans CIR homepage online was last updated: 06/15/2011 Talk to the CIR contractors or agency’s that have already completed a project. - Most of the contractors who specialize in CIR will provide lunch and learn opportunities or will be willing to share lessons learned. - www.RoadResource.org is also a great resource. www.FMGCoInc.com
  • 24. Critical! Before Starting A Project! www.FMGCoInc.com JITT Training – Just in time training This can be after samples have been pulled and a mix design has been developed. 1. JITT training needs to be done before the work within the pavement section begins. 2. Have the conversations that you don’t want to have. 3. Staging areas, Traffic handling, mix design, contingency plan, on site contacts, who is responsible for what, concerns from all sides, etc. 4. This meeting, with all parties involved, will set the tone and expectations of the project.
  • 25. 1. Lower Utilities - Min. 3” below CIR depth
  • 26. 2. Do Your Milling First. Key cut and conforms need to be done before CIR if they are within the area to be recycled. IF YOU DON’T HAVE TO, DON’T MILL THE CIR SURFACE.
  • 27. Profile And Cross Slope Adjustments
  • 28. Typical Cross Section Detail www.FMGCoInc.com
  • 29. Typical Cross Section Example www.FMGCoInc.com
  • 31. Close-Up of Fog Seal www.FMGCoInc.com
  • 33. Close-Up of RAP Mat www.FMGCoInc.com
  • 34. Cold Material – Minimal cross traffic, emergency vehicles and driveway access is ok. www.FMGCoInc.com
  • 35. Final CIR Surface Before The Overlay Time between completion of CIR and final surfacing: Foamed Asphalt Minimum: 2 to 3 days of curing Maximum: 15 days of exposure to traffic Emulsions Minimum: Moisture 2% or less. Supplemental Compaction Maximum: 15 days of exposure to traffic www.FMGCoInc.com
  • 36. Final CIR Surface Before The Overlay What is Supplemental Compaction? ◦ Re-Rolling the entire CIR Surface prior to smoothness testing or final surfacing. ◦ After moisture loss due to curing there are more air voids in the mixture. Re-rolling the surface takes out those voids. Foamed Asphalt doesn’t require supplemental compaction. www.FMGCoInc.com
  • 37. Need to apply tack coat before the HMA overlay is placed. ◦ A fog seal was applied on the final CIR surface? Overlay Install, Tack Coat applied in front of paver & Final CIR Surface www.FMGCoInc.com
  • 38. Cul De Sac Example www.FMGCoInc.com
  • 39. Cul De Sac Example www.FMGCoInc.com
  • 40. Cul De Sacs Contd. Paved exterior of cul de sac CIR Ties into new paved exterior of the cul de sac And directly to the lip of gutter. AC Paving was left 2” low along lip of gutter. NO milling required later. www.FMGCoInc.com
  • 41. Point Reyes Petaluma Road – Marin County Shoulder widening www.FMGCoInc.com
  • 42. Shoulder Widening with CIR www.FMGCoInc.com
  • 43. Contact Info Dennis McElroy FMG Division Manager Dmcelroy@Graniterock.com Cell:408-639-8063 www.FMGCoInc.com