Curriculum Vitae
Name of Expert : Ashour Abdel Salam Abdel Monem
Moussa
Date of Birth: June 18, 1965
Country of Citizenship/Residence: Egypt
E-mail : ashour_2am@yahoo.com
Tele. : 002012 7747 3802
Key Qualifications of Relevance
Eng. Ashour holds a B. Sc. degree in mechanical engineering from the Cairo University, Egypt. He was one of the
key person in preparing the Wind atlas for Gulf of Suez and the Wind Atlas for Egypt. He was the supervisor for
selecting the locations, installation and data collection of met. Masts all over Egypt. He has Extensive knowledge
of wind energy resources in Egypt and Arab/African Countries (Yemen, Sudan, Saudi Arabia, Ethiopia and
Rwanda) including, site selection, pre-feasibility and feasibility studies; bid documents; tendering, layout
planning, contracting.
Eng. Ashour has more than 24 years of experience in the field of wind power as tender expert, wind park
planning expert, Coordinator of overall activities in many multi megawatt wind farms projects such as the
Siemens 2000 MW, 220 MW, 200 MW and 120 MW at Gulf of Suez/El Zayt/Nile West, 3600 km² wind power
development study at the West Nile Valley(JICA), 3000 MW development planning study at the Gulf of el Zayt and
200 MW wind farm feasibility study at Gulf of El Zayt (KfW), 200 MW wind farm feasibility study at Gulf of Suez
(KfW), 200 MW wind farm at Gulf of Suez (NREA/Masdar) which will be executed under PPP Scheme, eight
Zafarana wind farms projects (545 MW) includes JBIC (120 MW), KfW I (30 MW) ,KfW II/III (50 MW), KfW V (80
MW), Danida 1 (30 MW), Danida II (30MW), Danida III (120 MW) and Spanish (85 MW) wind farm
implementation projects in Egypt, as well as one 2x250 MW BOO wind farm projects at Gulf of Suez and The Nile
West, two large-scale (1000 & 1500 MW) ESIA studies for wind farms at Gulf of El Zayt Gulf of Suez, Egypt.
He is familiar with the complete project cycle of internationally bank financed projects with special emphasis on
feasibility studies (200 MW West Nile Valley/Egypt, 200 MW Gulf of El Zayt/Egypt, 200 MW Gulf of El Suez (GS1),
200 MW Gulf of El Suez (GS2)), tender documents and tendering (e.g. 220 MW Gulf of El Zayt/JICA, 250 MW BOO
Gulf of Suez, JBIC 120 MW & KfW I Zafarana, conceptual design/layout planning (e.g. JBIC & KfW Zafarana I,
Egypt), preparation of tender documents, tender process , bid evaluation up to contract signature according to
international standards (e.g. World Bank, JBIC/JICA, KFW, AFDB, AFD, Danida), contract revision, supervision of
implementation and warranty periods and acceptance negotiations at the end of the warranty period. He has
also carried out wind measuring programmes (e.g. Gulf of El Zayt/Egypt, Upper Nile/, Egypt, Gulf of Suez/Egypt)
as well as site identification, project appraisal and study missions for wind power development.
Eng. Ashour has significant experience in Tendering and Contract Negotiations of large projects such as for El
Zayt 220 MW wind farm project. El-Zayt 200 MW wind farm, El-Zayt 120 MW wind farm and Zafarana 120 MW
wind farm project. Furthermore he was participated in contract negotiations for 2000 MW in cooperation with
Siemens. He also has experience in overall project management and reporting, design review and
implementation supervision, contract supervision and claim management, testing before taking over.
2
Further Eng. Ashour is a WAsP user and conduct trainings courses in WAsP software for many staff in cooperation
with RCREEE, Nile basin, Yemen and Sudan.
His Responsibility also include overall coordination and giving the input concerning wind power development
planning in Egypt .
Education / Professional Studies:
B.Sc. in Mechanical Power Engineering
Faculty of Engineering / Cairo University June 1989
Current Position
- Managing Director of Operation and Maintenance Sector (Since 14 May 2016)
- General Manager of Wind Energy Department in New & Renewable Energy Authority (NREA), Ministry
of Electricity and Energy, Egypt (since 2010 till 13 May 2016).
Years with Firms
More than 24years
Language Skills:
Language Reading Speaking Writing
Arabic Mother tongue
English Very Good Very Good Very Good
Countries of Work Experience:
Egypt, Sudan, Kingdom of Saudi Arabia, Yemen, Rwanda, Senegal, Ethiopia, Morocco, Germany, Denmark, India, Abu
Dhabi, Brazil, Spain, Italy.
Training Courses:
- Master Plan for utilization wind energy in Egypt - Denmark 1995.
- WAsP Training course – Denmark 1999.
- Advanced training course on "Grid Connection of Wind Energy Converters" - for one year (Nov.1999 – Oct.
2000) in Germany.
- Training on control and monitoring system of V43/660 KW in Denmark for 2 weeks in December 2003.
- Renewable Energy Training Course in India for 10 weeks (October – December 2005).
- Wind Turbines inspections before delivery to the project site – Spain Oct. 2013 & Spain May 2016.
- ……. etc
Previous Experience:
2010 – 2015 2000 MW wind farm in cooperation With Siemens
Project: 220 MW Wind Farm at the Gulf of El Zayt financed by JICA
Project task:
 Conceptual wind farm layout, PQ and bid document preparation for the 220 MW wind farm
and the expansion of 250 MVA Substation at the Gulf of El Zayt
 Prequalification and tendering according to JICA guidelines
 Bid evaluation
 Negotiation and Completion of Contracts
Project: 200 MW Wind Farm at the Gulf of El Zayt financed by KfW, EIB, EU
Project task:
 Conceptual wind farm layout, PQ and bid document preparation for the 200 MW wind farm
and a 250 MVA Substation at the Gulf of El Zayt
 Prequalification and tendering according to KfW guidelines
 Bid evaluation
 Negotiation and Completion of Contracts
Project: 120 MW Wind Farm at the Gulf of El Zayt financed by Kingdom of Spain
Project task:
 Conceptual wind farm layout, PQ and bid document preparation for the 120 MW wind farm
3
and a 250 MVA Substation at the Gulf of El Zayt
 Prequalification and tendering according to the Egyptian law.
 Bid evaluation
 Negotiation and Completion of Contracts
Project: 2000 MW Wind Farms in cooperation with Siemens
Project task:
 Negotiation and Completion of Contracts
Coordination of overall activities of the ESIA Study on a 200 km² area at the Gulf of El Suez for up to
1000 MW Wind Power Generation including ornithological field monitoring; establishment of typical wind
farm layouts and project design; impact assessment; coordination of stakeholder participation process and
public hearing .
Coordination of overall activities to assess wind power feasibility in the overall area of 4200 km², wind
power development plan and a feasibility study preparation for a 200 MW wind farm at Nile west area.
Wind Resource Assessment of different sites using WAsP Software in Egypt, Sudan, Yemen, Rwanda and
kingdom of Saudi; detailed evaluation of wind data; energy yield estimates; assessment of
economic/technical feasibility;
1992 - 2010 545 MW in Zafarana Wind Power Plant Projects, Egypt
Financed by Denmark (180 MW), Germany (160 MW), Japan (120 MW) and Spain (85 MW)
Project task: Implementation of a 550 MW wind power plants in different phases at Zafarana: Conceptual
design, preparation of prequalification and bidding documents, follow up of PQ and Bidding evaluation
Process, contract negotiations.
Project: Wind Atlas for Egypt and Gulf of Suez
One of the Co-author the following :-
1. Wind Atlas for Egypt 2005, ISBN 87-550-3493-4
2. Wind Atlas for Gulf of Suez 2003, ISBN 87-550-3195-1
Coordination of overall activities such as wind power pre-assessment from 40 measuring masts, selection
of areas for detailed investigations and of sites for implementation of measurement masts, wind data
validation and evaluation, wind farm layout , infrastructure, pre-feasibility studies. Area assessment for
selection of wind farm sites. Layout planning including external access, infrastructure and micro–siting.
Coordinator for the following activities :-
All local logistics related to the wind measurement campaign
Support in data collection related to electrical works
Coordination of geotechnical study
Coordination of of topographical maps
Publications
 Mortensen, N.G., U. Said Said, H.P. Frank, L. Georgy, C.B. Hasager, M. Akmal, J.C. Hansen and
Ashour Abdel Salam (2005).Wind Atlas for Egypt – Measurement and modelling 1991-2005. New and
Renewable Energy Authority, Cairo, and Risø National Laboratory, Roskilde. ISBN 87-550-3195-1.
196 pp.
 Mortensen, N.G., U. Said Said, H.P. Frank, L. Georgy, C.B. Hasager, M. Akmal, J.C. Hansen and
Ashour Abdel Salam (2003). Wind Atlas for the Gulf of Suez. Measurements and Modelling 1991-
2001. New and Renewable Energy Authority, Cairo, and Risø National Laboratory, Roskilde. ISBN
87-550-3493-4. 258 pp.
 “Wind Energy in Egypt” – DEWI Magazine - Germany Aug. 2000.
 “Wind Resource assessment in Egypt” – Mansoura University April 2008
 Several papers and presentations about the wind resources of the Gulf of Suez, the Red Sea and Egypt.
 The Wind data analysis & Site Selection Report For Sudan, March 2008
 The Wind data analysis & Site Selection Report For Yemen, May 2007 (Arabic).
 Report about “Possible internalizations of External costs and policy recommendations For Egypt” -
Project no: 502687 NEEDS New Energy Externalities Developments for Sustainability - Project co-
funded by the European Commission within the Sixth Framework Programme (2002-2006).
 Feasibility Study for Wind Energy Production at the Kingdom Saudi Arabia – Jan. 2010.

Weitere ähnliche Inhalte

Andere mochten auch

A importância vital da unidade cristã
A importância vital da unidade cristãA importância vital da unidade cristã
A importância vital da unidade cristãerivander
 
Theories on Sociological Perspective
Theories on Sociological PerspectiveTheories on Sociological Perspective
Theories on Sociological PerspectiveLei Veluz
 
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...UNM Continuing Education
 
Implementation of Rapid Transit Project departing in Tanzania
Implementation of Rapid Transit Project departing in TanzaniaImplementation of Rapid Transit Project departing in Tanzania
Implementation of Rapid Transit Project departing in TanzaniaRobius Bagoka
 

Andere mochten auch (6)

A importância vital da unidade cristã
A importância vital da unidade cristãA importância vital da unidade cristã
A importância vital da unidade cristã
 
Theories on Sociological Perspective
Theories on Sociological PerspectiveTheories on Sociological Perspective
Theories on Sociological Perspective
 
annual report - 2008-9
annual report - 2008-9annual report - 2008-9
annual report - 2008-9
 
A importância do estudo bíblico para a igreja
A importância do estudo bíblico para a igrejaA importância do estudo bíblico para a igreja
A importância do estudo bíblico para a igreja
 
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...
Cariño Early Childhood TTAP at UNM Continuing Education 4th Quarter 2015-2016...
 
Implementation of Rapid Transit Project departing in Tanzania
Implementation of Rapid Transit Project departing in TanzaniaImplementation of Rapid Transit Project departing in Tanzania
Implementation of Rapid Transit Project departing in Tanzania
 

Ähnlich wie Short CV_ashour_Sept 2016

Osama Fouad (Update)
Osama Fouad (Update)Osama Fouad (Update)
Osama Fouad (Update)Usama Fouad
 
Artificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerArtificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerChris Westra
 
New base special 16 june 2014
New base special  16 june 2014New base special  16 june 2014
New base special 16 june 2014Khaled Al Awadi
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egyptRCREEE
 
Prospective of large scale wind power in Sudan
Prospective of large scale wind power in SudanProspective of large scale wind power in Sudan
Prospective of large scale wind power in SudanMohammed Khalf Allah
 
IWaTec_winter school
IWaTec_winter schoolIWaTec_winter school
IWaTec_winter schoolMahmoud Eisa
 
RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE
 
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...Khaled Al Awadi
 
New base special 02 september 2014
New base special  02 september   2014New base special  02 september   2014
New base special 02 september 2014Khaled Al Awadi
 
Detailed (moaz resume)
Detailed (moaz resume)Detailed (moaz resume)
Detailed (moaz resume)Moaz beddah
 
New base 514 special 08 january 2014
New base 514 special  08 january 2014New base 514 special  08 january 2014
New base 514 special 08 january 2014Khaled Al Awadi
 

Ähnlich wie Short CV_ashour_Sept 2016 (20)

SHORT BIOGRAPHY
SHORT BIOGRAPHYSHORT BIOGRAPHY
SHORT BIOGRAPHY
 
Proyectos de Energías Renovables en Marruecos
Proyectos de Energías Renovables en MarruecosProyectos de Energías Renovables en Marruecos
Proyectos de Energías Renovables en Marruecos
 
Wind Power in Egypt
Wind Power in EgyptWind Power in Egypt
Wind Power in Egypt
 
Osama Fouad (Update)
Osama Fouad (Update)Osama Fouad (Update)
Osama Fouad (Update)
 
Artificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind PowerArtificial Islands For Offshore Wind Power
Artificial Islands For Offshore Wind Power
 
New base special 16 june 2014
New base special  16 june 2014New base special  16 june 2014
New base special 16 june 2014
 
Assad Itbail CV
Assad Itbail CVAssad Itbail CV
Assad Itbail CV
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy  an overview by mohammed mostafa el khayat- nrea_egyptWind energy  an overview by mohammed mostafa el khayat- nrea_egypt
Wind energy an overview by mohammed mostafa el khayat- nrea_egypt
 
Prospective of large scale wind power in Sudan
Prospective of large scale wind power in SudanProspective of large scale wind power in Sudan
Prospective of large scale wind power in Sudan
 
Ahmed Gamal-CV
Ahmed Gamal-CVAhmed Gamal-CV
Ahmed Gamal-CV
 
IWaTec_winter school
IWaTec_winter schoolIWaTec_winter school
IWaTec_winter school
 
RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development RCREEE-enerMENA_Tunisa development
RCREEE-enerMENA_Tunisa development
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
MY CV.DOC
MY CV.DOCMY CV.DOC
MY CV.DOC
 
Moaz resume
Moaz resumeMoaz resume
Moaz resume
 
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...NewBase  05 January 2024  Energy News issue - 1687 by Khaled Al Awadi_compres...
NewBase 05 January 2024 Energy News issue - 1687 by Khaled Al Awadi_compres...
 
New base special 02 september 2014
New base special  02 september   2014New base special  02 september   2014
New base special 02 september 2014
 
Detailed (moaz resume)
Detailed (moaz resume)Detailed (moaz resume)
Detailed (moaz resume)
 
New base 514 special 08 january 2014
New base 514 special  08 january 2014New base 514 special  08 january 2014
New base 514 special 08 january 2014
 

Short CV_ashour_Sept 2016

  • 1. 1 Curriculum Vitae Name of Expert : Ashour Abdel Salam Abdel Monem Moussa Date of Birth: June 18, 1965 Country of Citizenship/Residence: Egypt E-mail : ashour_2am@yahoo.com Tele. : 002012 7747 3802 Key Qualifications of Relevance Eng. Ashour holds a B. Sc. degree in mechanical engineering from the Cairo University, Egypt. He was one of the key person in preparing the Wind atlas for Gulf of Suez and the Wind Atlas for Egypt. He was the supervisor for selecting the locations, installation and data collection of met. Masts all over Egypt. He has Extensive knowledge of wind energy resources in Egypt and Arab/African Countries (Yemen, Sudan, Saudi Arabia, Ethiopia and Rwanda) including, site selection, pre-feasibility and feasibility studies; bid documents; tendering, layout planning, contracting. Eng. Ashour has more than 24 years of experience in the field of wind power as tender expert, wind park planning expert, Coordinator of overall activities in many multi megawatt wind farms projects such as the Siemens 2000 MW, 220 MW, 200 MW and 120 MW at Gulf of Suez/El Zayt/Nile West, 3600 km² wind power development study at the West Nile Valley(JICA), 3000 MW development planning study at the Gulf of el Zayt and 200 MW wind farm feasibility study at Gulf of El Zayt (KfW), 200 MW wind farm feasibility study at Gulf of Suez (KfW), 200 MW wind farm at Gulf of Suez (NREA/Masdar) which will be executed under PPP Scheme, eight Zafarana wind farms projects (545 MW) includes JBIC (120 MW), KfW I (30 MW) ,KfW II/III (50 MW), KfW V (80 MW), Danida 1 (30 MW), Danida II (30MW), Danida III (120 MW) and Spanish (85 MW) wind farm implementation projects in Egypt, as well as one 2x250 MW BOO wind farm projects at Gulf of Suez and The Nile West, two large-scale (1000 & 1500 MW) ESIA studies for wind farms at Gulf of El Zayt Gulf of Suez, Egypt. He is familiar with the complete project cycle of internationally bank financed projects with special emphasis on feasibility studies (200 MW West Nile Valley/Egypt, 200 MW Gulf of El Zayt/Egypt, 200 MW Gulf of El Suez (GS1), 200 MW Gulf of El Suez (GS2)), tender documents and tendering (e.g. 220 MW Gulf of El Zayt/JICA, 250 MW BOO Gulf of Suez, JBIC 120 MW & KfW I Zafarana, conceptual design/layout planning (e.g. JBIC & KfW Zafarana I, Egypt), preparation of tender documents, tender process , bid evaluation up to contract signature according to international standards (e.g. World Bank, JBIC/JICA, KFW, AFDB, AFD, Danida), contract revision, supervision of implementation and warranty periods and acceptance negotiations at the end of the warranty period. He has also carried out wind measuring programmes (e.g. Gulf of El Zayt/Egypt, Upper Nile/, Egypt, Gulf of Suez/Egypt) as well as site identification, project appraisal and study missions for wind power development. Eng. Ashour has significant experience in Tendering and Contract Negotiations of large projects such as for El Zayt 220 MW wind farm project. El-Zayt 200 MW wind farm, El-Zayt 120 MW wind farm and Zafarana 120 MW wind farm project. Furthermore he was participated in contract negotiations for 2000 MW in cooperation with Siemens. He also has experience in overall project management and reporting, design review and implementation supervision, contract supervision and claim management, testing before taking over.
  • 2. 2 Further Eng. Ashour is a WAsP user and conduct trainings courses in WAsP software for many staff in cooperation with RCREEE, Nile basin, Yemen and Sudan. His Responsibility also include overall coordination and giving the input concerning wind power development planning in Egypt . Education / Professional Studies: B.Sc. in Mechanical Power Engineering Faculty of Engineering / Cairo University June 1989 Current Position - Managing Director of Operation and Maintenance Sector (Since 14 May 2016) - General Manager of Wind Energy Department in New & Renewable Energy Authority (NREA), Ministry of Electricity and Energy, Egypt (since 2010 till 13 May 2016). Years with Firms More than 24years Language Skills: Language Reading Speaking Writing Arabic Mother tongue English Very Good Very Good Very Good Countries of Work Experience: Egypt, Sudan, Kingdom of Saudi Arabia, Yemen, Rwanda, Senegal, Ethiopia, Morocco, Germany, Denmark, India, Abu Dhabi, Brazil, Spain, Italy. Training Courses: - Master Plan for utilization wind energy in Egypt - Denmark 1995. - WAsP Training course – Denmark 1999. - Advanced training course on "Grid Connection of Wind Energy Converters" - for one year (Nov.1999 – Oct. 2000) in Germany. - Training on control and monitoring system of V43/660 KW in Denmark for 2 weeks in December 2003. - Renewable Energy Training Course in India for 10 weeks (October – December 2005). - Wind Turbines inspections before delivery to the project site – Spain Oct. 2013 & Spain May 2016. - ……. etc Previous Experience: 2010 – 2015 2000 MW wind farm in cooperation With Siemens Project: 220 MW Wind Farm at the Gulf of El Zayt financed by JICA Project task:  Conceptual wind farm layout, PQ and bid document preparation for the 220 MW wind farm and the expansion of 250 MVA Substation at the Gulf of El Zayt  Prequalification and tendering according to JICA guidelines  Bid evaluation  Negotiation and Completion of Contracts Project: 200 MW Wind Farm at the Gulf of El Zayt financed by KfW, EIB, EU Project task:  Conceptual wind farm layout, PQ and bid document preparation for the 200 MW wind farm and a 250 MVA Substation at the Gulf of El Zayt  Prequalification and tendering according to KfW guidelines  Bid evaluation  Negotiation and Completion of Contracts Project: 120 MW Wind Farm at the Gulf of El Zayt financed by Kingdom of Spain Project task:  Conceptual wind farm layout, PQ and bid document preparation for the 120 MW wind farm
  • 3. 3 and a 250 MVA Substation at the Gulf of El Zayt  Prequalification and tendering according to the Egyptian law.  Bid evaluation  Negotiation and Completion of Contracts Project: 2000 MW Wind Farms in cooperation with Siemens Project task:  Negotiation and Completion of Contracts Coordination of overall activities of the ESIA Study on a 200 km² area at the Gulf of El Suez for up to 1000 MW Wind Power Generation including ornithological field monitoring; establishment of typical wind farm layouts and project design; impact assessment; coordination of stakeholder participation process and public hearing . Coordination of overall activities to assess wind power feasibility in the overall area of 4200 km², wind power development plan and a feasibility study preparation for a 200 MW wind farm at Nile west area. Wind Resource Assessment of different sites using WAsP Software in Egypt, Sudan, Yemen, Rwanda and kingdom of Saudi; detailed evaluation of wind data; energy yield estimates; assessment of economic/technical feasibility; 1992 - 2010 545 MW in Zafarana Wind Power Plant Projects, Egypt Financed by Denmark (180 MW), Germany (160 MW), Japan (120 MW) and Spain (85 MW) Project task: Implementation of a 550 MW wind power plants in different phases at Zafarana: Conceptual design, preparation of prequalification and bidding documents, follow up of PQ and Bidding evaluation Process, contract negotiations. Project: Wind Atlas for Egypt and Gulf of Suez One of the Co-author the following :- 1. Wind Atlas for Egypt 2005, ISBN 87-550-3493-4 2. Wind Atlas for Gulf of Suez 2003, ISBN 87-550-3195-1 Coordination of overall activities such as wind power pre-assessment from 40 measuring masts, selection of areas for detailed investigations and of sites for implementation of measurement masts, wind data validation and evaluation, wind farm layout , infrastructure, pre-feasibility studies. Area assessment for selection of wind farm sites. Layout planning including external access, infrastructure and micro–siting. Coordinator for the following activities :- All local logistics related to the wind measurement campaign Support in data collection related to electrical works Coordination of geotechnical study Coordination of of topographical maps Publications  Mortensen, N.G., U. Said Said, H.P. Frank, L. Georgy, C.B. Hasager, M. Akmal, J.C. Hansen and Ashour Abdel Salam (2005).Wind Atlas for Egypt – Measurement and modelling 1991-2005. New and Renewable Energy Authority, Cairo, and Risø National Laboratory, Roskilde. ISBN 87-550-3195-1. 196 pp.  Mortensen, N.G., U. Said Said, H.P. Frank, L. Georgy, C.B. Hasager, M. Akmal, J.C. Hansen and Ashour Abdel Salam (2003). Wind Atlas for the Gulf of Suez. Measurements and Modelling 1991- 2001. New and Renewable Energy Authority, Cairo, and Risø National Laboratory, Roskilde. ISBN 87-550-3493-4. 258 pp.  “Wind Energy in Egypt” – DEWI Magazine - Germany Aug. 2000.  “Wind Resource assessment in Egypt” – Mansoura University April 2008  Several papers and presentations about the wind resources of the Gulf of Suez, the Red Sea and Egypt.  The Wind data analysis & Site Selection Report For Sudan, March 2008  The Wind data analysis & Site Selection Report For Yemen, May 2007 (Arabic).  Report about “Possible internalizations of External costs and policy recommendations For Egypt” - Project no: 502687 NEEDS New Energy Externalities Developments for Sustainability - Project co- funded by the European Commission within the Sixth Framework Programme (2002-2006).  Feasibility Study for Wind Energy Production at the Kingdom Saudi Arabia – Jan. 2010.