1© 2020 GitaCloud, Inc. All Rights Reserved.
Integrated Business Planning for MTO Industries
8th December 2020
GitaCloud Webinar Series
2© 2020 GitaCloud, Inc. All Rights Reserved.
Webinar Launch
• Housekeeping Items:
• Zoom Controls:
• You can click on to ask your questions at any time during the webinar. You will be able to see all the questions others have asked,
panelist responses, and upvote unanswered questions.
• You can also click on to interact with the panelists and other attendees.
• All attendee microphones will stay muted during the content presentation. We will also have live Q&A towards the end. Please request to be
promoted at that time, so we can unmute your mic.
• This webinar is being recorded. Recording will be posted on GitaCloud website and SAP website later this week.
Webinar Moderator: Gabrielle Brignetti, GitaCloud
• SAP IBP Pre-Sales Consultant
• Helping manage GitaCloud Knowledge Asset Library (ValueNow)
• Majored in Business Administration from San Francisco State University (SFSU)
• Passionate about SAP IBP and SAP SAC solution stack; recipient of Undergraduate SAP Recognition Award from SFSU
Welcome to this webinar focused on Integrated Business Planning IBP for Make To Order MTO Industries
3© 2020 GitaCloud, Inc. All Rights Reserved.
Panelists
Markus Vogel, IT Lead for Business Transformation SCM & PLM, Varian Medical Systems
• Results driven SAP professional and leader with experience in implementing and rolling out ERP solutions.
• Expert in procure to pay manufacturing and process re-engineering and solution design around those
processes.
• Project manager and facilitator.
• SAP technology and supply chain process expert who loves to design processes with a diverse and global
business team and drive continuous improvement initiatives.
Kevin Lau, Director Global S&OP, Varian Medical Systems
• Experienced Operations Executive with a proven track record of achievements in the medical device, capital
equipment, laser and contract manufacturing industries.
• Responsible for ushering in strategic and operations initiatives including: DFT/Lean transformation, direct cost
reductions, MBO programs, continuous improvement programs - including Lean Six Sigma, staff development and
succession planning, NPI/time-to-market strategies, and organizational structure optimization and synchronization.
• Highly effective at fostering collaboration and cooperation cross-functionally to achieve enterprise-wide strategic
and financial objectives.
• A well-rounded, hands-on, data-driven leader who is best at leading highly complex manufacturing environments.
4© 2020 GitaCloud, Inc. All Rights Reserved.
Panelists
Eric Simonson, Director SCM Solution Management, SAP
• Eric Simonson is a Director of Solution Management at SAP, with overall experience of 25+ years in Supply Chain
Management.
• His current focus is within the Supply Chain Planning area with emphasis on Integrated Business Planning,
specifically Response and Supply.
• Eric held the role of Product Owner for APO-PPDS for 4 years before transitioning to Solution Management 7
years ago.
• This current role includes working with partners, customers, and internal SAP organizations across many
industries in order to bring the next generation of SAP’s Supply Chain Planning solutions to the market.
Ashutosh Bansal, President & CEO, GitaCloud
• 25 years of SAP Supply Chain experience spanning from selling to delivering large scale SAP SCM/IBP transformation
engagements across High-Tech, Consumer Products, Industrial Machinery & Components, Automotive, Process, and other
industries working with clients globally.
• Founded GitaCloud in 2015, 14K+ followers on LinkedIn.
• Leadership roles at SAP for 10 years 2006-2015. Helped IBP product launch and customer adoption while at SAP.
• Led 5 IBP engagements in US in 2020. IBP driven Transformation & Value Architect with a track record of delivering
innovative solutions across customers globally
5© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
6© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
7© 2020 GitaCloud, Inc. All Rights Reserved.
hat
hy
Key Results by 2022
• Increase our customer NPS from 53% to 70%
• Increase employee engagement from 73 to 79
• Double the cancer patients we impact to 6M
• Build a $4B cancer company with $0.5B outside
Radiation Oncology
A world without the fear of cancer
Worldwide cancer burden is growing
Focus on all cancer patient treatments
Varian Overview
8© 2020 GitaCloud, Inc. All Rights Reserved.
2019: Global Leader in Radiation Therapy, AND
Building a Multi-Modality Cancer Company
Focus driving strong operational execution
Varian Overview
Realizing our long-term growth and strategy
$1,527M
(47%)
AMERICAS EMEA
$1,073M
(33%)
APAC
$624.3M
(19%)
Geographic Footprint (FY19 Revenue)
8% 3Y Oncology
Orders CAGR
8,500+ 9%*
Linac Installed Base
4M+ 40%+*
Patients Touched
5,500+ 22%*
Software Installs
Oncology Systems Proton Solutions
79
NPS Score**
Interventional Solutions
$3.2B 23%*
FY19 Revenue
Chief Growth Office
Oncology Software
Solutions
Note: Data as of FY2017, excluding Varex.
* Comparison of FY19 to FY17
** According to IMV ServiceTrak in U.S. Radiation Oncology Systems Report
9© 2020 GitaCloud, Inc. All Rights Reserved.
Enable sustainable and profitable growth
Aligned with Customer expectations
Sales & Operations Planning (S&OP) – Key Elements
New Products & GEO
Forecasting
Ownership from Product
Marketing & GEOs
Supply Planning
(MPS)
Translate demand into factory
requirements
Integrated Financial
Reconciliation
Align demand/supply to
financial plan. Identify and
assess gaps
Executive
S&OP Review
Scenarios, trade-offs, decision-
making, and contingency
planning
Demand Forecast Planning
(LRDF)
Demand signals: goal of rolling
24 month forecast
InventorySupply
Demand
10© 2020 GitaCloud, Inc. All Rights Reserved.
Sales & Operations Planning (S&OP) – Key Elements
• Revenue Recognition
aligned via Integrated
Financial Reconciliation
• Ship demand
coordination with
Logistics Team
• Master Production
Scheduling
• Manufacturing Execution
• Demand Profiling – Two
year rolling horizon
• Supply Recommendations
• Rough Cut Capacity
Planning
• Inventory Planning and
Projections
Plan Make
InstallDeliver
11© 2020 GitaCloud, Inc. All Rights Reserved.
Varian’s S&OP Transformation Charter
Solution: Integrated Business Process (IBP) to Integrate and Synchronize a Comprehensive S&OP Process
• Aggregate and analyze ERP, CRM, Financial Projections and Commercial Intelligence Data
• Provide additional analytical capabilities:
• Statistical Forecasting and Extrapolation to drive longer horizons
• Scenario generation and planning
• Single source of truth
• Drive data and fact-based decision making
• Elimination of waste and improve process efficiency/productivity through automation
Primary Business Need and Driver: Immature S&OP Process
• Compartmentalized, disconnected, and fragmented management of key process elements
• Poor demand data integrity – insufficient for decision-making
• Limited demand inputs and forecasting capabilities - not representative of key stakeholders
• Lacked key and relevant metrics to monitor effectiveness of process
• Manual, offline, and resource intensive process
• No system of record
• Overall credibility deficiency
12© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
13© 2020 GitaCloud, Inc. All Rights Reserved.
Varian’s Make-To-Order Challenges
Varian’s
Challenges
FG Product and
Sales Order
Complexity
Demand
Uncertainty and
Volatility
Disconnected
Data and
Planning
Processes
14© 2020 GitaCloud, Inc. All Rights Reserved.
TrueBeam SAP Super BOM
Sales BOM Header
~300 components & options
(Software/Hardware/Services)
Production BOM header for Kitting
~20 Machine variations made to stock
~150 Accessories make or buy
One Product 2500 Product Variants
Varian’s Sample Product Structure
15© 2020 GitaCloud, Inc. All Rights Reserved.
Varian’s Planning Complexities
Revenue Forecast vs. Ship Forecast & Date Uncertainty
• Contractual title transfer agreements shift Revenue Forecast into different periods than Ship Forecast
• Inconsistent date management across the globe based on Incoterms
• Pre-ship line items with different delivery dates and revenue implications as the main machine
High Variability of Product
• A single configurable (KMAT) part can represent a multitude of machines and accessory combinations
• 5 Main hardware products that need to be broken down into ~100 machine & main assembly part numbers as well as long lead-
time procured items
Complicated Sales Order Structure
• Sales orders with hundreds of line items broken into various categories:
• Revenue relevant items
• Shippable items
• Software (intangibles)
• Multi level Variant Configuration structure in Sales Orders with KIT-To-Order concept
16© 2020 GitaCloud, Inc. All Rights Reserved.
Varian’s Planning Complexities
CRM and SAP S/4 Systems Operate with Disconnected Data Sets
• CRM (SFDC) operating on sub-set of data and lacking granularity compared to S/4
• CRM quotes contain features Varian sells, but no manufacturing part number details
• Different quoting processes globally in CRM
• Inconsistent global use of probability & forecast percentages to qualify opportunities
Supply Planning
• Supply planning constrained by ‘bad’ sales order dates and largely spreadsheet & tribal knowledge driven and limited to
machines only
• Machine and options mix calculations all manual
• Options utilize planning BOM updated manually twice a year
• Capacity information in SAP not used and not perceived as valuable
17© 2020 GitaCloud, Inc. All Rights Reserved.
July 2019
March 2020
April 2020
July 2020
September 2020
January 2021
Initialization
• Agile Build of Solution Capabilities
• IBP Model Configuration
• S/4HANA and SFDC Interface
Development
• Excel Template Development
Build Phase
• Solution in Parallel Use with Legacy
S&OP Process
• Data Cleanup (Demand and supply)
• Set up of Executive Dashboards
Operational Go-live
• IBP Setup and Onboarding
• Launch Explore Phase Together
with GitaCloud
• Requirements & Design Workshops
• IBP Prototypes & Sprint Demos
Project Kickoff
• SIT & UAT Phases
• Multiple Test Cycles of the S&OP
process
Test phase
• S&OP on IBP will Replace Legacy
Excel driven S&OP process
• Inbound Supply Interfaces (PIRs)
fully live
S&OP on IBP
• Business Case & Business
Requirements Gathering
• Tool & System Integrator Evaluation
2022 and beyond..
IBP Roadmap
• SAP IBP Response and Supply for
Order Based Supply Planning
• SAP IBP Inventory
Varian’s IBP S&OP Project Journey with GitaCloud
18© 2020 GitaCloud, Inc. All Rights Reserved.
Success Drivers & Lessons Learned
Lessons Learned
• Start a master data track early and in parallel to the process implementation
• SAP does not support Variant configuration in the standard yet, creative approaches needed in S/4-IBP interface to make it work
• Plan extra for interface development / IBP Modeling effort required to deliver the right level of visibility
• Factor in enough time for change management
Success Drivers
• Management support and buy-in for a fully integrated and global S&OP process
• Flexibility and Willingness to change the process as you go along
• A knowledgeable implementation partner that can innovate rapidly to deliver high fit to business requirements
• Prototype early & demonstrate often: keep business engaged and following along
• Single Point Of Contact from IT Team for all Source Systems
19© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
20© 2020 GitaCloud, Inc. All Rights Reserved.
GitaCloud Overview
Digital Supply Chain Innovation at Scale
WHO WE ARE WHERE WE ARE WHOM WE SERVE
Competency
WHAT WE OFFER
SAP Services and Sell Partner globally: focused
on Digital Supply Chain, Digital Core
Specialists in Planning & Scheduling: SAP IBP,
S/4 PPDS, MRP, SAC, etc.
Niche expertise in SAP IBP Response & Supply:
Order based Planning
Foundation &
Philosophy
Founded in 2015 by Ashutosh Bansal
Philosophy: Deliver significant economic value
from integrated business planning& scheduling
transformation powered by innovative and
highly tailored solutions
Headquarters
Headquartered in San Francisco Bay Area
Global Presence
Incorporated in United States | Canada |
India
Helped customers globally: North America,
Latin America, Europe, Middle East, and
Asia Pacific
Industries
Offerings
Discrete
High-Tech and Semiconductor | Industrial
Machinery & Components | Automotive
Consumer
Consumer Products | Life Sciences |
Agribusiness
Energy and Natural Resources
Chemical | Oil & Gas | Mining
Discovery Services: Value Discovery Pilot & Business Case,
Project Audit / Design Review
Implementation Services: SAP IBP Global Templates /
Rollouts, S/4 PPDS (Synchronized Planning with SAP IBP),
SAP MRP, SAC, S/4 AATP, S/4 or IBP based DDMRP
Managed Services: Planning as a Service (Demand
Forecasting / Sensing, Inventory Optimization, Supply
Optimization, S&OP Analytics Package), IBP Support &
Enhancements
Customer engagements in 2020
21© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
22© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Monthly S&OP Planning Cycle Supported by Weekly S&OE Planning Cycle
Marketing Forecasting:
Configurable FG Options
Forecast with Attach
Rate Forecasting
Sales Forecasting:
Sales Pipeline Qualification
& Range Forecasting
Consensus Demand
Planning:
Forecast Value Add Based
Consensus
Inventory Optimization:
Sub-Assembly /
Component Safety Stock
Calculation & Review
Forecast Consumption:
Generate & Release Open
Forecast to Order Based
Supply Planning
Inbound Demand
Management:
Planners override Backlog
Requested Dates
Order Based
Unconstrained Supply
Planning:
Sales Orders, Qualified
Opportunities, Forecasts
Supply Plan Review:
View Confirmations,
Pegging, Gating Factors,
Raise Action Messages for
PO Collaboration
Supplier Collaboration:
PO Expedite / Delay /
Reduce using Web Based
Planning & S/4 PO Mass
Updates
Order Based
Constrained Response
Planning:
Constrain based on
Supplier Commits
Outbound Demand
Management:
Sales Order Confirmation
Overrides and publish to
S/4
Finance Reconciliation:
Revenue Forecast Per
Scheduled Backlog and
RevRec Rules, Review Gaps
vs. Targets, What-If
Simulation
Management Review:
Performance Trends &
Forecasts
Monthly Tactical Planning Cycle
(S&OP) with IBP S&OP
Weekly Operational Planning Cycle
(S&OE) with IBP Response & Supply
Quarterly Inventory Optimization
Cycle with IBP Inventory
23© 2020 GitaCloud, Inc. All Rights Reserved.
SAP Analytics Cloud
SAP Add-On for IBP
IBP Response & SupplyIBP S&OP
MTO Solution Architecture
Unified Planning Processes across SAP S/4HANA, IBP, PPDS, SAC, and CRM
SAP S/4HANA
Time Series
Based Forecast
Consumption
What-If
Simulation (Big
Deal / Rush
Order Simulation)
Statistical
Forecasting
Open Forecast
Explosion Using
Attach Rates
Outbound Demand
Management: Refine Dates
& Publish Confirmations
ABC/XYZ
Segmentation
Integrated
Reconciliation
(Revenue Range
Forecasting)
IBP Inventory
Multi-Stage Inventory
Optimization
Production Order
Execution with Mass
Confirmation
NPI/Marketing
Forecasting
Consensus
Demand Planning
using Forecast
Value Add
Inventory Analytics,
What-If Simulation
Sales Order
Processing
Embedded PPDS
Shipment
Processing
Purchase Order
Processing
Review &
Release Open
Forecast for
Supply
Planning
Order Based
Supply
Planning
(Unconstrained)
Intelligent
Alerting &
Action
Messages
View
Confirmations,
Gating Factors,
and Pegging
Order Based
Collaboration
with Suppliers
& Shop Floor
Order Based
Response
Planning
(Constrained)
Order Based Response & Supply Planning
Vendor
Master
Material
Master
Customer
Master
BOM
Work
Center
Routing
Sales
Forecasting
Forecast Consumption & Release
Unconstrained Demand Planning
Gross Forecast
Explosion using
Attach Rates
Inbound
Demand
Management
Safety Stock
Review
& Approval
Sales Order Specific
Material Variant
CRM
Sales
Opportunities
Quote
Configuration
View
Confirmations
KMAT material
Reverse Translation
View Projected
Stock
Publish
Planned
Orders,
Purchase Reqs,
Stock
Transport Reqs
Planned Orders
Purchase
Reqs
Management
Business Review
Bottoms-Up
Performance
Forecasts
Performance
Trends
Revenue & Margin Forecasting
Sales Pipeline Management
Attach Rate
Calculation
Mass Update
Purchase
Orders,
Production
Orders
GitaCloud ValueNow
MTO Extension
SAP IBP Standard
Capabilities
24© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
25© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Dynamic Attach Rate Generation based on S/4 Sales History
Problem Statement:
• Sales Orders have unique configurations resulting into a
sub-set of the Super-BOM in every sales order. This
makes it difficult to convert MTO Finished Goods level
forecast to Make To Stock MTS sub-assembly or
component level requirements.
• These attach rates of MTO Finished Good to next level
MTS sub-assemblies vary as order mix changes monthly.
Any planning based on static attach rates results in
excess inventory or stock-outs at MTS levels of the BOM.
Time Series
Planning
Implemented at
Varian Medical
26© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Demand Forecast for Sub-Assemblies with Planning BOMs and Attach Rates
Solution & Value:
• Planning BOMs modeled per
Configurable FG (KMAT) in IBP
S&OP based on attach rates
calculated dynamically in IBP
from SAP S/4HANA Shipment
History
• Marketing Teams or Demand
Planners can forecast MTS sub-
assembly level requirements
accurately with period specific
attach rates and Planning BOMs
Time Series
Planning
Implemented at
Varian Medical
27© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
28© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Sales Forecast Using Opportunity Qualification Problem Statement:
• Sales opportunity win probabilities evolve over its life cycle.
Copying all opportunities into sales forecast does not work.
• Opportunities also have specific configurations. Some
opportunities have thin or even negative margins. Need to
forecast revenue and margin with respect to the win
probability.
• Sales opportunities close date in CRM is a point forecast. The
large uncertainty band around the close date makes it
challenging to know when to pull the trigger on buying
components needed to build corresponding BOM.
Time Series
Planning
29© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Sales Forecast Using Range Forecasts for Close Date in IBP S&OP
Solution & Value:
• Load sales opportunity with a
specific BOM for accurate
costing and margin forecast.
• Dynamic generation of Product
(Variant) ID in IBP S&OP through
enhancements in S/4 Add-On for
IBP.
• Weigh opportunity quantity and
revenue down in-sync with the
win probability.
• Close date uncertainty modeling:
Turn point projections on
revenue into range forecasts.
This is based on analysis of close
date volatility and variance of
final value from initial close date.
• Enable Supply Planning and
Finance teams to see close date
risk and make plans accordingly.
• Consider high-quality sales
opportunities into revenue
forecast. Understand
Opportunity Revenue & Margin
risks upfront.
Time Series
Planning
Implemented at
Varian Medical
30© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
31© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Revenue Forecast Using Range Forecasting
Problem Statement:
• MTO businesses must also
consider post-production
constraints like customer-site
installation schedules and
customer funds availability.
• Installation Project Managers
and Contract Administrators
may have independent ranges
of the revenue realization risk.
Hard to capture this diversity
in simple date fields, e.g.,
planned ship date or install
date.
• Factory Production Plan based
Shipment Confirmed Date
does not provide visibility into
the revenue risk due to
downstream activities.
• Incoterms and transit times
also play into when the
revenue will be realized and
may cross quarter boundaries
resulting into a revenue
surprise.
Time Series
Planning
Implemented at
Varian Medical
32© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Revenue Forecast Using Range Forecasting
Solution & Value:
• Dynamic revenue projection
based on the production &
installation scheduled of the
current sales order backlog.
• Precise calculations at sales
order item level factoring
complex revenue recognition
rules (performance
obligations, Incoterms, Transit
Times, etc.)
• Full transparency into
revenue risk from multiple
stakeholders. Project revenue
numbers to Executives and to
the Street with confidence.
• What-if Simulation capability
to model revenue risk
scenarios for large sales
orders.
Time Series
Planning
Implemented at
Varian Medical
33© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
34© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Purchase Order Based Supplier Collaboration (Using Web Based Planning)
Problem Statement:
• MTO businesses cannot
predict FG level demand and
often need to buy
corresponding components
within lead time to fulfill sales
orders (unforecasted
demands, or unusual
configurations).
• Production plans need to be
developed unconstrained by
procurement as first pass.
• Buyers need to work with
Suppliers on procurement
plans to support the
production plan. Only the
hard procurement
constraints post the supplier
collaboration should
constrain Production Plan
and corresponding sales
order confirmation dates.
• Supplier collaboration
process needs to manage
Purchase Order Expedite /
Delay / Reduce scenarios.
Order Based
Planning
35© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Purchase Order Based Supplier Collaboration (Using Web Based Planning)
Solution & Value:
• IBP Order Based Planning
generates a Production Plan
unconstrained by
procurement lead times for
the components.
• Pegging data is examined to
raise Purchase Order specific
action messages (expedite /
delay / reduce) in sync with
current requirements.
• Supplier Collaboration
process leverages Web
Based Planning or IBP Excel
templates.
• Purchase Orders are mass
updated in S/4 based on
Supplier Response.
• Supplier Response
constrains the Production
Plan and Sales Order
Confirmations are adjusted
accordingly.
• Dynamic process to buy
sales order specific BOMs
and manage PO exceptions
in a fully automated loop.
Order Based
Planning
36© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
37© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Demand Management (Planner Override of IBP Requested / Confirmed Dates)
Problem Statement:
• Planners need to plan in IBP
Order Based Planning with
earlier dates than per
Requested Ship Date on the
Sales Order (to create a time
buffer).
• Planners may also want to
publish more conservative
confirmed date to S/4 to be
communicated to customers.
Planned Orders raised as per
IBP production Plan, sales
order confirmed per Planner
override.
• Currently, SAP IBP standard
does not have hooks for
planners to override sales
order requested date or
confirmed date.
• On Time Delivery (OTD)
metric is challenging to
understand and analyze
given all the Sales Order
Requested Date changes and
Factory Schedule changes.
Order Based
Planning
Manual Override
38© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Demand Management (Planner Override of IBP Requested / Confirmed Dates)
Solution & Value:
• GitaCloud ValueNow MTO
Extension enables planners to
override requested date or
confirmed dates on sales
orders in IBP.
• Enable granular tracking of
On-Time Delivery (OTD)
metric and performance
trends in IBP Analytics &
Dashboards.
• This First Commit Date is reset
only in the case of a
Requested Ship Date change
from the Customer. Actual
Ship Date is measured against
the First Commit Date in IBP
to generate On Time Delivery
(OTD) metric by sales order
item.
• OTD performance trends can
be aggregated & reported at
higher levels (Location /
Month) as a waterfall chart.
Alert Raised: First Commit Date at Risk
On Time Delivery Issue Resolved
Order Based
Planning
Manual Override
39© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Design Showcase
1. IBP Process Map & Solution Architecture for MTO
2. Dynamic Attach Rates Based Planning
3. Sales Opportunity Qualification & Range Forecasting
4. Sales Order Based Revenue Forecasting
5. Purchase Order Based Supplier Collaboration
6. Demand Management (Planner Override of Sales Order Dates)
7. GitaCloud ValueNow MTO Extension & Key Takeaways
40© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
GitaCloud ValueNow MTO Extension
Tactical / Operational
Demand Planning
Tactical / Operational
Supply Planning
Finance Reconciliation
/Management Review
SAP IBP Standard Capabilities for MTO GitaCloud ValueNow MTO Extension
 Sub-Assembly Statistical Forecasting (Point Forecasts)
 Sales Forecasting using Opportunities
 Consensus Demand Planning
 Dynamic Attach Rates Based Planning
 Range Forecasting for Close Dates & Qualification of Sales Pipeline
 Forecast Value Add based Consensus Planning
 Time Series Forecast Consumption
 Operational Supply Planning Heuristic / Optimizer
 Multi-Stage Inventory Optimization
 Sales Order Confirmation with Demand Prioritization
 Pegging, Gating Factors
 View Projected Stock
 Web Based Planning
 Sales Order Simulation
 Intelligent Visibility
 Make To Order MTO Products: Dynamic Product Variants
 Sales Opportunities & Sales Orders with multi-level Configuration in IBP
 MTO based IBP Planned Order Publish back to S/4
 Forecast Consumption & Release via S/4 Add-On for OBP
 Planning Model Extension to show Sales Order Item level Excel Add-In views
 Order Based Supplier Collaboration with Mass PO Updates
 Order Based Shop Floor Collaboration with Mass Production Order Updates
 Business Rules and Pegging Based Intelligent Alerting
 Demand Management (Planner Override of Dates)
 Intercompany PO Support and Date Change Propagation
 MTO Sales Order Simulation
 Period Lot Sizing support in IBP OBP
 Mass Confirmation of MTO Production Orders based on IBP
 Driver Based Planning
 What-if Simulation
 Analytics & Dashboards
 Revenue Range Forecasting for Sales Orders
 Performance Obligations, Incoterms based Revenue Forecasting
 Performance Trends (On-Time Delivery with Business Rules on Date
Management)
41© 2020 GitaCloud, Inc. All Rights Reserved.
IBP for MTO
Key Takeaways
MTO presents complex challenges. Standard IBP does not cover all the scenarios.
• Business Challenges: Highly uncertain sales pipeline, volatile sales order backlog, complex revenue recognition, etc.
• Order Based Planning: Varian Configuration based sales orders not supported in IBP interface
• Time Series Planning: range forecasting, revenue recognition ruleset, etc.
GitaCloud ValueNow MTO extension enables coverage across MTO scenarios
• GitaCloud’s ValueNow MTO Extension dynamically generates unique product variants
• Plan VC sales orders with sales order BOMs using IBP Time Series or Order Based Planning
• Generate revenue forecast taking installation / commercial risks into account
GitaCloud can help MTO customers implement with SAP IBP or S/4 MRP
• SAP IBP S&OP - Time Series Planning: Order Based granular Planning Model
• SAP IBP Response & Supply - Order Based Planning: Order Based Planning & Supplier Collaboration
• SAP S/4 or ECC MRP: Characteristics Planning (MRP Strategy 56)
42© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
43© 2020 GitaCloud, Inc. All Rights Reserved.
Legal disclaimer
The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of SAP.
This presentation is not subject to your license agreement or any other service or subscription agreement with SAP. SAP has no obligation
to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This
document, or any related presentation, and SAP’s strategy and possible future developments, products, and platforms, directions, and functionality are all
subject to change and may be changed by SAP at any time for any reason without notice. The information in this document is not a commitment, promise,
or legal obligation to deliver any material, code, or functionality. This document is provided without
a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or
noninfringement. This document is for informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or
omissions in this document, except if such damages were caused by SAP’s willful misconduct or gross negligence.
All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers
are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates,
and they should not be relied upon in making purchasing decisions.
For all recent and planned innovations, potential data protection and privacy features include simplified deletion of personal data, reporting
of personal data to an identified data subject, restricted access to personal data, masking of personal data, read access logging to special
categories of personal data, change logging of personal data, and consent management mechanisms.
44© 2020 GitaCloud, Inc. All Rights Reserved.
Official roadmap timing by feature, can now be found in the Roadmap Explorer at link below.
The following slides are for reference only and not published externally anymore.
https://roadmaps.sap.com/board?PRODUCT=67838200100800006742
Official IBP Roadmap
45© 2020 GitaCloud, Inc. All Rights Reserved.
1. This is the current state of planning and may be changed by SAP at any time without notice.
• V2011 – Recent innovations • V2102 – Planned Q1/20211 • V2105 – Planned Q2/20211 • V2108 – Planned Q3/20211
Order-based planning
 Deployment cost generation
 Display configurable master data for any
master data type in one harmonized Fiori
App
 Include OBP settings during planning
area copy
Order-based planning
 Interactive planning: Order creation/delete
 Transportation resource
 Last Period Aggregation in Projected
Stock Calculation
 Location Product substitution for
optimizer (supersession)
 Create/change configurable master data
in Fiori App
Tactical supply planning
 Aggregated constraints as soft constraints
 Aggregated constraints in time dimension
Order-based planning
 Create fixed supply in key figure
 Planning with subnetworks (upstream
planning)
 Switchable constraints on object level
 Location Product substitution for heuristics
(supersession)
 New planning run: Supply Planning
Tactical supply planning
 Non-stocking location-products in
finite heuristic
 Freeze horizon
 Fair-share demand fulfillment for finite
heuristic
Order-based planning
 Order-based DDMRP: order-creation and
integration
 Synchronized Planning: Tight integration
between order-based planning in IBP and
short-term Production Planning in
S/4HANA PP/DS
 Demand Cost Key Figures for Optimizer
Tactical supply planning
 Product decomposition for optimizer​
 Support lead-times in daily time-granularity​
 Repeat Resources on production source of
supply​
 Planning run data monitor​
 Elastic planning runs for Optimizer and
Finite heuristic algorithms
Tactical supply planning
 Support of transportation and
production capacity usage
aggregated
constraints for normalized planning
area
 Late-demand delivery for inter-
subnetwork demand
SAP Integrated Business Planning for response and supply
Product road map overview – Key innovations
46© 2020 GitaCloud, Inc. All Rights Reserved.
Enhancements in order-based planning
• Periodic lot sizes
• Multiple activities in planned orders
• Near-real-time integration from SAP S/4HANA and SAP ERP to SAP
Integrated Business Planning
• MRP areas
• Scheduling agreement support
• Production in another plant
• Coproducts and by-products
• MRP segments for make-to-order and project segments
• Characteristics-based planning and shelf-life planning
• Telescopic buckets
• Subcontracting
Supply and allocations planning
• Delta planning, enhanced parallel planning
Response planning
• Allocation on components and aggregate levels
Deployment planning
• Handling resources
• Storage resources
• Push deployment (heuristic)
• Outbound quotas
• Load consolidation
Operational supply planning
• Capacity leveling on infinite planning result
1. This is the current state of planning and may be changed by SAP at any time without notice.
SAP Integrated Business Planning for response and supply
Product Direction update1
47© 2020 GitaCloud, Inc. All Rights Reserved.
1. This is the current state of planning and may be changed by SAP at any time without notice.
• 2023+ - Outlook• 2022 - Outlook
Generic Supply Planning
• Supply Chain Sub-Networks
• Switchable constraints for infinite
planning
• Create/ delete version dependent
master data
• Order Visibility
• Control Tower to order data navigation
Distribution Planning
• Transportation resources
Order-based Optimization
• Deployment Optimization (for Push)
• Fair Share in Optimization
• Supply Optimization
Process Integration
• Production Planning Integration:
Integration between IBP and S/4 with
ePP/DS
• Subcontracting
Integration with S/4 and ERP
• Integration of single ERP to multiple IBPs
• Near real-time integration
• Configurable data model for master and
transactional data
• Extensible supply chain – for priorities and UI
Generic Supply Planning
• Stock segments, MRP Areas
• Interactive planning on order level
• Delta Planning, Repair Planning
• Infinite MRP-like heuristics
• Re-order point planning
• Order-based planning support for DDMRP
Distribution Planning
• Shipping/Receiving resources
• Product Substitution on finished products
• Storage resources (Optimization)
• Outbound quotas
Order-based Optimization
• Telescopic buckets
• Results monitor
Process Integration
• Production Planning Integration: further
integration scenarios
• Make-to-order segments
• Scheduling agreements
• Production in another plant
• Co-products, recursive BOMs
• Initial use case for charact.-based planning
• 2020 – Planned Innovations • 2021 - Outlook
Integration with S/4 and ERP
• Cross system STR integration
• Combined Data Model for
Supply&Response
Generic Supply Planning
• Capacity Leveling
• Intelligent Alert
Distribution Planning
• Load Consolidation Service linked to IBP
Distribution Planning
• Vendor-Managed Inventory
Process Integration
• Batches
• Shelf Life Propagation
• Further use cases for characteristics-
based planning
• Product substitution on components
• Planning of configured products
Integration with S/4 and ERP
• Enhancements to scalability and usability
Generic Supply Planning
• Component Allocation, Supply
Segmentation
• Algorithmic Extensibility
Process Integration
• Project Orders
• Further use cases for Characteristics-
based Planning
• Location substitution
SAP Integrated Business Planning for response and supply
Long-term Product road map overview for order-based planning – key themes and capabilities
55366enUS (20/02)
© 2020 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of
SAP SE or an SAP affiliate company.
The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its
distributors contain proprietary software components of other software vendors. National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or
warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the materials.
The only warranties for SAP or SAP affiliate company products and services are those that are set forth in the express warranty
statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional
warranty.
In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or
any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation,
and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platforms, directions, and
functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason
without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or
functionality. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ
materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, and they
should not be relied upon in making purchasing decisions.
SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered
trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names
mentioned are the trademarks of their respective companies.
See www.sap.com/copyright for additional trademark information and notices.
www.sap.com/contactsap
Follow us
49© 2020 GitaCloud, Inc. All Rights Reserved.
Agenda
S&OP Maturity
Journey at Varian
Medical
Wrap-up
Q&A
10 min
Kick-off
5 min 10 min
Gabrielle Kevin All
IBP for MTO: Solution Showcase
40 min
Ashutosh
Make To Order
Products Planning
Challenges
10 min
Markus
SAP IBP Roadmap
15 min
Eric
50© 2020 GitaCloud, Inc. All Rights Reserved.
Call To Action
Q&A
• Please fill the survey at the end of this webinar
• GitaCloud is offering a 4-hour complimentary discovery
workshop. Send us an email at connect@gitacloud.com if you are
interested
• GitaCloud can help you further your digital supply chain strategy,
powered by SAP IBP or S/4 capabilities (S/4 PPDS, S/4 MRP, etc.)
• GitaCloud can implement SAP IBP or S/4 MRP in 3-4 months. We
deliver innovation with speed in a cost-effective manner (80%+
offshore model)
• GitaCloud can help you excel in all phases of your digital
transformation journey: IBP discovery, implementation, support, or
planning as a service (Forecasting, IO)
• Visit www.gitacloud.com to learn more
51© 2020 GitaCloud, Inc. All Rights Reserved.
Ashutosh Bansal
President & CEO, GitaCloud
+1 925-519-5965
6200 Stoneridge Mall Road, 3rd Floor, Pleasanton, CA
ashutosh@gitacloud.com
www.GitaCloud.com

Weitere ähnliche Inhalte

Was ist angesagt?

SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationBluefin Solutions
 
Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSoumya De
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Plan4Demand
 
L1_RISE_with_SAP_NNN_V3.4.pptx
L1_RISE_with_SAP_NNN_V3.4.pptxL1_RISE_with_SAP_NNN_V3.4.pptx
L1_RISE_with_SAP_NNN_V3.4.pptxGuruprasad Bellary
 
SAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSingbBablu
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABluefin Solutions
 
Transition to SAP S/4HANA System Conversion: A step-by-step guide
Transition to SAP S/4HANA System Conversion: A step-by-step guide Transition to SAP S/4HANA System Conversion: A step-by-step guide
Transition to SAP S/4HANA System Conversion: A step-by-step guide Kellton Tech Solutions Ltd
 
Sap s4 hana (2)
Sap s4 hana (2)Sap s4 hana (2)
Sap s4 hana (2)babloo6
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitEdwin Weijers
 
“Migration to Suite of HANA”
“Migration to Suite of HANA”“Migration to Suite of HANA”
“Migration to Suite of HANA”Wise Men
 
SAP Learning Hub - Integrated Business Planning
SAP Learning Hub - Integrated Business PlanningSAP Learning Hub - Integrated Business Planning
SAP Learning Hub - Integrated Business PlanningLejlaseperovic
 
SAP S/4HANA Adoption- Establishing a Digital Core
SAP S/4HANA Adoption- Establishing a Digital Core SAP S/4HANA Adoption- Establishing a Digital Core
SAP S/4HANA Adoption- Establishing a Digital Core Tania Cirone-Fenyes
 
GitaCloud SAP IBP for Inventory Webinar May 25th 2018
GitaCloud SAP IBP for Inventory Webinar May 25th 2018GitaCloud SAP IBP for Inventory Webinar May 25th 2018
GitaCloud SAP IBP for Inventory Webinar May 25th 2018Ashutosh Bansal
 
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfRDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfandy564912
 
SAP SuccessFactors Solutions Road Map
SAP SuccessFactors Solutions Road MapSAP SuccessFactors Solutions Road Map
SAP SuccessFactors Solutions Road MapAhmed Negm
 
SalesForce Consulting Service & Customization
SalesForce Consulting Service & CustomizationSalesForce Consulting Service & Customization
SalesForce Consulting Service & Customizationvarianceinfotech
 
SAP-SuccessFactors Customer Presentation
SAP-SuccessFactors Customer PresentationSAP-SuccessFactors Customer Presentation
SAP-SuccessFactors Customer PresentationSplunk
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh Nayak
 
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)Spinnaker Management Group
 

Was ist angesagt? (20)

SAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementationSAP S/4HANA: Everything you need to know for a successul implementation
SAP S/4HANA: Everything you need to know for a successul implementation
 
Sap S/4 HANA New Implementation
Sap S/4 HANA New ImplementationSap S/4 HANA New Implementation
Sap S/4 HANA New Implementation
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
 
L1_RISE_with_SAP_NNN_V3.4.pptx
L1_RISE_with_SAP_NNN_V3.4.pptxL1_RISE_with_SAP_NNN_V3.4.pptx
L1_RISE_with_SAP_NNN_V3.4.pptx
 
SAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptxSAP HANA Migration Deck.pptx
SAP HANA Migration Deck.pptx
 
Building the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANABuilding the Business Case for SAP S/4HANA
Building the Business Case for SAP S/4HANA
 
Transition to SAP S/4HANA System Conversion: A step-by-step guide
Transition to SAP S/4HANA System Conversion: A step-by-step guide Transition to SAP S/4HANA System Conversion: A step-by-step guide
Transition to SAP S/4HANA System Conversion: A step-by-step guide
 
S4HANA Migration Overview
S4HANA Migration OverviewS4HANA Migration Overview
S4HANA Migration Overview
 
Sap s4 hana (2)
Sap s4 hana (2)Sap s4 hana (2)
Sap s4 hana (2)
 
SAP S/4HANA Migration Cockpit
SAP S/4HANA Migration CockpitSAP S/4HANA Migration Cockpit
SAP S/4HANA Migration Cockpit
 
“Migration to Suite of HANA”
“Migration to Suite of HANA”“Migration to Suite of HANA”
“Migration to Suite of HANA”
 
SAP Learning Hub - Integrated Business Planning
SAP Learning Hub - Integrated Business PlanningSAP Learning Hub - Integrated Business Planning
SAP Learning Hub - Integrated Business Planning
 
SAP S/4HANA Adoption- Establishing a Digital Core
SAP S/4HANA Adoption- Establishing a Digital Core SAP S/4HANA Adoption- Establishing a Digital Core
SAP S/4HANA Adoption- Establishing a Digital Core
 
GitaCloud SAP IBP for Inventory Webinar May 25th 2018
GitaCloud SAP IBP for Inventory Webinar May 25th 2018GitaCloud SAP IBP for Inventory Webinar May 25th 2018
GitaCloud SAP IBP for Inventory Webinar May 25th 2018
 
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfRDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
 
SAP SuccessFactors Solutions Road Map
SAP SuccessFactors Solutions Road MapSAP SuccessFactors Solutions Road Map
SAP SuccessFactors Solutions Road Map
 
SalesForce Consulting Service & Customization
SalesForce Consulting Service & CustomizationSalesForce Consulting Service & Customization
SalesForce Consulting Service & Customization
 
SAP-SuccessFactors Customer Presentation
SAP-SuccessFactors Customer PresentationSAP-SuccessFactors Customer Presentation
SAP-SuccessFactors Customer Presentation
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
Building a Roadmap to Adopt SAP Integrated Business Planning (IBP)
 

Ähnlich wie GitaCloud Webinar - SAP Integrated Business Planning IBP for Make To Order MTO Industries - Dec 8th, 2020

Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate PresentationSupriya SAVIC
 
Aligning IT With World-Class Fashion
Aligning IT With World-Class FashionAligning IT With World-Class Fashion
Aligning IT With World-Class FashionCA Technologies
 
5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PXProduct School
 
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...SAP Analytics
 
Cynoteck - Salesforce Presentation - Consulting Services
Cynoteck  -  Salesforce Presentation - Consulting ServicesCynoteck  -  Salesforce Presentation - Consulting Services
Cynoteck - Salesforce Presentation - Consulting ServicesRosa Aguiar Catraio
 
Value driver planning for mining using microsoft power bi webinar
Value driver planning for mining using microsoft power bi   webinarValue driver planning for mining using microsoft power bi   webinar
Value driver planning for mining using microsoft power bi webinarVisual_BI
 
LABS PURE Executive Presentation
LABS PURE Executive PresentationLABS PURE Executive Presentation
LABS PURE Executive PresentationAhmed Ammar
 
Cognos Data Manager Support Changes: Entitlements Migrate to DataStage
Cognos Data Manager Support Changes: Entitlements Migrate to DataStageCognos Data Manager Support Changes: Entitlements Migrate to DataStage
Cognos Data Manager Support Changes: Entitlements Migrate to DataStageSenturus
 
Your Digital Finance Transformation Journey
Your Digital Finance Transformation JourneyYour Digital Finance Transformation Journey
Your Digital Finance Transformation JourneyWorkday, Inc.
 
5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PXProduct School
 
PPM Summit San Francisco Hitachi
PPM Summit San Francisco HitachiPPM Summit San Francisco Hitachi
PPM Summit San Francisco HitachiMicrosoft
 
Webinar - ValQ for Production Planning and Control
Webinar - ValQ for Production Planning and ControlWebinar - ValQ for Production Planning and Control
Webinar - ValQ for Production Planning and ControlVisual_BI
 
Nagaraju Kalluri_SD - 1.DOC
Nagaraju Kalluri_SD - 1.DOCNagaraju Kalluri_SD - 1.DOC
Nagaraju Kalluri_SD - 1.DOCNagaraju Kalluri
 
Latest Innovations in Planning Analytics on Cloud_Chris
Latest Innovations in Planning Analytics on Cloud_ChrisLatest Innovations in Planning Analytics on Cloud_Chris
Latest Innovations in Planning Analytics on Cloud_ChrisCharles Wilson
 

Ähnlich wie GitaCloud Webinar - SAP Integrated Business Planning IBP for Make To Order MTO Industries - Dec 8th, 2020 (20)

Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate Presentation
 
Aligning IT With World-Class Fashion
Aligning IT With World-Class FashionAligning IT With World-Class Fashion
Aligning IT With World-Class Fashion
 
5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX
 
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...
#askSAP Analytics Innovations Community Call: Delivering Big Data Inisghts wi...
 
Resume-Functinal Lead
Resume-Functinal LeadResume-Functinal Lead
Resume-Functinal Lead
 
The World of Agility
The World of Agility The World of Agility
The World of Agility
 
Cynoteck - Salesforce Presentation - Consulting Services
Cynoteck  -  Salesforce Presentation - Consulting ServicesCynoteck  -  Salesforce Presentation - Consulting Services
Cynoteck - Salesforce Presentation - Consulting Services
 
Value driver planning for mining using microsoft power bi webinar
Value driver planning for mining using microsoft power bi   webinarValue driver planning for mining using microsoft power bi   webinar
Value driver planning for mining using microsoft power bi webinar
 
Resume-Functional Lead
Resume-Functional LeadResume-Functional Lead
Resume-Functional Lead
 
Jagadeesh_Bangalore_5.01_yrs
Jagadeesh_Bangalore_5.01_yrsJagadeesh_Bangalore_5.01_yrs
Jagadeesh_Bangalore_5.01_yrs
 
LABS PURE Executive Presentation
LABS PURE Executive PresentationLABS PURE Executive Presentation
LABS PURE Executive Presentation
 
Cognos Data Manager Support Changes: Entitlements Migrate to DataStage
Cognos Data Manager Support Changes: Entitlements Migrate to DataStageCognos Data Manager Support Changes: Entitlements Migrate to DataStage
Cognos Data Manager Support Changes: Entitlements Migrate to DataStage
 
Your Digital Finance Transformation Journey
Your Digital Finance Transformation JourneyYour Digital Finance Transformation Journey
Your Digital Finance Transformation Journey
 
5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX5 Ways to Enhance the Customer Experience with Gainsight PX
5 Ways to Enhance the Customer Experience with Gainsight PX
 
Resume_Sap
Resume_SapResume_Sap
Resume_Sap
 
PPM Summit San Francisco Hitachi
PPM Summit San Francisco HitachiPPM Summit San Francisco Hitachi
PPM Summit San Francisco Hitachi
 
Webinar - ValQ for Production Planning and Control
Webinar - ValQ for Production Planning and ControlWebinar - ValQ for Production Planning and Control
Webinar - ValQ for Production Planning and Control
 
Nagaraju Kalluri_SD - 1.DOC
Nagaraju Kalluri_SD - 1.DOCNagaraju Kalluri_SD - 1.DOC
Nagaraju Kalluri_SD - 1.DOC
 
Bibzbrain Corporate Deck
Bibzbrain Corporate DeckBibzbrain Corporate Deck
Bibzbrain Corporate Deck
 
Latest Innovations in Planning Analytics on Cloud_Chris
Latest Innovations in Planning Analytics on Cloud_ChrisLatest Innovations in Planning Analytics on Cloud_Chris
Latest Innovations in Planning Analytics on Cloud_Chris
 

Kürzlich hochgeladen

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 

Kürzlich hochgeladen (20)

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 

GitaCloud Webinar - SAP Integrated Business Planning IBP for Make To Order MTO Industries - Dec 8th, 2020

  • 1. 1© 2020 GitaCloud, Inc. All Rights Reserved. Integrated Business Planning for MTO Industries 8th December 2020 GitaCloud Webinar Series
  • 2. 2© 2020 GitaCloud, Inc. All Rights Reserved. Webinar Launch • Housekeeping Items: • Zoom Controls: • You can click on to ask your questions at any time during the webinar. You will be able to see all the questions others have asked, panelist responses, and upvote unanswered questions. • You can also click on to interact with the panelists and other attendees. • All attendee microphones will stay muted during the content presentation. We will also have live Q&A towards the end. Please request to be promoted at that time, so we can unmute your mic. • This webinar is being recorded. Recording will be posted on GitaCloud website and SAP website later this week. Webinar Moderator: Gabrielle Brignetti, GitaCloud • SAP IBP Pre-Sales Consultant • Helping manage GitaCloud Knowledge Asset Library (ValueNow) • Majored in Business Administration from San Francisco State University (SFSU) • Passionate about SAP IBP and SAP SAC solution stack; recipient of Undergraduate SAP Recognition Award from SFSU Welcome to this webinar focused on Integrated Business Planning IBP for Make To Order MTO Industries
  • 3. 3© 2020 GitaCloud, Inc. All Rights Reserved. Panelists Markus Vogel, IT Lead for Business Transformation SCM & PLM, Varian Medical Systems • Results driven SAP professional and leader with experience in implementing and rolling out ERP solutions. • Expert in procure to pay manufacturing and process re-engineering and solution design around those processes. • Project manager and facilitator. • SAP technology and supply chain process expert who loves to design processes with a diverse and global business team and drive continuous improvement initiatives. Kevin Lau, Director Global S&OP, Varian Medical Systems • Experienced Operations Executive with a proven track record of achievements in the medical device, capital equipment, laser and contract manufacturing industries. • Responsible for ushering in strategic and operations initiatives including: DFT/Lean transformation, direct cost reductions, MBO programs, continuous improvement programs - including Lean Six Sigma, staff development and succession planning, NPI/time-to-market strategies, and organizational structure optimization and synchronization. • Highly effective at fostering collaboration and cooperation cross-functionally to achieve enterprise-wide strategic and financial objectives. • A well-rounded, hands-on, data-driven leader who is best at leading highly complex manufacturing environments.
  • 4. 4© 2020 GitaCloud, Inc. All Rights Reserved. Panelists Eric Simonson, Director SCM Solution Management, SAP • Eric Simonson is a Director of Solution Management at SAP, with overall experience of 25+ years in Supply Chain Management. • His current focus is within the Supply Chain Planning area with emphasis on Integrated Business Planning, specifically Response and Supply. • Eric held the role of Product Owner for APO-PPDS for 4 years before transitioning to Solution Management 7 years ago. • This current role includes working with partners, customers, and internal SAP organizations across many industries in order to bring the next generation of SAP’s Supply Chain Planning solutions to the market. Ashutosh Bansal, President & CEO, GitaCloud • 25 years of SAP Supply Chain experience spanning from selling to delivering large scale SAP SCM/IBP transformation engagements across High-Tech, Consumer Products, Industrial Machinery & Components, Automotive, Process, and other industries working with clients globally. • Founded GitaCloud in 2015, 14K+ followers on LinkedIn. • Leadership roles at SAP for 10 years 2006-2015. Helped IBP product launch and customer adoption while at SAP. • Led 5 IBP engagements in US in 2020. IBP driven Transformation & Value Architect with a track record of delivering innovative solutions across customers globally
  • 5. 5© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 6. 6© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 7. 7© 2020 GitaCloud, Inc. All Rights Reserved. hat hy Key Results by 2022 • Increase our customer NPS from 53% to 70% • Increase employee engagement from 73 to 79 • Double the cancer patients we impact to 6M • Build a $4B cancer company with $0.5B outside Radiation Oncology A world without the fear of cancer Worldwide cancer burden is growing Focus on all cancer patient treatments Varian Overview
  • 8. 8© 2020 GitaCloud, Inc. All Rights Reserved. 2019: Global Leader in Radiation Therapy, AND Building a Multi-Modality Cancer Company Focus driving strong operational execution Varian Overview Realizing our long-term growth and strategy $1,527M (47%) AMERICAS EMEA $1,073M (33%) APAC $624.3M (19%) Geographic Footprint (FY19 Revenue) 8% 3Y Oncology Orders CAGR 8,500+ 9%* Linac Installed Base 4M+ 40%+* Patients Touched 5,500+ 22%* Software Installs Oncology Systems Proton Solutions 79 NPS Score** Interventional Solutions $3.2B 23%* FY19 Revenue Chief Growth Office Oncology Software Solutions Note: Data as of FY2017, excluding Varex. * Comparison of FY19 to FY17 ** According to IMV ServiceTrak in U.S. Radiation Oncology Systems Report
  • 9. 9© 2020 GitaCloud, Inc. All Rights Reserved. Enable sustainable and profitable growth Aligned with Customer expectations Sales & Operations Planning (S&OP) – Key Elements New Products & GEO Forecasting Ownership from Product Marketing & GEOs Supply Planning (MPS) Translate demand into factory requirements Integrated Financial Reconciliation Align demand/supply to financial plan. Identify and assess gaps Executive S&OP Review Scenarios, trade-offs, decision- making, and contingency planning Demand Forecast Planning (LRDF) Demand signals: goal of rolling 24 month forecast InventorySupply Demand
  • 10. 10© 2020 GitaCloud, Inc. All Rights Reserved. Sales & Operations Planning (S&OP) – Key Elements • Revenue Recognition aligned via Integrated Financial Reconciliation • Ship demand coordination with Logistics Team • Master Production Scheduling • Manufacturing Execution • Demand Profiling – Two year rolling horizon • Supply Recommendations • Rough Cut Capacity Planning • Inventory Planning and Projections Plan Make InstallDeliver
  • 11. 11© 2020 GitaCloud, Inc. All Rights Reserved. Varian’s S&OP Transformation Charter Solution: Integrated Business Process (IBP) to Integrate and Synchronize a Comprehensive S&OP Process • Aggregate and analyze ERP, CRM, Financial Projections and Commercial Intelligence Data • Provide additional analytical capabilities: • Statistical Forecasting and Extrapolation to drive longer horizons • Scenario generation and planning • Single source of truth • Drive data and fact-based decision making • Elimination of waste and improve process efficiency/productivity through automation Primary Business Need and Driver: Immature S&OP Process • Compartmentalized, disconnected, and fragmented management of key process elements • Poor demand data integrity – insufficient for decision-making • Limited demand inputs and forecasting capabilities - not representative of key stakeholders • Lacked key and relevant metrics to monitor effectiveness of process • Manual, offline, and resource intensive process • No system of record • Overall credibility deficiency
  • 12. 12© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 13. 13© 2020 GitaCloud, Inc. All Rights Reserved. Varian’s Make-To-Order Challenges Varian’s Challenges FG Product and Sales Order Complexity Demand Uncertainty and Volatility Disconnected Data and Planning Processes
  • 14. 14© 2020 GitaCloud, Inc. All Rights Reserved. TrueBeam SAP Super BOM Sales BOM Header ~300 components & options (Software/Hardware/Services) Production BOM header for Kitting ~20 Machine variations made to stock ~150 Accessories make or buy One Product 2500 Product Variants Varian’s Sample Product Structure
  • 15. 15© 2020 GitaCloud, Inc. All Rights Reserved. Varian’s Planning Complexities Revenue Forecast vs. Ship Forecast & Date Uncertainty • Contractual title transfer agreements shift Revenue Forecast into different periods than Ship Forecast • Inconsistent date management across the globe based on Incoterms • Pre-ship line items with different delivery dates and revenue implications as the main machine High Variability of Product • A single configurable (KMAT) part can represent a multitude of machines and accessory combinations • 5 Main hardware products that need to be broken down into ~100 machine & main assembly part numbers as well as long lead- time procured items Complicated Sales Order Structure • Sales orders with hundreds of line items broken into various categories: • Revenue relevant items • Shippable items • Software (intangibles) • Multi level Variant Configuration structure in Sales Orders with KIT-To-Order concept
  • 16. 16© 2020 GitaCloud, Inc. All Rights Reserved. Varian’s Planning Complexities CRM and SAP S/4 Systems Operate with Disconnected Data Sets • CRM (SFDC) operating on sub-set of data and lacking granularity compared to S/4 • CRM quotes contain features Varian sells, but no manufacturing part number details • Different quoting processes globally in CRM • Inconsistent global use of probability & forecast percentages to qualify opportunities Supply Planning • Supply planning constrained by ‘bad’ sales order dates and largely spreadsheet & tribal knowledge driven and limited to machines only • Machine and options mix calculations all manual • Options utilize planning BOM updated manually twice a year • Capacity information in SAP not used and not perceived as valuable
  • 17. 17© 2020 GitaCloud, Inc. All Rights Reserved. July 2019 March 2020 April 2020 July 2020 September 2020 January 2021 Initialization • Agile Build of Solution Capabilities • IBP Model Configuration • S/4HANA and SFDC Interface Development • Excel Template Development Build Phase • Solution in Parallel Use with Legacy S&OP Process • Data Cleanup (Demand and supply) • Set up of Executive Dashboards Operational Go-live • IBP Setup and Onboarding • Launch Explore Phase Together with GitaCloud • Requirements & Design Workshops • IBP Prototypes & Sprint Demos Project Kickoff • SIT & UAT Phases • Multiple Test Cycles of the S&OP process Test phase • S&OP on IBP will Replace Legacy Excel driven S&OP process • Inbound Supply Interfaces (PIRs) fully live S&OP on IBP • Business Case & Business Requirements Gathering • Tool & System Integrator Evaluation 2022 and beyond.. IBP Roadmap • SAP IBP Response and Supply for Order Based Supply Planning • SAP IBP Inventory Varian’s IBP S&OP Project Journey with GitaCloud
  • 18. 18© 2020 GitaCloud, Inc. All Rights Reserved. Success Drivers & Lessons Learned Lessons Learned • Start a master data track early and in parallel to the process implementation • SAP does not support Variant configuration in the standard yet, creative approaches needed in S/4-IBP interface to make it work • Plan extra for interface development / IBP Modeling effort required to deliver the right level of visibility • Factor in enough time for change management Success Drivers • Management support and buy-in for a fully integrated and global S&OP process • Flexibility and Willingness to change the process as you go along • A knowledgeable implementation partner that can innovate rapidly to deliver high fit to business requirements • Prototype early & demonstrate often: keep business engaged and following along • Single Point Of Contact from IT Team for all Source Systems
  • 19. 19© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 20. 20© 2020 GitaCloud, Inc. All Rights Reserved. GitaCloud Overview Digital Supply Chain Innovation at Scale WHO WE ARE WHERE WE ARE WHOM WE SERVE Competency WHAT WE OFFER SAP Services and Sell Partner globally: focused on Digital Supply Chain, Digital Core Specialists in Planning & Scheduling: SAP IBP, S/4 PPDS, MRP, SAC, etc. Niche expertise in SAP IBP Response & Supply: Order based Planning Foundation & Philosophy Founded in 2015 by Ashutosh Bansal Philosophy: Deliver significant economic value from integrated business planning& scheduling transformation powered by innovative and highly tailored solutions Headquarters Headquartered in San Francisco Bay Area Global Presence Incorporated in United States | Canada | India Helped customers globally: North America, Latin America, Europe, Middle East, and Asia Pacific Industries Offerings Discrete High-Tech and Semiconductor | Industrial Machinery & Components | Automotive Consumer Consumer Products | Life Sciences | Agribusiness Energy and Natural Resources Chemical | Oil & Gas | Mining Discovery Services: Value Discovery Pilot & Business Case, Project Audit / Design Review Implementation Services: SAP IBP Global Templates / Rollouts, S/4 PPDS (Synchronized Planning with SAP IBP), SAP MRP, SAC, S/4 AATP, S/4 or IBP based DDMRP Managed Services: Planning as a Service (Demand Forecasting / Sensing, Inventory Optimization, Supply Optimization, S&OP Analytics Package), IBP Support & Enhancements Customer engagements in 2020
  • 21. 21© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 22. 22© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Monthly S&OP Planning Cycle Supported by Weekly S&OE Planning Cycle Marketing Forecasting: Configurable FG Options Forecast with Attach Rate Forecasting Sales Forecasting: Sales Pipeline Qualification & Range Forecasting Consensus Demand Planning: Forecast Value Add Based Consensus Inventory Optimization: Sub-Assembly / Component Safety Stock Calculation & Review Forecast Consumption: Generate & Release Open Forecast to Order Based Supply Planning Inbound Demand Management: Planners override Backlog Requested Dates Order Based Unconstrained Supply Planning: Sales Orders, Qualified Opportunities, Forecasts Supply Plan Review: View Confirmations, Pegging, Gating Factors, Raise Action Messages for PO Collaboration Supplier Collaboration: PO Expedite / Delay / Reduce using Web Based Planning & S/4 PO Mass Updates Order Based Constrained Response Planning: Constrain based on Supplier Commits Outbound Demand Management: Sales Order Confirmation Overrides and publish to S/4 Finance Reconciliation: Revenue Forecast Per Scheduled Backlog and RevRec Rules, Review Gaps vs. Targets, What-If Simulation Management Review: Performance Trends & Forecasts Monthly Tactical Planning Cycle (S&OP) with IBP S&OP Weekly Operational Planning Cycle (S&OE) with IBP Response & Supply Quarterly Inventory Optimization Cycle with IBP Inventory
  • 23. 23© 2020 GitaCloud, Inc. All Rights Reserved. SAP Analytics Cloud SAP Add-On for IBP IBP Response & SupplyIBP S&OP MTO Solution Architecture Unified Planning Processes across SAP S/4HANA, IBP, PPDS, SAC, and CRM SAP S/4HANA Time Series Based Forecast Consumption What-If Simulation (Big Deal / Rush Order Simulation) Statistical Forecasting Open Forecast Explosion Using Attach Rates Outbound Demand Management: Refine Dates & Publish Confirmations ABC/XYZ Segmentation Integrated Reconciliation (Revenue Range Forecasting) IBP Inventory Multi-Stage Inventory Optimization Production Order Execution with Mass Confirmation NPI/Marketing Forecasting Consensus Demand Planning using Forecast Value Add Inventory Analytics, What-If Simulation Sales Order Processing Embedded PPDS Shipment Processing Purchase Order Processing Review & Release Open Forecast for Supply Planning Order Based Supply Planning (Unconstrained) Intelligent Alerting & Action Messages View Confirmations, Gating Factors, and Pegging Order Based Collaboration with Suppliers & Shop Floor Order Based Response Planning (Constrained) Order Based Response & Supply Planning Vendor Master Material Master Customer Master BOM Work Center Routing Sales Forecasting Forecast Consumption & Release Unconstrained Demand Planning Gross Forecast Explosion using Attach Rates Inbound Demand Management Safety Stock Review & Approval Sales Order Specific Material Variant CRM Sales Opportunities Quote Configuration View Confirmations KMAT material Reverse Translation View Projected Stock Publish Planned Orders, Purchase Reqs, Stock Transport Reqs Planned Orders Purchase Reqs Management Business Review Bottoms-Up Performance Forecasts Performance Trends Revenue & Margin Forecasting Sales Pipeline Management Attach Rate Calculation Mass Update Purchase Orders, Production Orders GitaCloud ValueNow MTO Extension SAP IBP Standard Capabilities
  • 24. 24© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 25. 25© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Dynamic Attach Rate Generation based on S/4 Sales History Problem Statement: • Sales Orders have unique configurations resulting into a sub-set of the Super-BOM in every sales order. This makes it difficult to convert MTO Finished Goods level forecast to Make To Stock MTS sub-assembly or component level requirements. • These attach rates of MTO Finished Good to next level MTS sub-assemblies vary as order mix changes monthly. Any planning based on static attach rates results in excess inventory or stock-outs at MTS levels of the BOM. Time Series Planning Implemented at Varian Medical
  • 26. 26© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Demand Forecast for Sub-Assemblies with Planning BOMs and Attach Rates Solution & Value: • Planning BOMs modeled per Configurable FG (KMAT) in IBP S&OP based on attach rates calculated dynamically in IBP from SAP S/4HANA Shipment History • Marketing Teams or Demand Planners can forecast MTS sub- assembly level requirements accurately with period specific attach rates and Planning BOMs Time Series Planning Implemented at Varian Medical
  • 27. 27© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 28. 28© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Sales Forecast Using Opportunity Qualification Problem Statement: • Sales opportunity win probabilities evolve over its life cycle. Copying all opportunities into sales forecast does not work. • Opportunities also have specific configurations. Some opportunities have thin or even negative margins. Need to forecast revenue and margin with respect to the win probability. • Sales opportunities close date in CRM is a point forecast. The large uncertainty band around the close date makes it challenging to know when to pull the trigger on buying components needed to build corresponding BOM. Time Series Planning
  • 29. 29© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Sales Forecast Using Range Forecasts for Close Date in IBP S&OP Solution & Value: • Load sales opportunity with a specific BOM for accurate costing and margin forecast. • Dynamic generation of Product (Variant) ID in IBP S&OP through enhancements in S/4 Add-On for IBP. • Weigh opportunity quantity and revenue down in-sync with the win probability. • Close date uncertainty modeling: Turn point projections on revenue into range forecasts. This is based on analysis of close date volatility and variance of final value from initial close date. • Enable Supply Planning and Finance teams to see close date risk and make plans accordingly. • Consider high-quality sales opportunities into revenue forecast. Understand Opportunity Revenue & Margin risks upfront. Time Series Planning Implemented at Varian Medical
  • 30. 30© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 31. 31© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Revenue Forecast Using Range Forecasting Problem Statement: • MTO businesses must also consider post-production constraints like customer-site installation schedules and customer funds availability. • Installation Project Managers and Contract Administrators may have independent ranges of the revenue realization risk. Hard to capture this diversity in simple date fields, e.g., planned ship date or install date. • Factory Production Plan based Shipment Confirmed Date does not provide visibility into the revenue risk due to downstream activities. • Incoterms and transit times also play into when the revenue will be realized and may cross quarter boundaries resulting into a revenue surprise. Time Series Planning Implemented at Varian Medical
  • 32. 32© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Revenue Forecast Using Range Forecasting Solution & Value: • Dynamic revenue projection based on the production & installation scheduled of the current sales order backlog. • Precise calculations at sales order item level factoring complex revenue recognition rules (performance obligations, Incoterms, Transit Times, etc.) • Full transparency into revenue risk from multiple stakeholders. Project revenue numbers to Executives and to the Street with confidence. • What-if Simulation capability to model revenue risk scenarios for large sales orders. Time Series Planning Implemented at Varian Medical
  • 33. 33© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 34. 34© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Purchase Order Based Supplier Collaboration (Using Web Based Planning) Problem Statement: • MTO businesses cannot predict FG level demand and often need to buy corresponding components within lead time to fulfill sales orders (unforecasted demands, or unusual configurations). • Production plans need to be developed unconstrained by procurement as first pass. • Buyers need to work with Suppliers on procurement plans to support the production plan. Only the hard procurement constraints post the supplier collaboration should constrain Production Plan and corresponding sales order confirmation dates. • Supplier collaboration process needs to manage Purchase Order Expedite / Delay / Reduce scenarios. Order Based Planning
  • 35. 35© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Purchase Order Based Supplier Collaboration (Using Web Based Planning) Solution & Value: • IBP Order Based Planning generates a Production Plan unconstrained by procurement lead times for the components. • Pegging data is examined to raise Purchase Order specific action messages (expedite / delay / reduce) in sync with current requirements. • Supplier Collaboration process leverages Web Based Planning or IBP Excel templates. • Purchase Orders are mass updated in S/4 based on Supplier Response. • Supplier Response constrains the Production Plan and Sales Order Confirmations are adjusted accordingly. • Dynamic process to buy sales order specific BOMs and manage PO exceptions in a fully automated loop. Order Based Planning
  • 36. 36© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 37. 37© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Demand Management (Planner Override of IBP Requested / Confirmed Dates) Problem Statement: • Planners need to plan in IBP Order Based Planning with earlier dates than per Requested Ship Date on the Sales Order (to create a time buffer). • Planners may also want to publish more conservative confirmed date to S/4 to be communicated to customers. Planned Orders raised as per IBP production Plan, sales order confirmed per Planner override. • Currently, SAP IBP standard does not have hooks for planners to override sales order requested date or confirmed date. • On Time Delivery (OTD) metric is challenging to understand and analyze given all the Sales Order Requested Date changes and Factory Schedule changes. Order Based Planning Manual Override
  • 38. 38© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Demand Management (Planner Override of IBP Requested / Confirmed Dates) Solution & Value: • GitaCloud ValueNow MTO Extension enables planners to override requested date or confirmed dates on sales orders in IBP. • Enable granular tracking of On-Time Delivery (OTD) metric and performance trends in IBP Analytics & Dashboards. • This First Commit Date is reset only in the case of a Requested Ship Date change from the Customer. Actual Ship Date is measured against the First Commit Date in IBP to generate On Time Delivery (OTD) metric by sales order item. • OTD performance trends can be aggregated & reported at higher levels (Location / Month) as a waterfall chart. Alert Raised: First Commit Date at Risk On Time Delivery Issue Resolved Order Based Planning Manual Override
  • 39. 39© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Design Showcase 1. IBP Process Map & Solution Architecture for MTO 2. Dynamic Attach Rates Based Planning 3. Sales Opportunity Qualification & Range Forecasting 4. Sales Order Based Revenue Forecasting 5. Purchase Order Based Supplier Collaboration 6. Demand Management (Planner Override of Sales Order Dates) 7. GitaCloud ValueNow MTO Extension & Key Takeaways
  • 40. 40© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO GitaCloud ValueNow MTO Extension Tactical / Operational Demand Planning Tactical / Operational Supply Planning Finance Reconciliation /Management Review SAP IBP Standard Capabilities for MTO GitaCloud ValueNow MTO Extension  Sub-Assembly Statistical Forecasting (Point Forecasts)  Sales Forecasting using Opportunities  Consensus Demand Planning  Dynamic Attach Rates Based Planning  Range Forecasting for Close Dates & Qualification of Sales Pipeline  Forecast Value Add based Consensus Planning  Time Series Forecast Consumption  Operational Supply Planning Heuristic / Optimizer  Multi-Stage Inventory Optimization  Sales Order Confirmation with Demand Prioritization  Pegging, Gating Factors  View Projected Stock  Web Based Planning  Sales Order Simulation  Intelligent Visibility  Make To Order MTO Products: Dynamic Product Variants  Sales Opportunities & Sales Orders with multi-level Configuration in IBP  MTO based IBP Planned Order Publish back to S/4  Forecast Consumption & Release via S/4 Add-On for OBP  Planning Model Extension to show Sales Order Item level Excel Add-In views  Order Based Supplier Collaboration with Mass PO Updates  Order Based Shop Floor Collaboration with Mass Production Order Updates  Business Rules and Pegging Based Intelligent Alerting  Demand Management (Planner Override of Dates)  Intercompany PO Support and Date Change Propagation  MTO Sales Order Simulation  Period Lot Sizing support in IBP OBP  Mass Confirmation of MTO Production Orders based on IBP  Driver Based Planning  What-if Simulation  Analytics & Dashboards  Revenue Range Forecasting for Sales Orders  Performance Obligations, Incoterms based Revenue Forecasting  Performance Trends (On-Time Delivery with Business Rules on Date Management)
  • 41. 41© 2020 GitaCloud, Inc. All Rights Reserved. IBP for MTO Key Takeaways MTO presents complex challenges. Standard IBP does not cover all the scenarios. • Business Challenges: Highly uncertain sales pipeline, volatile sales order backlog, complex revenue recognition, etc. • Order Based Planning: Varian Configuration based sales orders not supported in IBP interface • Time Series Planning: range forecasting, revenue recognition ruleset, etc. GitaCloud ValueNow MTO extension enables coverage across MTO scenarios • GitaCloud’s ValueNow MTO Extension dynamically generates unique product variants • Plan VC sales orders with sales order BOMs using IBP Time Series or Order Based Planning • Generate revenue forecast taking installation / commercial risks into account GitaCloud can help MTO customers implement with SAP IBP or S/4 MRP • SAP IBP S&OP - Time Series Planning: Order Based granular Planning Model • SAP IBP Response & Supply - Order Based Planning: Order Based Planning & Supplier Collaboration • SAP S/4 or ECC MRP: Characteristics Planning (MRP Strategy 56)
  • 42. 42© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 43. 43© 2020 GitaCloud, Inc. All Rights Reserved. Legal disclaimer The information in this presentation is confidential and proprietary to SAP and may not be disclosed without the permission of SAP. This presentation is not subject to your license agreement or any other service or subscription agreement with SAP. SAP has no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP’s strategy and possible future developments, products, and platforms, directions, and functionality are all subject to change and may be changed by SAP at any time for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or noninfringement. This document is for informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in this document, except if such damages were caused by SAP’s willful misconduct or gross negligence. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions. For all recent and planned innovations, potential data protection and privacy features include simplified deletion of personal data, reporting of personal data to an identified data subject, restricted access to personal data, masking of personal data, read access logging to special categories of personal data, change logging of personal data, and consent management mechanisms.
  • 44. 44© 2020 GitaCloud, Inc. All Rights Reserved. Official roadmap timing by feature, can now be found in the Roadmap Explorer at link below. The following slides are for reference only and not published externally anymore. https://roadmaps.sap.com/board?PRODUCT=67838200100800006742 Official IBP Roadmap
  • 45. 45© 2020 GitaCloud, Inc. All Rights Reserved. 1. This is the current state of planning and may be changed by SAP at any time without notice. • V2011 – Recent innovations • V2102 – Planned Q1/20211 • V2105 – Planned Q2/20211 • V2108 – Planned Q3/20211 Order-based planning  Deployment cost generation  Display configurable master data for any master data type in one harmonized Fiori App  Include OBP settings during planning area copy Order-based planning  Interactive planning: Order creation/delete  Transportation resource  Last Period Aggregation in Projected Stock Calculation  Location Product substitution for optimizer (supersession)  Create/change configurable master data in Fiori App Tactical supply planning  Aggregated constraints as soft constraints  Aggregated constraints in time dimension Order-based planning  Create fixed supply in key figure  Planning with subnetworks (upstream planning)  Switchable constraints on object level  Location Product substitution for heuristics (supersession)  New planning run: Supply Planning Tactical supply planning  Non-stocking location-products in finite heuristic  Freeze horizon  Fair-share demand fulfillment for finite heuristic Order-based planning  Order-based DDMRP: order-creation and integration  Synchronized Planning: Tight integration between order-based planning in IBP and short-term Production Planning in S/4HANA PP/DS  Demand Cost Key Figures for Optimizer Tactical supply planning  Product decomposition for optimizer​  Support lead-times in daily time-granularity​  Repeat Resources on production source of supply​  Planning run data monitor​  Elastic planning runs for Optimizer and Finite heuristic algorithms Tactical supply planning  Support of transportation and production capacity usage aggregated constraints for normalized planning area  Late-demand delivery for inter- subnetwork demand SAP Integrated Business Planning for response and supply Product road map overview – Key innovations
  • 46. 46© 2020 GitaCloud, Inc. All Rights Reserved. Enhancements in order-based planning • Periodic lot sizes • Multiple activities in planned orders • Near-real-time integration from SAP S/4HANA and SAP ERP to SAP Integrated Business Planning • MRP areas • Scheduling agreement support • Production in another plant • Coproducts and by-products • MRP segments for make-to-order and project segments • Characteristics-based planning and shelf-life planning • Telescopic buckets • Subcontracting Supply and allocations planning • Delta planning, enhanced parallel planning Response planning • Allocation on components and aggregate levels Deployment planning • Handling resources • Storage resources • Push deployment (heuristic) • Outbound quotas • Load consolidation Operational supply planning • Capacity leveling on infinite planning result 1. This is the current state of planning and may be changed by SAP at any time without notice. SAP Integrated Business Planning for response and supply Product Direction update1
  • 47. 47© 2020 GitaCloud, Inc. All Rights Reserved. 1. This is the current state of planning and may be changed by SAP at any time without notice. • 2023+ - Outlook• 2022 - Outlook Generic Supply Planning • Supply Chain Sub-Networks • Switchable constraints for infinite planning • Create/ delete version dependent master data • Order Visibility • Control Tower to order data navigation Distribution Planning • Transportation resources Order-based Optimization • Deployment Optimization (for Push) • Fair Share in Optimization • Supply Optimization Process Integration • Production Planning Integration: Integration between IBP and S/4 with ePP/DS • Subcontracting Integration with S/4 and ERP • Integration of single ERP to multiple IBPs • Near real-time integration • Configurable data model for master and transactional data • Extensible supply chain – for priorities and UI Generic Supply Planning • Stock segments, MRP Areas • Interactive planning on order level • Delta Planning, Repair Planning • Infinite MRP-like heuristics • Re-order point planning • Order-based planning support for DDMRP Distribution Planning • Shipping/Receiving resources • Product Substitution on finished products • Storage resources (Optimization) • Outbound quotas Order-based Optimization • Telescopic buckets • Results monitor Process Integration • Production Planning Integration: further integration scenarios • Make-to-order segments • Scheduling agreements • Production in another plant • Co-products, recursive BOMs • Initial use case for charact.-based planning • 2020 – Planned Innovations • 2021 - Outlook Integration with S/4 and ERP • Cross system STR integration • Combined Data Model for Supply&Response Generic Supply Planning • Capacity Leveling • Intelligent Alert Distribution Planning • Load Consolidation Service linked to IBP Distribution Planning • Vendor-Managed Inventory Process Integration • Batches • Shelf Life Propagation • Further use cases for characteristics- based planning • Product substitution on components • Planning of configured products Integration with S/4 and ERP • Enhancements to scalability and usability Generic Supply Planning • Component Allocation, Supply Segmentation • Algorithmic Extensibility Process Integration • Project Orders • Further use cases for Characteristics- based Planning • Location substitution SAP Integrated Business Planning for response and supply Long-term Product road map overview for order-based planning – key themes and capabilities
  • 48. 55366enUS (20/02) © 2020 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or platforms, directions, and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, and they should not be relied upon in making purchasing decisions. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies. See www.sap.com/copyright for additional trademark information and notices. www.sap.com/contactsap Follow us
  • 49. 49© 2020 GitaCloud, Inc. All Rights Reserved. Agenda S&OP Maturity Journey at Varian Medical Wrap-up Q&A 10 min Kick-off 5 min 10 min Gabrielle Kevin All IBP for MTO: Solution Showcase 40 min Ashutosh Make To Order Products Planning Challenges 10 min Markus SAP IBP Roadmap 15 min Eric
  • 50. 50© 2020 GitaCloud, Inc. All Rights Reserved. Call To Action Q&A • Please fill the survey at the end of this webinar • GitaCloud is offering a 4-hour complimentary discovery workshop. Send us an email at connect@gitacloud.com if you are interested • GitaCloud can help you further your digital supply chain strategy, powered by SAP IBP or S/4 capabilities (S/4 PPDS, S/4 MRP, etc.) • GitaCloud can implement SAP IBP or S/4 MRP in 3-4 months. We deliver innovation with speed in a cost-effective manner (80%+ offshore model) • GitaCloud can help you excel in all phases of your digital transformation journey: IBP discovery, implementation, support, or planning as a service (Forecasting, IO) • Visit www.gitacloud.com to learn more
  • 51. 51© 2020 GitaCloud, Inc. All Rights Reserved. Ashutosh Bansal President & CEO, GitaCloud +1 925-519-5965 6200 Stoneridge Mall Road, 3rd Floor, Pleasanton, CA ashutosh@gitacloud.com www.GitaCloud.com