King’sScholars’PondSewer Bridge
TheBridgeinaBottle
Presenter - Mark Lusher
Brief History of the KSP Sewer
Location on the Surface
3
KSP Sewer
London Underground
Tunnel beneath road
Baker Street
Station
Location: Baker Street Station
Peak flow in the
sewer is around
8500 litres per
second.
That is
approximately 8.5
tonnes of water
per second
King Scholars Pond Sewer Crossing
at Baker Street
Tunnel has settled around
166mm since construction
150+ years ago
As constructed
Tunnel footings
have moved
inwards
Current
Sewer Bridge has SettledAway from the Rail
tunnel the sewer is
in its original
location
Cracking Cracking
London Underground Tunnel
Sewer passing through crown
of tunnel
The Problem
The Problem
Before 2010 April 2015
Key Construction Issues
• Busy 6 lane highway - Key Artery Road for Central London.
• Baker Street Underground Station - One of LUL’s Key Stations
• Residential - Known noise complaint black spot
• Pedestrians – Very busy pedestrian route
• Cycling - Key cycle route
• Buses – Principle Bus Route
• Parking – Very Limited
• Site Compound availability – Very Limited
• Excavation would be extremely complex in this location
• Flow within the sewer is relatively low but would need to be dealt with.
• Multiple Stakeholders.
Key Design Issues
• Capable of being constructed by hand through a small manhole.
• The flow in the sewer could not be diverted therefore the structure had to be built with
the sewer live.
• Design life of 120 years (The existing structure is already 155 years old)
• Material choice was critical
• Low or No Maintenance.
• Light Weight.
• Take into account Bimetallic Corrosion with particular relation to the existing Cast Iron
Structure.
• Full CAT3 checks on all elements of the design.
Sub-surface composition at Marylebone
and Baker Street Intersection
Data Gathering
Before the New Sewer Bridge was
Installed
Brickwork is 155 years old
Steelwork is 7 years old
Building a Bridge Inside a Live Sewer
13
The entire sewer bridge structure
was built through this manhole.
With the sewer still flowing
The Access Manhole
Original Proposal
The original proposal was to install new
support beams under the structure with a
carbon fibre lining grouted in place inside
the sewer
Revised Structure
Duplex Vierendeel Girder Structure bearing on the walls
of the London Underground Tunnel with a Glass Fibre
Reinforced Polymer (GFRP) Liner.
The New Sewer Bridge
Approx.
100 Tonnes
Approx.
100 Tonnes
Original
Padstone
Locations
(To remain)
Bearing Bearing
Bridge Structure With Lining
Test Assembly
Structure held together by over 4000 high
strength Duplex Bolts
Test Assembly of Liner and Liner Testing
High Specification GFRP
inner structure had to be
100% watertight to a
pressure 1.5 times greater
than its maximum operating
pressure with equally high
levels of Chemical resistance.
GFRP inner structure held
together and secured to the
Vierendeel Girder by 4500 Duplex
Bolts
Assembly and Staff Training
Assembly in the Sewer
Built by a team of 3 to 4 working
24 hours per day, 5 days per
week.
Backed up by a rescue team of 8.
Safety
Safety
Safety
The Finished Product
• Saved over 26,000 tonnes of CO2
• Defined a new best practice standard for
confined space entry which has now
been adopted by many other projects.
• Didn’t result in any property flooding.
• Multi Award Winner
• Eliminated the need for major Road and
Rail closures reducing misery for hundreds
oj thousands of commuters
• Saved £23m against the Business Plan
Solution
Questions ?

Weitere ähnliche Inhalte

Was ist angesagt?

Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteAglaia Connect
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo MachineTamar Swan
 
Use of silica fumes in concrete
Use of silica fumes in concreteUse of silica fumes in concrete
Use of silica fumes in concreteVijaya Gayki
 
High performance concrete project
High performance concrete projectHigh performance concrete project
High performance concrete projectakhil reddy
 
High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.shebina a
 
High performance concrete
High performance concreteHigh performance concrete
High performance concreteMuhammad Aamir
 
High strength cement concrete
High strength cement concreteHigh strength cement concrete
High strength cement concretetirath prajapati
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)SSudhaVelan
 
High strength concrete
High strength concreteHigh strength concrete
High strength concreteDr K M SONI
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concreteAglaia Connect
 
High performance concrete
High performance concreteHigh performance concrete
High performance concreteAglaia Connect
 
1180095 634511533955941250
1180095 6345115339559412501180095 634511533955941250
1180095 634511533955941250satishloveguru
 
High strength pdf.pdf
High strength pdf.pdfHigh strength pdf.pdf
High strength pdf.pdfAnik Yadav
 
Tw Rcc Dams Display
Tw Rcc Dams DisplayTw Rcc Dams Display
Tw Rcc Dams DisplayTed Warren
 

Was ist angesagt? (17)

Structural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concreteStructural behavious-of-high-strength-concrete
Structural behavious-of-high-strength-concrete
 
Roklin's VariFlo Machine
Roklin's VariFlo MachineRoklin's VariFlo Machine
Roklin's VariFlo Machine
 
Use of silica fumes in concrete
Use of silica fumes in concreteUse of silica fumes in concrete
Use of silica fumes in concrete
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 
High performance concrete project
High performance concrete projectHigh performance concrete project
High performance concrete project
 
High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.High density concrete, high strength concrete and high performance concrete.
High density concrete, high strength concrete and high performance concrete.
 
High performance concrete
High performance concreteHigh performance concrete
High performance concrete
 
High strength cement concrete
High strength cement concreteHigh strength cement concrete
High strength cement concrete
 
MOSE PROJECT
MOSE PROJECT MOSE PROJECT
MOSE PROJECT
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)
 
High strength concrete
High strength concreteHigh strength concrete
High strength concrete
 
Reactive powder-concrete
Reactive powder-concreteReactive powder-concrete
Reactive powder-concrete
 
High performance concrete
High performance concreteHigh performance concrete
High performance concrete
 
1180095 634511533955941250
1180095 6345115339559412501180095 634511533955941250
1180095 634511533955941250
 
3 external work
3 external work3 external work
3 external work
 
High strength pdf.pdf
High strength pdf.pdfHigh strength pdf.pdf
High strength pdf.pdf
 
Tw Rcc Dams Display
Tw Rcc Dams DisplayTw Rcc Dams Display
Tw Rcc Dams Display
 

Ähnlich wie Kings Scholar Pond - The Bridge in a Bottle #COMIT2019

conceptual desig of Chenab bridge
conceptual desig of Chenab bridge conceptual desig of Chenab bridge
conceptual desig of Chenab bridge muzafar farooq
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationThomasSexton8
 
Flatlick Sewer Rehabilitation Phase III
Flatlick Sewer Rehabilitation Phase IIIFlatlick Sewer Rehabilitation Phase III
Flatlick Sewer Rehabilitation Phase IIIFairfax County
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyMEL3360
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
Water customer presentation
Water customer presentationWater customer presentation
Water customer presentationSuj Kang
 
ASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 PresentationASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 PresentationJeremy Young, PE
 
Berkmar Article 2012 copy
Berkmar Article 2012 copyBerkmar Article 2012 copy
Berkmar Article 2012 copyFrank Sisk
 
Engineering Landmarks in London
Engineering Landmarks in LondonEngineering Landmarks in London
Engineering Landmarks in LondonTristan Robinson
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRPdewcraig
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysisMohammad Ali
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineFilipe Mello
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_AkhtarJavad Akhtar
 

Ähnlich wie Kings Scholar Pond - The Bridge in a Bottle #COMIT2019 (20)

conceptual desig of Chenab bridge
conceptual desig of Chenab bridge conceptual desig of Chenab bridge
conceptual desig of Chenab bridge
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
 
Flatlick Sewer Rehabilitation Phase III
Flatlick Sewer Rehabilitation Phase IIIFlatlick Sewer Rehabilitation Phase III
Flatlick Sewer Rehabilitation Phase III
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
euclid creek tunnel ppt may 2013
euclid creek tunnel ppt may 2013euclid creek tunnel ppt may 2013
euclid creek tunnel ppt may 2013
 
Water customer presentation
Water customer presentationWater customer presentation
Water customer presentation
 
ASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 PresentationASDSO NE Regional 2009 Presentation
ASDSO NE Regional 2009 Presentation
 
Berkmar Article 2012 copy
Berkmar Article 2012 copyBerkmar Article 2012 copy
Berkmar Article 2012 copy
 
Long wall top coal caving
Long wall top coal cavingLong wall top coal caving
Long wall top coal caving
 
coalpreppic
coalpreppiccoalpreppic
coalpreppic
 
Engineering Landmarks in London
Engineering Landmarks in LondonEngineering Landmarks in London
Engineering Landmarks in London
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysis
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
0410_Paddington-Brunel LoBEG-Oct04-Presentation_Javad_Akhtar
 

Mehr von Comit Projects Ltd

COMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckCOMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckComit Projects Ltd
 
Success through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationSuccess through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationComit Projects Ltd
 
Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Comit Projects Ltd
 
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019Comit Projects Ltd
 
Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Comit Projects Ltd
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Comit Projects Ltd
 
Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Comit Projects Ltd
 
The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...Comit Projects Ltd
 
It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019Comit Projects Ltd
 
Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Comit Projects Ltd
 
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Comit Projects Ltd
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019Comit Projects Ltd
 
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Comit Projects Ltd
 
Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Comit Projects Ltd
 
New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019Comit Projects Ltd
 
Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Comit Projects Ltd
 
Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Comit Projects Ltd
 
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Comit Projects Ltd
 
Tools & techniques for co-creation & learning between project teams #COMIT2019
Tools & techniques for co-creation & learning between project teams #COMIT2019Tools & techniques for co-creation & learning between project teams #COMIT2019
Tools & techniques for co-creation & learning between project teams #COMIT2019Comit Projects Ltd
 

Mehr von Comit Projects Ltd (20)

COMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckCOMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full Slidedeck
 
Success through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationSuccess through Failure: The Paradox of Innovation
Success through Failure: The Paradox of Innovation
 
Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019
 
Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019
 
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
 
Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
 
Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019
 
The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...
 
It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019
 
Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019
 
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019
 
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
 
Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019
 
New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019
 
Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019
 
Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019
 
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019
 
Tools & techniques for co-creation & learning between project teams #COMIT2019
Tools & techniques for co-creation & learning between project teams #COMIT2019Tools & techniques for co-creation & learning between project teams #COMIT2019
Tools & techniques for co-creation & learning between project teams #COMIT2019
 

Kürzlich hochgeladen

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Kürzlich hochgeladen (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Kings Scholar Pond - The Bridge in a Bottle #COMIT2019

  • 2. Brief History of the KSP Sewer
  • 3. Location on the Surface 3 KSP Sewer London Underground Tunnel beneath road Baker Street Station
  • 4. Location: Baker Street Station Peak flow in the sewer is around 8500 litres per second. That is approximately 8.5 tonnes of water per second
  • 5. King Scholars Pond Sewer Crossing at Baker Street
  • 6. Tunnel has settled around 166mm since construction 150+ years ago As constructed Tunnel footings have moved inwards Current Sewer Bridge has SettledAway from the Rail tunnel the sewer is in its original location Cracking Cracking London Underground Tunnel Sewer passing through crown of tunnel The Problem
  • 8. Key Construction Issues • Busy 6 lane highway - Key Artery Road for Central London. • Baker Street Underground Station - One of LUL’s Key Stations • Residential - Known noise complaint black spot • Pedestrians – Very busy pedestrian route • Cycling - Key cycle route • Buses – Principle Bus Route • Parking – Very Limited • Site Compound availability – Very Limited • Excavation would be extremely complex in this location • Flow within the sewer is relatively low but would need to be dealt with. • Multiple Stakeholders.
  • 9. Key Design Issues • Capable of being constructed by hand through a small manhole. • The flow in the sewer could not be diverted therefore the structure had to be built with the sewer live. • Design life of 120 years (The existing structure is already 155 years old) • Material choice was critical • Low or No Maintenance. • Light Weight. • Take into account Bimetallic Corrosion with particular relation to the existing Cast Iron Structure. • Full CAT3 checks on all elements of the design.
  • 10. Sub-surface composition at Marylebone and Baker Street Intersection
  • 12. Before the New Sewer Bridge was Installed Brickwork is 155 years old Steelwork is 7 years old
  • 13. Building a Bridge Inside a Live Sewer 13 The entire sewer bridge structure was built through this manhole. With the sewer still flowing
  • 15. Original Proposal The original proposal was to install new support beams under the structure with a carbon fibre lining grouted in place inside the sewer
  • 16. Revised Structure Duplex Vierendeel Girder Structure bearing on the walls of the London Underground Tunnel with a Glass Fibre Reinforced Polymer (GFRP) Liner.
  • 17. The New Sewer Bridge Approx. 100 Tonnes Approx. 100 Tonnes Original Padstone Locations (To remain) Bearing Bearing
  • 19. Test Assembly Structure held together by over 4000 high strength Duplex Bolts
  • 20. Test Assembly of Liner and Liner Testing High Specification GFRP inner structure had to be 100% watertight to a pressure 1.5 times greater than its maximum operating pressure with equally high levels of Chemical resistance. GFRP inner structure held together and secured to the Vierendeel Girder by 4500 Duplex Bolts
  • 21. Assembly and Staff Training
  • 22. Assembly in the Sewer Built by a team of 3 to 4 working 24 hours per day, 5 days per week. Backed up by a rescue team of 8.
  • 26. The Finished Product • Saved over 26,000 tonnes of CO2 • Defined a new best practice standard for confined space entry which has now been adopted by many other projects. • Didn’t result in any property flooding. • Multi Award Winner • Eliminated the need for major Road and Rail closures reducing misery for hundreds oj thousands of commuters • Saved £23m against the Business Plan Solution

Hinweis der Redaktion

  1. At this location the sewer is supported by 2 primary cast iron beams which span between pad-stone embedded within the brick wall of the railway tunnel. Between these two primary beams are profiled cast iron invert plates connected back to the beams via bolted connections. A brick crown completes the sewer profile.
  2. Severe cracking on either side due to settlement and an inward movement of the tunnel footings. Total settlement since construction has been 166mm.
  3. Condition pre-2010 and during condition assessment in 2015.
  4. Road composition – Bomb protection during World War 2
  5. Previous solution was a modular carbon fibre liner (within the sewer) and steel beam support to be clamped to the underside of the cast iron girders within the LU tunnel. 3 key themes; Change in load path – by clamping to the underside of the beams, we would be changing the load path that the girders have been subject too over the last 160years. Concerns here is it would move from being in compression to now in tension (although calc. proved very conservatively there was capacity in them to do so. Maintenance and
  6. Used as a storm relief sewer for the mid level 2.