LEED Green Associate Pool D
Question 1:
A preliminary rating would NOT include what item?
A Conceptual design
B Targeted LEED certification level
C Credits that will be attempted
D Completed LEED Score Card
Question 2:
What systems will increase a building's energy use?
A Stormwater management
B Mechanical onsite wastewater treatment
C Increased ventilation for mechanical HVAC systems
D Acoustic performance
Question 4:
What types of land does LEED prefer project teams build on?
A Brownfields
B Floodplains
C Farmland
D Greenfields
Question 5:
What would qualify as preferred parking for LEED?
A Delivery truck parking
B Providing discounted parking passes for low-emitting and fuel efficient vehicles
C Visitor drop-off areas
D Bicycle parking
Question 6:
What statement is true about RECs?
A RECs may only be sold in locations approved by Green-e
B RECs are sold separately from electricity
C RECs can be sold back to an electricity provider through net-metering
D RECs are sold within a 500 mile radius of the project
Question 7:
What area is included in the building footprint?
A Area of the building structure
B Ponds
C Stone walkways
D Parking lots made with permeable concrete
Question 8:
What is true about a new building project that uses a Halon-based fire suppression system?
A The system must have a leakage rate of 5% or less annually for the project to earn LEED certification
B The project could not earn LEED Platinum
C The system must be installed to meet local fire codes
D The project would not meet the LEED Minimum Program Requirements
Question 9:
Why use commingled recycling?
A Materials are less likely to be contaminated
B Commingled recycling takes up less space
C Recycled materials can be sold for more money
D More kinds of materials can be recycled
Question 10:
Which statement is true regarding the LEED for Commercial Interiors rating system?
A A tenant's LEED project that occupies less than 10% of the building can earn LEED for Commercial
Interiors certification
B Projects with tenants that occupy the entire building are ineligible for LEED for Commercial Interiors
certification
C A project must occupy at least 1,000 square feet (93 square meters) of gross floor area to earn LEED
for Commercial Interiors certification
D LEED for Commercial Interiors certification can only be achieved if the building has already achieved
LEED for Core and Shell certification
Question 11:
What plan details the strategies to improve indoor air quality for a building's occupants?
A Air Quality Assessment Plan
B Indoor Air Quality Management Plan
C Indoor Air Management Best Practices
D Integrated Indoor Air Quality Management Plan
Question 12:
When purchasing RECs, what is the project purchasing?
A Positive environmental attributes of off-site renewable energy
B On-site renewable energy
C Carbon offsets
D Electricity
Question 13:
Which of the following materials can earn credit in the Materials & Resources category?
A Wood that has low life-cycle costs
B FSC Certified wood
C Wood that is sealed with low VOC sealants
D Wood that was transported via rail lines
Question 14:
What project design feature would decrease energy costs in a building?
A Cogeneration
B Purchasing materials with low VOC content
C Increased Ventilation with a mechanical system
D Installing equipment that uses more kBtu
Question 15:
What implies a direct impact on global warming?
A Ozone depleting potential
B Refrigerant charge
C Service life
D Global warming potential
Question 16:
What is at the core of the integrated process?
A Cost-based decision making
B Working toward individual goals
C Collaborative team members
D Linear planning
Question 17:
What community issues are of primary importance for the project team to research?
A Local incentives, policies, and regulations that promote green design
B Building codes
C Requirements for parking spaces
D Local voting records on city sales and other taxes
E Availability of Renewable Energy Certificates (RECs)
Question 18:
What type of building system might use halons?
A Irrigation
B Fire suppression
C Plumbing
D Electrical
Question 19:
What are the economic benefits of installing a vegetated roof?
A Lower cooling costs for HVAC
B Increased habitat for birds
C Lower investment cost compared to roof surfaces with high SRI
D Provides occupants a connection to the outdoors
Question 20:
Which of the following refrigerants are banned or are scheduled to be banned under the Montreal Protocol?
A CFCs
B Isopentane
C HCFCs
D HFCs
Question 21:
A project team achieved an 80% water use reduction for an office building. What is true about this achievement?
A The project team must verify that all flush fixtures in the office building are low-flow
B The project will earn a Regional Priority credit
C All of the flow and flush fixtures in the building must be WaterSense labeled in order for the project to
be eligible for LEED certification
D The project will earn an exemplary performance point under Innovation in Design
Question 22:
What major concepts are integral to green building and sustainability?
A Systems thinking
B Life cycle approach
C Integrated process
D Linear planning and design processes
E Open systems
Question 23:
Purchased power must meet which certification's standards to qualify as off-site renewable sources of energy for
LEED projects?
A Green-e
B Green Label
C Green Seal
D Green Label Plus
Question 24:
Which of the following actions/concepts may earn a project Innovation in Design (ID) credit for innovative
performance?
A Providing an educational program on the environmental and human health benefits of a green
building's practices
B Addressing a geographically specific environmental priority for an existing LEED credit
C Achieving the next incremental threshold of a credit's requirements
D Doubling a credit requirement's threshold of achievement
Question 25:
What does the Construction Carbon Calculator measure?
A Greenhouse gas emissions from a building's energy use during operations
B Fossil fuels consumed from material transport
C The embodied carbon implications of the construction process
D The carbon footprint of Full Time Equivalents (FTEs)
Question 26:
Each LEED 2009 Rating System has ___ Regional Priority credits specified by zip code and can earn ___ points for
the Regional Priority section.
A 6, 3
B 6, 5
C 6, 4
D 4, 4
Question 27:
What site and/or project characteristics would contribute to earning Maximize Open Space?
A Building on a previously developed site
B Building on a Greenfield site
C Creating a narrow 10 story building instead of a wider 5 story building
D Building next door to a park
Question 28:
What strategies can earn LEED credit for reducing heat islands?
A Provide occupants free offsite parking
B Use hardscape materials with high SRI
C Increase the amount of open space and plant it with native vegetation
D Provide shade with architectural devices that are covered with materials with high SRI
E Place parking spaces underground
Question 29:
Which of the following is a type of biofuel?
A Hydro
B Solar
C Wind
D Corn oil
Question 30:
What additional LEED certification would a project team likely pursue for an office building that has already earned
LEED Core & Shell if the offices will be leased out to tenants?
A LEED for New Construction
B LEED for Commercial Interiors
C LEED Core & Shell post-certification
D LEED for Homes
Question 31:
What provides a volume certification path to enable owners to integrate LEED across the board as a standard feature
of their design, construction and operations?
A LEED Volume Program
B Local green initiatives
C LEED Online
D LEED for Neighborhood Development
Question 32:
A new construction project must at a minimum use ___ less water than the building's water use baseline calculated
for Water Use Reduction.
A 50%
B 25%
C 20%
D 10%
Question 33:
What standard helps calculate a baseline building energy performance rating for LEED?
A Advanced Buildings Core Performance Guide
B ASHRAE 90.1-2007
C ASHRAE 62.1-2007
D ASHRAE Advanced Energy Design Guide
Question 34:
What types of energy sources generate the least air and water pollution?
A Oil
B Natural gas
C Wind
D Biofuel
E Coal
Question 35:
Collecting and using stormwater to replace the use of potable water in flush fixtures helps with what project areas?
A Reducing heat islands
B Reducing the development footprint
C Water use reduction
D Stormwater management
Question 36:
Which of the following are not required to be identified in writing to achieve an Innovation in Design (ID) credit for
innovative performance?
A The strategies used to meet the requirements
B The intent of the proposed credit
C The proposed requirements for compliance
D The regional variations for the credit
Question 37:
Which projects would not be eligible for LEED certification?
A An existing building project that reduces CFC-based refrigerants by 95% prior to submitting the LEED
application and will continue to use this CFC system for another 10 years
B An existing building project that phases out the use of CFC-based refrigerants no later than 5 years
after the project is completed
C A new building project that uses CFC-based refrigerants
D A new building project that uses no refrigerants
E A new building project that uses hydrocarbons (HCs) as refrigerants
Question 38:
What organization is responsible for qualifying sources of off-site renewable energy acceptable by LEED?
A EPA
B ASHRAE
C Center for Resource Solutions
D Green-e
Question 39:
What measurements does the baseline water case use?
A Flow and flush rates of all design case fixtures
B The Energy Policy Act of 1992 (EPAct 1992) flow and flush rates
C The amount of water metered for the entire project
D The amount of water metered for the building's indoor areas
Question 40:
What benefit to the environment does a project that uses Recycled Materials contribute?
A Reducing demand for virgin resources
B Supporting the use of local resources
C Reduced air and water pollution
D Reducing a project's soft costs
Question 41:
What is applicable to the ongoing operations and maintenance of a building?
A Passive design strategies
B Commissioning
C Sustainable purchasing policy
D Floor area ratio
Question 42:
Which of the following is effective at reducing potable water consumption indoors?
A Installing fixtures that meet the EPAct 1992 standard
B Implementing cooling tower water management
C Installing low-consumption flush fixtures and low-flow rate faucets
D Increasing potable water demand
Question 43:
What type of water is rainwater?
A Blackwater
B Potable water
C Non-potable water
D Graywater
Question 44:
What attribute should recycled materials have in order to take advantage of synergies with regional materials?
A Remanufactured regionally
B Low VOCs
C Lower life-cycle costs
D More durability
Question 45:
What information is needed to determine if a product will help with the heat island effect of a non-roof surface?
A Life cycle costs of the material
B Emissivity of material
C Run-off coefficients for the material
D SRI of the material
Question 46:
How is the LEED boundary defined for a single building development?
A The edge of the building footprint
B The edge of the development footprint
C The entire project scope - generally limited to the site boundary
D The portion of project site submitted for LEED certification
Question 47:
Compared to those for a conventional building, a green building project and construction budget will also include:
A Fees to review local laws and standards
B Life cycle costing
C Costs to implement erosion control plans
D Soft costs
Question 48:
Which of the following can increase the heat island effect in urban areas?
A Rooftops covered with a high SRI material
B Air-conditioners
C Street equipment
D Buildings that have passive ventilation
Question 49:
What are acceptable ways to reference a LEED Registered Project?
A Upon completion, XYZ Building will apply to become LEED certified
B XYZ Building is registered with the certification goal of LEED Platinum
C XYX Building is registered under the LEED Green Building Rating System
D XYZ Building is LEED Qualified
E XYZ Building is LEED Platinum registered
Question 50:
What is different about green building design compared to conventional design?
A Green building costs more
B Green building uses an integrated building design
C Green building does not have a bidding phase
D Green building has longer schedules
Question 51:
The recycling of construction and demolition debris helps with what issue?
A Reducing the amount of materials needed for a construction project
B Reducing CFCs leaked into the atmosphere
C Reducing demand for virgin resources
D Keeping hazardous materials out of landfills
Question 52:
If a mechanical engineer on a LEED project team needs guidance on whether a particular software package can be
used to measure energy efficiency, how should the engineer proceed?
A Submit a CIR to the LEED Steering Committee
B Submit a CIR to the project administrator
C Submit a CIR using LEED Online
D See if the credit is marked 'Anticipated' during the design phase review
Question 53:
Which items are considered pre-consumer recycled content?
A Magazine overruns
B Excavated soil
C Leftover drywall from a renovation
D Wooden pallets used by a shipping company
Question 54:
Developing nations banned chlorofluorocarbons under the:
A Kyoto Treaty
B EPA Clean Air Act
C Montreal Protocol
D Executive Order 95-231
Question 55:
How is ozone created?
A Emissions from factories
B Emissions from incinerators
C Sunlight-driven chemical reaction between molecules
D Transportation emissions
Question 56:
What area would not be considered previously developed?
A Wetland
B Abandoned urban parking lot
C Railroad yard
D Site of an old barn
Question 57:
The leakage rate is the speed at which an appliance loses refrigerant, measured between refrigerant charges or over
_____, whichever is shorter.
A 24 months
B 12 months
C 18 months
D 6 months
Question 58:
What does not meet LEED requirements for minimizing the negative impacts of refrigerants on the environment?
A Designing a building with natural ventilation
B Reducing the annual leakage rate of refrigerants to 10% or less
C Selecting refrigerants with zero or low ozone depletion potential (ODP) and minimal global warming
potential (GWP).
D Designing a building that does not use chemical refrigerants
Question 59:
Fertilized landscape plantings can create new sources of pollution in conventional development if what is not
controlled?
A Parking capacity
B Heat islands
C Project density
D Stormwater runoff
Question 60:
A 10 acre multi-building development has five buildings. How is the LEED boundary determined if each building will
be a separate LEED project?
A Each building has the boundary at the edge of a two-acre area
B The LEED boundary is at the perimeter of the ten-acre area
C The LEED boundary is at the edge of each building's footprint
D The project team determines the LEED boundary for each LEED project
Question 61:
A project team has excluded a section of land in order to meet the requirements of one of the LEED credits. What is
true about this action?
A This action is allowed if the gross floor area of the LEED project building is less than 2% of the gross
land area within the LEED project boundary
B This action would only be allowed under the LEED for Existing Buildings: Operations & Maintenance
rating system
C Certain sections of land can be excluded from the site boundary if a responsible party submits a
licensed professional exemption form
D This action would not be allowed under any of the rating systems
Question 62:
The use of onsite treated wastewater can help with what credit areas?
A Onsite renewable energy
B Energy use reduction
C Stormwater runoff
D Water use reduction
Question 63
What term refers to a mandatory project characteristic, measurement, quality, value or function as identified within the
LEED rating system?
A Minimum Program Requirement
B Certification Requirement
C Credit
D Prerequisite
Question 64:
Section 608 of the EPA Clean Air Act established regulations that helped with what issue?
A CO2 levels inside buildings
B Humidity from heat islands
C Using and recycling ozone-depleting compounds
D Smog
Question 65:
Developments located within walking distance of basic services reduce:
A Sedimentation of nearby water bodies
B Water use
C Air pollution
D Greenhouse gas emissions
Question 66:
What unit of measurement is used for water closets?
A FTE
B Gallons per minute
C Wastewater efficiency
D Gallons per flush
Question 67:
Which of the following projects would not be eligible for LEED for Existing Buildings: Operations & Maintenance
certification?
A A 12-month-old school building that has not earned any LEED certification
B A tenant-occupied building certified under LEED for Commercial Interiors
C A commercial building that doesn't have any tenants yet and is unoccupied
D An owner-occupied building certified under LEED for Commercial Interiors
Question 68:
Bonus points under the LEED rating systems are awarded when what occurs?
A Exemplary or innovative performance is achieved
B The project exceeds the Minimum Program Requirements
C Prerequisites and a certain number of credits are earned
D Two LEED APs work as principal participants on the project
Question 69:
How are the sections in the LEED Scorecard grouped?
A By cost
B By credit weight
C By environmental category
D Alphabetically
Question 70:
How can regional priority credits be earned?
A Using 100% native plants for the site's landscaping
B Addressing green measures or strategies that are more important to a climate or region
C Using materials that are located within 500 miles of the project site
D Developing an educational or training system that addresses local building issues
Question 71:
What area would not be considered previously developed?
A Unoccupied big-box retail store
B Cotton field
C Old, torn-down steel mill
D Parking lot grown over into a field
Question 72:
Which of the following is NOT an example of passive design?
A Using natural refrigerants
B Capturing sunlight for natural lighting (daylighting)
C Using wind for natural ventilation
D Orienting a building for optimal sun exposure
Question 73:
What information is needed to calculate the SRI of a material?
A Reflectance
B Thermal gradient
C Emissivity
D Thickness of the material
Question 74:
How is the quantity of locally harvested and manufactured materials used on a project calculated?
A By the number of board feet
B By the amount of leftovers diverted from landfills
C By the materials' average distance from the project site
D By the materials' proportion of cost
Question 75:
What is a feature of adaptive plants?
A They only bloom once a year
B They require more water than other plants
C They are invasive
D They are low maintenance
Question 76:
Rain gardens, vegetated rooftops, and permeable pavements are strategies to manage stormwater and contribute to:
A Increased water efficiency
B Low impact development
C Increased potable water
D More compact development
Question 77:
What is the purpose of the LEED Pilot Credit Library?
A To manage the LEED documentation process
B To provide extensions of existing rating systems to address specific types of spaces or requirements
for international projects
C Provide precedent-setting rulings reviewed by USGBC on formal inquiries submitted by LEED project
teams that can be applied to multiple projects.
D To allow credits to be refined through LEED project evaluations before they complete the balloting
process for introduction into LEED
Question 78:
What is FSC Certified wood?
A Composite wood that does not contain any urea formaldehyde
B Wood that has been procured from well managed forests
C Composite wood that contains post-consumer recycled wood, usually from construction and demolition
debris
D Wood that has been extracted and harvested within 500 miles of the project site
Question 79:
The process of life cycle assessment encompasses what stages of the building process?
A Operations
B Design
C Design and construction
D Planning
E All stages
Question 80:
The number of occupants in a building would be used for what calculations?
A Energy use intensity
B Building density
C Water use baseline
D Development density
Question 81:
What is lighting power density measured in?
A Number of luminaires per unit area
B Footcandles per floor area
C Installed lighting power per unit area
D The quantity of light trespass on adjacent sites, measured in watts
Question 82:
Which green building strategies help conserve natural resources?
A Choosing product materials with low VOCs
B Installing composting toilets
C Providing pedestrian access between a project building and basic services
D Removing asbestos tiles from an existing building
Question 83:
A project team has submitted registration information for a building that has a target rating of Gold. When can the
project team advertise that the project is LEED Gold?
A After substantial completion of the project
B Once the registration has been approved by GBCI
C After the preliminary review
D After the final application review is accepted and the project is awarded LEED Gold certification
E After the registration is submitted
Question 84:
What encourages recycling among building occupants?
A Installing can crushers and cardboard bailers
B The cost of waste haulers
C The size of the recycling area
D Accessibility and convenience to recycling bins
Question 85:
The baseline water use of a water closet is:
A 1.6 gpf
B 2.2 gpf
C 1.6 gpm
D 2.2 gpm
Question 86:
Reducing external light pollution will result in synergies between what LEED credit categories?
A Energy and Atmosphere
B Innovation in Design
C Sustainable Sites
D Indoor Environmental Quality
Question 87:
What statements are NOT true regarding the LEED certification process?
A Credit Interpretation Requests (CIRs) have a submission fee
B The Credit Interpretation Request (CIR) process is available to all rating systems except LEED for
Existing Buildings: Operations & Maintenance
C The project administrator must be a LEED AP
D Appeals for credits can be filed for any of the LEED rating systems
Question 88:
The size of the parking lot for a project will be determined by:
A Local zoning
B Size of the property boundary
C Size of the LEED boundary
D Size of the project boundary
Question 89:
What is a LEED strategy to reduce single occupant automobile transportation to the project site?
A Build the project on a brownfield
B Locate the project in a suburban area
C Increase the building density
D Designate preferred parking spaces for car pools
Question 90:
What steps would be included in the pre-design phase of a green building project?
A Develop, test, and select green systems
B Develop a project schedule
C Review materials test data
D Review laws and standards
Question 91:
What project issues are addressed by guidelines from SMACNA?
A Refrigerant quantities
B Air quality issues from construction or renovation
C VOCs in materials
D Carpet durability
Question 92:
Which item can NOT contribute to Construction Waste Management?
A Wood given to a salvage hauler
B Recycling packaging material
C PCB removal
D Ground up brick used for drainage
Question 93:
What minimum floor area is needed for New Construction, Core and Shell, Schools, and Existing Buildings
Operations & Maintenance projects?
A 10,000 sq. ft.
B 1,000 sq. ft.
C There is no minimum
D 5,000 sq. ft.
Question 94:
Which of the following is a primary goal of the USGBC?
A Market transformation of the building industry
B To reduce the construction costs of a building
C To promote green products
D To reduce the construction schedule of projects
Question 95:
What is not an example of smart growth?
A Development of a site that is far from existing development and infrastructure
B Residential development on a previously developed site located near shops and schools
C Neighborhood design that has offices and shops within walking distance to public transportation
D Retail, office, and residential townhouses on the site of a former gas station
Question 96:
Where should a project team go for updates and errata for the LEED for New Construction rating system?
A usgbc.org
B LEED online
C GBCI.org
D LEED reference guides
Question 97:
A project located near which of the following would help earn Public Transportation Access credit?
A Public park
B Secure bicycle storage rack
C Bus stop
D 10 or more basic services
E Car pool parking lot
F Subway station
Question 98:
What is SRI?
A Measure of air quality
B Measure of VOC levels in paint
C Measure of an automobile's emissions
D Measure of a material's ability to reflect solar heat
Question 99:
What variables measure a refrigerant's impact on the environment?
A Global warming potential
B Global warming period
C Lifecycle potential
D Ozone depletion potential
E Greenhouse gas lifetime
Question 100:
What type of land is NOT considered previously developed?
A Farmland
B Site of an old drive-in theatre
C Graded site that has grown over with grass
D Tree mill

Weitere ähnliche Inhalte

Was ist angesagt?

Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer Bilal Mohamed
 
Leed green associate pool b - question
Leed green associate   pool b - questionLeed green associate   pool b - question
Leed green associate pool b - questionBilal Mohamed
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer Bilal Mohamed
 
Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Bilal Mohamed
 
Leed green associate iv. project systems and energy impacts answer
Leed green associate  iv. project systems and energy impacts   answer Leed green associate  iv. project systems and energy impacts   answer
Leed green associate iv. project systems and energy impacts answer Bilal Mohamed
 
Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Bilal Mohamed
 
Leed green associate pool c - question
Leed green associate   pool c - questionLeed green associate   pool c - question
Leed green associate pool c - questionBilal Mohamed
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Bilal Mohamed
 
Leed green associate pool a - answer
Leed green associate    pool a - answer Leed green associate    pool a - answer
Leed green associate pool a - answer Bilal Mohamed
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach questionBilal Mohamed
 
Leed green associate ii. project site factors question
Leed green associate  ii. project site factors   questionLeed green associate  ii. project site factors   question
Leed green associate ii. project site factors questionBilal Mohamed
 
Leed green associate pool f - question
Leed green associate   pool f - questionLeed green associate   pool f - question
Leed green associate pool f - questionBilal Mohamed
 
Leed green associate iii. water management question
Leed green associate iii. water management   questionLeed green associate iii. water management   question
Leed green associate iii. water management questionBilal Mohamed
 
Leed green associate vi. stakeholder involvement in innovation question
Leed green associate vi. stakeholder involvement in innovation   questionLeed green associate vi. stakeholder involvement in innovation   question
Leed green associate vi. stakeholder involvement in innovation questionBilal Mohamed
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer Bilal Mohamed
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer Bilal Mohamed
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Scott Bowman
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1mattvaughn33
 

Was ist angesagt? (20)

Leed green associate pool f - answer
Leed green associate   pool f - answer Leed green associate   pool f - answer
Leed green associate pool f - answer
 
Leed green associate pool b - question
Leed green associate   pool b - questionLeed green associate   pool b - question
Leed green associate pool b - question
 
Leed green associate ii. project site factors answer
Leed green associate  ii. project site factors   answer Leed green associate  ii. project site factors   answer
Leed green associate ii. project site factors answer
 
Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...
 
Leed green associate iv. project systems and energy impacts answer
Leed green associate  iv. project systems and energy impacts   answer Leed green associate  iv. project systems and energy impacts   answer
Leed green associate iv. project systems and energy impacts answer
 
Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...Leed green associate v. acquisition, installation, and management of project ...
Leed green associate v. acquisition, installation, and management of project ...
 
Leed green associate pool c - question
Leed green associate   pool c - questionLeed green associate   pool c - question
Leed green associate pool c - question
 
Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...Leed green associate i. synergistic opportunities and leed application proces...
Leed green associate i. synergistic opportunities and leed application proces...
 
Leed green associate pool a - answer
Leed green associate    pool a - answer Leed green associate    pool a - answer
Leed green associate pool a - answer
 
Leed green associate vii. project surroundings and public outreach question
Leed green associate vii. project surroundings and public outreach   questionLeed green associate vii. project surroundings and public outreach   question
Leed green associate vii. project surroundings and public outreach question
 
Leed green associate ii. project site factors question
Leed green associate  ii. project site factors   questionLeed green associate  ii. project site factors   question
Leed green associate ii. project site factors question
 
Leed green associate pool f - question
Leed green associate   pool f - questionLeed green associate   pool f - question
Leed green associate pool f - question
 
Leed green associate iii. water management question
Leed green associate iii. water management   questionLeed green associate iii. water management   question
Leed green associate iii. water management question
 
Leed green associate vi. stakeholder involvement in innovation question
Leed green associate vi. stakeholder involvement in innovation   questionLeed green associate vi. stakeholder involvement in innovation   question
Leed green associate vi. stakeholder involvement in innovation question
 
Leed green associate vii. project surroundings and public outreach answer
Leed green associate vii. project surroundings and public outreach   answer Leed green associate vii. project surroundings and public outreach   answer
Leed green associate vii. project surroundings and public outreach answer
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 
Leed ga answer
Leed ga answerLeed ga answer
Leed ga answer
 
Leed ga question
Leed ga questionLeed ga question
Leed ga question
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1
 

Ähnlich wie Leed green associate pool d question

Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010rcnewcomer
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB PresentationKevin Sneed
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsTerri Meyer Boake
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentationprdrueke
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13GreenHomeNYC
 
LEED-EB O&M Basics
LEED-EB O&M BasicsLEED-EB O&M Basics
LEED-EB O&M BasicsLida_Lewis
 
2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer WebinarDominic Butler
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedGreenHomeNYC
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 TransformationOC_Composites
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED RequirementsScott DeGaro
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfSunshineBeats
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignJefreyAbalos
 
REBA - Building Green - Building Energy Codes
REBA - Building Green - Building Energy CodesREBA - Building Green - Building Energy Codes
REBA - Building Green - Building Energy CodesAndy Burns
 

Ähnlich wie Leed green associate pool d question (17)

Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
 
Build Green with Daikin!
Build Green with Daikin!Build Green with Daikin!
Build Green with Daikin!
 
Leed Green Associate Study Slides
Leed Green Associate Study SlidesLeed Green Associate Study Slides
Leed Green Associate Study Slides
 
Sustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment SystemsSustainable Design Part Five: Assessment Systems
Sustainable Design Part Five: Assessment Systems
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentation
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
LEED-EB O&M Basics
LEED-EB O&M BasicsLEED-EB O&M Basics
LEED-EB O&M Basics
 
2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar2017 Multifamily Green Building Primer Webinar
2017 Multifamily Green Building Primer Webinar
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leed
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 Transformation
 
Intent: The Real LEED Requirements
Intent: The Real LEED RequirementsIntent: The Real LEED Requirements
Intent: The Real LEED Requirements
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
Leed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering DesignLeed Plumbing Sanitary Engineering Design
Leed Plumbing Sanitary Engineering Design
 
REBA - Building Green - Building Energy Codes
REBA - Building Green - Building Energy CodesREBA - Building Green - Building Energy Codes
REBA - Building Green - Building Energy Codes
 

Kürzlich hochgeladen

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Kürzlich hochgeladen (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Leed green associate pool d question

  • 1. LEED Green Associate Pool D Question 1: A preliminary rating would NOT include what item? A Conceptual design B Targeted LEED certification level C Credits that will be attempted D Completed LEED Score Card Question 2: What systems will increase a building's energy use? A Stormwater management B Mechanical onsite wastewater treatment C Increased ventilation for mechanical HVAC systems D Acoustic performance Question 4: What types of land does LEED prefer project teams build on? A Brownfields B Floodplains C Farmland D Greenfields Question 5: What would qualify as preferred parking for LEED? A Delivery truck parking B Providing discounted parking passes for low-emitting and fuel efficient vehicles
  • 2. C Visitor drop-off areas D Bicycle parking Question 6: What statement is true about RECs? A RECs may only be sold in locations approved by Green-e B RECs are sold separately from electricity C RECs can be sold back to an electricity provider through net-metering D RECs are sold within a 500 mile radius of the project Question 7: What area is included in the building footprint? A Area of the building structure B Ponds C Stone walkways D Parking lots made with permeable concrete Question 8: What is true about a new building project that uses a Halon-based fire suppression system? A The system must have a leakage rate of 5% or less annually for the project to earn LEED certification B The project could not earn LEED Platinum C The system must be installed to meet local fire codes D The project would not meet the LEED Minimum Program Requirements Question 9: Why use commingled recycling?
  • 3. A Materials are less likely to be contaminated B Commingled recycling takes up less space C Recycled materials can be sold for more money D More kinds of materials can be recycled Question 10: Which statement is true regarding the LEED for Commercial Interiors rating system? A A tenant's LEED project that occupies less than 10% of the building can earn LEED for Commercial Interiors certification B Projects with tenants that occupy the entire building are ineligible for LEED for Commercial Interiors certification C A project must occupy at least 1,000 square feet (93 square meters) of gross floor area to earn LEED for Commercial Interiors certification D LEED for Commercial Interiors certification can only be achieved if the building has already achieved LEED for Core and Shell certification Question 11: What plan details the strategies to improve indoor air quality for a building's occupants? A Air Quality Assessment Plan B Indoor Air Quality Management Plan C Indoor Air Management Best Practices D Integrated Indoor Air Quality Management Plan Question 12: When purchasing RECs, what is the project purchasing? A Positive environmental attributes of off-site renewable energy B On-site renewable energy C Carbon offsets D Electricity
  • 4. Question 13: Which of the following materials can earn credit in the Materials & Resources category? A Wood that has low life-cycle costs B FSC Certified wood C Wood that is sealed with low VOC sealants D Wood that was transported via rail lines Question 14: What project design feature would decrease energy costs in a building? A Cogeneration B Purchasing materials with low VOC content C Increased Ventilation with a mechanical system D Installing equipment that uses more kBtu Question 15: What implies a direct impact on global warming? A Ozone depleting potential B Refrigerant charge C Service life D Global warming potential Question 16: What is at the core of the integrated process? A Cost-based decision making B Working toward individual goals
  • 5. C Collaborative team members D Linear planning Question 17: What community issues are of primary importance for the project team to research? A Local incentives, policies, and regulations that promote green design B Building codes C Requirements for parking spaces D Local voting records on city sales and other taxes E Availability of Renewable Energy Certificates (RECs) Question 18: What type of building system might use halons? A Irrigation B Fire suppression C Plumbing D Electrical Question 19: What are the economic benefits of installing a vegetated roof? A Lower cooling costs for HVAC B Increased habitat for birds C Lower investment cost compared to roof surfaces with high SRI D Provides occupants a connection to the outdoors
  • 6. Question 20: Which of the following refrigerants are banned or are scheduled to be banned under the Montreal Protocol? A CFCs B Isopentane C HCFCs D HFCs Question 21: A project team achieved an 80% water use reduction for an office building. What is true about this achievement? A The project team must verify that all flush fixtures in the office building are low-flow B The project will earn a Regional Priority credit C All of the flow and flush fixtures in the building must be WaterSense labeled in order for the project to be eligible for LEED certification D The project will earn an exemplary performance point under Innovation in Design Question 22: What major concepts are integral to green building and sustainability? A Systems thinking B Life cycle approach C Integrated process D Linear planning and design processes E Open systems Question 23: Purchased power must meet which certification's standards to qualify as off-site renewable sources of energy for LEED projects? A Green-e
  • 7. B Green Label C Green Seal D Green Label Plus Question 24: Which of the following actions/concepts may earn a project Innovation in Design (ID) credit for innovative performance? A Providing an educational program on the environmental and human health benefits of a green building's practices B Addressing a geographically specific environmental priority for an existing LEED credit C Achieving the next incremental threshold of a credit's requirements D Doubling a credit requirement's threshold of achievement Question 25: What does the Construction Carbon Calculator measure? A Greenhouse gas emissions from a building's energy use during operations B Fossil fuels consumed from material transport C The embodied carbon implications of the construction process D The carbon footprint of Full Time Equivalents (FTEs) Question 26: Each LEED 2009 Rating System has ___ Regional Priority credits specified by zip code and can earn ___ points for the Regional Priority section. A 6, 3 B 6, 5 C 6, 4 D 4, 4
  • 8. Question 27: What site and/or project characteristics would contribute to earning Maximize Open Space? A Building on a previously developed site B Building on a Greenfield site C Creating a narrow 10 story building instead of a wider 5 story building D Building next door to a park Question 28: What strategies can earn LEED credit for reducing heat islands? A Provide occupants free offsite parking B Use hardscape materials with high SRI C Increase the amount of open space and plant it with native vegetation D Provide shade with architectural devices that are covered with materials with high SRI E Place parking spaces underground Question 29: Which of the following is a type of biofuel? A Hydro B Solar C Wind D Corn oil Question 30: What additional LEED certification would a project team likely pursue for an office building that has already earned LEED Core & Shell if the offices will be leased out to tenants?
  • 9. A LEED for New Construction B LEED for Commercial Interiors C LEED Core & Shell post-certification D LEED for Homes Question 31: What provides a volume certification path to enable owners to integrate LEED across the board as a standard feature of their design, construction and operations? A LEED Volume Program B Local green initiatives C LEED Online D LEED for Neighborhood Development Question 32: A new construction project must at a minimum use ___ less water than the building's water use baseline calculated for Water Use Reduction. A 50% B 25% C 20% D 10% Question 33: What standard helps calculate a baseline building energy performance rating for LEED? A Advanced Buildings Core Performance Guide B ASHRAE 90.1-2007 C ASHRAE 62.1-2007
  • 10. D ASHRAE Advanced Energy Design Guide Question 34: What types of energy sources generate the least air and water pollution? A Oil B Natural gas C Wind D Biofuel E Coal Question 35: Collecting and using stormwater to replace the use of potable water in flush fixtures helps with what project areas? A Reducing heat islands B Reducing the development footprint C Water use reduction D Stormwater management Question 36: Which of the following are not required to be identified in writing to achieve an Innovation in Design (ID) credit for innovative performance? A The strategies used to meet the requirements B The intent of the proposed credit C The proposed requirements for compliance D The regional variations for the credit Question 37: Which projects would not be eligible for LEED certification?
  • 11. A An existing building project that reduces CFC-based refrigerants by 95% prior to submitting the LEED application and will continue to use this CFC system for another 10 years B An existing building project that phases out the use of CFC-based refrigerants no later than 5 years after the project is completed C A new building project that uses CFC-based refrigerants D A new building project that uses no refrigerants E A new building project that uses hydrocarbons (HCs) as refrigerants Question 38: What organization is responsible for qualifying sources of off-site renewable energy acceptable by LEED? A EPA B ASHRAE C Center for Resource Solutions D Green-e Question 39: What measurements does the baseline water case use? A Flow and flush rates of all design case fixtures B The Energy Policy Act of 1992 (EPAct 1992) flow and flush rates C The amount of water metered for the entire project D The amount of water metered for the building's indoor areas Question 40: What benefit to the environment does a project that uses Recycled Materials contribute? A Reducing demand for virgin resources B Supporting the use of local resources C Reduced air and water pollution
  • 12. D Reducing a project's soft costs Question 41: What is applicable to the ongoing operations and maintenance of a building? A Passive design strategies B Commissioning C Sustainable purchasing policy D Floor area ratio Question 42: Which of the following is effective at reducing potable water consumption indoors? A Installing fixtures that meet the EPAct 1992 standard B Implementing cooling tower water management C Installing low-consumption flush fixtures and low-flow rate faucets D Increasing potable water demand Question 43: What type of water is rainwater? A Blackwater B Potable water C Non-potable water D Graywater Question 44: What attribute should recycled materials have in order to take advantage of synergies with regional materials?
  • 13. A Remanufactured regionally B Low VOCs C Lower life-cycle costs D More durability Question 45: What information is needed to determine if a product will help with the heat island effect of a non-roof surface? A Life cycle costs of the material B Emissivity of material C Run-off coefficients for the material D SRI of the material Question 46: How is the LEED boundary defined for a single building development? A The edge of the building footprint B The edge of the development footprint C The entire project scope - generally limited to the site boundary D The portion of project site submitted for LEED certification Question 47: Compared to those for a conventional building, a green building project and construction budget will also include: A Fees to review local laws and standards B Life cycle costing C Costs to implement erosion control plans D Soft costs
  • 14. Question 48: Which of the following can increase the heat island effect in urban areas? A Rooftops covered with a high SRI material B Air-conditioners C Street equipment D Buildings that have passive ventilation Question 49: What are acceptable ways to reference a LEED Registered Project? A Upon completion, XYZ Building will apply to become LEED certified B XYZ Building is registered with the certification goal of LEED Platinum C XYX Building is registered under the LEED Green Building Rating System D XYZ Building is LEED Qualified E XYZ Building is LEED Platinum registered Question 50: What is different about green building design compared to conventional design? A Green building costs more B Green building uses an integrated building design C Green building does not have a bidding phase D Green building has longer schedules Question 51: The recycling of construction and demolition debris helps with what issue? A Reducing the amount of materials needed for a construction project
  • 15. B Reducing CFCs leaked into the atmosphere C Reducing demand for virgin resources D Keeping hazardous materials out of landfills Question 52: If a mechanical engineer on a LEED project team needs guidance on whether a particular software package can be used to measure energy efficiency, how should the engineer proceed? A Submit a CIR to the LEED Steering Committee B Submit a CIR to the project administrator C Submit a CIR using LEED Online D See if the credit is marked 'Anticipated' during the design phase review Question 53: Which items are considered pre-consumer recycled content? A Magazine overruns B Excavated soil C Leftover drywall from a renovation D Wooden pallets used by a shipping company Question 54: Developing nations banned chlorofluorocarbons under the: A Kyoto Treaty B EPA Clean Air Act C Montreal Protocol D Executive Order 95-231
  • 16. Question 55: How is ozone created? A Emissions from factories B Emissions from incinerators C Sunlight-driven chemical reaction between molecules D Transportation emissions Question 56: What area would not be considered previously developed? A Wetland B Abandoned urban parking lot C Railroad yard D Site of an old barn Question 57: The leakage rate is the speed at which an appliance loses refrigerant, measured between refrigerant charges or over _____, whichever is shorter. A 24 months B 12 months C 18 months D 6 months Question 58: What does not meet LEED requirements for minimizing the negative impacts of refrigerants on the environment? A Designing a building with natural ventilation
  • 17. B Reducing the annual leakage rate of refrigerants to 10% or less C Selecting refrigerants with zero or low ozone depletion potential (ODP) and minimal global warming potential (GWP). D Designing a building that does not use chemical refrigerants Question 59: Fertilized landscape plantings can create new sources of pollution in conventional development if what is not controlled? A Parking capacity B Heat islands C Project density D Stormwater runoff Question 60: A 10 acre multi-building development has five buildings. How is the LEED boundary determined if each building will be a separate LEED project? A Each building has the boundary at the edge of a two-acre area B The LEED boundary is at the perimeter of the ten-acre area C The LEED boundary is at the edge of each building's footprint D The project team determines the LEED boundary for each LEED project Question 61: A project team has excluded a section of land in order to meet the requirements of one of the LEED credits. What is true about this action? A This action is allowed if the gross floor area of the LEED project building is less than 2% of the gross land area within the LEED project boundary B This action would only be allowed under the LEED for Existing Buildings: Operations & Maintenance rating system C Certain sections of land can be excluded from the site boundary if a responsible party submits a licensed professional exemption form D This action would not be allowed under any of the rating systems
  • 18. Question 62: The use of onsite treated wastewater can help with what credit areas? A Onsite renewable energy B Energy use reduction C Stormwater runoff D Water use reduction Question 63 What term refers to a mandatory project characteristic, measurement, quality, value or function as identified within the LEED rating system? A Minimum Program Requirement B Certification Requirement C Credit D Prerequisite Question 64: Section 608 of the EPA Clean Air Act established regulations that helped with what issue? A CO2 levels inside buildings B Humidity from heat islands C Using and recycling ozone-depleting compounds D Smog Question 65: Developments located within walking distance of basic services reduce: A Sedimentation of nearby water bodies
  • 19. B Water use C Air pollution D Greenhouse gas emissions Question 66: What unit of measurement is used for water closets? A FTE B Gallons per minute C Wastewater efficiency D Gallons per flush Question 67: Which of the following projects would not be eligible for LEED for Existing Buildings: Operations & Maintenance certification? A A 12-month-old school building that has not earned any LEED certification B A tenant-occupied building certified under LEED for Commercial Interiors C A commercial building that doesn't have any tenants yet and is unoccupied D An owner-occupied building certified under LEED for Commercial Interiors Question 68: Bonus points under the LEED rating systems are awarded when what occurs? A Exemplary or innovative performance is achieved B The project exceeds the Minimum Program Requirements C Prerequisites and a certain number of credits are earned D Two LEED APs work as principal participants on the project
  • 20. Question 69: How are the sections in the LEED Scorecard grouped? A By cost B By credit weight C By environmental category D Alphabetically Question 70: How can regional priority credits be earned? A Using 100% native plants for the site's landscaping B Addressing green measures or strategies that are more important to a climate or region C Using materials that are located within 500 miles of the project site D Developing an educational or training system that addresses local building issues Question 71: What area would not be considered previously developed? A Unoccupied big-box retail store B Cotton field C Old, torn-down steel mill D Parking lot grown over into a field Question 72: Which of the following is NOT an example of passive design? A Using natural refrigerants B Capturing sunlight for natural lighting (daylighting)
  • 21. C Using wind for natural ventilation D Orienting a building for optimal sun exposure Question 73: What information is needed to calculate the SRI of a material? A Reflectance B Thermal gradient C Emissivity D Thickness of the material Question 74: How is the quantity of locally harvested and manufactured materials used on a project calculated? A By the number of board feet B By the amount of leftovers diverted from landfills C By the materials' average distance from the project site D By the materials' proportion of cost Question 75: What is a feature of adaptive plants? A They only bloom once a year B They require more water than other plants C They are invasive D They are low maintenance Question 76: Rain gardens, vegetated rooftops, and permeable pavements are strategies to manage stormwater and contribute to:
  • 22. A Increased water efficiency B Low impact development C Increased potable water D More compact development Question 77: What is the purpose of the LEED Pilot Credit Library? A To manage the LEED documentation process B To provide extensions of existing rating systems to address specific types of spaces or requirements for international projects C Provide precedent-setting rulings reviewed by USGBC on formal inquiries submitted by LEED project teams that can be applied to multiple projects. D To allow credits to be refined through LEED project evaluations before they complete the balloting process for introduction into LEED Question 78: What is FSC Certified wood? A Composite wood that does not contain any urea formaldehyde B Wood that has been procured from well managed forests C Composite wood that contains post-consumer recycled wood, usually from construction and demolition debris D Wood that has been extracted and harvested within 500 miles of the project site Question 79: The process of life cycle assessment encompasses what stages of the building process? A Operations B Design C Design and construction D Planning
  • 23. E All stages Question 80: The number of occupants in a building would be used for what calculations? A Energy use intensity B Building density C Water use baseline D Development density Question 81: What is lighting power density measured in? A Number of luminaires per unit area B Footcandles per floor area C Installed lighting power per unit area D The quantity of light trespass on adjacent sites, measured in watts Question 82: Which green building strategies help conserve natural resources? A Choosing product materials with low VOCs B Installing composting toilets C Providing pedestrian access between a project building and basic services D Removing asbestos tiles from an existing building Question 83: A project team has submitted registration information for a building that has a target rating of Gold. When can the project team advertise that the project is LEED Gold?
  • 24. A After substantial completion of the project B Once the registration has been approved by GBCI C After the preliminary review D After the final application review is accepted and the project is awarded LEED Gold certification E After the registration is submitted Question 84: What encourages recycling among building occupants? A Installing can crushers and cardboard bailers B The cost of waste haulers C The size of the recycling area D Accessibility and convenience to recycling bins Question 85: The baseline water use of a water closet is: A 1.6 gpf B 2.2 gpf C 1.6 gpm D 2.2 gpm Question 86: Reducing external light pollution will result in synergies between what LEED credit categories? A Energy and Atmosphere B Innovation in Design C Sustainable Sites
  • 25. D Indoor Environmental Quality Question 87: What statements are NOT true regarding the LEED certification process? A Credit Interpretation Requests (CIRs) have a submission fee B The Credit Interpretation Request (CIR) process is available to all rating systems except LEED for Existing Buildings: Operations & Maintenance C The project administrator must be a LEED AP D Appeals for credits can be filed for any of the LEED rating systems Question 88: The size of the parking lot for a project will be determined by: A Local zoning B Size of the property boundary C Size of the LEED boundary D Size of the project boundary Question 89: What is a LEED strategy to reduce single occupant automobile transportation to the project site? A Build the project on a brownfield B Locate the project in a suburban area C Increase the building density D Designate preferred parking spaces for car pools Question 90: What steps would be included in the pre-design phase of a green building project? A Develop, test, and select green systems
  • 26. B Develop a project schedule C Review materials test data D Review laws and standards Question 91: What project issues are addressed by guidelines from SMACNA? A Refrigerant quantities B Air quality issues from construction or renovation C VOCs in materials D Carpet durability Question 92: Which item can NOT contribute to Construction Waste Management? A Wood given to a salvage hauler B Recycling packaging material C PCB removal D Ground up brick used for drainage Question 93: What minimum floor area is needed for New Construction, Core and Shell, Schools, and Existing Buildings Operations & Maintenance projects? A 10,000 sq. ft. B 1,000 sq. ft. C There is no minimum D 5,000 sq. ft.
  • 27. Question 94: Which of the following is a primary goal of the USGBC? A Market transformation of the building industry B To reduce the construction costs of a building C To promote green products D To reduce the construction schedule of projects Question 95: What is not an example of smart growth? A Development of a site that is far from existing development and infrastructure B Residential development on a previously developed site located near shops and schools C Neighborhood design that has offices and shops within walking distance to public transportation D Retail, office, and residential townhouses on the site of a former gas station Question 96: Where should a project team go for updates and errata for the LEED for New Construction rating system? A usgbc.org B LEED online C GBCI.org D LEED reference guides Question 97: A project located near which of the following would help earn Public Transportation Access credit? A Public park B Secure bicycle storage rack C Bus stop
  • 28. D 10 or more basic services E Car pool parking lot F Subway station Question 98: What is SRI? A Measure of air quality B Measure of VOC levels in paint C Measure of an automobile's emissions D Measure of a material's ability to reflect solar heat Question 99: What variables measure a refrigerant's impact on the environment? A Global warming potential B Global warming period C Lifecycle potential D Ozone depletion potential E Greenhouse gas lifetime Question 100: What type of land is NOT considered previously developed? A Farmland B Site of an old drive-in theatre C Graded site that has grown over with grass D Tree mill