Leveraging BIM Throughout The
Construction Process
A Specialty Contractor ’s Perspective

Eric Lindquist
Project Manager
elindquist@adjustableforms.com

www.adjustableforms.com
Company
Headquarters in Lombard, IL United States. Focused on work in Chicagoland area
In business since 1930.
Horizontal formwork till 1998 - Transition to full cast in place (in situ) concrete frames
Top 20 Commercial Building Concrete Contractor in the US.
Annual Revenue $30-100M/year (£19M -60M)
75-450 employees → Very lean office rela;ve to field opera;ons
Small company performing large and complex work
Typical Projects
Overview
Utilization BIM as an In-Situ Concrete Contractor
Why Tekla is the preferred BIM software as a concrete contractor
Reasons for choosing Tekla
Benefits
How Adjustable Forms Implements BIM in its operations
Preconstruction Phase
Construction
Project Turnover
How can we justify the software in our environment
As a specialty contractor without leverage
Contractual Requirements (or lack thereof)
Project Case Studies
1K Fulton Offices
Franklin & Illinois Apartments
Northwestern University North Campus Garage
Utilizing BIM
A Specialty Contractor’s Perspective
Finding the absolute best product for the intended application.
Don’t get locked into an ecosystem → Use the tools that help your business most.
Designer’s BIM or Detailed Data Driven Construction BIM?
Focused BIM software for structural trades.
Compatibility through the IFC file format.
Software companies must play nice.
Architects/Engineering/General Contractors must be more open minded.
Remember what the “I” stands for in BIM.
Emphasis on the aesthetic in the Construction and Design Communities.
“Hollywood BIM” can stay with the general contractors and marketers.
Usability and Stability of Software
Reasonable Hardware Requirements
Fast and fluid modeling capabilities
Tekla allows the user to approach a task in many different ways.
Highly customizable through Open API / Extensions
Tekla Structures
How AF utilizes Tekla Structures as an In-Situ Concrete Contractor
Preconstruction Modeling
Quantity Takeoff/Extraction
Drawing coordination and issues identified early in process. Ask the questions before the
concrete is being delivered.
Communication Tool: Owners, General Contractors, Field
Construction Modeling
Refine Preconstruction Model (the hard work is already done)
Tekla BIMSight
Schedule Loading (4D Modeling)
Drawing Coordination & RFI’s > 3D PDF
Reinforcing Steel Detailing
Shoring Layout & Drawings
Safety Systems
Project Turnover
3D As-Builts of structural frame
Prepare for more robust requirements trickling down from ownership.
Adjustable Forms Use of BIM
Leveraging BIM as a Specialty Contractor (Who Can’t Control the BIM Process Upstream)
Q: How can a small specialty contractor
justify investing in BIM?
Not required by contract (yet…)
Not fully utilized by majority of
General Contractors
Competitors aren’t using it (and the
ones who don’t “get it” don’t have
any plans to start)
A: Integrate the technology into as much
of internal operations as possible.
Only utilize BIM if faster, more
efficient, and more accurate.
Avoid “modeling for the sake of
modeling”
Leverage data across multiple areas
of work.
Preconstruction Phase
BIM Implementation Before We Get the Job
Develop Preconstruction Models
Design files, models, or none of the above? Did the designer cheat?
4D Schedule Loading
Quan;ty Extrac;on → Export Files → Import to Es;ma;ng → Bid
Modeling = Minimize impact of unfit numbers from competition.
Buy-in from GC’s → Coordina;on and logis;cs benefits prior to construction.
Project Case Study
1K Fulton Office Facility (Google, SRAM) Chicago, IL
Existing cold storage facility in
Chicago’s Meatpacking District
Existing Facility Work
Supplemental Structural Infills
Topping Slabs
Elevator Bay
New Structure
Seven Story cast in place frame
200,000 sf
Project Case Study
1K Fulton Office Facility (Google, SRAM) Chicago, IL
Scope Revisions after meeting with General Contractor and Ownership.
Scope Reductions Tagged In Model
Visualization Settings set to display only bid revisions.
Absolute clarity
Scope “equalizer”
Project Case Study
Franklin & Illinois Apartments Chicago, IL

Foundations under
construction
Main Contractor Lend Lease
290,000 sf

26 Story Apartment Tower in
Chicago’s River North
Neighborhood
6 Levels of Parking
Construction Phase
Rebar Steel Modeling & Model Based Shop Drawings
Mandate on AF Projects
Detailers/Fabricators have responded with
widespread investment in Tekla
Success on multiple projects
Fabricators embracing BIM
Modeling → Drawing Crea;on →
Fabrication
Industry consolidation = tighter control =
better models
Efficiencies
Custom Component creation & tools
Identify congestion zones, installation
issues, & problems.
Project Case Study
Northwestern University North Campus Parking Garage – Evanston, IL
Main Contractor: Lend Lease
7 Story Parking Garage
Split into three phases to accommodate
GC logistics.
Complex Project & Design Issues
37 drawng revisions through
275 RFI’s
Additional 2 levels of parking
garage added.
Leveraging BIM
Embracing Technology Improve
Why are you using BIM or investigating BIM Software?
1. Have specific reasons – not just because everybody else is doing it.
2. This is not just marketing software.
3. What part of your business is struggling?
Where to start?
1. Get the right people making the decisions.
2. Start small. Better to be an expert in one area and expand.
Avoid workflow misconceptions.
1. It’s a (fill-in-the-blank BIM software job) so I’m stuck using what the design team uses.
2. I don’t have the resources or a “BIM specialist.” Break down traditional contractor positions.
3. Compatibility across platforms has never been better (IFC, import files, etc)
Questions?

1 East Progress Rd. Lombard, IL 60148
p: (630) 953-8700| | e: hiring@adjustableforms.com

Weitere ähnliche Inhalte

Was ist angesagt?

AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
Ahmad Balawi
 

Was ist angesagt? (20)

BIM Technology Knowledge & Implementation
BIM Technology Knowledge & ImplementationBIM Technology Knowledge & Implementation
BIM Technology Knowledge & Implementation
 
MTECH BIM project case study
MTECH BIM project case studyMTECH BIM project case study
MTECH BIM project case study
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...
 
An Introduction to BIM
An Introduction to BIM An Introduction to BIM
An Introduction to BIM
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 
BIM
BIMBIM
BIM
 
BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
Bim level-2 information-management
Bim level-2 information-managementBim level-2 information-management
Bim level-2 information-management
 
Bim Facades.Final
Bim Facades.FinalBim Facades.Final
Bim Facades.Final
 
RICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew SaundersRICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew Saunders
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
Bim services
Bim servicesBim services
Bim services
 
Virtual Design and Construction
Virtual Design and ConstructionVirtual Design and Construction
Virtual Design and Construction
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
 
Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017
 

Andere mochten auch

2012시공학회 추계학술발표대회
2012시공학회 추계학술발표대회 2012시공학회 추계학술발표대회
2012시공학회 추계학술발표대회
성진 김
 
Annual Subsea Meeting Registration Form
Annual Subsea Meeting Registration FormAnnual Subsea Meeting Registration Form
Annual Subsea Meeting Registration Form
Paulo de Tarso Molina
 
FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)
NLandUSA
 
B2b newsletter_april
B2b newsletter_aprilB2b newsletter_april
B2b newsletter_april
Rene Jack
 
Programação semana de extensão 2012 folia
Programação semana de extensão 2012 foliaProgramação semana de extensão 2012 folia
Programação semana de extensão 2012 folia
Adriana Rocha
 
Strategies for Vacant Properties - John Mills, Camelot Property Management
Strategies for Vacant Properties - John Mills, Camelot Property ManagementStrategies for Vacant Properties - John Mills, Camelot Property Management
Strategies for Vacant Properties - John Mills, Camelot Property Management
fhanley
 
Saludo protocolar al cuerpo diplomático acreditado en panamá
Saludo protocolar al cuerpo diplomático acreditado en panamáSaludo protocolar al cuerpo diplomático acreditado en panamá
Saludo protocolar al cuerpo diplomático acreditado en panamá
mirepanama
 

Andere mochten auch (20)

IES BIM Faculty - New IESVE Interoperability Navigator
IES BIM Faculty - New IESVE Interoperability NavigatorIES BIM Faculty - New IESVE Interoperability Navigator
IES BIM Faculty - New IESVE Interoperability Navigator
 
Potted History of BIM from an MEP Perspective
Potted History of BIM from an MEP PerspectivePotted History of BIM from an MEP Perspective
Potted History of BIM from an MEP Perspective
 
IES Faculty - Integration of IES with Revit
IES Faculty - Integration of IES with RevitIES Faculty - Integration of IES with Revit
IES Faculty - Integration of IES with Revit
 
2012시공학회 추계학술발표대회
2012시공학회 추계학술발표대회 2012시공학회 추계학술발표대회
2012시공학회 추계학술발표대회
 
bsk_참여연구인력
bsk_참여연구인력bsk_참여연구인력
bsk_참여연구인력
 
Annual Subsea Meeting Registration Form
Annual Subsea Meeting Registration FormAnnual Subsea Meeting Registration Form
Annual Subsea Meeting Registration Form
 
Pelleting: The link between practice and engineering
Pelleting: The link between practice and engineeringPelleting: The link between practice and engineering
Pelleting: The link between practice and engineering
 
Yoga ocular
Yoga ocularYoga ocular
Yoga ocular
 
Cyclus-US Portfolio
Cyclus-US PortfolioCyclus-US Portfolio
Cyclus-US Portfolio
 
Reconociendo habilidades
Reconociendo habilidadesReconociendo habilidades
Reconociendo habilidades
 
FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)FLOW - Far and Large Offshore Wind (Summary)
FLOW - Far and Large Offshore Wind (Summary)
 
Pulpo congelado en españa
Pulpo congelado en españaPulpo congelado en españa
Pulpo congelado en españa
 
B2b newsletter_april
B2b newsletter_aprilB2b newsletter_april
B2b newsletter_april
 
Programação semana de extensão 2012 folia
Programação semana de extensão 2012 foliaProgramação semana de extensão 2012 folia
Programação semana de extensão 2012 folia
 
EBT Health & Safety
EBT Health & SafetyEBT Health & Safety
EBT Health & Safety
 
La gestión de la elección gd e e mail
La gestión de la elección gd e e mailLa gestión de la elección gd e e mail
La gestión de la elección gd e e mail
 
Cardiodiagnostico
CardiodiagnosticoCardiodiagnostico
Cardiodiagnostico
 
Strategies for Vacant Properties - John Mills, Camelot Property Management
Strategies for Vacant Properties - John Mills, Camelot Property ManagementStrategies for Vacant Properties - John Mills, Camelot Property Management
Strategies for Vacant Properties - John Mills, Camelot Property Management
 
Saludo protocolar al cuerpo diplomático acreditado en panamá
Saludo protocolar al cuerpo diplomático acreditado en panamáSaludo protocolar al cuerpo diplomático acreditado en panamá
Saludo protocolar al cuerpo diplomático acreditado en panamá
 
Final.gest.hum.1
Final.gest.hum.1Final.gest.hum.1
Final.gest.hum.1
 

Ähnlich wie Leveraging BIM throughout the construction process

A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
Siddhartha Kamat
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
Est
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
4 All of Us
 

Ähnlich wie Leveraging BIM throughout the construction process (20)

A Critical Review of Building Information Modelling
A Critical Review of Building Information ModellingA Critical Review of Building Information Modelling
A Critical Review of Building Information Modelling
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
IBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and OperatorsIBM BIM and Maximo: Values for Owners and Operators
IBM BIM and Maximo: Values for Owners and Operators
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
Bim
BimBim
Bim
 
Bim
BimBim
Bim
 
ENR467723
ENR467723ENR467723
ENR467723
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 
How BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction IndustryHow BIM is Transforming the Design and Construction Industry
How BIM is Transforming the Design and Construction Industry
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212
 

Mehr von Be2camp Admin

Ckm mjm uk phipps presentation
Ckm mjm uk phipps presentationCkm mjm uk phipps presentation
Ckm mjm uk phipps presentation
Be2camp Admin
 
Green Buildings Delivered
Green Buildings DeliveredGreen Buildings Delivered
Green Buildings Delivered
Be2camp Admin
 

Mehr von Be2camp Admin (20)

BIM and PPP
BIM and PPPBIM and PPP
BIM and PPP
 
Be2Awards and Be2Talks 2013 - event slides
Be2Awards and Be2Talks 2013 - event slidesBe2Awards and Be2Talks 2013 - event slides
Be2Awards and Be2Talks 2013 - event slides
 
Sharing BIM data through social media
Sharing BIM data through social mediaSharing BIM data through social media
Sharing BIM data through social media
 
The third BIM: the social built environment model
The third BIM: the social built environment modelThe third BIM: the social built environment model
The third BIM: the social built environment model
 
Ckm mjm uk phipps presentation
Ckm mjm uk phipps presentationCkm mjm uk phipps presentation
Ckm mjm uk phipps presentation
 
Green Buildings Delivered
Green Buildings DeliveredGreen Buildings Delivered
Green Buildings Delivered
 
Green Towns
Green TownsGreen Towns
Green Towns
 
A planet and its people under pressure: why cities matter
A planet and its people under pressure: why cities matterA planet and its people under pressure: why cities matter
A planet and its people under pressure: why cities matter
 
Green Deal powered by Social Media
Green Deal powered by Social MediaGreen Deal powered by Social Media
Green Deal powered by Social Media
 
Bottle Alley Glass - Pecha Kucha by Philippa Ashbee
Bottle Alley Glass - Pecha Kucha by Philippa AshbeeBottle Alley Glass - Pecha Kucha by Philippa Ashbee
Bottle Alley Glass - Pecha Kucha by Philippa Ashbee
 
Responsible Sourcing of building materials
Responsible Sourcing of building materialsResponsible Sourcing of building materials
Responsible Sourcing of building materials
 
Web-enabling sustainability events
Web-enabling sustainability eventsWeb-enabling sustainability events
Web-enabling sustainability events
 
Using social media in sustainability education
Using social media in sustainability educationUsing social media in sustainability education
Using social media in sustainability education
 
Be2camp and the Be2Awards
Be2camp and the Be2AwardsBe2camp and the Be2Awards
Be2camp and the Be2Awards
 
CostX pecha kucha presentation by James Villette
CostX pecha kucha presentation by James VilletteCostX pecha kucha presentation by James Villette
CostX pecha kucha presentation by James Villette
 
Think Bim Nick Tune
Think Bim Nick TuneThink Bim Nick Tune
Think Bim Nick Tune
 
Leeds pm v1
Leeds pm v1Leeds pm v1
Leeds pm v1
 
Philippa ashbee
Philippa ashbeePhilippa ashbee
Philippa ashbee
 
Green Vision Biomimicry
Green Vision BiomimicryGreen Vision Biomimicry
Green Vision Biomimicry
 
ThinkBIM keynote, December 2012
ThinkBIM keynote, December 2012ThinkBIM keynote, December 2012
ThinkBIM keynote, December 2012
 

Kürzlich hochgeladen

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Kürzlich hochgeladen (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 

Leveraging BIM throughout the construction process

  • 1. Leveraging BIM Throughout The Construction Process A Specialty Contractor ’s Perspective Eric Lindquist Project Manager elindquist@adjustableforms.com www.adjustableforms.com
  • 2. Company Headquarters in Lombard, IL United States. Focused on work in Chicagoland area In business since 1930. Horizontal formwork till 1998 - Transition to full cast in place (in situ) concrete frames Top 20 Commercial Building Concrete Contractor in the US. Annual Revenue $30-100M/year (£19M -60M) 75-450 employees → Very lean office rela;ve to field opera;ons Small company performing large and complex work
  • 4. Overview Utilization BIM as an In-Situ Concrete Contractor Why Tekla is the preferred BIM software as a concrete contractor Reasons for choosing Tekla Benefits How Adjustable Forms Implements BIM in its operations Preconstruction Phase Construction Project Turnover How can we justify the software in our environment As a specialty contractor without leverage Contractual Requirements (or lack thereof) Project Case Studies 1K Fulton Offices Franklin & Illinois Apartments Northwestern University North Campus Garage
  • 5. Utilizing BIM A Specialty Contractor’s Perspective Finding the absolute best product for the intended application. Don’t get locked into an ecosystem → Use the tools that help your business most. Designer’s BIM or Detailed Data Driven Construction BIM? Focused BIM software for structural trades. Compatibility through the IFC file format. Software companies must play nice. Architects/Engineering/General Contractors must be more open minded. Remember what the “I” stands for in BIM. Emphasis on the aesthetic in the Construction and Design Communities. “Hollywood BIM” can stay with the general contractors and marketers. Usability and Stability of Software Reasonable Hardware Requirements Fast and fluid modeling capabilities Tekla allows the user to approach a task in many different ways. Highly customizable through Open API / Extensions
  • 6. Tekla Structures How AF utilizes Tekla Structures as an In-Situ Concrete Contractor Preconstruction Modeling Quantity Takeoff/Extraction Drawing coordination and issues identified early in process. Ask the questions before the concrete is being delivered. Communication Tool: Owners, General Contractors, Field Construction Modeling Refine Preconstruction Model (the hard work is already done) Tekla BIMSight Schedule Loading (4D Modeling) Drawing Coordination & RFI’s > 3D PDF Reinforcing Steel Detailing Shoring Layout & Drawings Safety Systems Project Turnover 3D As-Builts of structural frame Prepare for more robust requirements trickling down from ownership.
  • 7. Adjustable Forms Use of BIM Leveraging BIM as a Specialty Contractor (Who Can’t Control the BIM Process Upstream) Q: How can a small specialty contractor justify investing in BIM? Not required by contract (yet…) Not fully utilized by majority of General Contractors Competitors aren’t using it (and the ones who don’t “get it” don’t have any plans to start) A: Integrate the technology into as much of internal operations as possible. Only utilize BIM if faster, more efficient, and more accurate. Avoid “modeling for the sake of modeling” Leverage data across multiple areas of work.
  • 8. Preconstruction Phase BIM Implementation Before We Get the Job Develop Preconstruction Models Design files, models, or none of the above? Did the designer cheat? 4D Schedule Loading Quan;ty Extrac;on → Export Files → Import to Es;ma;ng → Bid Modeling = Minimize impact of unfit numbers from competition. Buy-in from GC’s → Coordina;on and logis;cs benefits prior to construction.
  • 9. Project Case Study 1K Fulton Office Facility (Google, SRAM) Chicago, IL Existing cold storage facility in Chicago’s Meatpacking District Existing Facility Work Supplemental Structural Infills Topping Slabs Elevator Bay New Structure Seven Story cast in place frame 200,000 sf
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Project Case Study 1K Fulton Office Facility (Google, SRAM) Chicago, IL Scope Revisions after meeting with General Contractor and Ownership. Scope Reductions Tagged In Model Visualization Settings set to display only bid revisions. Absolute clarity Scope “equalizer”
  • 17. Project Case Study Franklin & Illinois Apartments Chicago, IL Foundations under construction Main Contractor Lend Lease 290,000 sf 26 Story Apartment Tower in Chicago’s River North Neighborhood 6 Levels of Parking
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. Construction Phase Rebar Steel Modeling & Model Based Shop Drawings Mandate on AF Projects Detailers/Fabricators have responded with widespread investment in Tekla Success on multiple projects Fabricators embracing BIM Modeling → Drawing Crea;on → Fabrication Industry consolidation = tighter control = better models Efficiencies Custom Component creation & tools Identify congestion zones, installation issues, & problems.
  • 23. Project Case Study Northwestern University North Campus Parking Garage – Evanston, IL Main Contractor: Lend Lease 7 Story Parking Garage Split into three phases to accommodate GC logistics. Complex Project & Design Issues 37 drawng revisions through 275 RFI’s Additional 2 levels of parking garage added.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Leveraging BIM Embracing Technology Improve Why are you using BIM or investigating BIM Software? 1. Have specific reasons – not just because everybody else is doing it. 2. This is not just marketing software. 3. What part of your business is struggling? Where to start? 1. Get the right people making the decisions. 2. Start small. Better to be an expert in one area and expand. Avoid workflow misconceptions. 1. It’s a (fill-in-the-blank BIM software job) so I’m stuck using what the design team uses. 2. I don’t have the resources or a “BIM specialist.” Break down traditional contractor positions. 3. Compatibility across platforms has never been better (IFC, import files, etc)
  • 31. Questions? 1 East Progress Rd. Lombard, IL 60148 p: (630) 953-8700| | e: hiring@adjustableforms.com