Tachometric surveying
Prepared By-
Prof. Basweshwar S. J.
Prepared By-
Prof. Basweshwar S. J.
Advantages of Tacheometric surveying
It eliminates use of chain and tape. .
We can do survey in area like Hill and mountain where it is very
difficult to do survey by other methods.
If we not need very high standards and accuracy then this is right
method.
It require low amount of time compare to other ways of
surveying.
Because Tacheometry is indirect method that we do not require
some instrument that is necessary in plan table surveying or in
theodolite surveying.
Prepared By-
Prof. Basweshwar S. J.
Disadvantages of Tacheometric
surveying
Major disadvantage of tacheometric surveying is
that, it is not used where higher accuracy is
required.
Prepared By-
Prof. Basweshwar S. J.
Applications
In rough country, both horizontal and vertical
measurements are tedious and chaining is in accurate,
slow and difficult.
when obstacles such as steep and broken ground,
stretches of water.
In locating contours and filling in detail in a topographic
survey, this method is usually the quickest & best.
When area to be surveyed is very large and accuracy
required is less.
Prepared By-
Prof. Basweshwar S. J.
Applications
Preparation of topographic maps which require both
horizontal distances and elevations.
Survey work in difficult terrain where direct methods
are inconvenient.
Filling details in a traverse.
location surveys for highways, railways, canals, etc.
hydrographic surveys.
Prepared By-
Prof. Basweshwar S. J.
Prepared By-
Prof. Basweshwar S. J.
Prepared By-
Prof. Basweshwar S. J.
Stadia method
• It is the most prevalent method for
tacheometric surveying.
• In this method, the telescope of the
theodolite is equipped with two
additional cross hairs, one above
and the other below the main
horizontal hair at equal distance.
• These additional cross hairs are
known as stadia hairs.
Tangential Method
• The tangential method of tacheometry is being
used when stadia hairs are not present in the
diaphragm of the instrument.
• In this method, the staff sighted is fitted with
two big targets (or vanes) spaced at a fixed
vertical distances.
• Vertical angles corresponding to the vanes,
say q1 and q2 are measured.
• The horizontal distance, say D and vertical
intercept, say V are computed from the values
s (pre-defined / known) q1 and q2 .
• This method is less accurate than the stadia
method.Prepared By-
Prof. Basweshwar S. J.
Fixed Hair Method: In the fixed hair
method the cross hairs of the diaphragm
are kept at a constant distance apart and
the staff intercept varies with the
horizontal and vertical position of the
staff with respect to the Theodolite.
Movable Hair Method: In this method
the staff intercept between the lower hair
and the upper hair is kept constant by
moving the horizontal cross hairs in the
vertical plane.
Prepared By-
Prof. Basweshwar S. J.
2. Additive constant
B=(f+d) where,
f=focal length of the lens
d= horizontal distance
between instrument axis to
optical centre of a lens The
value of additive constant.
varies from 0.15 m to 0.60
m.
Prepared By-
Prof. Basweshwar S. J.
In tachometric surveying, instrument used is known as a tachometer.
With the help of a tachometer observations (stadia readings and vertical
angles) are taken and horizontal and vertical distances are determined by
using formulae.
Before doing calculations we should known the values of two constants for
a tachometer to be used for survey work.
Generally their values are mentioned in the catalogue supplied by
the manufacturer.
Also the constants may be determined by:
1.Laboratory measurement
2. Field measurementPrepared By-
Prof. Basweshwar S. J.
Anallatic lens
It is an additional lens generally provided in the external focusing
tachometer between object glass & eyepiece
Advantages of anallatic lens:
1) For calculation of horizontal & vertical distances constant (f+c)=0,
if tacheometer is provided with anallatic lens.
2) Calculation becomes simple.
Disadvantages of anallatic lens:
1. The anallatic lens absorbs some of the incident light which
consequently results in reduction of the brightness of the image.
2. It also adds to the initial cost of the instrument because of one extra
lens.
Prepared By-
Prof. Basweshwar S. J.
Auto reduction Tachometer
Prepared By-
Prof. Basweshwar S. J.
FIELD WORK
• Set up the instrument.
• Set the vernier of the vertical circle to zero.
• With the altitude level at the center of its run, measure the height of the instrument with a measuring
tape accurately.
• Orient the instrument.
• Hold the staff on the benchmark and take the bearing, read the vertical angle and the top, bottom, and axial hair
readings.
• If any benchmark is not nearby the area of traversing, Fly level may be carried out.
• After all the representative points are located from the first station, take a foresight at the second station and
note down the bearings.
• Vertical angle and the staff readings corresponding to the top, bottom and the axial hairs.
• As each station is sighted twice two Values for the distances and elevations of the stations are obtained which
should be within the permissible limits; otherwise, the work should be repeated.
Prepared By-
Prof. Basweshwar S. J.
ELECTRONIC DISTANCE MEASURMENTS [EDM]
• Electronic distance measuring instrument is a surveying instrument for measuring
distance electronically between two points through electromagnetic waves.
• The method of direct distance measurement cannot be implemented in difficult
terrains.
• When large amount of variation in the terrain or large obstructions exist, this
method is avoided.
• As an alternative to this optical distance measurement method was developed.
Still it gained a disadvantage of limited range of measurement.
• It is limited to 15 to 150m with an accuracy of 1 in 1000 to 1 in 10000. Above all
we have EDM with an accuracy of 1 in 105, having a distance range of 100km.
Prepared By-
Prof. Basweshwar S. J.
Sun light or artificially generated electromagnetic wave consists of waves
of different lengths. The spectrum of an electromagnetic wave is as
shown below:
Prepared By-
Prof. Basweshwar S. J.
Types of Electronic Distance Measurement Instrument
Microwave instruments Infrared wave instruments Light wave instruments.
These instruments make use
of microwaves.
In this instrument amplitude
modulated infrared waves
are used.
These instruments rely on
propagation of modulated
light waves.
The instrument needs only
12 to 24 V batteries.
Prism reflectors are used at
the end of line to be
measured.
Light waves are most suited
way in this instrument.
They are light and highly
portable. Tellurometers can
be used in day as well as in
night.
These instruments are light
and economical and can be
mounted on theodolite.
These instruments are also
very useful for civil
engineering projects.
The range of these
instruments is up to 100 km.
With these instruments
accuracy achieved is ± 10
mm. The range of these
instruments is up to 3 km.
During night its range is up
to 2.5 km while in day its
range is up to 3 km.
Accuracy of these
instruments varies from 0.5
mm to 5 mm/km distance.
Prepared By-
Prof. Basweshwar S. J.
From the transit time and known velocity, the distance can be easily
measured. Now to solve the problem arise due to difficulty in starting the
timer at B, a reflector can be placed as shown below instead of a receiver at
B.
Fig. Transit measurement arrangement with the help of a EDM and a reflector
Prepared By-
Prof. Basweshwar S. J.
ERRORS in Electronic Distance Measurement
Personal Errors Instrumental Errors Natural Errors
Inaccuracy in initial setups of EDMs
and the reflectors over the preferred
stations
Calibration errors Atmospheric variations in
temperature, pressure as well
as humidity.
Instrument and reflector
measurements going wrong
Chances of getting
maladjusted time to time
generating frequent errors.
Micro wave EDM
instruments are more
susceptible to these.
Atmospheric pressures and
temperature determination errors
Errors shown by the
reflectors.
Multiple refraction of the
signals.
• The advantage of using EDM instruments is the speed and accuracy in measurement.
• Several obstacles to chaining are automatically overcome when these instruments are
used.Prepared By-
Prof. Basweshwar S. J.
STUDY AND USE OF TOTAL STATION
• Total station is a surveying equipment combination of Electromagnetic Distance
Measuring Instrument and electronic theodolite.
• It is also integrated with microprocessor, electronic data collector and storage system.
• The instrument can be used to measure horizontal and vertical angles as well as
sloping distance of object to the instrument.
Capability of a Total Station
Microprocessor unit in total station processes the data collected to compute:
• Average of multiple angles measured.
• Average of multiple distance measured.
• Horizontal distance.
• Distance between any two points.
• Elevation of objects and
• All the three coordinates of the observed points.
Prepared By-
Prof. Basweshwar S. J.
Prepared By-
Prof. Basweshwar S. J.
Important Operations of Total Station
Distance Measurement- range varies from 2.8 km to 4.2
km.
Angle Measurements- angle measurement varies from 2 to
6 seconds.
Data Processing- computes the horizontal distance and X,
Y, Z coordinates.
Display- capable of displaying horizontal distance, vertical
distance, horizontal and vertical angles, difference in
elevations of two observed points
Electronic Book- capacity of electronic note book varies
from 2000 points to 4000 points data.Prepared By-
Prof. Basweshwar S. J.
Prepared By-
Prof. Basweshwar S. J.
Advantages of Using Total Stations
The following are some of the major advantages of using total station over the
conventional surveying instruments:
1.Field work is carried out very fast.
2.Accuracy of measurement is high.
3.Manual errors involved in reading and recording are eliminated.
4.Calculation of coordinates is very fast and accurate.
5.Corrections for temperature and pressure are automatically made.
6.Computers can be employed for map making and plotting contour and cross-
sections.
7.Contour intervals and scales can be changed in no time.Prepared By-
Prof. Basweshwar S. J.
SUBTENSE BAR
Prepared By-
Prof. Basweshwar S. J.
 The subtense bar is an instrument used for measuring the
horizontal distance between the instrument station and a station
where the subtense bar is to be set up.
 Substense method is an indirect method of distance determination.
 This method essentially consists of measuring the angle subtended by
two ends of a horizontal rod of fixed length, called a subtense bar.
 In this method a staff or target rod is not necessary, and the theodolite
required is also of the ordinary transit type.
Prepared By-
Prof. Basweshwar S. J.

Weitere ähnliche Inhalte

Was ist angesagt?

Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying pptNaufil Sayyad
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Trigonometric levelling jithin
Trigonometric levelling   jithinTrigonometric levelling   jithin
Trigonometric levelling jithinJithin Jose
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTUVATSAL PATEL
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)Umarfarook Momin
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTUVATSAL PATEL
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying Krish Bhavsar
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-iiMarvin Ken
 

Was ist angesagt? (20)

tacheometry surveying
tacheometry surveyingtacheometry surveying
tacheometry surveying
 
Unit 4
Unit 4Unit 4
Unit 4
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Trigonometric levelling jithin
Trigonometric levelling   jithinTrigonometric levelling   jithin
Trigonometric levelling jithin
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
EDM ( Electronic distance meter)
EDM ( Electronic distance meter)EDM ( Electronic distance meter)
EDM ( Electronic distance meter)
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
 
Curves
CurvesCurves
Curves
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
 
Surveying and Levelling
Surveying and LevellingSurveying and Levelling
Surveying and Levelling
 
Traversing
TraversingTraversing
Traversing
 

Ähnlich wie Module 1 tacheometry

EDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxEDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxDenish Jangid
 
Modern Surveying & Mapping
Modern Surveying & MappingModern Surveying & Mapping
Modern Surveying & MappingEr.Karan Chauhan
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its applicationChavanRavishankar
 
Total_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxTotal_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxrahulsharma76abc
 
DISTANCE MEASUREMENTS.pptx
DISTANCE MEASUREMENTS.pptxDISTANCE MEASUREMENTS.pptx
DISTANCE MEASUREMENTS.pptxMagakaneRonald
 
Total station For Btech Engineering Students
Total station For Btech Engineering StudentsTotal station For Btech Engineering Students
Total station For Btech Engineering StudentsVinayVitekari
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instrumentsAditya Mistry
 
Electronic Distance Measurement (EDM) - Report
Electronic Distance Measurement (EDM)  - ReportElectronic Distance Measurement (EDM)  - Report
Electronic Distance Measurement (EDM) - ReportSarchia Khursheed
 
Modern survey Instruments (2).pdf
Modern survey Instruments (2).pdfModern survey Instruments (2).pdf
Modern survey Instruments (2).pdfBivaYadav3
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfNkosiAnsari
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdfsandipanpaul16
 
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..nhatty966
 
Units and measurements chapter 1 converted
Units and measurements chapter 1 convertedUnits and measurements chapter 1 converted
Units and measurements chapter 1 convertedAbhirajAshokPV
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. Ahmed Nassar
 
Ultrasound imaging system
Ultrasound imaging system Ultrasound imaging system
Ultrasound imaging system Riadh Al-Haidari
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveysbrett_grocock
 

Ähnlich wie Module 1 tacheometry (20)

EDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptxEDM-Electronic Distance Measurement by Denis Jangeed.pptx
EDM-Electronic Distance Measurement by Denis Jangeed.pptx
 
3 a1 lecture 8
3 a1 lecture 83 a1 lecture 8
3 a1 lecture 8
 
Modern Surveying & Mapping
Modern Surveying & MappingModern Surveying & Mapping
Modern Surveying & Mapping
 
Total station surveying and its application
Total station surveying and its applicationTotal station surveying and its application
Total station surveying and its application
 
Total_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptxTotal_station_and_its_application_in_sur.pptx
Total_station_and_its_application_in_sur.pptx
 
DISTANCE MEASUREMENTS.pptx
DISTANCE MEASUREMENTS.pptxDISTANCE MEASUREMENTS.pptx
DISTANCE MEASUREMENTS.pptx
 
Total station For Btech Engineering Students
Total station For Btech Engineering StudentsTotal station For Btech Engineering Students
Total station For Btech Engineering Students
 
Modern surveying instruments
Modern surveying instrumentsModern surveying instruments
Modern surveying instruments
 
Electronic Distance Measurement (EDM) - Report
Electronic Distance Measurement (EDM)  - ReportElectronic Distance Measurement (EDM)  - Report
Electronic Distance Measurement (EDM) - Report
 
Modern survey Instruments (2).pdf
Modern survey Instruments (2).pdfModern survey Instruments (2).pdf
Modern survey Instruments (2).pdf
 
Total station
Total stationTotal station
Total station
 
group-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdfgroup-3-a21-traverse-report.pdf
group-3-a21-traverse-report.pdf
 
UNIT-V.pptx
UNIT-V.pptxUNIT-V.pptx
UNIT-V.pptx
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..
HOPE ENTERPRISE UNVERSITY COLLEGE.pptx ..
 
MM-UNIT-V.pptx
MM-UNIT-V.pptxMM-UNIT-V.pptx
MM-UNIT-V.pptx
 
Units and measurements chapter 1 converted
Units and measurements chapter 1 convertedUnits and measurements chapter 1 converted
Units and measurements chapter 1 converted
 
TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS. TOTAL STATION: THEORY, USES AND APPLICATIONS.
TOTAL STATION: THEORY, USES AND APPLICATIONS.
 
Ultrasound imaging system
Ultrasound imaging system Ultrasound imaging system
Ultrasound imaging system
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveys
 

Mehr von Dr. BASWESHWAR JIRWANKAR

MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606Dr. BASWESHWAR JIRWANKAR
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606Dr. BASWESHWAR JIRWANKAR
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]Dr. BASWESHWAR JIRWANKAR
 

Mehr von Dr. BASWESHWAR JIRWANKAR (20)

M3_IE_D&HE.pdf
M3_IE_D&HE.pdfM3_IE_D&HE.pdf
M3_IE_D&HE.pdf
 
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdfTRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 
TRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdfTRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdf
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
 
TRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdfTRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdf
 
TRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdfTRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdf
 
MODULE 5 EG.pdf
MODULE 5 EG.pdfMODULE 5 EG.pdf
MODULE 5 EG.pdf
 
MODULE-4 EG.pdf
MODULE-4 EG.pdfMODULE-4 EG.pdf
MODULE-4 EG.pdf
 
MODULE-3 EG.pdf
MODULE-3 EG.pdfMODULE-3 EG.pdf
MODULE-3 EG.pdf
 
MODULE-I EG.pdf
MODULE-I EG.pdfMODULE-I EG.pdf
MODULE-I EG.pdf
 
MODULE-II EG
MODULE-II EGMODULE-II EG
MODULE-II EG
 
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
 

Kürzlich hochgeladen

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Kürzlich hochgeladen (20)

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Module 1 tacheometry

  • 3. Advantages of Tacheometric surveying It eliminates use of chain and tape. . We can do survey in area like Hill and mountain where it is very difficult to do survey by other methods. If we not need very high standards and accuracy then this is right method. It require low amount of time compare to other ways of surveying. Because Tacheometry is indirect method that we do not require some instrument that is necessary in plan table surveying or in theodolite surveying. Prepared By- Prof. Basweshwar S. J.
  • 4. Disadvantages of Tacheometric surveying Major disadvantage of tacheometric surveying is that, it is not used where higher accuracy is required. Prepared By- Prof. Basweshwar S. J.
  • 5. Applications In rough country, both horizontal and vertical measurements are tedious and chaining is in accurate, slow and difficult. when obstacles such as steep and broken ground, stretches of water. In locating contours and filling in detail in a topographic survey, this method is usually the quickest & best. When area to be surveyed is very large and accuracy required is less. Prepared By- Prof. Basweshwar S. J.
  • 6. Applications Preparation of topographic maps which require both horizontal distances and elevations. Survey work in difficult terrain where direct methods are inconvenient. Filling details in a traverse. location surveys for highways, railways, canals, etc. hydrographic surveys. Prepared By- Prof. Basweshwar S. J.
  • 9. Stadia method • It is the most prevalent method for tacheometric surveying. • In this method, the telescope of the theodolite is equipped with two additional cross hairs, one above and the other below the main horizontal hair at equal distance. • These additional cross hairs are known as stadia hairs. Tangential Method • The tangential method of tacheometry is being used when stadia hairs are not present in the diaphragm of the instrument. • In this method, the staff sighted is fitted with two big targets (or vanes) spaced at a fixed vertical distances. • Vertical angles corresponding to the vanes, say q1 and q2 are measured. • The horizontal distance, say D and vertical intercept, say V are computed from the values s (pre-defined / known) q1 and q2 . • This method is less accurate than the stadia method.Prepared By- Prof. Basweshwar S. J.
  • 10. Fixed Hair Method: In the fixed hair method the cross hairs of the diaphragm are kept at a constant distance apart and the staff intercept varies with the horizontal and vertical position of the staff with respect to the Theodolite. Movable Hair Method: In this method the staff intercept between the lower hair and the upper hair is kept constant by moving the horizontal cross hairs in the vertical plane. Prepared By- Prof. Basweshwar S. J.
  • 11. 2. Additive constant B=(f+d) where, f=focal length of the lens d= horizontal distance between instrument axis to optical centre of a lens The value of additive constant. varies from 0.15 m to 0.60 m. Prepared By- Prof. Basweshwar S. J.
  • 12. In tachometric surveying, instrument used is known as a tachometer. With the help of a tachometer observations (stadia readings and vertical angles) are taken and horizontal and vertical distances are determined by using formulae. Before doing calculations we should known the values of two constants for a tachometer to be used for survey work. Generally their values are mentioned in the catalogue supplied by the manufacturer. Also the constants may be determined by: 1.Laboratory measurement 2. Field measurementPrepared By- Prof. Basweshwar S. J.
  • 13. Anallatic lens It is an additional lens generally provided in the external focusing tachometer between object glass & eyepiece Advantages of anallatic lens: 1) For calculation of horizontal & vertical distances constant (f+c)=0, if tacheometer is provided with anallatic lens. 2) Calculation becomes simple. Disadvantages of anallatic lens: 1. The anallatic lens absorbs some of the incident light which consequently results in reduction of the brightness of the image. 2. It also adds to the initial cost of the instrument because of one extra lens. Prepared By- Prof. Basweshwar S. J.
  • 14. Auto reduction Tachometer Prepared By- Prof. Basweshwar S. J.
  • 15. FIELD WORK • Set up the instrument. • Set the vernier of the vertical circle to zero. • With the altitude level at the center of its run, measure the height of the instrument with a measuring tape accurately. • Orient the instrument. • Hold the staff on the benchmark and take the bearing, read the vertical angle and the top, bottom, and axial hair readings. • If any benchmark is not nearby the area of traversing, Fly level may be carried out. • After all the representative points are located from the first station, take a foresight at the second station and note down the bearings. • Vertical angle and the staff readings corresponding to the top, bottom and the axial hairs. • As each station is sighted twice two Values for the distances and elevations of the stations are obtained which should be within the permissible limits; otherwise, the work should be repeated. Prepared By- Prof. Basweshwar S. J.
  • 16. ELECTRONIC DISTANCE MEASURMENTS [EDM] • Electronic distance measuring instrument is a surveying instrument for measuring distance electronically between two points through electromagnetic waves. • The method of direct distance measurement cannot be implemented in difficult terrains. • When large amount of variation in the terrain or large obstructions exist, this method is avoided. • As an alternative to this optical distance measurement method was developed. Still it gained a disadvantage of limited range of measurement. • It is limited to 15 to 150m with an accuracy of 1 in 1000 to 1 in 10000. Above all we have EDM with an accuracy of 1 in 105, having a distance range of 100km. Prepared By- Prof. Basweshwar S. J.
  • 17. Sun light or artificially generated electromagnetic wave consists of waves of different lengths. The spectrum of an electromagnetic wave is as shown below: Prepared By- Prof. Basweshwar S. J.
  • 18. Types of Electronic Distance Measurement Instrument Microwave instruments Infrared wave instruments Light wave instruments. These instruments make use of microwaves. In this instrument amplitude modulated infrared waves are used. These instruments rely on propagation of modulated light waves. The instrument needs only 12 to 24 V batteries. Prism reflectors are used at the end of line to be measured. Light waves are most suited way in this instrument. They are light and highly portable. Tellurometers can be used in day as well as in night. These instruments are light and economical and can be mounted on theodolite. These instruments are also very useful for civil engineering projects. The range of these instruments is up to 100 km. With these instruments accuracy achieved is ± 10 mm. The range of these instruments is up to 3 km. During night its range is up to 2.5 km while in day its range is up to 3 km. Accuracy of these instruments varies from 0.5 mm to 5 mm/km distance. Prepared By- Prof. Basweshwar S. J.
  • 19. From the transit time and known velocity, the distance can be easily measured. Now to solve the problem arise due to difficulty in starting the timer at B, a reflector can be placed as shown below instead of a receiver at B. Fig. Transit measurement arrangement with the help of a EDM and a reflector Prepared By- Prof. Basweshwar S. J.
  • 20. ERRORS in Electronic Distance Measurement Personal Errors Instrumental Errors Natural Errors Inaccuracy in initial setups of EDMs and the reflectors over the preferred stations Calibration errors Atmospheric variations in temperature, pressure as well as humidity. Instrument and reflector measurements going wrong Chances of getting maladjusted time to time generating frequent errors. Micro wave EDM instruments are more susceptible to these. Atmospheric pressures and temperature determination errors Errors shown by the reflectors. Multiple refraction of the signals. • The advantage of using EDM instruments is the speed and accuracy in measurement. • Several obstacles to chaining are automatically overcome when these instruments are used.Prepared By- Prof. Basweshwar S. J.
  • 21. STUDY AND USE OF TOTAL STATION • Total station is a surveying equipment combination of Electromagnetic Distance Measuring Instrument and electronic theodolite. • It is also integrated with microprocessor, electronic data collector and storage system. • The instrument can be used to measure horizontal and vertical angles as well as sloping distance of object to the instrument. Capability of a Total Station Microprocessor unit in total station processes the data collected to compute: • Average of multiple angles measured. • Average of multiple distance measured. • Horizontal distance. • Distance between any two points. • Elevation of objects and • All the three coordinates of the observed points. Prepared By- Prof. Basweshwar S. J.
  • 23. Important Operations of Total Station Distance Measurement- range varies from 2.8 km to 4.2 km. Angle Measurements- angle measurement varies from 2 to 6 seconds. Data Processing- computes the horizontal distance and X, Y, Z coordinates. Display- capable of displaying horizontal distance, vertical distance, horizontal and vertical angles, difference in elevations of two observed points Electronic Book- capacity of electronic note book varies from 2000 points to 4000 points data.Prepared By- Prof. Basweshwar S. J.
  • 25. Advantages of Using Total Stations The following are some of the major advantages of using total station over the conventional surveying instruments: 1.Field work is carried out very fast. 2.Accuracy of measurement is high. 3.Manual errors involved in reading and recording are eliminated. 4.Calculation of coordinates is very fast and accurate. 5.Corrections for temperature and pressure are automatically made. 6.Computers can be employed for map making and plotting contour and cross- sections. 7.Contour intervals and scales can be changed in no time.Prepared By- Prof. Basweshwar S. J.
  • 27.  The subtense bar is an instrument used for measuring the horizontal distance between the instrument station and a station where the subtense bar is to be set up.  Substense method is an indirect method of distance determination.  This method essentially consists of measuring the angle subtended by two ends of a horizontal rod of fixed length, called a subtense bar.  In this method a staff or target rod is not necessary, and the theodolite required is also of the ordinary transit type. Prepared By- Prof. Basweshwar S. J.