SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
PTSC Overview
PTSC – PetroVietnam Technical Services Corporation: a         CORE SERVICES
member of the Vietnam Oil and Gas Group
(PetroVietnam) providing diversified technical services for     ü Marine Services
the oil and gas industry inside and outside Vietnam.
                                                                ü EPCIC Project Services, Mechanical and Construction Services
With more than 25 subsidiaries, PTSC as a multi-sector
corporation has gained a reputation of a leader in              ü HUC, O&M and other Offshore Services
providing oil & gas services in Vietnam.
                                                                ü Production Services – FPSO/ROV

                                                                ü Supply Base Services

                                                                ü Procurement & Logistics Services

                                                                ü Other Services




                                      SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                        1   of      22
PTSC M&C Overview

                                   ü   Established on May 15, 2001 by Act No. 731/QD-
                                       HDQT of PetroVietnam, changed to Joint Stock
                                       Company since April 2011.
                                   ü   QHSE Management system: ISO 9001-2008, ISO
                                       14001-2004 and OHSAS 18001-2007 accredited by
                                       DNV
                                   ü   ASME “U” & “S” stamp for manufacture of Pressure
                                       Vessel and Power Boilers.
                                   ü   ISO 17025 certificate for Calib./Testing Laboratory
                                   ü   API Monogram for Structural Tubular Rolling




            SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                              2   of   22
PTSC M&C Overview
Annual Revenue
Revenue (US$ mil)
600.00
                                                                                                            533.49

500.00


400.00
                                                                                               349.22

300.00


200.00                                                                                177.26

                                                                 106.39       98.64
100.00
                    39.45   39.94                        51.54
                                      15.74    24.44
           0.98
    -
          2001      2002    2003     2004     2005       2006    2007     2008        2009     2010         2011

                                                     Revenue


                                    SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                             3     of     22
Services
With a team of committed, professional and dynamic engineers with experience from more than 40 successful projects
with average productivity of 50,000 MT per annual PTSC M&C continuously strives to deliver the highest HSE and QAQC
standards to our Clients’ expectations and beyond.




     OFFSHORE                                 ONSHORE                                 OTHERS

Executing full EPCIC services for         Executing EPC services for various      § Manpower supply
offshore facilities including fixed       onshore construction plants (power      § Equipment for rent
platforms,       floating    objects      plant, LNG, gas terminal..) and         § Production and manufacturing of
(ships, barges), modules, skids, vess     jetty, port, yard, workshop and           equipments and facilities
els and others.                           associated facilities.



                                        SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                            4   of   22
Organization
                                                                           Chairman


                                                                           Director


    Deputy Director                         Deputy Director                              Deputy Director                     Deputy Director




                                                                                                                                Admin Dept.



                                                                                                                                                    Constr Dept.
                                                             Plan. Dept.




                                                                                      T&O Dept.
 Com. Dept




                                               F&A Dept.
                               Engr. Dept




                                                                                                       HSE Dept
              BD Dept.




                                                                                                                  HR Dept.
                                                                                                   Services       Equipments
  Structure               Structure          Piping & Mec.                   E&I                                                              Security
                                                                                                   General          General
 Workshop 1              Workshop 2            Workshop                    Workshop                                                            Team
                                                                                                  Workshop         Workshop



                                                  SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                                       5      of          22
Human Resources
People are our priority


                                                                          Procurement                T&O
                                                                          Engineering                QAQC
     6000
                                                                          Business Development       Others

     5000


     4000                         3000
                                                     Casual
     3000                                                                                  326
                                                     Long term
                                                                                            41
     2000
                                                                                           151
                                  2187                                                     129
     1000         200
                  732                                                                      112
                                                                                            53
        0
                Indirect         Direct


                        Manpower Resouces                                          Indirect Manpower Divide
                                                              Dec, 2011


                                          SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                             6   of   22
HSE Statistic
       HSE mindset is a core value for our success

                                                                      YEAR
     Description                                                                                                                   TOTAL
                      2001 - 2005     2006           2007      2008            2009        2010        2011      Q1, 2012
Total Manhours
                       6,476,872    1,723,959   4,865,002    2,587,970       2,873,171   5,832,071   6,625,567   2,275,720       33,260,332
Worked

Lost Time Injuries         0            0             0         0               0           1           0           1                 2

Lost Work day              0            0             0         0               0           30          0           11                41
Restricted Duty                                                                             0
                           0            0             0         0               0                       0           0                 0
Injuries
Medical Treatment
                           1            1             1         0               1           1           1           0                 6
Injuries
First Aid                  3            1             1         0               1           2           4           0                 12
Near Miss                  6            5             8         6               4           25          12          7                 73
HAZOB Cards               N/A          700           1,571     734            2,696       3,753       4,450       1,641           15,545
Fire/Explosion             1            0             3         0               0           0           0           0                 4

Equipment Damage           1            2             2         0               0           0           1           1                 7

Vehicle Incidents          0            0             0         0               0           0           0           0                 0

No. of Fatality            0            0             0         0               0           0           0           0                 0


                                                SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                      7   of   22
Engineering Capability
                               ü Engineering Centre with more than 130 well educated in-house
                                 engineers with experience from various national and
                                 international engineering environment and projects.
                               ü Secure and efficient engineering infrastructure with fully
                                 equipped engineering softwares
                               ü Management teams with experience from approximately 40
                                 EPCIC projects in DE Execution, Construction Engineering and
                                 follow-on/procurement engineering across all major
                                 disciplines.
                               ü Extensive experience of in-house design process skids eg Fuel
                                 Gas Skids, Chemical Injection Skids, Pressure Vessels & Tanks..
                               ü Extensive experience of civil engineering for wharf, yard
                                 strengthening, jetty upgrade, piling foundation
                               ü Partnership with leading international engineering houses




                SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                             8   of   22
Procurement Capability
ü   Extensive in-house experience and capacity in purchasing materials, equipments regionally and globally
ü   More than 50 qualified procurement employees with experience from major international EPCIC projects
ü   Actively promote and follow international trading practices terms and conditions
ü   Provide the most efficiency & competitive price in the shortest time with high quality
ü   Possess a rich Vendors database and unit prices database
ü   Efficient in-house expediting team familiar with custom authorities and closely connected to regional and global
    forwarders and custom authorities




                                      SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                9   of    22
Construction Capability
      Yard Facilities

                                                                                                    ü   Total area: 57 ha
                                                                                                    ü   Quay length: ~500 m
                                                                                                    ü   Quay width: 28 m
                                                                                                    ü   Water depth: 10 – 15 m.
                                                                                                    ü   Jetty distribution: 7 MT cargo/m2
                                                                                                    ü   Quayside designed for 20,000 DWT
                                                                                                        Vessels
                                                                                                    ü   Dredging  the   sea     bed   to
                                                                                                        accommodate CPP up to 25,000 MT
                                                                                                    ü   3 Skidways (6,000 MT; 15,000MT &
                                                                                                        25,000MT)


• Subcontractors/ partners yard areas not included and able to utilise up to 180ha upon required.




                                                    SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                   10 of   22
Construction Capability
Manpower Resouces, Subcontractors, Tools & Equipments


 Manpower Resources                                        Tools & Equipments

A skilful and hard-working                                Deversified and modern in-
workforce with over 2,100                                 house fabrication facilities
workers; qualified & familiar                             ready for the work; chain
with international standards;                             system        to      increase
annual     trained     through                            productivity, minimize human
various courses; supervised by                            mistakes
over      100      experienced
supervisors at construction
yard.
 Subcontractors                                            3 rd parties services

Co-operating with experienced and qualified               Close partnership with various parties in
construction subcontractors inside and outside            cooperating, supervising and managing production
Vietnam     (maximizing  local   content, share           quality & safety; verifying
resources/workload and approach new potential
projects)




                                    SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                        11 of     22
T&I, HUC Capability




ü Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projects
  ranging from marginal field developments to large integrated gas processing facilities
ü Extensive experience of offshore services through out various EPCIC projects implemented.
ü Wide range of global T&I, HUC partners




                                       SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                           12 of   22
Major Projects
Offshore EPCIC Projects




Bien Dong 1 Project                           Su Tu Den NE Project                           Chim Sao Project
§ Client: Bien Dong POC                       § Client: CuuLong JOC                          § Client: Premier Oil Vietnam Offshore
§ Project type: EPCIC                         § Project type: EPCIC                          § Project type: EPCIC
§ Duration: 02/2010 – tentatively 07/2012     § Duration: 02/2008 – 07/2010                  § Duration: 08/2008 – 10/2010
§ Key Facilities: 01 CPP, 01 WHP, 01 CPP      § Key Facilities: 01 WHP, 01 jacket, infield   § Key Facilities: 01 WHP, 01 jacket &
  Jacket & Piles, Pipeline & subsea cables      pipelines & submarine cable                    piles, pipelines & submarine cable
§ Total weight: ~ 30,000 MT                   § Total weight: ~ 3,500 MT                     § Total weight: ~ 7,500 MT




                                             SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                         14 of    22
Major Projects
Offshore EPCIC Projects




Su Tu Trang Project                               Te Giac Trang Project                              Bunga Orkid Project
§ Client: CuuLong JOC                             § Client: Hoang Long JOC                           § Client: Talisman Malaysia Limited
§ Project type: EPCIC                             § Project type: EPCIC                              § Project type: EPC
§ Duration: 03/2010 – tentatively 06/2012         § Duration: 11/2009 – 08/2011                      § Duration: 07/2006 – 03/2008
§ Key Facilities: 01 WHP, 01 jacket, pipelines    § Key Facilities: 01 WHP, 02 jacket, 01 drilling   § Key Facilities: 03 WHPs
                                                    deck, infield pipeline
§ Total weight: ~ 2,500 MT                                                                           § Total weight: ~ 4,000 MT
                                                  § Total weight: ~ 4,000 MT




                                                 SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                             15 of   22
Major Projects
Offshore E-P-C Projects




Su Tu Den WHP-A Project          Ruby-B Project                           PLDP-A Project
§ Client: CuuLong JOC            § Client: Petronas Caligali Vietnam      § Client: Petronas Caligali Vietnam
§ Project type: EPC              § Project type: EPC                      § Project type: PCC
§ Duration: 05/2002 – 09/2003    § Duration: 10/2004 – 09/2005            § Duration: 01/2008 – 06/2009
§ Key Facilities: 01 WHP         § Key Facilities: 01 WHP                 § Key Facilities: 01 WHP
§ Weight: 2,200 MT               § Weight: 1,300 MT                       § Weight: 600 MT




                                SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                    16 of   22
Major Projects
Offshore E-P-C Projects




Topaz Project                                   Song Doc WHP-A Project                   Bunga Tulip A Project
§ Client: Petronas Caligali Vietnam             § Client: Truong Son JOC                 § Client: Talisman Malaysia Limited
§ Project type: PCC                             § Project type: PC                       § Project type: C
§ Duration: 10/2009 – 07/2010                   § Duration: 06/2007 – 02/2008            § Duration: 12/2005 – 07/2006
§ Key Facilities: 01 WHP, 01 Jacket, Piles &    § Key Facilities: 01 WHP                 § Key Facilities: 01 WHP, 01 Mono-pod
  Conductors                                                                               Jacket
                                                § Weight: 600 MT
§ Total weight: ~ 4,000 MT                                                               § Total weight: 900 MT




                                               SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                   17 of   22
Major Projects
Offshore E-P-C Projects




WHP-C1/CLPP/NBR3 Project                     JVPC S1 Project                             BP Compression Module Project
§ Client: Japan Vietnam Petroleum Company    § Client: Japan Vietnam Petroleum Company   § Client: British Petroleum (BP) Vietnam
§ Project type: C                            § Project type: C                           § Project type: PC
§ Duration: 10/2004 – 05/2005                § Duration: 02/2002 – 08/2002               § Duration: 07/2006 – 10/2007
§ Key Facilities: 02 WHPs, 01 bridge         § Key Facilities: 01 WHP                    § Key Facilities: 01 Compression Module
§ Total weight: ~ 1,200 MT                   § Weight: 450 MT                            § Weight: 2,000 MT




                                            SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                      18 of      22
Major Projects
Offshore E-P-C Projects




LQ-CPC/99 Project                         Bunga Raya-A Project                          JVPC NULQ Project
§ Client: VietsovPetro JV                 § Client: Talisman Malaysia Limited           § Client: Japan Vietnam Petroleum Company
§ Project type: EPC                       § Project type: EPC                           § Project type: EPC
§ Duration: 12/1999 – 12/2000             § Duration: 03/2002 – 07/2003                 § Duration: 02/2002 – 08/2003
§ Key Facilities: 02 LQs (70 men each)    § Key Facilities: 01 LQ (48 men), 01 Bridge   § Key Facilities: 01 LQ (63 men), 02 bridges
§ Total weight: ~ 2,300 MT                § Total weight: 1,000 MT                      § Total weight: 1,400 MT




                                         SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                         19 of    22
Major Projects
Offshore E-P-C Projects




100 Men LQ Project                           PTSC-01 Project                                3509 TUG BOAT Project
§ Client: Petrovietnam Marine Shipyard       § Client: PTSC                                 § Client: PTSC
§ Project type: C                            § Project type: EPC                            § Project type: PC
§ Duration: 10/2010 – 03/2011                § Duration: 10/2008 – 11/2009                  § Duration: 12/2009 – 10/2010
§ Key Facilities: 01 LQ (100 men) for 90m    § Key Facilities: 5,000DWT Ballast Barge for   § Key Facilities: 02 tug boats with capacity
  water depth jack-up rig                      transporting topsides, jackets,..              3,500 BHP and 4,750 BHP
§ Total weight: 300 MT                       § Total weight: 2,400 MT                       § Total weight: 1,000 MT




                                            SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                          20 of     22
Major Projects
Onshore Projects




Dung Quat Refinery Harbor Project                GPPIC Project                                 NCS Condesate Storage Project
§ Client: DungQuat Refinery PMT                  § Client: PetroVietnam Gas Company            § Client: Client: PetroVietnam Gas Company
§ Project type: PC                               § Project type: EPC                           § Project type: EPC
§ Duration: 06/2006 – 12/2007                    § Duration: 08/2001 – 02/2002                 § Duration: 11/2001 –11/2003
§ Key Facilities: construct from Berth 1 to 6    § Key Facilities: Four (04) big compressors   § Key Facilities: Two condensate
  of Product Export harbor for DungQuat                                                          tanks, condensate pumps, metering skid
  Refinery Harbor Project.                                                                       system, floating roofs
                                                                                               § Capacity: 16,500 m3/each




                                                SOLUTI ONS FOR THE OI L & GAS I NDUSTRY                                       21 of   22
Clients & Partners




                SOLUTI ONS FOR THE OI L & GAS I NDUSTRY   22 of   22

Weitere ähnliche Inhalte

Andere mochten auch

Parle company history of product
Parle company history of productParle company history of product
Parle company history of productnishant bhatia
 
Manufacturing process of Parle
Manufacturing process of ParleManufacturing process of Parle
Manufacturing process of ParleHITESH JAIN
 
Parle Products Presentation
Parle Products PresentationParle Products Presentation
Parle Products PresentationAkash Dhar
 
Project on parle g biscuits
Project on parle g biscuitsProject on parle g biscuits
Project on parle g biscuitsPallaviGore13
 
Parle product..ppt BY AMIT SINGH
Parle product..ppt BY AMIT SINGHParle product..ppt BY AMIT SINGH
Parle product..ppt BY AMIT SINGHAmit Singh
 
Parle-g marketing strategy
Parle-g marketing strategyParle-g marketing strategy
Parle-g marketing strategyDhruv Patar
 
Parle project- PDF
Parle project- PDFParle project- PDF
Parle project- PDFDarji jayesh
 
Business Environment
Business EnvironmentBusiness Environment
Business EnvironmentAj Khandelwal
 
Project on marketing study of parle
Project on marketing study of parleProject on marketing study of parle
Project on marketing study of parlePayal Awere
 
project work on BIG BAZAAR
project work on BIG BAZAARproject work on BIG BAZAAR
project work on BIG BAZAARgulab sharma
 
Business studies project
Business studies projectBusiness studies project
Business studies projectDisha Sehgal
 
Ppt For Visit To A Mall
Ppt For Visit To A MallPpt For Visit To A Mall
Ppt For Visit To A MallHarnam Arora
 

Andere mochten auch (15)

Parle G
Parle GParle G
Parle G
 
Parle g ppt(1)
Parle g ppt(1)Parle g ppt(1)
Parle g ppt(1)
 
Parle company history of product
Parle company history of productParle company history of product
Parle company history of product
 
Manufacturing process of Parle
Manufacturing process of ParleManufacturing process of Parle
Manufacturing process of Parle
 
Parle Products Presentation
Parle Products PresentationParle Products Presentation
Parle Products Presentation
 
Project on parle g biscuits
Project on parle g biscuitsProject on parle g biscuits
Project on parle g biscuits
 
Parle product..ppt BY AMIT SINGH
Parle product..ppt BY AMIT SINGHParle product..ppt BY AMIT SINGH
Parle product..ppt BY AMIT SINGH
 
Parle-g marketing strategy
Parle-g marketing strategyParle-g marketing strategy
Parle-g marketing strategy
 
Parle project- PDF
Parle project- PDFParle project- PDF
Parle project- PDF
 
Business Environment
Business EnvironmentBusiness Environment
Business Environment
 
Departmental stores
Departmental storesDepartmental stores
Departmental stores
 
Project on marketing study of parle
Project on marketing study of parleProject on marketing study of parle
Project on marketing study of parle
 
project work on BIG BAZAAR
project work on BIG BAZAARproject work on BIG BAZAAR
project work on BIG BAZAAR
 
Business studies project
Business studies projectBusiness studies project
Business studies project
 
Ppt For Visit To A Mall
Ppt For Visit To A MallPpt For Visit To A Mall
Ppt For Visit To A Mall
 

Ähnlich wie Ptsc m&c brief profile (may2012)

Present_angl
Present_anglPresent_angl
Present_anglvlz-ngs
 
REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngNasrin Khazali
 
Ats malaysia 2012 pdf
Ats malaysia 2012 pdfAts malaysia 2012 pdf
Ats malaysia 2012 pdfSolar Pang
 
Anewa Corporate Presentation
Anewa Corporate PresentationAnewa Corporate Presentation
Anewa Corporate Presentationpianistdee
 
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...UNEP OzonAction
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaSyafiqah Najib
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMOThushan Sivalingam
 
Airofluid Pumps & Compressors
Airofluid Pumps & CompressorsAirofluid Pumps & Compressors
Airofluid Pumps & CompressorsAlex Chen
 
IMG Medical Group Presentation
IMG Medical Group PresentationIMG Medical Group Presentation
IMG Medical Group Presentationwlskas
 
Fact Sheet EDG, Inc. Rev 07
Fact Sheet EDG, Inc. Rev  07Fact Sheet EDG, Inc. Rev  07
Fact Sheet EDG, Inc. Rev 07guest2c6403
 
20121127 tru
20121127 tru20121127 tru
20121127 truShaen PD
 
Derbigum - Evènement siemens (novembre 2011)
Derbigum -  Evènement siemens (novembre 2011)Derbigum -  Evènement siemens (novembre 2011)
Derbigum - Evènement siemens (novembre 2011)Cluster TWEED
 
120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerkeDigin
 
AT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic DigestionAT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic DigestionActive Technologies Limited
 
Teyma Presentation
Teyma PresentationTeyma Presentation
Teyma Presentationhendrix10
 
Imtech Vonk Presentation
Imtech Vonk PresentationImtech Vonk Presentation
Imtech Vonk Presentationwiert
 
TAI Gas & Utility Industries
TAI Gas & Utility IndustriesTAI Gas & Utility Industries
TAI Gas & Utility Industrieselyarrick
 
Quest global overview
Quest global overviewQuest global overview
Quest global overviewQuEST Global
 
MEHUL.H.VORA Project final.
MEHUL.H.VORA Project final.MEHUL.H.VORA Project final.
MEHUL.H.VORA Project final.Mehul Vora
 

Ähnlich wie Ptsc m&c brief profile (may2012) (20)

Present_angl
Present_anglPresent_angl
Present_angl
 
REDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 EngREDECO Profile 1394.11.21 Eng
REDECO Profile 1394.11.21 Eng
 
Ats malaysia 2012 pdf
Ats malaysia 2012 pdfAts malaysia 2012 pdf
Ats malaysia 2012 pdf
 
CG company profile
CG company profileCG company profile
CG company profile
 
Anewa Corporate Presentation
Anewa Corporate PresentationAnewa Corporate Presentation
Anewa Corporate Presentation
 
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...
The Duch approch - Netherlands experience from 1991 till F-gas regulation in ...
 
Internship Presentation - Siemens Malaysia
Internship Presentation - Siemens MalaysiaInternship Presentation - Siemens Malaysia
Internship Presentation - Siemens Malaysia
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
 
Airofluid Pumps & Compressors
Airofluid Pumps & CompressorsAirofluid Pumps & Compressors
Airofluid Pumps & Compressors
 
IMG Medical Group Presentation
IMG Medical Group PresentationIMG Medical Group Presentation
IMG Medical Group Presentation
 
Fact Sheet EDG, Inc. Rev 07
Fact Sheet EDG, Inc. Rev  07Fact Sheet EDG, Inc. Rev  07
Fact Sheet EDG, Inc. Rev 07
 
20121127 tru
20121127 tru20121127 tru
20121127 tru
 
Derbigum - Evènement siemens (novembre 2011)
Derbigum -  Evènement siemens (novembre 2011)Derbigum -  Evènement siemens (novembre 2011)
Derbigum - Evènement siemens (novembre 2011)
 
120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke120919 digitalkonferansen tore bjerke
120919 digitalkonferansen tore bjerke
 
AT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic DigestionAT Renewables presentation on Anaerobic Digestion
AT Renewables presentation on Anaerobic Digestion
 
Teyma Presentation
Teyma PresentationTeyma Presentation
Teyma Presentation
 
Imtech Vonk Presentation
Imtech Vonk PresentationImtech Vonk Presentation
Imtech Vonk Presentation
 
TAI Gas & Utility Industries
TAI Gas & Utility IndustriesTAI Gas & Utility Industries
TAI Gas & Utility Industries
 
Quest global overview
Quest global overviewQuest global overview
Quest global overview
 
MEHUL.H.VORA Project final.
MEHUL.H.VORA Project final.MEHUL.H.VORA Project final.
MEHUL.H.VORA Project final.
 

Kürzlich hochgeladen

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 

Kürzlich hochgeladen (20)

Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 

Ptsc m&c brief profile (may2012)

  • 1.
  • 2. PTSC Overview PTSC – PetroVietnam Technical Services Corporation: a CORE SERVICES member of the Vietnam Oil and Gas Group (PetroVietnam) providing diversified technical services for ü Marine Services the oil and gas industry inside and outside Vietnam. ü EPCIC Project Services, Mechanical and Construction Services With more than 25 subsidiaries, PTSC as a multi-sector corporation has gained a reputation of a leader in ü HUC, O&M and other Offshore Services providing oil & gas services in Vietnam. ü Production Services – FPSO/ROV ü Supply Base Services ü Procurement & Logistics Services ü Other Services SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 1 of 22
  • 3. PTSC M&C Overview ü Established on May 15, 2001 by Act No. 731/QD- HDQT of PetroVietnam, changed to Joint Stock Company since April 2011. ü QHSE Management system: ISO 9001-2008, ISO 14001-2004 and OHSAS 18001-2007 accredited by DNV ü ASME “U” & “S” stamp for manufacture of Pressure Vessel and Power Boilers. ü ISO 17025 certificate for Calib./Testing Laboratory ü API Monogram for Structural Tubular Rolling SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 2 of 22
  • 4. PTSC M&C Overview Annual Revenue Revenue (US$ mil) 600.00 533.49 500.00 400.00 349.22 300.00 200.00 177.26 106.39 98.64 100.00 39.45 39.94 51.54 15.74 24.44 0.98 - 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Revenue SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 3 of 22
  • 5. Services With a team of committed, professional and dynamic engineers with experience from more than 40 successful projects with average productivity of 50,000 MT per annual PTSC M&C continuously strives to deliver the highest HSE and QAQC standards to our Clients’ expectations and beyond. OFFSHORE ONSHORE OTHERS Executing full EPCIC services for Executing EPC services for various § Manpower supply offshore facilities including fixed onshore construction plants (power § Equipment for rent platforms, floating objects plant, LNG, gas terminal..) and § Production and manufacturing of (ships, barges), modules, skids, vess jetty, port, yard, workshop and equipments and facilities els and others. associated facilities. SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 4 of 22
  • 6. Organization Chairman Director Deputy Director Deputy Director Deputy Director Deputy Director Admin Dept. Constr Dept. Plan. Dept. T&O Dept. Com. Dept F&A Dept. Engr. Dept HSE Dept BD Dept. HR Dept. Services Equipments Structure Structure Piping & Mec. E&I Security General General Workshop 1 Workshop 2 Workshop Workshop Team Workshop Workshop SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 5 of 22
  • 7. Human Resources People are our priority Procurement T&O Engineering QAQC 6000 Business Development Others 5000 4000 3000 Casual 3000 326 Long term 41 2000 151 2187 129 1000 200 732 112 53 0 Indirect Direct Manpower Resouces Indirect Manpower Divide Dec, 2011 SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 6 of 22
  • 8. HSE Statistic HSE mindset is a core value for our success YEAR Description TOTAL 2001 - 2005 2006 2007 2008 2009 2010 2011 Q1, 2012 Total Manhours 6,476,872 1,723,959 4,865,002 2,587,970 2,873,171 5,832,071 6,625,567 2,275,720 33,260,332 Worked Lost Time Injuries 0 0 0 0 0 1 0 1 2 Lost Work day 0 0 0 0 0 30 0 11 41 Restricted Duty 0 0 0 0 0 0 0 0 0 Injuries Medical Treatment 1 1 1 0 1 1 1 0 6 Injuries First Aid 3 1 1 0 1 2 4 0 12 Near Miss 6 5 8 6 4 25 12 7 73 HAZOB Cards N/A 700 1,571 734 2,696 3,753 4,450 1,641 15,545 Fire/Explosion 1 0 3 0 0 0 0 0 4 Equipment Damage 1 2 2 0 0 0 1 1 7 Vehicle Incidents 0 0 0 0 0 0 0 0 0 No. of Fatality 0 0 0 0 0 0 0 0 0 SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 7 of 22
  • 9. Engineering Capability ü Engineering Centre with more than 130 well educated in-house engineers with experience from various national and international engineering environment and projects. ü Secure and efficient engineering infrastructure with fully equipped engineering softwares ü Management teams with experience from approximately 40 EPCIC projects in DE Execution, Construction Engineering and follow-on/procurement engineering across all major disciplines. ü Extensive experience of in-house design process skids eg Fuel Gas Skids, Chemical Injection Skids, Pressure Vessels & Tanks.. ü Extensive experience of civil engineering for wharf, yard strengthening, jetty upgrade, piling foundation ü Partnership with leading international engineering houses SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 8 of 22
  • 10. Procurement Capability ü Extensive in-house experience and capacity in purchasing materials, equipments regionally and globally ü More than 50 qualified procurement employees with experience from major international EPCIC projects ü Actively promote and follow international trading practices terms and conditions ü Provide the most efficiency & competitive price in the shortest time with high quality ü Possess a rich Vendors database and unit prices database ü Efficient in-house expediting team familiar with custom authorities and closely connected to regional and global forwarders and custom authorities SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 9 of 22
  • 11. Construction Capability Yard Facilities ü Total area: 57 ha ü Quay length: ~500 m ü Quay width: 28 m ü Water depth: 10 – 15 m. ü Jetty distribution: 7 MT cargo/m2 ü Quayside designed for 20,000 DWT Vessels ü Dredging the sea bed to accommodate CPP up to 25,000 MT ü 3 Skidways (6,000 MT; 15,000MT & 25,000MT) • Subcontractors/ partners yard areas not included and able to utilise up to 180ha upon required. SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 10 of 22
  • 12. Construction Capability Manpower Resouces, Subcontractors, Tools & Equipments Manpower Resources Tools & Equipments A skilful and hard-working Deversified and modern in- workforce with over 2,100 house fabrication facilities workers; qualified & familiar ready for the work; chain with international standards; system to increase annual trained through productivity, minimize human various courses; supervised by mistakes over 100 experienced supervisors at construction yard. Subcontractors 3 rd parties services Co-operating with experienced and qualified Close partnership with various parties in construction subcontractors inside and outside cooperating, supervising and managing production Vietnam (maximizing local content, share quality & safety; verifying resources/workload and approach new potential projects) SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 11 of 22
  • 13. T&I, HUC Capability ü Provide complete delivery solutions for offshore transportation, installation, hook-up & commissioning projects ranging from marginal field developments to large integrated gas processing facilities ü Extensive experience of offshore services through out various EPCIC projects implemented. ü Wide range of global T&I, HUC partners SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 12 of 22
  • 14. Major Projects Offshore EPCIC Projects Bien Dong 1 Project Su Tu Den NE Project Chim Sao Project § Client: Bien Dong POC § Client: CuuLong JOC § Client: Premier Oil Vietnam Offshore § Project type: EPCIC § Project type: EPCIC § Project type: EPCIC § Duration: 02/2010 – tentatively 07/2012 § Duration: 02/2008 – 07/2010 § Duration: 08/2008 – 10/2010 § Key Facilities: 01 CPP, 01 WHP, 01 CPP § Key Facilities: 01 WHP, 01 jacket, infield § Key Facilities: 01 WHP, 01 jacket & Jacket & Piles, Pipeline & subsea cables pipelines & submarine cable piles, pipelines & submarine cable § Total weight: ~ 30,000 MT § Total weight: ~ 3,500 MT § Total weight: ~ 7,500 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 14 of 22
  • 15. Major Projects Offshore EPCIC Projects Su Tu Trang Project Te Giac Trang Project Bunga Orkid Project § Client: CuuLong JOC § Client: Hoang Long JOC § Client: Talisman Malaysia Limited § Project type: EPCIC § Project type: EPCIC § Project type: EPC § Duration: 03/2010 – tentatively 06/2012 § Duration: 11/2009 – 08/2011 § Duration: 07/2006 – 03/2008 § Key Facilities: 01 WHP, 01 jacket, pipelines § Key Facilities: 01 WHP, 02 jacket, 01 drilling § Key Facilities: 03 WHPs deck, infield pipeline § Total weight: ~ 2,500 MT § Total weight: ~ 4,000 MT § Total weight: ~ 4,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 15 of 22
  • 16. Major Projects Offshore E-P-C Projects Su Tu Den WHP-A Project Ruby-B Project PLDP-A Project § Client: CuuLong JOC § Client: Petronas Caligali Vietnam § Client: Petronas Caligali Vietnam § Project type: EPC § Project type: EPC § Project type: PCC § Duration: 05/2002 – 09/2003 § Duration: 10/2004 – 09/2005 § Duration: 01/2008 – 06/2009 § Key Facilities: 01 WHP § Key Facilities: 01 WHP § Key Facilities: 01 WHP § Weight: 2,200 MT § Weight: 1,300 MT § Weight: 600 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 16 of 22
  • 17. Major Projects Offshore E-P-C Projects Topaz Project Song Doc WHP-A Project Bunga Tulip A Project § Client: Petronas Caligali Vietnam § Client: Truong Son JOC § Client: Talisman Malaysia Limited § Project type: PCC § Project type: PC § Project type: C § Duration: 10/2009 – 07/2010 § Duration: 06/2007 – 02/2008 § Duration: 12/2005 – 07/2006 § Key Facilities: 01 WHP, 01 Jacket, Piles & § Key Facilities: 01 WHP § Key Facilities: 01 WHP, 01 Mono-pod Conductors Jacket § Weight: 600 MT § Total weight: ~ 4,000 MT § Total weight: 900 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 17 of 22
  • 18. Major Projects Offshore E-P-C Projects WHP-C1/CLPP/NBR3 Project JVPC S1 Project BP Compression Module Project § Client: Japan Vietnam Petroleum Company § Client: Japan Vietnam Petroleum Company § Client: British Petroleum (BP) Vietnam § Project type: C § Project type: C § Project type: PC § Duration: 10/2004 – 05/2005 § Duration: 02/2002 – 08/2002 § Duration: 07/2006 – 10/2007 § Key Facilities: 02 WHPs, 01 bridge § Key Facilities: 01 WHP § Key Facilities: 01 Compression Module § Total weight: ~ 1,200 MT § Weight: 450 MT § Weight: 2,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 18 of 22
  • 19. Major Projects Offshore E-P-C Projects LQ-CPC/99 Project Bunga Raya-A Project JVPC NULQ Project § Client: VietsovPetro JV § Client: Talisman Malaysia Limited § Client: Japan Vietnam Petroleum Company § Project type: EPC § Project type: EPC § Project type: EPC § Duration: 12/1999 – 12/2000 § Duration: 03/2002 – 07/2003 § Duration: 02/2002 – 08/2003 § Key Facilities: 02 LQs (70 men each) § Key Facilities: 01 LQ (48 men), 01 Bridge § Key Facilities: 01 LQ (63 men), 02 bridges § Total weight: ~ 2,300 MT § Total weight: 1,000 MT § Total weight: 1,400 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 19 of 22
  • 20. Major Projects Offshore E-P-C Projects 100 Men LQ Project PTSC-01 Project 3509 TUG BOAT Project § Client: Petrovietnam Marine Shipyard § Client: PTSC § Client: PTSC § Project type: C § Project type: EPC § Project type: PC § Duration: 10/2010 – 03/2011 § Duration: 10/2008 – 11/2009 § Duration: 12/2009 – 10/2010 § Key Facilities: 01 LQ (100 men) for 90m § Key Facilities: 5,000DWT Ballast Barge for § Key Facilities: 02 tug boats with capacity water depth jack-up rig transporting topsides, jackets,.. 3,500 BHP and 4,750 BHP § Total weight: 300 MT § Total weight: 2,400 MT § Total weight: 1,000 MT SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 20 of 22
  • 21. Major Projects Onshore Projects Dung Quat Refinery Harbor Project GPPIC Project NCS Condesate Storage Project § Client: DungQuat Refinery PMT § Client: PetroVietnam Gas Company § Client: Client: PetroVietnam Gas Company § Project type: PC § Project type: EPC § Project type: EPC § Duration: 06/2006 – 12/2007 § Duration: 08/2001 – 02/2002 § Duration: 11/2001 –11/2003 § Key Facilities: construct from Berth 1 to 6 § Key Facilities: Four (04) big compressors § Key Facilities: Two condensate of Product Export harbor for DungQuat tanks, condensate pumps, metering skid Refinery Harbor Project. system, floating roofs § Capacity: 16,500 m3/each SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 21 of 22
  • 22. Clients & Partners SOLUTI ONS FOR THE OI L & GAS I NDUSTRY 22 of 22