Construction       Drum Plants                     1
What you will learn….

•   How gradation is controlled in a drum-mixer
•   How asphalt is controlled in a drum-mixer
•   Different styles of drum-mixers
•   Using RAP with a drum plant




Construction         Drum Plants                  2
Drum-Mix Production

Hot Mix Asphalt production characterized by:

          • Gradation Control at Cold Feed
          • Measure aggregate flow with belt scale
          • Meter asphalt binder to aggregate flow
          • Produce HMA continuously



Construction           Drum Plants                   3
Construction   Drum Plants   4
Cold Feed Proportioning


    Composite gradation is controlled at cold feed
    by proportioning material from individual bins.

    Gradation and quality of the individual
    materials is controlled at the quarry.



Construction           Drum Plants                    5
Construction   Drum Plants   6
Cold Feed Proportioning

Variation in material flow from individual bins:

          • Based on variable speed motor on belt
          • Adjustable manual gates help control
            minimum and maximum flow




Construction           Drum Plants                  7
Cold Feed Proportioning


• Accomplished by calibrating the feeders
• Material output is charted against belt speed
  in calibration charts
• Different charts are created for different gate
  settings on the same feeder



Construction           Drum Plants                  8
Construction   Drum Plants   9
Cold Feed Gradation Control


    Many styles of feeder controls found in field.

    All can perform satisfactory proportioning.




Construction          Drum Plants                    10
Construction   Drum Plants   11
Asphalt Binder Proportioning

Asphalt binder must proportion to aggregate flow.

First step in asphalt binder proportioning is
measuring aggregate flow.

Belt scale is used.



Construction          Drum Plants               12
Construction   Drum Plants   13
How a Belt Scale Works

• Weigh bridge measures weight of aggregate.
• Speed sensor measures speed of belt.
• “Integrator / Totalizer” calculates aggregate
  flow in ton (tonnes) per hour
• “Integrator / Totalizer” reports flow rate to
  plant control system



Construction          Drum Plants                 14
Construction   Drum Plants   15
Construction   Drum Plants   16
Asphalt Binder Proportioning

Asphalt binder must proportion to aggregate flow.

Second step is regulating asphalt binder flow.

Asphalt binder pumping / metering unit is used.




Construction         Drum Plants                  17
Construction   Drum Plants   18
Construction   Drum Plants   19
How the Asphalt Binder
  Proportioning System Works
• Controls system reads wet aggregate flow from belt scale.
• Controls accepts moisture content entered by operator to
  establish dry flow rate of aggregate
• Control system accepts target asphalt content entered by
  operator.
• Control system drives pumping/metering unit flow control
  device.
• Control system adjusts asphalt binder flow control system
  based on signal received back from meter


  Construction          Drum Plants                      20
Construction   Drum Plants   21
Plant Automation

               Many types of systems and levels of
                  complexity found in the field.




Construction               Drum Plants               22
Construction   Drum Plants   23
Drum-Mix
               Plant Calibration




Construction        Drum Plants    24
Step 1 -
               Calibrating Belt Scales




Construction           Drum Plants       25
Step 1 - Calibrate Belt Scale

• Verify belt scale reads zero per manufacturers
  guidelines
• Set the cold feed gates at an opening that will allow a
  good material feed
• Start main conveyor belt
• Run the variable speed belt feeder for the coarse
  aggregate bin - about 50% of desired production rate
• Record the belt feeder speed and weight indicated on
  the belt scale.


Construction           Drum Plants                          26
Step 1 - Calibrate Belt Scale (cont.)


• Stop belt and remove a six foot section of material
  from the conveyor
• Weigh the material removed
• Repeat process to get an average of two weights
• Adjust instrument so that it reads correctly




Construction           Drum Plants                      27
Example

• Conveyor is run at 225 feet per minute
• Run the belt feeder until the digital readout reads 90
  tons per hour
• Weight of material on a six ft section of belt = 76 lbs
  and 78 lbs for an average of 77 lbs




Construction            Drum Plants                         28
Example - cont.

• Determine the aggregate weight in lbs per minute.
            WR
      Q=
              r

where          Q =   weight of aggregate, lbs/min
               W=    wt of agg measured, lbs
               R =   speed of belt
               r =   length of belt from which
                     material was removed

Construction           Drum Plants                    29
Example - cont

• Therefore the aggregate weight in lbs/min is:
     q = WR/r = 77 x 225 = 2887.5 lbs/min
                     6
• To convert to tons per hour (q x 60)/2000
      2887.5 x 60 = 86.63 tph < 90 tph
       2000




Construction           Drum Plants                30
Example - cont

• Adjust instrument per manufacturer’s guidelines so
  that next test it reads 86.63
• Repeat test, adjust, until two consecutive readings
  are within acceptable tolerance

   (Unlike batch plant no department spec on this scale
    tolerance - because mix purchased from silo weigh
    tickets)



Construction           Drum Plants                        31
Step 1 - Alternate
               Calibrating Belt Scale
• Verify belt scale reads zero per manufacturers
  guidelines
• Set the cold feed gates at an opening that will allow a
  good material feed
• Start main conveyor belt
• Run the variable speed belt feeder for the coarse
  aggregate bin - about 50% of desired production rate
• Starting with empty belt run material in tared truck
  and stop material flow to end with empty belt


Construction           Drum Plants                          32
Step 1 - Alternate
               Calibrating Belt Scale
• Record the total weight indicated on the belt scale.
• Compare weight total on belt scale with actual weight
  on truck.
• Following manufacturers guidelines, adjust belt scale
  instrument based on weight difference.
• Repeat test, adjusting instrument, until two
  consecutive tests are within tolerance.




Construction           Drum Plants                        33
Example

•   Start belt scale and verify reads zero
•   Tare empty truck at 22,375#
•   Record belt scale totalizer at 437897.65
•   Start feeder at approximately 50% flow
•   Fill truck and stop and empty belt
•   Record belt scale totalizer at 437906.87
•   Calculate tonnage on scale at 9.22 tons (437906.87 -
    437897.65 = 9.22 tons)


Construction            Drum Plants                        34
Example - cont.

• Weigh truck at 41,401#
• Calculate weight in truck at 9.51 ton (41,401- 22,375
  = 19,026 ÷ 2,000 = 9.51 ton)
• Recall “span” value of instrument at 897654
• Adjust span value by 1.0314 (9.51 ÷ 9.22 = 1.0314)
• New span value = 925,840 (897654 x 1.0314 =
  925,840)
• Re-test, re-adjust, until two tests pass



Construction           Drum Plants                        35
Asphalt Binder Distribution
                  in Drum-Mix Plants




Construction             Drum Plants         36
Asphalt Binder Distribution

Understanding asphalt binder distribution…..

• Calculating Flow Requirements
• Calibrating Asphalt Binder Meter




Construction            Drum Plants            37
Asphalt Binder Distribution
                 Calculating AC Flow
Need to know the number of gallons/minute of asphalt
binder that is to be delivered
            R = P x T x 2000 x 1
                100         W   60

Where R =             asphalt binder to be delivered, gpm
        P=            optimum asphalt binder
        T=            production rate, tons per hour
        W=            unit weight of asphalt binder
                    (typically about 8.4 lb/gal)

Construction               Drum Plants                      38
Example – Asphalt Binder Flow
                  Required
This example, Asphalt Binder target is 6.0% of 200 tons
  per hour

             R = P x T x 2000 x 1
                100          W       60
      Where R = asphalt binder to be delivered, gpm
             P= 6
             T=     200
             W = 8.4


Construction            Drum Plants                       39
Example – Asphalt Binder Flow
                  Required
This example, Asphalt binder target is 6.0% of 200 tons
  per hour

             R = 6 x 200 x 2000 x 1
                100          8.4       60
      Where R = asphalt binder to be delivered, gpm
             P= 6
             T=     200
             W = 8.4


Construction            Drum Plants                       40
Example – Asphalt Binder Flow
                  Required
This example, Asphalt Binder target is 6.0% of
  200 tons per hour

               R = .06 x 200 x 238.095 x .0167

               R = 47.71 gpm




Construction           Drum Plants               41
QUESTIONS ?




Construction   Drum Plants   42

Weitere ähnliche Inhalte

Was ist angesagt?

Warm Mix Asphalt - Paving the Green Way
Warm Mix Asphalt - Paving the Green WayWarm Mix Asphalt - Paving the Green Way
Warm Mix Asphalt - Paving the Green WayShu Wei Goh
 
WMA Presentation at Transportation Research Board Conference 2007
WMA Presentation at Transportation Research Board Conference 2007WMA Presentation at Transportation Research Board Conference 2007
WMA Presentation at Transportation Research Board Conference 2007Shu Wei Goh
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoringManohar Tatwawadi
 
TPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceTPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceManohar Tatwawadi
 
Evaluation of Rutting and Stripping Potential of WMA with Different Additives
Evaluation of Rutting and Stripping Potential of WMA with Different AdditivesEvaluation of Rutting and Stripping Potential of WMA with Different Additives
Evaluation of Rutting and Stripping Potential of WMA with Different AdditivesViswalalViswanathan1
 
Effect of blade_shape_on_the_performance
Effect of blade_shape_on_the_performanceEffect of blade_shape_on_the_performance
Effect of blade_shape_on_the_performanceArcangelo Di Tano
 
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...Hossam Shafiq I
 

Was ist angesagt? (20)

#2 mix design procedures
#2 mix design procedures#2 mix design procedures
#2 mix design procedures
 
Asphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test MethodsAsphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test Methods
 
Warm Mix Asphalt - Paving the Green Way
Warm Mix Asphalt - Paving the Green WayWarm Mix Asphalt - Paving the Green Way
Warm Mix Asphalt - Paving the Green Way
 
Best Practices for Reclaimed Asphalt Pavement management
Best Practices for Reclaimed Asphalt Pavement managementBest Practices for Reclaimed Asphalt Pavement management
Best Practices for Reclaimed Asphalt Pavement management
 
NDOR Research Conference: Matt Beran
NDOR Research Conference: Matt BeranNDOR Research Conference: Matt Beran
NDOR Research Conference: Matt Beran
 
WMA Presentation at Transportation Research Board Conference 2007
WMA Presentation at Transportation Research Board Conference 2007WMA Presentation at Transportation Research Board Conference 2007
WMA Presentation at Transportation Research Board Conference 2007
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
Slurry Seal Mix Design
Slurry Seal Mix DesignSlurry Seal Mix Design
Slurry Seal Mix Design
 
TPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceTPS Coal Mills and Fan Performance
TPS Coal Mills and Fan Performance
 
Warm Mix Asphalt
Warm Mix AsphaltWarm Mix Asphalt
Warm Mix Asphalt
 
Evaluation of Rutting and Stripping Potential of WMA with Different Additives
Evaluation of Rutting and Stripping Potential of WMA with Different AdditivesEvaluation of Rutting and Stripping Potential of WMA with Different Additives
Evaluation of Rutting and Stripping Potential of WMA with Different Additives
 
Warm Mix Asphalt research and performance
Warm Mix Asphalt research and performanceWarm Mix Asphalt research and performance
Warm Mix Asphalt research and performance
 
WMA & Admixtures
WMA & AdmixturesWMA & Admixtures
WMA & Admixtures
 
Fpwe2016 warm mix presentation
Fpwe2016 warm mix presentationFpwe2016 warm mix presentation
Fpwe2016 warm mix presentation
 
Advantages and Benefits of Evotherm
Advantages and Benefits of EvothermAdvantages and Benefits of Evotherm
Advantages and Benefits of Evotherm
 
Effect of blade_shape_on_the_performance
Effect of blade_shape_on_the_performanceEffect of blade_shape_on_the_performance
Effect of blade_shape_on_the_performance
 
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...
05-Superpave Binder Specification ( Highway and Airport Engineering Dr. Sheri...
 
Block 5 SP 14
Block 5 SP 14Block 5 SP 14
Block 5 SP 14
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Mixing systems
Mixing systemsMixing systems
Mixing systems
 

Ähnlich wie Block 16 Drum Plants 13

Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewaterArpit Budania
 
Central Mix Concrete Batching Plant
Central Mix Concrete Batching PlantCentral Mix Concrete Batching Plant
Central Mix Concrete Batching PlantSourabh Vaid
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systemsArnab Chakraborty
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....Vipul Sinha
 
readymixconcrete-.pdf
readymixconcrete-.pdfreadymixconcrete-.pdf
readymixconcrete-.pdfFaizanSolanki
 
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentationramprasad89
 
Ready Mix Concrete (RMC) quality controls
Ready Mix Concrete (RMC) quality controls Ready Mix Concrete (RMC) quality controls
Ready Mix Concrete (RMC) quality controls Rushikesh Kolhe
 
BP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingBP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingJohn Downs
 
Lecture 9 Hot Mix Asphalt (HMA) described in detail.
Lecture 9 Hot Mix Asphalt (HMA) described in detail.Lecture 9 Hot Mix Asphalt (HMA) described in detail.
Lecture 9 Hot Mix Asphalt (HMA) described in detail.SmartEngineer5
 

Ähnlich wie Block 16 Drum Plants 13 (20)

Treatment of wastewater
Treatment of wastewaterTreatment of wastewater
Treatment of wastewater
 
Machinery
MachineryMachinery
Machinery
 
Central Mix Concrete Batching Plant
Central Mix Concrete Batching PlantCentral Mix Concrete Batching Plant
Central Mix Concrete Batching Plant
 
Presentation on coal handling systems
Presentation on coal handling systemsPresentation on coal handling systems
Presentation on coal handling systems
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....
 
readymixconcrete-.pdf
readymixconcrete-.pdfreadymixconcrete-.pdf
readymixconcrete-.pdf
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Used Cemco Model 275 for Sale
Used Cemco Model 275 for SaleUsed Cemco Model 275 for Sale
Used Cemco Model 275 for Sale
 
Model 275 Cemco Concrete Plant
Model 275 Cemco Concrete PlantModel 275 Cemco Concrete Plant
Model 275 Cemco Concrete Plant
 
Cemco Concrete Plant Brochure
Cemco Concrete Plant BrochureCemco Concrete Plant Brochure
Cemco Concrete Plant Brochure
 
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentation
 
Hirakud pWR overview.ppt
Hirakud pWR overview.pptHirakud pWR overview.ppt
Hirakud pWR overview.ppt
 
Ready Mix Concrete (RMC) quality controls
Ready Mix Concrete (RMC) quality controls Ready Mix Concrete (RMC) quality controls
Ready Mix Concrete (RMC) quality controls
 
Project report on concrete mix design of grade presentation
Project report on concrete mix design of grade presentationProject report on concrete mix design of grade presentation
Project report on concrete mix design of grade presentation
 
BP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforatingBP Rhum field - Use of cesium formate kill pills during perforating
BP Rhum field - Use of cesium formate kill pills during perforating
 
Concrete Batching Plant
Concrete Batching Plant Concrete Batching Plant
Concrete Batching Plant
 
SANDEEP PPT
SANDEEP PPTSANDEEP PPT
SANDEEP PPT
 
Huddersfield - Process Commisioning presentation 030209
Huddersfield - Process Commisioning presentation 030209Huddersfield - Process Commisioning presentation 030209
Huddersfield - Process Commisioning presentation 030209
 
Draglines (fabil &amp; venkatesh)
Draglines (fabil &amp; venkatesh)Draglines (fabil &amp; venkatesh)
Draglines (fabil &amp; venkatesh)
 
Lecture 9 Hot Mix Asphalt (HMA) described in detail.
Lecture 9 Hot Mix Asphalt (HMA) described in detail.Lecture 9 Hot Mix Asphalt (HMA) described in detail.
Lecture 9 Hot Mix Asphalt (HMA) described in detail.
 

Mehr von Chris Yarnell

Mehr von Chris Yarnell (20)

Block 3 SP 14
Block 3 SP 14Block 3 SP 14
Block 3 SP 14
 
Block 4 SP 14
Block 4 SP 14Block 4 SP 14
Block 4 SP 14
 
Block 2 SP 14
Block 2 SP 14Block 2 SP 14
Block 2 SP 14
 
Block 1 SP 14
Block 1 SP 14Block 1 SP 14
Block 1 SP 14
 
Block 6 SP 14
Block 6 SP 14Block 6 SP 14
Block 6 SP 14
 
Block 33 HMA Overlays c SP 13
Block 33   HMA Overlays c SP 13Block 33   HMA Overlays c SP 13
Block 33 HMA Overlays c SP 13
 
Block 33b SP 13
Block 33b SP 13Block 33b SP 13
Block 33b SP 13
 
Block 33a SP 13
Block 33a SP 13Block 33a SP 13
Block 33a SP 13
 
Block 32 SP 13
Block 32  SP 13Block 32  SP 13
Block 32 SP 13
 
Block 31 SP 13
Block 31   SP 13Block 31   SP 13
Block 31 SP 13
 
Block 30 SP 13
Block 30   SP 13Block 30   SP 13
Block 30 SP 13
 
Block 29 SP 13
Block 29   SP 13Block 29   SP 13
Block 29 SP 13
 
Block 28 Sp 13
Block 28   Sp 13Block 28   Sp 13
Block 28 Sp 13
 
Block 27 sp 13
Block 27 sp 13Block 27 sp 13
Block 27 sp 13
 
Block 25 Control Charts 13
Block 25   Control Charts 13Block 25   Control Charts 13
Block 25 Control Charts 13
 
Block 24 Obtaining Samples 13
Block 24   Obtaining Samples 13Block 24   Obtaining Samples 13
Block 24 Obtaining Samples 13
 
Block 23 Sampling - Theory 13
Block 23   Sampling - Theory 13Block 23   Sampling - Theory 13
Block 23 Sampling - Theory 13
 
Block 22 basic concepts
Block 22   basic conceptsBlock 22   basic concepts
Block 22 basic concepts
 
Block 21 Background 13
Block 21   Background 13Block 21   Background 13
Block 21 Background 13
 
Block 26 Acceptance 13
Block 26   Acceptance 13Block 26   Acceptance 13
Block 26 Acceptance 13
 

Block 16 Drum Plants 13

  • 1. Senior/Graduate HMA Course HMA Production Construction Drum Plants 1
  • 2. What you will learn…. • How gradation is controlled in a drum-mixer • How asphalt is controlled in a drum-mixer • Different styles of drum-mixers • Using RAP with a drum plant Construction Drum Plants 2
  • 3. Drum-Mix Production Hot Mix Asphalt production characterized by: • Gradation Control at Cold Feed • Measure aggregate flow with belt scale • Meter asphalt binder to aggregate flow • Produce HMA continuously Construction Drum Plants 3
  • 4. Construction Drum Plants 4
  • 5. Cold Feed Proportioning Composite gradation is controlled at cold feed by proportioning material from individual bins. Gradation and quality of the individual materials is controlled at the quarry. Construction Drum Plants 5
  • 6. Construction Drum Plants 6
  • 7. Cold Feed Proportioning Variation in material flow from individual bins: • Based on variable speed motor on belt • Adjustable manual gates help control minimum and maximum flow Construction Drum Plants 7
  • 8. Cold Feed Proportioning • Accomplished by calibrating the feeders • Material output is charted against belt speed in calibration charts • Different charts are created for different gate settings on the same feeder Construction Drum Plants 8
  • 9. Construction Drum Plants 9
  • 10. Cold Feed Gradation Control Many styles of feeder controls found in field. All can perform satisfactory proportioning. Construction Drum Plants 10
  • 11. Construction Drum Plants 11
  • 12. Asphalt Binder Proportioning Asphalt binder must proportion to aggregate flow. First step in asphalt binder proportioning is measuring aggregate flow. Belt scale is used. Construction Drum Plants 12
  • 13. Construction Drum Plants 13
  • 14. How a Belt Scale Works • Weigh bridge measures weight of aggregate. • Speed sensor measures speed of belt. • “Integrator / Totalizer” calculates aggregate flow in ton (tonnes) per hour • “Integrator / Totalizer” reports flow rate to plant control system Construction Drum Plants 14
  • 15. Construction Drum Plants 15
  • 16. Construction Drum Plants 16
  • 17. Asphalt Binder Proportioning Asphalt binder must proportion to aggregate flow. Second step is regulating asphalt binder flow. Asphalt binder pumping / metering unit is used. Construction Drum Plants 17
  • 18. Construction Drum Plants 18
  • 19. Construction Drum Plants 19
  • 20. How the Asphalt Binder Proportioning System Works • Controls system reads wet aggregate flow from belt scale. • Controls accepts moisture content entered by operator to establish dry flow rate of aggregate • Control system accepts target asphalt content entered by operator. • Control system drives pumping/metering unit flow control device. • Control system adjusts asphalt binder flow control system based on signal received back from meter Construction Drum Plants 20
  • 21. Construction Drum Plants 21
  • 22. Plant Automation Many types of systems and levels of complexity found in the field. Construction Drum Plants 22
  • 23. Construction Drum Plants 23
  • 24. Drum-Mix Plant Calibration Construction Drum Plants 24
  • 25. Step 1 - Calibrating Belt Scales Construction Drum Plants 25
  • 26. Step 1 - Calibrate Belt Scale • Verify belt scale reads zero per manufacturers guidelines • Set the cold feed gates at an opening that will allow a good material feed • Start main conveyor belt • Run the variable speed belt feeder for the coarse aggregate bin - about 50% of desired production rate • Record the belt feeder speed and weight indicated on the belt scale. Construction Drum Plants 26
  • 27. Step 1 - Calibrate Belt Scale (cont.) • Stop belt and remove a six foot section of material from the conveyor • Weigh the material removed • Repeat process to get an average of two weights • Adjust instrument so that it reads correctly Construction Drum Plants 27
  • 28. Example • Conveyor is run at 225 feet per minute • Run the belt feeder until the digital readout reads 90 tons per hour • Weight of material on a six ft section of belt = 76 lbs and 78 lbs for an average of 77 lbs Construction Drum Plants 28
  • 29. Example - cont. • Determine the aggregate weight in lbs per minute. WR Q= r where Q = weight of aggregate, lbs/min W= wt of agg measured, lbs R = speed of belt r = length of belt from which material was removed Construction Drum Plants 29
  • 30. Example - cont • Therefore the aggregate weight in lbs/min is: q = WR/r = 77 x 225 = 2887.5 lbs/min 6 • To convert to tons per hour (q x 60)/2000 2887.5 x 60 = 86.63 tph < 90 tph 2000 Construction Drum Plants 30
  • 31. Example - cont • Adjust instrument per manufacturer’s guidelines so that next test it reads 86.63 • Repeat test, adjust, until two consecutive readings are within acceptable tolerance (Unlike batch plant no department spec on this scale tolerance - because mix purchased from silo weigh tickets) Construction Drum Plants 31
  • 32. Step 1 - Alternate Calibrating Belt Scale • Verify belt scale reads zero per manufacturers guidelines • Set the cold feed gates at an opening that will allow a good material feed • Start main conveyor belt • Run the variable speed belt feeder for the coarse aggregate bin - about 50% of desired production rate • Starting with empty belt run material in tared truck and stop material flow to end with empty belt Construction Drum Plants 32
  • 33. Step 1 - Alternate Calibrating Belt Scale • Record the total weight indicated on the belt scale. • Compare weight total on belt scale with actual weight on truck. • Following manufacturers guidelines, adjust belt scale instrument based on weight difference. • Repeat test, adjusting instrument, until two consecutive tests are within tolerance. Construction Drum Plants 33
  • 34. Example • Start belt scale and verify reads zero • Tare empty truck at 22,375# • Record belt scale totalizer at 437897.65 • Start feeder at approximately 50% flow • Fill truck and stop and empty belt • Record belt scale totalizer at 437906.87 • Calculate tonnage on scale at 9.22 tons (437906.87 - 437897.65 = 9.22 tons) Construction Drum Plants 34
  • 35. Example - cont. • Weigh truck at 41,401# • Calculate weight in truck at 9.51 ton (41,401- 22,375 = 19,026 ÷ 2,000 = 9.51 ton) • Recall “span” value of instrument at 897654 • Adjust span value by 1.0314 (9.51 ÷ 9.22 = 1.0314) • New span value = 925,840 (897654 x 1.0314 = 925,840) • Re-test, re-adjust, until two tests pass Construction Drum Plants 35
  • 36. Asphalt Binder Distribution in Drum-Mix Plants Construction Drum Plants 36
  • 37. Asphalt Binder Distribution Understanding asphalt binder distribution….. • Calculating Flow Requirements • Calibrating Asphalt Binder Meter Construction Drum Plants 37
  • 38. Asphalt Binder Distribution Calculating AC Flow Need to know the number of gallons/minute of asphalt binder that is to be delivered R = P x T x 2000 x 1 100 W 60 Where R = asphalt binder to be delivered, gpm P= optimum asphalt binder T= production rate, tons per hour W= unit weight of asphalt binder (typically about 8.4 lb/gal) Construction Drum Plants 38
  • 39. Example – Asphalt Binder Flow Required This example, Asphalt Binder target is 6.0% of 200 tons per hour R = P x T x 2000 x 1 100 W 60 Where R = asphalt binder to be delivered, gpm P= 6 T= 200 W = 8.4 Construction Drum Plants 39
  • 40. Example – Asphalt Binder Flow Required This example, Asphalt binder target is 6.0% of 200 tons per hour R = 6 x 200 x 2000 x 1 100 8.4 60 Where R = asphalt binder to be delivered, gpm P= 6 T= 200 W = 8.4 Construction Drum Plants 40
  • 41. Example – Asphalt Binder Flow Required This example, Asphalt Binder target is 6.0% of 200 tons per hour R = .06 x 200 x 238.095 x .0167 R = 47.71 gpm Construction Drum Plants 41
  • 42. QUESTIONS ? Construction Drum Plants 42

Hinweis der Redaktion

  1. In this module we will cover how gradation and asphalt binder is controlled with a drum-mixer, how that is different that with a batch plant. We will also review the different styles of drum-mixers, and how RAP is used and recycled mixes are produced.
  2. With a drum-mixer the gradation is controlled at the cold feed, the total aggregate flow is measured with a belt scale device, then the asphalt binder is metered or proportioned to that aggregate flow. Mix is produced continuously, rather than a batch or load at a time as characterized by a batch plant. Surge and storage silos are required with drum-mixers so they can have a place to elevate, then store the finished mix prior to dispatch into a truck.
  3. As in the batch plant the controlled gradations are deposited in the cold feed bins (1), from which they are feed onto the cold feed conveyor (2). An automatic weighing system monitors the weight of the aggregate flowing into the drum mixer for heating and drying. The weighing system is interlocked with the controls on the asphalt storage pump that draws the asphalt binder from a storage tank (3) and introduces it into the drum (4).The asphalt binder and the heated aggregates are mixed in the drum mixer (4). If recycled asphalt pavement (RAP) is included in the HMA mixture it is feed from a separate bin (5). From the drum mixer the hot mix asphalt is transported by conveyor (6) to a surge bin or storage silo (7), from which it is loaded into trucks and hauled to the paving site. The entire operation is controlled from a control house (8). A dust collection system captures the excess dust escaping from the drum (9).
  4. With a drum plant, the composite gradation of the HMA is controlled at the cold feed by proportioning the material from the individual cold feed bins. It is important to note that the gradation and quality of the individual materials is controlled at the quarry, not at the hot plant. This is even more true with a drum plant than a batch plant. With a drum plant there is no opportunity for re-sizing or re-screening the cold feed materials what-so-ever. The only thing a drum plant can do is blend the individual materials together. The gradation must be correct coming from the aggregate source.
  5. This photograph shows a typical cold feed bin for a drum-mix plant. Continuous belt type feeders are always used with drum plants. Vibrating pan type feeders, sometime found on batch plants, cannot control blending accurately enough to be used on a drum-mix plant.
  6. Proportioning flow from each feeder on a drum plant is controlled two ways, by using a variable speed belt on the belt feeder, and adjusting the manual gate of the feeder opening to affect the minimum and maximum flow possible from the feeder.
  7. Cold feed proportioning is done by calibrating the feeder so one knows the output at various belt speed. Different charts are created for different gate settings on the same feeder.
  8. Notice how on this calibration chart the feeder speed on the x axis is plotted against the feeder output in tons per hour on the y axis. Lines 2, 3, and 4 are for gate position 2, 3, and 4 on the feeder. These could be 2”, 3” or 4”. Many state requirements insist that gates are clearly graduated, and it is better to mark the gates in inches. It is not advisable to run a feeder below 10% or above 90% of speed. Notice how the output of the feeder in non-linear below 10% and above 90% speed. Due to the nature of electro-mechanical devices, it is hard for any motor-controller package to be stable or perform consistently in these ranges. This is why manual strike-off gates are useful. In the example shown in this illustration, if one desired 30 tons per hour from this feeder, then it would be advisable to change the manual gate setting to “2”, and run the feeder at approximately 20% speed.
  9. When it comes to actual feeder controls for drum-mixer plants many different styles are found in the field. They all can perform satisfactory blending of different cold feed materials.
  10. This photograph shows another feeder system with digital readouts of the individual feeder output.
  11. The first step in proportioning asphalt binder flow is to measure aggregate flow. This is typically done with a belt scale device.
  12. This is a photograph of a belt scale on a drum-mix plant.
  13. A belt scale has several parts. It uses a “weigh bridge” to measure the weight of the aggregate passing over the scale area. A separate piece of equipment measures belt speed. This is typically referred to as the “speed sensor”. Finally an “integrator” or “totalizer” calculates the flow rate based on these two signals. This flow rate in tons per hour is reported to the plant automation. The flow rate is measured wet.
  14. This diagram shows how a belt scale works, and how each element contributes to the measurement process.
  15. This photograph shows an “integrator” or “totalizer” in the control room. The term “totalizer” is often used because these devices also provide a reading of total tons over the scale, much like an odometer in a automobile.
  16. The second step to proportioning asphalt binder is to control the flow of the asphalt binder to match the aggregate flow. The asphalt binder flow is controlled with the drum-mix pumping and metering unit.
  17. This illustration shows one method of how the asphalt binder is controlled in a drum-mix plant. This type of system has become vary popular. A variable speed motor is installed on the asphalt binder pump, and the pump is sped up or slowed down to match the requirements of the flow. The meter installed in the unit measures the flow of asphalt binder and reports the flow rate to the control system.
  18. This is a photograph of the same type of asphalt binder pumping and metering system shown in the previous diagram.
  19. The asphalt binder proportioning system on a drum plant functions by reading the belt scale signal, adjusting it for the moisture the operator enters into the system to establish the dry flow rate of the aggregate, calculating the flow required for the asphalt binder based on what the operator has entered into the system, then driving the flow control device of the asphalt binder until the signal coming back from the meter is what the control system expects to see.
  20. This diagram shows the process of the plant control system in regulating asphalt binder flow to aggregate flow, using the flow control device in the asphalt binder skid to vary the flow, and the meter in the asphalt binder skid to measure the flow.
  21. There are many types of automation systems found on drum-mix plants. Whether the plant has simple or complicated automation, mix of equal quality can be produced at the facility.
  22. Some plants are now being manufactured with a “touch-pad” or “touch-screen” operator interface. All plant controls are available from this one terminal. The manual backup controls on this plant are located to the left of where the operator is sitting.
  23. When calibrating a drum-mixer, the belt scale is first calibrated, then the feeders are calibrated. The asphalt binder meter is typically calibrated after the belt scale in case a simulated run is desired to ensure the asphalt binder is tracking the aggregate flow.
  24. When calibrating a belt scale, the following steps are typically used: 1) Verify belt scale reads zero per manufacturers guidelines 2) Set the cold feed gates at an opening that will allow a good material feed 3) Start main conveyor belt 4) Run the variable speed belt feeder for the coarse aggregate bin - about 50% of desired production rate 5) Record the belt feeder speed and weight indicated on the belt scale. 6) Stop belt and remove a six foot section of material from the conveyor 7) Weigh the material removed 8) Repeat process to get an average of two weights. 9) Adjust instrument per guidelines so that instrument reads correctly
  25. The following example shown in the illustrations will serve to illustrate the procedure.
  26. Once the procedure is finished, it is important to adjust the scale so that it reads the corrected value. The test must be repeated and any required adjustments made until two consecutive readings are within acceptable tolerance. It should be noted that there are no published specifications for belt scale accuracy. Similarly, belt scales are not required to be checked every six months like batch plant scales. With batch plants it is possible that the scales are being used to not only weigh the individual materials, but to sell the mix to the department. No such situation exists with a drum plant. Drum-mix materials are sold through the silo.
  27. This alternative for calibrating a belt scale is popular, as it eliminates much of the mathematics associated with calibration. It involves securing a truck, and requires the plant layout is sufficient to direct the material from the belt directly into the truck. With this method, start with a tared truck, and run material into the truck from the feed bin at a medium rate. Make sure the belt is empty before the test and after the test.
  28. Record the total amount of material loaded into the truck, not the rate. Compare the total amount of material weighed on the belt scale with the net weight in the truck. (Make sure you use a certified truck scale for your test.) Adjust the instrument based on manufacturers guidelines, retest, and readjust until two consecutive tests are within tolerance.
  29. The following example shown in the illustrations will serve to illustrate this alternative procedure. This is the type of test most frequently used in the field, but the other belt-cut method is handy if no trucks are available, or the plant equipment layout won’t allow loading a truck directly from a conveyor.
  30. There are two areas of interests to us with asphalt binder distribution in drum-mix plants; understanding how flow requirements are calculated, and understanding how meters are calibrated.
  31. Asphalt binder distribution is drum plants is typically accomplished automatically by the control system. The way this is established, however, is understood by running some simple math. The rate of asphalt binder required to be delivered in gallons per minute(gpm) is shown by the formula in the illustration.
  32. Following our previous example of 200 ton per hour with 6% liquid asphalt binder, we arrive at the values shown for the formula.
  33. Substituting the values in the formula creates the simple math problem shown.
  34. Completing the math provides 47.71 gpm as the target asphalt binder flow in gallons per minute (gpm).