Welcome to the world of wind energy
Dr. D. V. Kanellopoulos
OPWP Renewable Energy
Training Program
11-14 December 2016
Muscat, Oman
Wind Potential
22
Solar radiation powers up the wind
33
Surface air temperatures on earth for January
44
Global Surface Winds
latitude Predominate
wind
direction
60-90 N NE
30-60 N SW
0-30 N NE
0-30 S SE
30-60 S NW
60-90 S SE
55
Energy from the wind
•Air density depends on temperature and
barometric pressure.
•The larger the diameter of the wt, the
larger the gain.
•High speeds yield more energy Betz limit, named
after german
aerodynamist
Albert Betz
BL=16/27
BL=0.593
TIP SPEED ratio, λ
Power
coefficient
%
Cp
The tip-speed ratio, λ, or TSR for WTs is the ratio
between the tangential speed of the tip of a blade and the actual velocity of the wind,
The tip-speed ratio is related to efficiency, with the optimum varying with blade design.
Higher tip speeds result in higher noise levels and require stronger blades
due to large centrifugal forces.
The tip speed of the blade can be calculated as
ω times R, where ω is the rotor rotational speed in radians/second,
and R is the rotor radius in meters.
Tip speed ratio, λ
Cp vs wind speed for
various pitch angles
Cp vs TSR(λ) for
various pitch angles
Earth’s climatic zones
Meteorological parameters vary
These affect wt performance and certification
Measuring wind speed & wind direction
Wind speed
Estimate the
AEP in
kWh,
MWh,
GWH
Wind directions
Design wind
farm layouts in
order to
maximize
energy output,
minimize wake
losses and land
or sea use
Duration of wind measurements for safe AEP calculations ?
It cannot be less than a full year. More years reduce uncertainty in estimating AEP for the life
time of a project which is 20years.
Minimum duration period is normally obligatory by the regulatory authorities(e.g. RAE in GR)
Malin Head Met station in Ireland
Duration of wind measurements for safe AEP calculations ?
8.8
m/s
ok E
Anemometers or wind sensors
1846-Thomas Romney Robinson, Ireland
John Patterson, a Canadian weatherman
3 cup 1926
U m/s V m/s
W m/s
The wind vector, in reality. Most measurement
measure only the horizontal wind speed magnitude.
The horizontal wind comprises of the U and V
components of the true wind. This is used for
site evaluation.
Anemometers types
Rotating cup anemometers
Total cup anemometer.
No power needed!
Hand anemometer.
Battery needed.
Anemometers types
Rotating propeller anemometers
Hand anemometer.
Battery needed.
vane anemometer
Anemometers types
Rotating propeller anemometers
a U-V-W anemometer
a W anemometer, suitable for any angle
Anemometers types
Ultrasonic anemometers
Acoustic resonance anemometers
Anemometers types
Anemometers types
Hot wire anemometers
Laser Doppler velocimetry (LDV), also known as laser Doppler
anemometry (LDA), is the technique of using the Doppler shift in
a laser beam to measure the velocity in transparent or semi-transparent fluid
flows. The measurement with LDA is absolute, linear with velocity and
requires no pre-calibration.
Anemometers types
Laser Doppler anemometers
Anemometers types
Thermal Field Variation anemometers, TFV
This Design Idea describes a method by which you can detect and assess air or liquid
fluid flow using an externally heated semiconductor diode. Airflow across the heated
diode reduces its temperature, causing a variation in the diode's voltage drop. This
principle is similar to that used in hot-wire anemometers.
Anemometers types
Pressure tube anemometers
Technical specifications for cup anemometers
For site assessment and measurement of
power performance of wind energy power
plants.
Class A, B and S accredited according to
IEC 61400-12-1 (2005-12) ISO 17713-1,
Measnet: Classcup
Technical Data
Meas range 0,3...75 m/s
Meas. instability
(w/o calibration)
0,3...50 m/s < 1% of meas. value
or < 0,2 m/s
Survival speed 80 m/s (min. 30 minutes)
Permissible
Ambient condit.
-50…+80 °C, all occurring
situations of relative humidity (incl.
dew moistening)
Technical specifications for cup anemometers
Output signal
Form rectangle
Frequency 1082 Hz @ 50 m/s
Amplitude is supply voltage, max. 15 V
Load R > 1 kΩ (Push-pull output with 220 Ω in
series)
C < 200 nF (corresp. to length typical cable <
1km)
Linearity Correlation factor r between frequency and
wind speed
y= 0,0462*f+0,21 typical
r > 0.999 99 (4…20 m/s)
Starting
velocity
< 0,3 m/s
Resolution 0,05 m wind run
Distance
constant
<3m (acc. To ASTM D 5096 – 96), instrument
respond to 63.2% of speed change
Anemometers types
Wind direction sensors, wind vanes
Artistic traditional wind
vanes on house rooftops
Anemometers types
Wind direction sensors, wind vanes
Ice free wind vane
Technical specifications for wind vanes
Anemometers types
Combined type anemometers, nick named “airplane” anemometers
Used
extensively
in the 80’s
and 90’s in
Greece to
verify sites
Anemometers types
Combined type anemometers
Not used for verified wind
resource measurements
Anemometer towers
H m AGL or ASL
H minimum
= or > than 10 m
Anemometer towers
Anemometer towers
Anemometer towers, with and without guy wires
Other necessary meteorological instrument
used for wind resource evaluation,
barometric pressure sensor
Other necessary meteorological instrument
used for wind resource evaluation, thermometer
•Minimum
•Mean
•Maximum
Data Loggers, the “brain” of the measuring system
Data Loggers, the “brain” of the measuring system
Put your hard hats on.
Lets put up one wind measuring system
Installation of a meteorological tower for wind energy evaluation
How height we need the
measurements?
How many intermediate heights
are necessary?
Tubular or lattice towers?
Team qualifications?
Must follow standards in order
to be accepted by permit
procedure in the future
Installation of a meteorological tower for wind energy evaluation
Ground preparation
A 1:5000 scale map will give an indication of a suitable place,
eye verification absolutely necessary. Permission will be
necessary prior to erecting the tower.
For a 60 m mast, areas in red must be cleared from vegetation if necessary
90 m
63 m
46 m
Installation of a meteorological tower for wind energy evaluation
Ground preparation
Final
stage of
anchor
Final stage of
anchor in solid
rock
Installation of a meteorological tower for wind energy evaluation
Ground preparation
A 6.5 t hydraulic jack
Mast base
Installation of a meteorological tower for wind energy evaluation
Mast types
Tubular type,
e.g. D=152 mm
Latice, e.g.
L=500 mm
Installation of a meteorological tower for wind energy evaluation
Ground preparation
Mast
alignment
Side arm, L=2500 mm
Installation of a meteorological tower for wind energy evaluation
How far do we place the instruments?
Installation of a meteorological tower for wind energy evaluation
Instrument placements
Top mast layout
Installation of a meteorological tower for wind energy evaluation
Instrument s in place on top of the met mast
Installation of a meteorological tower for wind energy evaluation
Area needed, personnel placements prior to erection
Installation of a meteorological tower for wind energy evaluation
Erecting the mast
At 30 degrees angle
At 45 degrees angle
Final position

Weitere ähnliche Inhalte

Was ist angesagt?

Metrological instuments.
Metrological instuments.Metrological instuments.
Metrological instuments.neil0504
 
Meterological Instruments
Meterological InstrumentsMeterological Instruments
Meterological InstrumentsUsman Khawaja
 
meteorological instruments
meteorological instrumentsmeteorological instruments
meteorological instrumentsUsman Khawaja
 
TU2.T10.2.ppt
TU2.T10.2.pptTU2.T10.2.ppt
TU2.T10.2.pptgrssieee
 
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...Vahid Rasouli
 
Ppt fundamentalsof radar (1)
Ppt fundamentalsof radar (1)Ppt fundamentalsof radar (1)
Ppt fundamentalsof radar (1)YASSINAITOUABBOU
 
Meteorological instruments
Meteorological instrumentsMeteorological instruments
Meteorological instrumentsMariadebiologia
 
Radar communication 2
Radar communication 2Radar communication 2
Radar communication 2Ashwani Kumar
 
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONS
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONSEVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONS
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONSgrssieee
 
Thermal remote sensing
Thermal remote sensingThermal remote sensing
Thermal remote sensingSakthivel R
 
Gathering Weather Data CLASS NOTES
Gathering Weather Data CLASS NOTESGathering Weather Data CLASS NOTES
Gathering Weather Data CLASS NOTESMaria Donohue
 
Amdar & acars by david helms
Amdar & acars by david helmsAmdar & acars by david helms
Amdar & acars by david helmsBhanu Priya
 
Tools for weather forecasting
Tools for weather forecastingTools for weather forecasting
Tools for weather forecastingammulachu
 
Thermal Remote Sensing
Thermal Remote SensingThermal Remote Sensing
Thermal Remote SensingRohit Kumar
 

Was ist angesagt? (20)

Metrological instuments.
Metrological instuments.Metrological instuments.
Metrological instuments.
 
Meterological Instruments
Meterological InstrumentsMeterological Instruments
Meterological Instruments
 
meteorological instruments
meteorological instrumentsmeteorological instruments
meteorological instruments
 
TU2.T10.2.ppt
TU2.T10.2.pptTU2.T10.2.ppt
TU2.T10.2.ppt
 
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...
42 Wind Energy Potential Assessment In Order to Produce Electrical Energy for...
 
DLA_Presentation
DLA_PresentationDLA_Presentation
DLA_Presentation
 
AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15AIR POLLUTION CONTROL L 15
AIR POLLUTION CONTROL L 15
 
Ppt fundamentalsof radar (1)
Ppt fundamentalsof radar (1)Ppt fundamentalsof radar (1)
Ppt fundamentalsof radar (1)
 
Campbell iain
Campbell iainCampbell iain
Campbell iain
 
Dispersion of measured sound power levels for wind turbines acoustics 08-po...
Dispersion of measured sound power levels for wind turbines   acoustics 08-po...Dispersion of measured sound power levels for wind turbines   acoustics 08-po...
Dispersion of measured sound power levels for wind turbines acoustics 08-po...
 
Meteorological instruments
Meteorological instrumentsMeteorological instruments
Meteorological instruments
 
Radar communication 2
Radar communication 2Radar communication 2
Radar communication 2
 
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONS
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONSEVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONS
EVALUATIONS OF WIND VECTORS OBSERVED BY ASCAT USING STATISTICAL DISTRIBUTIONS
 
Thermal remote sensing
Thermal remote sensingThermal remote sensing
Thermal remote sensing
 
Gathering Weather Data CLASS NOTES
Gathering Weather Data CLASS NOTESGathering Weather Data CLASS NOTES
Gathering Weather Data CLASS NOTES
 
Amdar & acars by david helms
Amdar & acars by david helmsAmdar & acars by david helms
Amdar & acars by david helms
 
Tools for weather forecasting
Tools for weather forecastingTools for weather forecasting
Tools for weather forecasting
 
weather forecasting
weather forecasting weather forecasting
weather forecasting
 
Thermal Remote Sensing
Thermal Remote SensingThermal Remote Sensing
Thermal Remote Sensing
 
List of instrument
List of instrumentList of instrument
List of instrument
 

Ähnlich wie S4 oman wind energy potential - anemometers 2016

Wind Resource Assessment
Wind Resource AssessmentWind Resource Assessment
Wind Resource Assessmentmtingle
 
【潔能講堂】大型風力發電廠之發電效率分析與預測
【潔能講堂】大型風力發電廠之發電效率分析與預測【潔能講堂】大型風力發電廠之發電效率分析與預測
【潔能講堂】大型風力發電廠之發電效率分析與預測Energy-Education-Resource-Center
 
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...ndkelley
 
transmission line
transmission line transmission line
transmission line singh1515
 
WM_MAO_2012_Weiyang
WM_MAO_2012_WeiyangWM_MAO_2012_Weiyang
WM_MAO_2012_WeiyangMDO_Lab
 
Wind Energy Technology & Application of Remote Sensing
Wind Energy Technology & Application of Remote SensingWind Energy Technology & Application of Remote Sensing
Wind Energy Technology & Application of Remote SensingSiraj Ahmed
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.pptssuserc3b807
 
Wind energy tech 2015
Wind energy tech  2015Wind energy tech  2015
Wind energy tech 2015Lonnie Gamble
 
different caluclations of a runway design.pptx
different caluclations of a runway design.pptxdifferent caluclations of a runway design.pptx
different caluclations of a runway design.pptxsamatha6
 
Study About Wind turbines
Study About Wind turbinesStudy About Wind turbines
Study About Wind turbinesElia Tohmé
 
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationImpact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationWeiyang Tong
 
RET & Wind Energy Final part lecture 01.pptx
RET & Wind Energy Final part lecture 01.pptxRET & Wind Energy Final part lecture 01.pptx
RET & Wind Energy Final part lecture 01.pptxMdTanvirShahed
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaCarlos Silva
 
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...IRJET Journal
 

Ähnlich wie S4 oman wind energy potential - anemometers 2016 (20)

Wind Resource Assessment
Wind Resource AssessmentWind Resource Assessment
Wind Resource Assessment
 
【潔能講堂】大型風力發電廠之發電效率分析與預測
【潔能講堂】大型風力發電廠之發電效率分析與預測【潔能講堂】大型風力發電廠之發電效率分析與預測
【潔能講堂】大型風力發電廠之發電效率分析與預測
 
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...
Sodar and lidar activities at nrel, iea r&d wind annex xi expert meeting, nre...
 
transmission line
transmission line transmission line
transmission line
 
WM_MAO_2012_Weiyang
WM_MAO_2012_WeiyangWM_MAO_2012_Weiyang
WM_MAO_2012_Weiyang
 
Wind Energy Technology & Application of Remote Sensing
Wind Energy Technology & Application of Remote SensingWind Energy Technology & Application of Remote Sensing
Wind Energy Technology & Application of Remote Sensing
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.ppt
 
M010327985
M010327985M010327985
M010327985
 
Wind energy tech 2015
Wind energy tech  2015Wind energy tech  2015
Wind energy tech 2015
 
different caluclations of a runway design.pptx
different caluclations of a runway design.pptxdifferent caluclations of a runway design.pptx
different caluclations of a runway design.pptx
 
Energy in wind
Energy in windEnergy in wind
Energy in wind
 
Study About Wind turbines
Study About Wind turbinesStudy About Wind turbines
Study About Wind turbines
 
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power GenerationImpact of Different Wake Models on the Estimation of Wind Farm Power Generation
Impact of Different Wake Models on the Estimation of Wind Farm Power Generation
 
RET & Wind Energy Final part lecture 01.pptx
RET & Wind Energy Final part lecture 01.pptxRET & Wind Energy Final part lecture 01.pptx
RET & Wind Energy Final part lecture 01.pptx
 
WIND ENERGY ENGINEERING
WIND ENERGY ENGINEERINGWIND ENERGY ENGINEERING
WIND ENERGY ENGINEERING
 
EUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos SilvaEUREC-NTUA Projects - Carlos Silva
EUREC-NTUA Projects - Carlos Silva
 
Wind energy system india
Wind energy system indiaWind energy system india
Wind energy system india
 
Basic flow measurement
Basic flow measurementBasic flow measurement
Basic flow measurement
 
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...
IRJET- Experimental Investigation of Flow through Perforated Plate in Conical...
 
G010123643
G010123643G010123643
G010123643
 

Mehr von CETN

Transforming the gcc power sector wouters cenii 17052016
Transforming the gcc power sector   wouters cenii 17052016Transforming the gcc power sector   wouters cenii 17052016
Transforming the gcc power sector wouters cenii 17052016CETN
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsCETN
 
Session 2 jaap vente ecn_cenii
Session 2 jaap vente ecn_ceniiSession 2 jaap vente ecn_cenii
Session 2 jaap vente ecn_ceniiCETN
 
Session 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_ceniiSession 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_ceniiCETN
 
S5 RES Technical Considerations
S5 RES Technical ConsiderationsS5 RES Technical Considerations
S5 RES Technical ConsiderationsCETN
 
S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016CETN
 
S4 oman wind energy site selection 2016
S4 oman wind energy site selection 2016S4 oman wind energy site selection 2016
S4 oman wind energy site selection 2016CETN
 
S3 solar energy
S3 solar energyS3 solar energy
S3 solar energyCETN
 
S4 oman wind energy environment + wind 2016
S4 oman wind energy environment + wind 2016S4 oman wind energy environment + wind 2016
S4 oman wind energy environment + wind 2016CETN
 
S2 solar energy i pv
S2 solar energy i pvS2 solar energy i pv
S2 solar energy i pvCETN
 
S1 brief description of renewable energy options muscat
S1 brief description of renewable energy options muscatS1 brief description of renewable energy options muscat
S1 brief description of renewable energy options muscatCETN
 

Mehr von CETN (11)

Transforming the gcc power sector wouters cenii 17052016
Transforming the gcc power sector   wouters cenii 17052016Transforming the gcc power sector   wouters cenii 17052016
Transforming the gcc power sector wouters cenii 17052016
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicators
 
Session 2 jaap vente ecn_cenii
Session 2 jaap vente ecn_ceniiSession 2 jaap vente ecn_cenii
Session 2 jaap vente ecn_cenii
 
Session 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_ceniiSession 1 daniel jansen ecn_cenii
Session 1 daniel jansen ecn_cenii
 
S5 RES Technical Considerations
S5 RES Technical ConsiderationsS5 RES Technical Considerations
S5 RES Technical Considerations
 
S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016S4 oman wind energy the technology 2016
S4 oman wind energy the technology 2016
 
S4 oman wind energy site selection 2016
S4 oman wind energy site selection 2016S4 oman wind energy site selection 2016
S4 oman wind energy site selection 2016
 
S3 solar energy
S3 solar energyS3 solar energy
S3 solar energy
 
S4 oman wind energy environment + wind 2016
S4 oman wind energy environment + wind 2016S4 oman wind energy environment + wind 2016
S4 oman wind energy environment + wind 2016
 
S2 solar energy i pv
S2 solar energy i pvS2 solar energy i pv
S2 solar energy i pv
 
S1 brief description of renewable energy options muscat
S1 brief description of renewable energy options muscatS1 brief description of renewable energy options muscat
S1 brief description of renewable energy options muscat
 

Kürzlich hochgeladen

Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlMonica Sydney
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...kumargunjan9515
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...Sareena Khatun
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...Mark Jaeno P. Duyan
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Hyderabad Escorts Agency
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsMonica Sydney
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...ZAPPAC1
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRavikumar Vaniya
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotelkumargunjan9515
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsMonica Sydney
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesMonica Sydney
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...Sareena Khatun
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...HyderabadDolls
 

Kürzlich hochgeladen (20)

Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 

S4 oman wind energy potential - anemometers 2016

  • 1. 11 Welcome to the world of wind energy Dr. D. V. Kanellopoulos OPWP Renewable Energy Training Program 11-14 December 2016 Muscat, Oman Wind Potential
  • 3. 33 Surface air temperatures on earth for January
  • 4. 44 Global Surface Winds latitude Predominate wind direction 60-90 N NE 30-60 N SW 0-30 N NE 0-30 S SE 30-60 S NW 60-90 S SE
  • 5. 55 Energy from the wind •Air density depends on temperature and barometric pressure. •The larger the diameter of the wt, the larger the gain. •High speeds yield more energy Betz limit, named after german aerodynamist Albert Betz
  • 6. BL=16/27 BL=0.593 TIP SPEED ratio, λ Power coefficient % Cp
  • 7. The tip-speed ratio, λ, or TSR for WTs is the ratio between the tangential speed of the tip of a blade and the actual velocity of the wind, The tip-speed ratio is related to efficiency, with the optimum varying with blade design. Higher tip speeds result in higher noise levels and require stronger blades due to large centrifugal forces. The tip speed of the blade can be calculated as ω times R, where ω is the rotor rotational speed in radians/second, and R is the rotor radius in meters. Tip speed ratio, λ
  • 8. Cp vs wind speed for various pitch angles Cp vs TSR(λ) for various pitch angles
  • 9. Earth’s climatic zones Meteorological parameters vary These affect wt performance and certification
  • 10. Measuring wind speed & wind direction Wind speed Estimate the AEP in kWh, MWh, GWH Wind directions Design wind farm layouts in order to maximize energy output, minimize wake losses and land or sea use
  • 11. Duration of wind measurements for safe AEP calculations ? It cannot be less than a full year. More years reduce uncertainty in estimating AEP for the life time of a project which is 20years. Minimum duration period is normally obligatory by the regulatory authorities(e.g. RAE in GR) Malin Head Met station in Ireland
  • 12. Duration of wind measurements for safe AEP calculations ? 8.8 m/s ok E
  • 13. Anemometers or wind sensors 1846-Thomas Romney Robinson, Ireland John Patterson, a Canadian weatherman 3 cup 1926
  • 14. U m/s V m/s W m/s The wind vector, in reality. Most measurement measure only the horizontal wind speed magnitude. The horizontal wind comprises of the U and V components of the true wind. This is used for site evaluation.
  • 15. Anemometers types Rotating cup anemometers Total cup anemometer. No power needed! Hand anemometer. Battery needed.
  • 16. Anemometers types Rotating propeller anemometers Hand anemometer. Battery needed. vane anemometer
  • 17. Anemometers types Rotating propeller anemometers a U-V-W anemometer a W anemometer, suitable for any angle
  • 21. Laser Doppler velocimetry (LDV), also known as laser Doppler anemometry (LDA), is the technique of using the Doppler shift in a laser beam to measure the velocity in transparent or semi-transparent fluid flows. The measurement with LDA is absolute, linear with velocity and requires no pre-calibration. Anemometers types Laser Doppler anemometers
  • 22. Anemometers types Thermal Field Variation anemometers, TFV This Design Idea describes a method by which you can detect and assess air or liquid fluid flow using an externally heated semiconductor diode. Airflow across the heated diode reduces its temperature, causing a variation in the diode's voltage drop. This principle is similar to that used in hot-wire anemometers.
  • 24. Technical specifications for cup anemometers For site assessment and measurement of power performance of wind energy power plants. Class A, B and S accredited according to IEC 61400-12-1 (2005-12) ISO 17713-1, Measnet: Classcup Technical Data Meas range 0,3...75 m/s Meas. instability (w/o calibration) 0,3...50 m/s < 1% of meas. value or < 0,2 m/s Survival speed 80 m/s (min. 30 minutes) Permissible Ambient condit. -50…+80 °C, all occurring situations of relative humidity (incl. dew moistening)
  • 25. Technical specifications for cup anemometers Output signal Form rectangle Frequency 1082 Hz @ 50 m/s Amplitude is supply voltage, max. 15 V Load R > 1 kΩ (Push-pull output with 220 Ω in series) C < 200 nF (corresp. to length typical cable < 1km) Linearity Correlation factor r between frequency and wind speed y= 0,0462*f+0,21 typical r > 0.999 99 (4…20 m/s) Starting velocity < 0,3 m/s Resolution 0,05 m wind run Distance constant <3m (acc. To ASTM D 5096 – 96), instrument respond to 63.2% of speed change
  • 26. Anemometers types Wind direction sensors, wind vanes Artistic traditional wind vanes on house rooftops
  • 27. Anemometers types Wind direction sensors, wind vanes Ice free wind vane
  • 29. Anemometers types Combined type anemometers, nick named “airplane” anemometers Used extensively in the 80’s and 90’s in Greece to verify sites
  • 30. Anemometers types Combined type anemometers Not used for verified wind resource measurements
  • 31. Anemometer towers H m AGL or ASL H minimum = or > than 10 m
  • 34. Anemometer towers, with and without guy wires
  • 35. Other necessary meteorological instrument used for wind resource evaluation, barometric pressure sensor
  • 36. Other necessary meteorological instrument used for wind resource evaluation, thermometer •Minimum •Mean •Maximum
  • 37. Data Loggers, the “brain” of the measuring system
  • 38. Data Loggers, the “brain” of the measuring system
  • 39. Put your hard hats on. Lets put up one wind measuring system
  • 40. Installation of a meteorological tower for wind energy evaluation How height we need the measurements? How many intermediate heights are necessary? Tubular or lattice towers? Team qualifications? Must follow standards in order to be accepted by permit procedure in the future
  • 41. Installation of a meteorological tower for wind energy evaluation Ground preparation A 1:5000 scale map will give an indication of a suitable place, eye verification absolutely necessary. Permission will be necessary prior to erecting the tower. For a 60 m mast, areas in red must be cleared from vegetation if necessary 90 m 63 m 46 m
  • 42. Installation of a meteorological tower for wind energy evaluation Ground preparation Final stage of anchor Final stage of anchor in solid rock
  • 43. Installation of a meteorological tower for wind energy evaluation Ground preparation A 6.5 t hydraulic jack Mast base
  • 44. Installation of a meteorological tower for wind energy evaluation Mast types Tubular type, e.g. D=152 mm Latice, e.g. L=500 mm
  • 45. Installation of a meteorological tower for wind energy evaluation Ground preparation Mast alignment
  • 46. Side arm, L=2500 mm Installation of a meteorological tower for wind energy evaluation How far do we place the instruments?
  • 47. Installation of a meteorological tower for wind energy evaluation Instrument placements Top mast layout
  • 48. Installation of a meteorological tower for wind energy evaluation Instrument s in place on top of the met mast
  • 49. Installation of a meteorological tower for wind energy evaluation Area needed, personnel placements prior to erection
  • 50. Installation of a meteorological tower for wind energy evaluation Erecting the mast At 30 degrees angle At 45 degrees angle Final position