 Introduction
 Company Profile
 Objective & Scope of Project
 Project Appraisal & Financial
Modelling
 Risk Analysis
 SWOT Analysis
 Conclusion
Introduction
 Electricity plays a vital role in economic development of any
country.
 The demand of electricity is enormous and growing steadily
when we consider countries like India.
 In India, since independence there is a steep increase in
capacity of electricity generation.
 Currently, India stands as the fifth largest electricity generation
capacity in the world pegged at 3,88,134 MW.
 In India, Power is primarily generated from thermal, nuclear
fuels, hydro energy and renewable sources.
 Inadequate supply of domestic coal, domestic natural gas, land
availability, etc. are the major issues in the Indian power sector.
 Government has encouraged private sector players to
participate in power sector through PPP mode with up to 100%
foreign equity under automatic route.
 The State Government should be proactive in promoting
distribution channels to bring down the decreasing aggregate
technical & commercial losses.
Company Profile
 Power Finance Corporation Ltd. was incorporated in1986 as
a Development Public Financial Institution.
 It is dedicated to Power Sector. It is wholly owned by
Government of India.
 It provides financial assistance to all types of power projects
i.e. Generation, R&M, Transmission, Distribution, System
Improvement, etc.
 It's mission is to excel as a pivotal developmental financial
institution in the power sector committed to the integrated
development of the power and associated sectors by
channelling the resources and providing financial,
technological and managerial services for ensuring the
development of economic, reliable and efficient systems and
institutions.
 It had been awarded with Sovereign Rating by International
Rating Agencies and also been awarded with the highest
safety rating by Accredited Rating Agencies in India.
 It’s main objective is to rise the resources from international
and domestic sources at the competitive rate and terms and
conditions, to act as catalyst to bring institutional, managerial,
operational and financial improvement in the functioning of
the state power utilities, etc.
 State Electricity Boards, State Power Utilities, State
Electricity/Power Department, Central Power Utilities, etc. are
the clients of PFC.
 It offers various range of services i.e. Fund Based Service
such as Rupee Term Loan, Foreign Currency Term Loan,
Buyer’s Line of Credit, etc. and Non-Fund Based Services
such as Guarantees and Exchange Risk Management.
 It is providing financial assistance to reform-minded States
under relaxed lending criteria/exposure limit norms.
 It also provides technical/financial assistance to State
Govt./Power Utilities for structural reforms of the State Power
Sector.
Objective of Project
The objective of the Project Report is:
 Finding out the factors affecting a project’s capital and
operational expenditure which directly impact on the cash
outlay and revenue generation of the project. Thus,
performing Project Appraisal of a 660 MW Coal Based Super-
critical Thermal Power Plant.
 A financial model of a 660 MW Coal Based Super-critical
Thermal Power Project so as to study the effect of above
factors on tariff and revenue flows.
 To find out probable values of IRR, DSCR among other ratios
using the financial model to study the feasibility and
attractiveness of a 660 MW Coal Based Super- critical
Thermal Project.
Scope of Project
 Scope of project highlights installation, commissioning,
operation and maintenance of 660 MW coal fired Thermal
Power Plant and associated systems.
 Indian Power Sector wants to increase the level of the
installed capacity to meet the growing demand. This project
provides us the factors that will affect the project cost and
thus have an impact on the total investment and operational
expenses of the project.
 The assessment and analysis of these factors will help in
determining the project cost, the associated risks and the
tariff for supply from the project and thus the revenue
generations and cash flows.
Project Appraisal
 The Guiding Principal for Project Appraisal at PFC is “Offering
credit is an operation fraught with risk. Before offering credit
to an organization, its financial health must be analyzed.
Credit should be disbursed only after ascertaining satisfactory
financial performance. Based on the financial health of an
organization, PFC assigns integrated ratings. These credit
ratings are used to fix the interest rate, exposure limit and
security criteria.”
 The major criteria's to be fulfilled for obtaining any project
financing under PFC are as follows:
I. Entity Eligibility Criteria
II. Statutory Clearances
III. Cost Estimate
IV. Project Cost-Benefit Analysis
V. Project Analysis
Financial Modelling
 In every project finance deal, where everyone’s financial security
based on the future performance of a new undertaking, a
thorough analysis of the project’s finances under a arrange of
assumptions is prerequisite for arranging debt and equity
funding, financial model play a critical role in decision-making.
 Determining the scope of the project and the related EPC cost,
O&M cost through the concession period, assessment of tariff in
order to determine revenue generation potential for the project,
calculating the fixed and variable cost relating to the project, etc.
are the steps taken for designing a financial model.
 The purpose of Financial Modelling provides a basic analysis,
generally rests on raw, preliminary data and simplified financing
assumptions, to establish weather a given project is worth
pursuing further. The required outcomes may be: -
I. Basic Project IRR
II. Debt Service Coverage Ratios and other debt ratios
III. Developing a financial structure that is suitable for the
project
Risk Analysis
The following risk involved in the different stages of the
construction of a Project are: -
 Pre Construction Stage
1. Grant of Approvals/Clearances
2. Finalization of Contracts
3. Procurement of Land
 Construction Stage
1. Cost Estimate
2. Cost increase and Price Escalation
3. Completion Delay and Equipment Supply Delay
4. Equity Infusion
 Post Construction Stage
1. Fuel Supply risk
2. Fuel Price Risk
3. Performance Shortfall
4. Technology Risk
5. Price Risk
6. Payment risk
7. Environment Hazards
8. Lower Cost power Producers
SWOT Analysis
Strength
 The Project has long term fuel supply agreement with Coal
India Limited of Coal for use in the Project.
 The Project is located in severe power shortage region.
 The Company has already acquired 600 Ha land which is
adequate for the main power plant block.
 The Project is rested on Super Critical Technology which is
expected to provide efficiency gains to the Company resulting
in lower cost of generation.
Weakness
 Company shall be selling 30% of power on Merchant Basis
and may get lower return than the levelized cost of
generation.
 Environment and Forest Clearances still to be obtained.
Opportunity
 The Electricity Act 2003 and subsequent National Electricity
Policy and Tariff Policy have opened up several opportunities
for the power sector by allowing the IPPs and captive power
producers open access to transmission system, thus allowing
them to bypass the SEBs and sell power directly to bulk
consumers.
 With the advent of the era of competitive bidding for tariff for
procurement of power, the new capacities would not be
subject to regulated tariff and regulated return of equity and
thus provide investment opportunities to Developers in the
power sector where returns would be market determined.
 There is huge power deficit in the country and the demand
supply situation in the country is expected to remain favorable
to power generators for the next 8/10 years at least. This
presents huge opportunities in the power sector for power
generators.
Threats
 A part of power generated will be sold on Merchant basis and
may get lower return than the levelized cost of generation.
 Fuel supply agreement with Coal India Limited may result in
delay.
Limitation
Some of the major limitations and issues regarding the project
appraisal are as follows: -
 The rate of escalation is taken as constant over the life of the
project i.e. about 25 years.
 Cash flows not really known until the project is in service.
 Value of debt and equity driven by cash flow.
 Measure the value of different securities supported by project
cash flow.
 Risk analysis depends on contracts used to allocate risk to
different parties.
Conclusion
Company has proposed to set-up 660 MW Coal fired Thermal Power
Project based on Super Critical Technology. State Government has
supported this Project and has issued letter of support to provide all kind of
administrative support required.
The Company has already acquired the land required for the Main plant
from Industrial Development Corporation and has made the requisite
payments. The remaining required land has been identified and the
process of acquisition is underway.
The Proposed Project will be implemented by way of a turnkey
Engineering, Procurement and Construction (EPC) contract to be awarded
on Competitive Bidding Process.
The Project requires about 3771700 TPA coal based on average GCV of
3400 kcal/kg and PLF of 85%. The company made an FSA with CIL for the
Proposed Project. The Project will require about 150 cubic meter per hour
make-up water during operation. A raw water reservoir of 25200m3
capacity to hold 7 days requirement for plant requirement of water will be
constructed at the plant site.
Of the total 462 MW of power is proposed to be sold as PPA as per CERC
tariff. Balance 198 MW will be sold on Merchant basis at Rs 3.5 per unit
with an escalation of 3% p.a. Considering the cost of generation of Rs.
2.475 per unit, company does not envisage any difficulties in selling the
power through merchant route. Power Evacuation will be through two
double circuit 400 KV transmission lines connecting the Project to the
PGCIL substation and State TRANSCO substation.
Thank You

Weitere ähnliche Inhalte

Ähnlich wie Birendra Behuria ppt.pptx

StocksInsights Hidden Treasure November 2015 pick - Techno Electric
StocksInsights Hidden Treasure November 2015 pick - Techno ElectricStocksInsights Hidden Treasure November 2015 pick - Techno Electric
StocksInsights Hidden Treasure November 2015 pick - Techno ElectricStocksInsights
 
SHP development in India - A roadmap
SHP development in India - A roadmapSHP development in India - A roadmap
SHP development in India - A roadmapNikhil Jaipurkar
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementpakistanvisionaryforum
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...OECD Environment
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Akhilesh Upadhyay
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 
Comparative analysis of balance sheet funding and project
Comparative analysis of balance sheet funding and projectComparative analysis of balance sheet funding and project
Comparative analysis of balance sheet funding and projectAbhi Singh
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly TechnologyProbodh Mallick
 
Q3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallQ3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallAES_BigSky
 
Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Renganathan M G
 
2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation2Q13 Earnings Release Presentation
2Q13 Earnings Release PresentationMPX_RI
 
Summary for HyEnergy's
Summary for HyEnergy's Summary for HyEnergy's
Summary for HyEnergy's nraulji
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencefinance20
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencefinance20
 
World Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentWorld Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentMirzo Ibragimov
 

Ähnlich wie Birendra Behuria ppt.pptx (20)

StocksInsights Hidden Treasure November 2015 pick - Techno Electric
StocksInsights Hidden Treasure November 2015 pick - Techno ElectricStocksInsights Hidden Treasure November 2015 pick - Techno Electric
StocksInsights Hidden Treasure November 2015 pick - Techno Electric
 
SHP development in India - A roadmap
SHP development in India - A roadmapSHP development in India - A roadmap
SHP development in India - A roadmap
 
Energy crisis in Pakistan and its management
Energy crisis in Pakistan and its managementEnergy crisis in Pakistan and its management
Energy crisis in Pakistan and its management
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
Comparative analysis of balance sheet funding and project
Comparative analysis of balance sheet funding and projectComparative analysis of balance sheet funding and project
Comparative analysis of balance sheet funding and project
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly Technology
 
Q3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallQ3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference Call
 
01 ltbr
01 ltbr01 ltbr
01 ltbr
 
LTBR Presentation April 2014
LTBR Presentation April 2014LTBR Presentation April 2014
LTBR Presentation April 2014
 
Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010Eai presentation investment challenges in small hydro in india delhi mar 2010
Eai presentation investment challenges in small hydro in india delhi mar 2010
 
2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation2Q13 Earnings Release Presentation
2Q13 Earnings Release Presentation
 
Summary for HyEnergy's
Summary for HyEnergy's Summary for HyEnergy's
Summary for HyEnergy's
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConference
 
public serviceenterprise group LehmanConference
public serviceenterprise group LehmanConferencepublic serviceenterprise group LehmanConference
public serviceenterprise group LehmanConference
 
Energy Sector
Energy SectorEnergy Sector
Energy Sector
 
Final project
Final projectFinal project
Final project
 
World Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy DevelopmentWorld Bank Group’s Support to Renewable Energy Development
World Bank Group’s Support to Renewable Energy Development
 

Mehr von BanaDurga

RISK MANAGEMENT IN BANKING SECTOR.pptx
RISK MANAGEMENT IN         BANKING SECTOR.pptxRISK MANAGEMENT IN         BANKING SECTOR.pptx
RISK MANAGEMENT IN BANKING SECTOR.pptxBanaDurga
 
Parthsarathi Suar PPT Agritech.pptx
Parthsarathi Suar PPT Agritech.pptxParthsarathi Suar PPT Agritech.pptx
Parthsarathi Suar PPT Agritech.pptxBanaDurga
 
BIRENDRA SAMANTA.pptx
BIRENDRA  SAMANTA.pptxBIRENDRA  SAMANTA.pptx
BIRENDRA SAMANTA.pptxBanaDurga
 
ABHIJIT DAS.pptx
ABHIJIT  DAS.pptxABHIJIT  DAS.pptx
ABHIJIT DAS.pptxBanaDurga
 
ABINASH MISHRA PPT.pptx
ABINASH  MISHRA PPT.pptxABINASH  MISHRA PPT.pptx
ABINASH MISHRA PPT.pptxBanaDurga
 
Stock_Market_Basics (1).ppt
Stock_Market_Basics (1).pptStock_Market_Basics (1).ppt
Stock_Market_Basics (1).pptBanaDurga
 
Rashmi Ranjan Manthan ppt(sip).pptx
Rashmi Ranjan Manthan ppt(sip).pptxRashmi Ranjan Manthan ppt(sip).pptx
Rashmi Ranjan Manthan ppt(sip).pptxBanaDurga
 

Mehr von BanaDurga (7)

RISK MANAGEMENT IN BANKING SECTOR.pptx
RISK MANAGEMENT IN         BANKING SECTOR.pptxRISK MANAGEMENT IN         BANKING SECTOR.pptx
RISK MANAGEMENT IN BANKING SECTOR.pptx
 
Parthsarathi Suar PPT Agritech.pptx
Parthsarathi Suar PPT Agritech.pptxParthsarathi Suar PPT Agritech.pptx
Parthsarathi Suar PPT Agritech.pptx
 
BIRENDRA SAMANTA.pptx
BIRENDRA  SAMANTA.pptxBIRENDRA  SAMANTA.pptx
BIRENDRA SAMANTA.pptx
 
ABHIJIT DAS.pptx
ABHIJIT  DAS.pptxABHIJIT  DAS.pptx
ABHIJIT DAS.pptx
 
ABINASH MISHRA PPT.pptx
ABINASH  MISHRA PPT.pptxABINASH  MISHRA PPT.pptx
ABINASH MISHRA PPT.pptx
 
Stock_Market_Basics (1).ppt
Stock_Market_Basics (1).pptStock_Market_Basics (1).ppt
Stock_Market_Basics (1).ppt
 
Rashmi Ranjan Manthan ppt(sip).pptx
Rashmi Ranjan Manthan ppt(sip).pptxRashmi Ranjan Manthan ppt(sip).pptx
Rashmi Ranjan Manthan ppt(sip).pptx
 

Kürzlich hochgeladen

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 

Kürzlich hochgeladen (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

Birendra Behuria ppt.pptx

  • 1.
  • 2.  Introduction  Company Profile  Objective & Scope of Project  Project Appraisal & Financial Modelling  Risk Analysis  SWOT Analysis  Conclusion
  • 3. Introduction  Electricity plays a vital role in economic development of any country.  The demand of electricity is enormous and growing steadily when we consider countries like India.  In India, since independence there is a steep increase in capacity of electricity generation.  Currently, India stands as the fifth largest electricity generation capacity in the world pegged at 3,88,134 MW.  In India, Power is primarily generated from thermal, nuclear fuels, hydro energy and renewable sources.  Inadequate supply of domestic coal, domestic natural gas, land availability, etc. are the major issues in the Indian power sector.  Government has encouraged private sector players to participate in power sector through PPP mode with up to 100% foreign equity under automatic route.  The State Government should be proactive in promoting distribution channels to bring down the decreasing aggregate technical & commercial losses.
  • 4. Company Profile  Power Finance Corporation Ltd. was incorporated in1986 as a Development Public Financial Institution.  It is dedicated to Power Sector. It is wholly owned by Government of India.  It provides financial assistance to all types of power projects i.e. Generation, R&M, Transmission, Distribution, System Improvement, etc.  It's mission is to excel as a pivotal developmental financial institution in the power sector committed to the integrated development of the power and associated sectors by channelling the resources and providing financial, technological and managerial services for ensuring the development of economic, reliable and efficient systems and institutions.  It had been awarded with Sovereign Rating by International Rating Agencies and also been awarded with the highest safety rating by Accredited Rating Agencies in India.
  • 5.  It’s main objective is to rise the resources from international and domestic sources at the competitive rate and terms and conditions, to act as catalyst to bring institutional, managerial, operational and financial improvement in the functioning of the state power utilities, etc.  State Electricity Boards, State Power Utilities, State Electricity/Power Department, Central Power Utilities, etc. are the clients of PFC.  It offers various range of services i.e. Fund Based Service such as Rupee Term Loan, Foreign Currency Term Loan, Buyer’s Line of Credit, etc. and Non-Fund Based Services such as Guarantees and Exchange Risk Management.  It is providing financial assistance to reform-minded States under relaxed lending criteria/exposure limit norms.  It also provides technical/financial assistance to State Govt./Power Utilities for structural reforms of the State Power Sector.
  • 6. Objective of Project The objective of the Project Report is:  Finding out the factors affecting a project’s capital and operational expenditure which directly impact on the cash outlay and revenue generation of the project. Thus, performing Project Appraisal of a 660 MW Coal Based Super- critical Thermal Power Plant.  A financial model of a 660 MW Coal Based Super-critical Thermal Power Project so as to study the effect of above factors on tariff and revenue flows.  To find out probable values of IRR, DSCR among other ratios using the financial model to study the feasibility and attractiveness of a 660 MW Coal Based Super- critical Thermal Project.
  • 7. Scope of Project  Scope of project highlights installation, commissioning, operation and maintenance of 660 MW coal fired Thermal Power Plant and associated systems.  Indian Power Sector wants to increase the level of the installed capacity to meet the growing demand. This project provides us the factors that will affect the project cost and thus have an impact on the total investment and operational expenses of the project.  The assessment and analysis of these factors will help in determining the project cost, the associated risks and the tariff for supply from the project and thus the revenue generations and cash flows.
  • 8. Project Appraisal  The Guiding Principal for Project Appraisal at PFC is “Offering credit is an operation fraught with risk. Before offering credit to an organization, its financial health must be analyzed. Credit should be disbursed only after ascertaining satisfactory financial performance. Based on the financial health of an organization, PFC assigns integrated ratings. These credit ratings are used to fix the interest rate, exposure limit and security criteria.”  The major criteria's to be fulfilled for obtaining any project financing under PFC are as follows: I. Entity Eligibility Criteria II. Statutory Clearances III. Cost Estimate IV. Project Cost-Benefit Analysis V. Project Analysis
  • 9. Financial Modelling  In every project finance deal, where everyone’s financial security based on the future performance of a new undertaking, a thorough analysis of the project’s finances under a arrange of assumptions is prerequisite for arranging debt and equity funding, financial model play a critical role in decision-making.  Determining the scope of the project and the related EPC cost, O&M cost through the concession period, assessment of tariff in order to determine revenue generation potential for the project, calculating the fixed and variable cost relating to the project, etc. are the steps taken for designing a financial model.  The purpose of Financial Modelling provides a basic analysis, generally rests on raw, preliminary data and simplified financing assumptions, to establish weather a given project is worth pursuing further. The required outcomes may be: - I. Basic Project IRR II. Debt Service Coverage Ratios and other debt ratios III. Developing a financial structure that is suitable for the project
  • 10. Risk Analysis The following risk involved in the different stages of the construction of a Project are: -  Pre Construction Stage 1. Grant of Approvals/Clearances 2. Finalization of Contracts 3. Procurement of Land  Construction Stage 1. Cost Estimate 2. Cost increase and Price Escalation 3. Completion Delay and Equipment Supply Delay 4. Equity Infusion
  • 11.  Post Construction Stage 1. Fuel Supply risk 2. Fuel Price Risk 3. Performance Shortfall 4. Technology Risk 5. Price Risk 6. Payment risk 7. Environment Hazards 8. Lower Cost power Producers
  • 12. SWOT Analysis Strength  The Project has long term fuel supply agreement with Coal India Limited of Coal for use in the Project.  The Project is located in severe power shortage region.  The Company has already acquired 600 Ha land which is adequate for the main power plant block.  The Project is rested on Super Critical Technology which is expected to provide efficiency gains to the Company resulting in lower cost of generation. Weakness  Company shall be selling 30% of power on Merchant Basis and may get lower return than the levelized cost of generation.  Environment and Forest Clearances still to be obtained.
  • 13. Opportunity  The Electricity Act 2003 and subsequent National Electricity Policy and Tariff Policy have opened up several opportunities for the power sector by allowing the IPPs and captive power producers open access to transmission system, thus allowing them to bypass the SEBs and sell power directly to bulk consumers.  With the advent of the era of competitive bidding for tariff for procurement of power, the new capacities would not be subject to regulated tariff and regulated return of equity and thus provide investment opportunities to Developers in the power sector where returns would be market determined.  There is huge power deficit in the country and the demand supply situation in the country is expected to remain favorable to power generators for the next 8/10 years at least. This presents huge opportunities in the power sector for power generators. Threats  A part of power generated will be sold on Merchant basis and may get lower return than the levelized cost of generation.  Fuel supply agreement with Coal India Limited may result in delay.
  • 14. Limitation Some of the major limitations and issues regarding the project appraisal are as follows: -  The rate of escalation is taken as constant over the life of the project i.e. about 25 years.  Cash flows not really known until the project is in service.  Value of debt and equity driven by cash flow.  Measure the value of different securities supported by project cash flow.  Risk analysis depends on contracts used to allocate risk to different parties.
  • 15. Conclusion Company has proposed to set-up 660 MW Coal fired Thermal Power Project based on Super Critical Technology. State Government has supported this Project and has issued letter of support to provide all kind of administrative support required. The Company has already acquired the land required for the Main plant from Industrial Development Corporation and has made the requisite payments. The remaining required land has been identified and the process of acquisition is underway. The Proposed Project will be implemented by way of a turnkey Engineering, Procurement and Construction (EPC) contract to be awarded on Competitive Bidding Process. The Project requires about 3771700 TPA coal based on average GCV of 3400 kcal/kg and PLF of 85%. The company made an FSA with CIL for the Proposed Project. The Project will require about 150 cubic meter per hour make-up water during operation. A raw water reservoir of 25200m3 capacity to hold 7 days requirement for plant requirement of water will be constructed at the plant site.
  • 16. Of the total 462 MW of power is proposed to be sold as PPA as per CERC tariff. Balance 198 MW will be sold on Merchant basis at Rs 3.5 per unit with an escalation of 3% p.a. Considering the cost of generation of Rs. 2.475 per unit, company does not envisage any difficulties in selling the power through merchant route. Power Evacuation will be through two double circuit 400 KV transmission lines connecting the Project to the PGCIL substation and State TRANSCO substation.