ANALYTICAL STUDY ON THE BEHAVIOUR OF G+10 RC BUILDING
SUBJECTED TO PROGRESSIVE COLLAPSE USING ETABS
DEPARTMENT OF CIVIL ENGINEERING
(PHASE-II REVIEW)
GROUP MEMBERS REGISTER NO
R. ARUN 14TA2903
N. SATHISH 14TA2919
B. THIYAGARAJAN 14TA2929
R. VASANTH 14TA2930
GUIDED BY
Mr. R.VIGHNESHWARAN
(Assistant Professor Department of Civil Engineering )
1
Introduction:
The progressive collapse of building is initiated when one or more vertical
load carrying members (typically columns) is removed.
 When a column is removed, (due to a vehicle impact, fire, earthquake, man-
made or natural hazards) the building’s weight (gravity load) transfers to
neighboring columns in the structure.
If these neighboring columns are not properly designed to resist and
redistribute the additional gravity load that part of the structure fails.
2
3
Need for study:
If the structure shows signs of failure then suitable retrofit measures may also
be suggested.
It is very important to establish the likelihood of progressive collapse of
structures to avoid catastrophic events.
Design the column safely to avoid the progressive collapse.
To study the formation of hinge patterns in different stages using pushover
analysis.
Design the structure to sustain the accidental actions.
4
Objective:
To design the G+10 Reinforced concrete structures.
To analyze the structure by Non linear static analysis method.
To identify the critical columns in various seismic Zones.
To perform Pushover analysis for the structure with the removal of
columns as per GSA guidelines.
To determine the potential for progressive collapse.
To give the preventive measures.
5
To determine the Axial Load distribution in the columns with
various cases such as frame with all columns, Corner column
removed, Exterior column removed and interior column in various
seismic zones.
To determine the critical column of the Building columns with
various cases such as frame with all columns, Corner column
removed, Exterior column removed and interior column in various
seismic zones.
To study the Hinge Pattern of G+10 multistorey building before and
after removing of column as per GSA guidelines
Scope:
6
Literature study summary
7
The literature survey carried out in the present work clearly indicates that
the pushover analysis is one of the powerful tools for predicting the
performance of a building under seismic forces.
Based on these facts, the numerical model development and analysis under
pushover analysis is planned in the present work.
Capacity of the member at any section is calculated as per IS 456:2000
from the obtained reinforcement details after analysis and design.
Member forces are obtained by analysis results carried out in ETABS 16.0.
And result comparison is to be done for these parameters before and after the
progressive collapse of the building.
METHODOLOGY
Detailed study of literature review
Removal of Critical column initiate progressive collapse
Check for acceptance as per GSA 2003 guidelines
G+10 RCC building is taken for project
Prepare Plan for G+10 structure
Non linear static analysis is carried out
Determination of Axial load values of column
Result comparison – before and after progressive collapse
Modeling in ETABS
Identification of critical columns
By these evaluation building can be assessed whether
it can withstand progressive collapse 8
Modelling
9
FRAME WITH ALL COLUMNS: (Plan view)
10
Elevation View:
11
3D View Model:
12
Result and Discussion
13
C1 REMOVED (PLAN VIEW):
Plan View 3D View
The above shown figures are the Plan View and 3D view of the G+10 framed structure with
Corner column c1 removed in the Ground storey.
14
COLUMN LOAD(KN)
C1 2849.53
C2 3854.75
C6 3826.19
C7 4666.36
COLUMN LOAD(KN)
C1 0
C2 5199.81
C6 5213.32
C7 4915.29
Axial Load Values of Column: Axial load values of C1 Column removed:
0
1000
2000
3000
4000
5000
6000
C1 C2 C6 C7
C1
REMOVED
FRAME
WITH ALL
COLUMNS
COMPARATIVE GRAPHLOAD(KN)
COLUMN
15
C3 COLUMN REMOVED IN GROUND STOREY:
Plan view 3D view
The above shown figures are the Plan View and 3D view of the G+10 framed structure C3 with
the removal of C3 column in the Ground storey.
16
COLUMN LOAD(KN)
C3 3956.03
C2 3854.75
C4 3854.72
C8 5059.93
Axial load values of columns:
COLUMN LOAD(KN)
C3 0
C2 5031.78
C4 4698.61
C8 6123.95
Axial load values of C3 column Removed:
0
2000
4000
6000
8000
C3 C2 C4 C8
C3
REMOVED
LOAD(KN)
COLUMN
COMPARATIVE GRAPH
17
C5 COLUMN REMOVED IN GROUN STOREY:
Plan view 3D view
The above shown figures are the Plan View and 3D view of the G+10 framed structure with
Corner column c5 was removed in the ground storey. 18
COLUMN LOAD(KN)
C5 2849.24
C4 3854.72
C9 4657.67
C10 3826.69
Frame with all Column in Ground storey:
COLUMN LOAD(KN)
C5 0
C4 5199.57
C9 4907.65
C10 5213.83
C5 column removed in ground storey:
0
1000
2000
3000
4000
5000
6000
C5 C4 C9 C10
C5
REMOVED
FRAME WITH
ALL COLUMN
COLUMNS
LOAD(KN)
COMPARATIVE GRAPH
19
C13 COLUMN REMOVED IN GROUND STOREY:
Plan view 3D view
The above shown figures are the Plan View and 3D view of the G+10 framed structure
with the removal of middle column in the building C13in Ground storey. 20
COLUMN LOAD(KN)
C13 5209.64
C12 4786.71
C14 4786.76
C8 5059.93
C18 5059.82
Frame with all Columns in ground storey:
COLUMN LOAD(KN)
C13 0
C12 6045.76
C14 6048.57
C8 6064.6
C18 6067.9
C13 column removed in ground storey:
0
1000
2000
3000
4000
5000
6000
7000
C13 C12 C14 C8 C18
C13
REMOVED
FRAME
WITH ALL
COLUMNS
COLUMNS
COMPARITIVE GRAPH
LOAD(KN)
21
COLUMN C1 REMOVED IN 5TH
STOREY:
Plan view 3D view
The above shown figures are the Plan View and 3D view of the G+10 framed structure
with removal of corner column C1 in Fifth storey. 22
COLUMN LOAD(KN)
C1 0
C2 2817.41
C6 3081.36
C7 1711.43
C1 column in 5th storey:
COLUMN LOAD(KN)
C1 1036.75
C2 1280.79
C6 1267.83
C7 1627.08
Frame with all columns in 5th storey
0
1000
2000
3000
4000
C1 C2 C6 C7
C1 REMOVED IN
5TH FLOOR
ALL COLUMN IN
5TH FLOOR
COLUMNS
LOAD(KN)
COMPARITIVE GRAPH
23
ZONE COMPARISON:
ZONE ZONE FACTOR SEISMIC INTENSITY
ZONE-I 0.10 LOW
ZONE-II 0.16 MODERATE
ZONE-III 0.24 SEVERE
ZONE-IV 0.36 VERY SEVERE
Similarly, the columns C1, C3, C5, C13 in ground storey and column C1 in 5th floor has to
be analyzed in ZONE 3, ZONE3, ZONE1 and the Critical column was determined and designed
safely to avoid the progressive collapse of the building.
24
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C1 1594.45 1630.97 2772 2849.53
C2 3666.07 3709.61 3767.66 3854.75
C3 3765.2 3809.24 3867.95 3956.03
C4 3666.04 3709.58 3767.64 3854.72
C5 1468.82 1430.06 2771.72 2849.245
C6 3629.08 3674.57 3735.22 3826.195
C7 4898.14 4900.65 4904 4666.36
C8 5048.3 5050.98 5054.56 5059.93
C9 4898.16 4900.67 4904.02 4657.67
C10 3629.49 3675 3735.68 3826.69
C11 3730.33 3776.26 3837.5 3929.26
C12 5051.76 5053.23 5055.19 4786.76
C13 5209.63 5209.63 5209.63 5209.637
C14 5051.75 5053.21 5055.16 4786.71
C15 3730.76 3776.71 3837.97 3929.86
C16 3629.01 3674.49 3735.15 3826.12
C17 4899.15 4900.67 4904.02 4657.68
C18 5048.27 5050.94 5054.49 5059.82
C19 4898.17 4900.69 4904.14 4666.45
C20 3629.42 3674.93 3735.6 4826.62
C21 1772.53 1436.01 2771.68 2849.209
C22 3666.72 3710.3 3768.4 3855.54
C23 3765.9 3809.96 3868.71 3956.83
C24 3666.69 3710.27 3768.37 3855.519
C25 1468.62 1429.86 2771.4 2848.92
25
0
1000
2000
3000
4000
5000
6000
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25
ZONE 1
ZONE 2
ZONE 3
ZONE 4
STOREY 1 FRAME WITH ALL COLUMNS
COULMNS
LOAD(KN)
26
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C1 0 0 0 0
C2 4777.6 4838 5077.2 5199.81
C6 4913.73 4981.74 5084.15 5213.32
C7 5095.36 5100.79 5132.16 4915.29
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C1 1630.97 1630.97 2772 2849.53
C2 3709.61 3709.61 3767.66 3854.75
C6 3674.57 3674.57 3735.22 3826.19
C7 4900.65 4900.65 5054.56 4666.36
0
1000
2000
3000
4000
5000
6000
C1 C2 C6 C7
ZONE 1
ZONE 2
ZONE 3
ZONE 4
COLUMNS
C1 COLUMN REMOVED
LOAD(KN)0
1000
2000
3000
4000
5000
6000
C1 C2 C6 C7
ZONE 1
ZONE 2
ZONE 3
ZONE 4
COLUMNS
FRAME WITH ALL COLUMNS
Frame with all column in all seismic zones: Frame with C1 column removed in all seismic zones:
27
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C3 0 0 0 0
C2 4724.38 4842.22 4918.05 5031.78
C4 4788.35 4845.26 4921.15 4698.61
C8 6097.54 6124.06 6124.01 6123.95
0
1000
2000
3000
4000
5000
6000
7000
C3 C2 C4 C8
ZONE 1
ZONE 2
ZONE 3
ZONE 4
COLUMNS
C3 COLUMN REMOVED
LOAD(KN)
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C3 3765.2 3809.24 3867.95 3956.03
C2 3666.07 3709.61 3767.66 3854.75
C4 3666.04 3709.58 3767.64 3854.72
C8 5048.3 5050.98 5054.56 5059.93
0
1000
2000
3000
4000
5000
6000
C3 C2 C4 C8
ZONE 1
ZONE 2
ZONE 3
ZONE 4
FRAME WITH ALL COLUMNS
COLUMNS
LOAD(KN) Frame with all columns in ground storey: Frame with C3 column removed in ground storey:
28
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C5 0 0 0 0
C4 4872.97 4995.24 5076.91 5199.57
C9 5120.02 5125.16 5132.01 4907.65
C10 4872.89 4998.47 5084.61 5213.83
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C5 1468.82 1430.06 2771.72 2849.24
C4 3666.04 3709.58 3767.64 3854.72
C9 4898.16 4900.67 4904.02 4657.67
C10 3629.49 3675 3735.68 3826.69
Load distribution in the columns with all seismic zones: C5 column removed in all seismic zones:
0
1000
2000
3000
4000
5000
C5 C4 C9 C10
ZONE 1
ZONE 2
ZONE 3
ZONE 4
COLUMNS
FRAME WITH ALL COLUMNS
AXIALLOAD(KN)
0
1000
2000
3000
4000
5000
6000
C5 C4 C9 C10
ZONE 1
ZONE 2
ZONE 3
ZONE 4
C5 COLUMN REMOVED
COLUMNS
AXIALLOAD(KN) 29
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C13 0 0 0 0
C8 6054.12 6056.54 6062.98 6045.76
C12 6041.9 6042.79 6043.98 6048.57
C14 6044.51 6045.45 6046.7 6064.6
C18 6057.25 6059.71 6062.98 6067.9
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C13 5209.63 5209.63 5209.63 5209.64
C8 5048.3 5050.98 5054.56 4786.71
C12 5051.76 5053.23 5055.19 4786.76
C14 5051.75 5053.21 5055.16 5059.93
C18 5048.27 5050.94 5054.49 5059.82
Frame with all columns in ground storey in all Seismic Zones: C13 column removed in all seismic zones:
0
2000
4000
6000
8000
C13 C8 C12 C14 C18
ZONE 1
ZONE 2
ZONE 3
ZONE 4
C13 COLUMN REMOVED
COLUMNS
AXIALLOAD(KN)
4400
4600
4800
5000
5200
5400
C13 C8 C12 C14 C18
ZONE 1
ZONE 2
ZONE 3
ZONE 4
FRAME WITH ALL COLUMNS
COLUMNS
AXIALLOAD(KN)
30
COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4
C1 0 0 0 0
C2 2863.09 2852.55 2838.49 2817.41
C6 2901.51 2924 2953.99 3081.36
C7 1694.06 1698.07 1703.41 1711.43
0
500
1000
1500
2000
2500
3000
3500
ZONE 1 ZONE 2 ZONE 3 ZONE 4
C1
C2
C6
C7
5TH FLOOR C1 REMOVED
COLUMNS
AXIALLOAD(KN)
C1 column removed in fifth storey with all seismic zones:
31
Force VS Deformation curve
32
PLASTIC DEFORMATION CURVE:
Pushover Curve - Base Shear vs Monitored Displacement:
Hinge Pattern in-direction X:
33
Hinges pattern in C3 column Removed Model:
Hinge Pattern in-direction Y:
Pushover Curve - Base Shear vs Monitored Displacement:
34
35
36
37
38
39
Conclusion:
40
From the analytical result, I would like to conclude that critical column needs special
care at the time of construction and maintenance.
Critical column should be given some extra strengthening such as adding new
concrete jacket with additional reinforcement, using external steel angles, horizontal
strips, wrapping the original column section and retrofitting.
 In practical situation the critical column should not be disturbed by any external
forces.
The planning of building should be made in such a way that, critical column should
not be near to way explosive areas such of kitchen the critical columns should be
avoided from direct impact any external forces such as vehicle impact.
References
 Kokot S., Anthoine A., Negro P. and Solomos G, Static and Dynamic Analysis Of A Reinforced Concrete Flat Slab Frame
Building For Progressive Collapse, JRC 62663, European Commission, Joint Research Centre, 2010.
 Kokot S, Literature Survey on Current Methodologies of Assessment of Building Robustness and Avoidance of Progressive
Collapse, JRC 55989, European Commission, Joint Research Centre, 2009.
 Khazaee A, Nonlinear Static and Dynamic Analysis for Assessment of Progressive Collapse Potential in intermediate RC frame
structures, I.J. of Advances in Engineering Sciences 2013; Vol.3, Issue 4.
 Bing-bing Tu, Dong Zhao, Judgment of Key Components during Progressive Collapse. EJGE, 19; PP: 195-204, 2014
 FEMA, World Trade Center Building Performance Study: Data Collection, Preliminary Observations, and Recommendations,
FEMA 403, 2002.
 Starossek U, Avoiding disproportionate collapse of tall buildings. Structural Engg. International, 3:238–245, 2008.
 Ellingwood B. R, Load and Resistance Factor Criteria for Progressive Collapse Design. Proceedings of the Workshop on
Prevention of Progressive Collapse, Multi-hazard Mitigation, Council of the National Institute of Building Sciences,
Rosemont,2002,
 Ellingwood B. R et al, Best Practices for Reducing the Potential for Progressive Collapse in Buildings, National Institute of
Standards and Technology, U.S. Department of Commerce, 2007.
 Stevens D., Martin E, Williamson E, McKay A. and Marchand, Recent Developments In Progressive Collapse Design,
Protection Engineering Consultants, San Antonio, Texas, 2013
 Unified Facilities Criteria (UFC), Design Of Buildings To Resist Progressive Collapse, Department of Defense (DOD), 2009.
41
American Society of Civil Engineers (ASCE), Seismic Rehabilitation of Existing
Buildings, ASCE 41-06, Reston, Virginia, 2006.
 Alrudaini T. M. S, A New Mitigation Scheme to Resist Progressive Collapse of
Reinforced Concrete Buildings. Doctor Thesis, University of Wollongong, 2011
 Iribarren, B. S, Progressive Collapse Simulation of Reinforced Concrete Structures:
Influence of Design and Material Parameters and Investigation of the Strain Rate
Effects. Ph.D. Thesis, Université Libre de Bruxelles, 2011.
 Mwafy A. M., Elnashai A.S, Static pushover versus dynamic collapse analysis of RC
buildings, Engineering Structures,23, PP: 407–424, 2001
 Rakshith K G, Radhakrishna, Progressive Collapse Analysis Of Reinforced Concrete
Framed Structure, IJRET: I.J. of Research in Engg. and Technology, PP:32-40, 2013
 Gururaja B., and Sridhar R, Progressive Collapse Potential of Irregular Concrete
Building. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 67; pp:
320-34, 2014.
 Li Y., Lu X., Guan H. and Ye L, An improved tie force method for progressive
collapse resistance design of reinforced concrete frame structures. Engineering
Structures, 33, PP: 2931–2942, 2011.
42
General Services Administration (GSA). (2003). Progressive collapse analysis and
design guidelines for new federal office buildings and major modernization projects,
GSA.
 IS 456:2000 (2005). Plain and reinforced concrete code of practice, 4th Revision,
7th Reprint, Bureau of Indian Standards, New Delhi.
 IS 1893 (Part 1):2002 (2006). Criteria for earthquake resistant design of
structures.5th Revision, 3rd Reprint, Bureau of Indian Standards, New Delhi
 ETAB v 9.7 analysis reference manual, Computers and Structures, Inc., Berkeley.
S.R. Damodarasamy and S. Kavitha book name Basics of Structural Dynamics and
a seismic Design is referred for the load calculation and other Purpose.
Image reference for progressive collapse and its URL is
(http://911review.com/coverup/fantasy/progressive.html)
Image reference for Domino effect and its URL is
 (https://speakzeasy.wordpress.com/tag/domino-effect/)
43
44

Weitere ähnliche Inhalte

Was ist angesagt?

Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting TechniquesAritra Banerjee
 
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...Rahul Leslie
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieRahul Leslie
 
Introduction to Limit State Design
Introduction to Limit State DesignIntroduction to Limit State Design
Introduction to Limit State DesignAlamin Sikder
 
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and SizingCE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and SizingFawad Najam
 
Seismic Design Of Structures Project
Seismic Design Of Structures ProjectSeismic Design Of Structures Project
Seismic Design Of Structures ProjectGunjan Shetye
 
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed Anwar
Performance Based Design, Value Engineering  and Peer Review by Dr. Naveed AnwarPerformance Based Design, Value Engineering  and Peer Review by Dr. Naveed Anwar
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed AnwarAIT Solutions
 
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...AM Publications
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSYousuf Dinar
 
CE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersCE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersFawad Najam
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000PraveenKumar Shanmugam
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PROAli Meer
 
Precast pretensioned concrete girders
Precast pretensioned concrete girdersPrecast pretensioned concrete girders
Precast pretensioned concrete girdersMD.Yeasin Mostafiz
 
Progression of Structural Design Approaches by Dr. Naveed Anwar
Progression of Structural Design Approaches by Dr. Naveed AnwarProgression of Structural Design Approaches by Dr. Naveed Anwar
Progression of Structural Design Approaches by Dr. Naveed AnwarAIT Solutions
 
BRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKEBRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKESajid Iqbal
 
Analysis and design of high rise building frame using staad pro
Analysis and design of high rise building frame using staad proAnalysis and design of high rise building frame using staad pro
Analysis and design of high rise building frame using staad proeSAT Journals
 
Yield line theory
Yield line theoryYield line theory
Yield line theoryVikas Mehta
 

Was ist angesagt? (20)

Seismic Retrofitting Techniques
Seismic Retrofitting TechniquesSeismic Retrofitting Techniques
Seismic Retrofitting Techniques
 
Composite column
Composite columnComposite column
Composite column
 
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
Part-I: Seismic Analysis/Design of Multi-storied RC Buildings using STAAD.Pro...
 
Retrofitting
Retrofitting Retrofitting
Retrofitting
 
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul LeslieModelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
Modelling Building Frame with STAAD.Pro & ETABS - Rahul Leslie
 
Introduction to Limit State Design
Introduction to Limit State DesignIntroduction to Limit State Design
Introduction to Limit State Design
 
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and SizingCE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
CE 72.32 (January 2016 Semester) Lecture 5 - Preliminary Design and Sizing
 
Seismic Design Of Structures Project
Seismic Design Of Structures ProjectSeismic Design Of Structures Project
Seismic Design Of Structures Project
 
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed Anwar
Performance Based Design, Value Engineering  and Peer Review by Dr. Naveed AnwarPerformance Based Design, Value Engineering  and Peer Review by Dr. Naveed Anwar
Performance Based Design, Value Engineering and Peer Review by Dr. Naveed Anwar
 
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...
PROGRESSIVE COLLAPSE ANALYSIS OF REINFORCED CONCRETE SYMMETRICAL AND UNSYMMET...
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 
CE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC MembersCE 72.52 - Lecture 8b - Retrofitting of RC Members
CE 72.52 - Lecture 8b - Retrofitting of RC Members
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
 
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRODESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
DESIGN AND ANALAYSIS OF MULTI STOREY BUILDING USING STAAD PRO
 
Precast pretensioned concrete girders
Precast pretensioned concrete girdersPrecast pretensioned concrete girders
Precast pretensioned concrete girders
 
Progression of Structural Design Approaches by Dr. Naveed Anwar
Progression of Structural Design Approaches by Dr. Naveed AnwarProgression of Structural Design Approaches by Dr. Naveed Anwar
Progression of Structural Design Approaches by Dr. Naveed Anwar
 
BRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKEBRACED STEEL FRAMES IN EARTHQUAKE
BRACED STEEL FRAMES IN EARTHQUAKE
 
Analysis and design of high rise building frame using staad pro
Analysis and design of high rise building frame using staad proAnalysis and design of high rise building frame using staad pro
Analysis and design of high rise building frame using staad pro
 
Beam design
Beam designBeam design
Beam design
 
Yield line theory
Yield line theoryYield line theory
Yield line theory
 

Ähnlich wie Progressive collapse of reinforced concrete structures using ETABS

IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...
IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...
IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...IRJET Journal
 
IRJET- Progressive Collapse Resistance of Flat Slab Building
IRJET- Progressive Collapse Resistance of Flat Slab BuildingIRJET- Progressive Collapse Resistance of Flat Slab Building
IRJET- Progressive Collapse Resistance of Flat Slab BuildingIRJET Journal
 
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...IRJET Journal
 
IRJET- Seismic Analysis of G+6 Frame Building using ETABS
IRJET-  	  Seismic Analysis of G+6 Frame Building using ETABSIRJET-  	  Seismic Analysis of G+6 Frame Building using ETABS
IRJET- Seismic Analysis of G+6 Frame Building using ETABSIRJET Journal
 
IRJET- Progressive Collapse Analysis of RC Building
IRJET-  	  Progressive Collapse Analysis of RC BuildingIRJET-  	  Progressive Collapse Analysis of RC Building
IRJET- Progressive Collapse Analysis of RC BuildingIRJET Journal
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGAnjneya Srivastava
 
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-Tabs
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-TabsIRJET- Seismic Analysis for Vertically Geometric Irregularity using E-Tabs
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-TabsIRJET Journal
 
Progressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresProgressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresIRJET Journal
 
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGSTUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGIRJET Journal
 
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGSTUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGIRJET Journal
 
Behavioural studies of floating column on framed structure
Behavioural studies of floating column on framed structureBehavioural studies of floating column on framed structure
Behavioural studies of floating column on framed structureeSAT Journals
 
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...fijsekkdmdm2w
 
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...zan2736ban
 
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...fhsejkdkmen
 
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...fjjskejdmdn
 
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...ikdkkdmdmdm
 

Ähnlich wie Progressive collapse of reinforced concrete structures using ETABS (20)

IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...
IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...
IRJET- Collapse Analysis of Irregular Flat Slab Structure at different Seismi...
 
San Julian.Docx
San Julian.DocxSan Julian.Docx
San Julian.Docx
 
San Julian.Docx
San Julian.DocxSan Julian.Docx
San Julian.Docx
 
FYP Structure.pdf
FYP Structure.pdfFYP Structure.pdf
FYP Structure.pdf
 
IRJET- Progressive Collapse Resistance of Flat Slab Building
IRJET- Progressive Collapse Resistance of Flat Slab BuildingIRJET- Progressive Collapse Resistance of Flat Slab Building
IRJET- Progressive Collapse Resistance of Flat Slab Building
 
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...
COMPARE THE EFFECT OF FLOATING COLUMN UNDER EARTHQUAKE EXCIATATION IN G+15 L ...
 
Instructions
InstructionsInstructions
Instructions
 
IRJET- Seismic Analysis of G+6 Frame Building using ETABS
IRJET-  	  Seismic Analysis of G+6 Frame Building using ETABSIRJET-  	  Seismic Analysis of G+6 Frame Building using ETABS
IRJET- Seismic Analysis of G+6 Frame Building using ETABS
 
IRJET- Progressive Collapse Analysis of RC Building
IRJET-  	  Progressive Collapse Analysis of RC BuildingIRJET-  	  Progressive Collapse Analysis of RC Building
IRJET- Progressive Collapse Analysis of RC Building
 
DESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDINGDESIGN OF G+20 MULTISTOREY BUILDING
DESIGN OF G+20 MULTISTOREY BUILDING
 
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-Tabs
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-TabsIRJET- Seismic Analysis for Vertically Geometric Irregularity using E-Tabs
IRJET- Seismic Analysis for Vertically Geometric Irregularity using E-Tabs
 
Progressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresProgressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC Structures
 
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGSTUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
 
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDINGSTUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
STUDY OF PROGRESSIVE COLLAPSE IN G+8 MULTI-STOREY BUILDING
 
Behavioural studies of floating column on framed structure
Behavioural studies of floating column on framed structureBehavioural studies of floating column on framed structure
Behavioural studies of floating column on framed structure
 
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
 
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
Caterpillar Cat 325C and 325C L Excavator (Prefix BMM) Service Repair Manual ...
 
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
 
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...
Caterpillar cat 325 c excavator (prefix bmm) service repair manual (bmm00001 ...
 
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
Caterpillar cat 325 c l excavator (prefix bmm) service repair manual (bmm0000...
 

Kürzlich hochgeladen

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Kürzlich hochgeladen (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Progressive collapse of reinforced concrete structures using ETABS

  • 1. ANALYTICAL STUDY ON THE BEHAVIOUR OF G+10 RC BUILDING SUBJECTED TO PROGRESSIVE COLLAPSE USING ETABS DEPARTMENT OF CIVIL ENGINEERING (PHASE-II REVIEW) GROUP MEMBERS REGISTER NO R. ARUN 14TA2903 N. SATHISH 14TA2919 B. THIYAGARAJAN 14TA2929 R. VASANTH 14TA2930 GUIDED BY Mr. R.VIGHNESHWARAN (Assistant Professor Department of Civil Engineering ) 1
  • 2. Introduction: The progressive collapse of building is initiated when one or more vertical load carrying members (typically columns) is removed.  When a column is removed, (due to a vehicle impact, fire, earthquake, man- made or natural hazards) the building’s weight (gravity load) transfers to neighboring columns in the structure. If these neighboring columns are not properly designed to resist and redistribute the additional gravity load that part of the structure fails. 2
  • 3. 3
  • 4. Need for study: If the structure shows signs of failure then suitable retrofit measures may also be suggested. It is very important to establish the likelihood of progressive collapse of structures to avoid catastrophic events. Design the column safely to avoid the progressive collapse. To study the formation of hinge patterns in different stages using pushover analysis. Design the structure to sustain the accidental actions. 4
  • 5. Objective: To design the G+10 Reinforced concrete structures. To analyze the structure by Non linear static analysis method. To identify the critical columns in various seismic Zones. To perform Pushover analysis for the structure with the removal of columns as per GSA guidelines. To determine the potential for progressive collapse. To give the preventive measures. 5
  • 6. To determine the Axial Load distribution in the columns with various cases such as frame with all columns, Corner column removed, Exterior column removed and interior column in various seismic zones. To determine the critical column of the Building columns with various cases such as frame with all columns, Corner column removed, Exterior column removed and interior column in various seismic zones. To study the Hinge Pattern of G+10 multistorey building before and after removing of column as per GSA guidelines Scope: 6
  • 7. Literature study summary 7 The literature survey carried out in the present work clearly indicates that the pushover analysis is one of the powerful tools for predicting the performance of a building under seismic forces. Based on these facts, the numerical model development and analysis under pushover analysis is planned in the present work. Capacity of the member at any section is calculated as per IS 456:2000 from the obtained reinforcement details after analysis and design. Member forces are obtained by analysis results carried out in ETABS 16.0. And result comparison is to be done for these parameters before and after the progressive collapse of the building.
  • 8. METHODOLOGY Detailed study of literature review Removal of Critical column initiate progressive collapse Check for acceptance as per GSA 2003 guidelines G+10 RCC building is taken for project Prepare Plan for G+10 structure Non linear static analysis is carried out Determination of Axial load values of column Result comparison – before and after progressive collapse Modeling in ETABS Identification of critical columns By these evaluation building can be assessed whether it can withstand progressive collapse 8
  • 10. FRAME WITH ALL COLUMNS: (Plan view) 10
  • 14. C1 REMOVED (PLAN VIEW): Plan View 3D View The above shown figures are the Plan View and 3D view of the G+10 framed structure with Corner column c1 removed in the Ground storey. 14
  • 15. COLUMN LOAD(KN) C1 2849.53 C2 3854.75 C6 3826.19 C7 4666.36 COLUMN LOAD(KN) C1 0 C2 5199.81 C6 5213.32 C7 4915.29 Axial Load Values of Column: Axial load values of C1 Column removed: 0 1000 2000 3000 4000 5000 6000 C1 C2 C6 C7 C1 REMOVED FRAME WITH ALL COLUMNS COMPARATIVE GRAPHLOAD(KN) COLUMN 15
  • 16. C3 COLUMN REMOVED IN GROUND STOREY: Plan view 3D view The above shown figures are the Plan View and 3D view of the G+10 framed structure C3 with the removal of C3 column in the Ground storey. 16
  • 17. COLUMN LOAD(KN) C3 3956.03 C2 3854.75 C4 3854.72 C8 5059.93 Axial load values of columns: COLUMN LOAD(KN) C3 0 C2 5031.78 C4 4698.61 C8 6123.95 Axial load values of C3 column Removed: 0 2000 4000 6000 8000 C3 C2 C4 C8 C3 REMOVED LOAD(KN) COLUMN COMPARATIVE GRAPH 17
  • 18. C5 COLUMN REMOVED IN GROUN STOREY: Plan view 3D view The above shown figures are the Plan View and 3D view of the G+10 framed structure with Corner column c5 was removed in the ground storey. 18
  • 19. COLUMN LOAD(KN) C5 2849.24 C4 3854.72 C9 4657.67 C10 3826.69 Frame with all Column in Ground storey: COLUMN LOAD(KN) C5 0 C4 5199.57 C9 4907.65 C10 5213.83 C5 column removed in ground storey: 0 1000 2000 3000 4000 5000 6000 C5 C4 C9 C10 C5 REMOVED FRAME WITH ALL COLUMN COLUMNS LOAD(KN) COMPARATIVE GRAPH 19
  • 20. C13 COLUMN REMOVED IN GROUND STOREY: Plan view 3D view The above shown figures are the Plan View and 3D view of the G+10 framed structure with the removal of middle column in the building C13in Ground storey. 20
  • 21. COLUMN LOAD(KN) C13 5209.64 C12 4786.71 C14 4786.76 C8 5059.93 C18 5059.82 Frame with all Columns in ground storey: COLUMN LOAD(KN) C13 0 C12 6045.76 C14 6048.57 C8 6064.6 C18 6067.9 C13 column removed in ground storey: 0 1000 2000 3000 4000 5000 6000 7000 C13 C12 C14 C8 C18 C13 REMOVED FRAME WITH ALL COLUMNS COLUMNS COMPARITIVE GRAPH LOAD(KN) 21
  • 22. COLUMN C1 REMOVED IN 5TH STOREY: Plan view 3D view The above shown figures are the Plan View and 3D view of the G+10 framed structure with removal of corner column C1 in Fifth storey. 22
  • 23. COLUMN LOAD(KN) C1 0 C2 2817.41 C6 3081.36 C7 1711.43 C1 column in 5th storey: COLUMN LOAD(KN) C1 1036.75 C2 1280.79 C6 1267.83 C7 1627.08 Frame with all columns in 5th storey 0 1000 2000 3000 4000 C1 C2 C6 C7 C1 REMOVED IN 5TH FLOOR ALL COLUMN IN 5TH FLOOR COLUMNS LOAD(KN) COMPARITIVE GRAPH 23
  • 24. ZONE COMPARISON: ZONE ZONE FACTOR SEISMIC INTENSITY ZONE-I 0.10 LOW ZONE-II 0.16 MODERATE ZONE-III 0.24 SEVERE ZONE-IV 0.36 VERY SEVERE Similarly, the columns C1, C3, C5, C13 in ground storey and column C1 in 5th floor has to be analyzed in ZONE 3, ZONE3, ZONE1 and the Critical column was determined and designed safely to avoid the progressive collapse of the building. 24
  • 25. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C1 1594.45 1630.97 2772 2849.53 C2 3666.07 3709.61 3767.66 3854.75 C3 3765.2 3809.24 3867.95 3956.03 C4 3666.04 3709.58 3767.64 3854.72 C5 1468.82 1430.06 2771.72 2849.245 C6 3629.08 3674.57 3735.22 3826.195 C7 4898.14 4900.65 4904 4666.36 C8 5048.3 5050.98 5054.56 5059.93 C9 4898.16 4900.67 4904.02 4657.67 C10 3629.49 3675 3735.68 3826.69 C11 3730.33 3776.26 3837.5 3929.26 C12 5051.76 5053.23 5055.19 4786.76 C13 5209.63 5209.63 5209.63 5209.637 C14 5051.75 5053.21 5055.16 4786.71 C15 3730.76 3776.71 3837.97 3929.86 C16 3629.01 3674.49 3735.15 3826.12 C17 4899.15 4900.67 4904.02 4657.68 C18 5048.27 5050.94 5054.49 5059.82 C19 4898.17 4900.69 4904.14 4666.45 C20 3629.42 3674.93 3735.6 4826.62 C21 1772.53 1436.01 2771.68 2849.209 C22 3666.72 3710.3 3768.4 3855.54 C23 3765.9 3809.96 3868.71 3956.83 C24 3666.69 3710.27 3768.37 3855.519 C25 1468.62 1429.86 2771.4 2848.92 25
  • 26. 0 1000 2000 3000 4000 5000 6000 C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 C25 ZONE 1 ZONE 2 ZONE 3 ZONE 4 STOREY 1 FRAME WITH ALL COLUMNS COULMNS LOAD(KN) 26
  • 27. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C1 0 0 0 0 C2 4777.6 4838 5077.2 5199.81 C6 4913.73 4981.74 5084.15 5213.32 C7 5095.36 5100.79 5132.16 4915.29 COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C1 1630.97 1630.97 2772 2849.53 C2 3709.61 3709.61 3767.66 3854.75 C6 3674.57 3674.57 3735.22 3826.19 C7 4900.65 4900.65 5054.56 4666.36 0 1000 2000 3000 4000 5000 6000 C1 C2 C6 C7 ZONE 1 ZONE 2 ZONE 3 ZONE 4 COLUMNS C1 COLUMN REMOVED LOAD(KN)0 1000 2000 3000 4000 5000 6000 C1 C2 C6 C7 ZONE 1 ZONE 2 ZONE 3 ZONE 4 COLUMNS FRAME WITH ALL COLUMNS Frame with all column in all seismic zones: Frame with C1 column removed in all seismic zones: 27
  • 28. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C3 0 0 0 0 C2 4724.38 4842.22 4918.05 5031.78 C4 4788.35 4845.26 4921.15 4698.61 C8 6097.54 6124.06 6124.01 6123.95 0 1000 2000 3000 4000 5000 6000 7000 C3 C2 C4 C8 ZONE 1 ZONE 2 ZONE 3 ZONE 4 COLUMNS C3 COLUMN REMOVED LOAD(KN) COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C3 3765.2 3809.24 3867.95 3956.03 C2 3666.07 3709.61 3767.66 3854.75 C4 3666.04 3709.58 3767.64 3854.72 C8 5048.3 5050.98 5054.56 5059.93 0 1000 2000 3000 4000 5000 6000 C3 C2 C4 C8 ZONE 1 ZONE 2 ZONE 3 ZONE 4 FRAME WITH ALL COLUMNS COLUMNS LOAD(KN) Frame with all columns in ground storey: Frame with C3 column removed in ground storey: 28
  • 29. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C5 0 0 0 0 C4 4872.97 4995.24 5076.91 5199.57 C9 5120.02 5125.16 5132.01 4907.65 C10 4872.89 4998.47 5084.61 5213.83 COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C5 1468.82 1430.06 2771.72 2849.24 C4 3666.04 3709.58 3767.64 3854.72 C9 4898.16 4900.67 4904.02 4657.67 C10 3629.49 3675 3735.68 3826.69 Load distribution in the columns with all seismic zones: C5 column removed in all seismic zones: 0 1000 2000 3000 4000 5000 C5 C4 C9 C10 ZONE 1 ZONE 2 ZONE 3 ZONE 4 COLUMNS FRAME WITH ALL COLUMNS AXIALLOAD(KN) 0 1000 2000 3000 4000 5000 6000 C5 C4 C9 C10 ZONE 1 ZONE 2 ZONE 3 ZONE 4 C5 COLUMN REMOVED COLUMNS AXIALLOAD(KN) 29
  • 30. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C13 0 0 0 0 C8 6054.12 6056.54 6062.98 6045.76 C12 6041.9 6042.79 6043.98 6048.57 C14 6044.51 6045.45 6046.7 6064.6 C18 6057.25 6059.71 6062.98 6067.9 COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C13 5209.63 5209.63 5209.63 5209.64 C8 5048.3 5050.98 5054.56 4786.71 C12 5051.76 5053.23 5055.19 4786.76 C14 5051.75 5053.21 5055.16 5059.93 C18 5048.27 5050.94 5054.49 5059.82 Frame with all columns in ground storey in all Seismic Zones: C13 column removed in all seismic zones: 0 2000 4000 6000 8000 C13 C8 C12 C14 C18 ZONE 1 ZONE 2 ZONE 3 ZONE 4 C13 COLUMN REMOVED COLUMNS AXIALLOAD(KN) 4400 4600 4800 5000 5200 5400 C13 C8 C12 C14 C18 ZONE 1 ZONE 2 ZONE 3 ZONE 4 FRAME WITH ALL COLUMNS COLUMNS AXIALLOAD(KN) 30
  • 31. COLUMN ZONE 1 ZONE 2 ZONE 3 ZONE 4 C1 0 0 0 0 C2 2863.09 2852.55 2838.49 2817.41 C6 2901.51 2924 2953.99 3081.36 C7 1694.06 1698.07 1703.41 1711.43 0 500 1000 1500 2000 2500 3000 3500 ZONE 1 ZONE 2 ZONE 3 ZONE 4 C1 C2 C6 C7 5TH FLOOR C1 REMOVED COLUMNS AXIALLOAD(KN) C1 column removed in fifth storey with all seismic zones: 31
  • 32. Force VS Deformation curve 32 PLASTIC DEFORMATION CURVE:
  • 33. Pushover Curve - Base Shear vs Monitored Displacement: Hinge Pattern in-direction X: 33
  • 34. Hinges pattern in C3 column Removed Model: Hinge Pattern in-direction Y: Pushover Curve - Base Shear vs Monitored Displacement: 34
  • 35. 35
  • 36. 36
  • 37. 37
  • 38. 38
  • 39. 39
  • 40. Conclusion: 40 From the analytical result, I would like to conclude that critical column needs special care at the time of construction and maintenance. Critical column should be given some extra strengthening such as adding new concrete jacket with additional reinforcement, using external steel angles, horizontal strips, wrapping the original column section and retrofitting.  In practical situation the critical column should not be disturbed by any external forces. The planning of building should be made in such a way that, critical column should not be near to way explosive areas such of kitchen the critical columns should be avoided from direct impact any external forces such as vehicle impact.
  • 41. References  Kokot S., Anthoine A., Negro P. and Solomos G, Static and Dynamic Analysis Of A Reinforced Concrete Flat Slab Frame Building For Progressive Collapse, JRC 62663, European Commission, Joint Research Centre, 2010.  Kokot S, Literature Survey on Current Methodologies of Assessment of Building Robustness and Avoidance of Progressive Collapse, JRC 55989, European Commission, Joint Research Centre, 2009.  Khazaee A, Nonlinear Static and Dynamic Analysis for Assessment of Progressive Collapse Potential in intermediate RC frame structures, I.J. of Advances in Engineering Sciences 2013; Vol.3, Issue 4.  Bing-bing Tu, Dong Zhao, Judgment of Key Components during Progressive Collapse. EJGE, 19; PP: 195-204, 2014  FEMA, World Trade Center Building Performance Study: Data Collection, Preliminary Observations, and Recommendations, FEMA 403, 2002.  Starossek U, Avoiding disproportionate collapse of tall buildings. Structural Engg. International, 3:238–245, 2008.  Ellingwood B. R, Load and Resistance Factor Criteria for Progressive Collapse Design. Proceedings of the Workshop on Prevention of Progressive Collapse, Multi-hazard Mitigation, Council of the National Institute of Building Sciences, Rosemont,2002,  Ellingwood B. R et al, Best Practices for Reducing the Potential for Progressive Collapse in Buildings, National Institute of Standards and Technology, U.S. Department of Commerce, 2007.  Stevens D., Martin E, Williamson E, McKay A. and Marchand, Recent Developments In Progressive Collapse Design, Protection Engineering Consultants, San Antonio, Texas, 2013  Unified Facilities Criteria (UFC), Design Of Buildings To Resist Progressive Collapse, Department of Defense (DOD), 2009. 41
  • 42. American Society of Civil Engineers (ASCE), Seismic Rehabilitation of Existing Buildings, ASCE 41-06, Reston, Virginia, 2006.  Alrudaini T. M. S, A New Mitigation Scheme to Resist Progressive Collapse of Reinforced Concrete Buildings. Doctor Thesis, University of Wollongong, 2011  Iribarren, B. S, Progressive Collapse Simulation of Reinforced Concrete Structures: Influence of Design and Material Parameters and Investigation of the Strain Rate Effects. Ph.D. Thesis, Université Libre de Bruxelles, 2011.  Mwafy A. M., Elnashai A.S, Static pushover versus dynamic collapse analysis of RC buildings, Engineering Structures,23, PP: 407–424, 2001  Rakshith K G, Radhakrishna, Progressive Collapse Analysis Of Reinforced Concrete Framed Structure, IJRET: I.J. of Research in Engg. and Technology, PP:32-40, 2013  Gururaja B., and Sridhar R, Progressive Collapse Potential of Irregular Concrete Building. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 67; pp: 320-34, 2014.  Li Y., Lu X., Guan H. and Ye L, An improved tie force method for progressive collapse resistance design of reinforced concrete frame structures. Engineering Structures, 33, PP: 2931–2942, 2011. 42
  • 43. General Services Administration (GSA). (2003). Progressive collapse analysis and design guidelines for new federal office buildings and major modernization projects, GSA.  IS 456:2000 (2005). Plain and reinforced concrete code of practice, 4th Revision, 7th Reprint, Bureau of Indian Standards, New Delhi.  IS 1893 (Part 1):2002 (2006). Criteria for earthquake resistant design of structures.5th Revision, 3rd Reprint, Bureau of Indian Standards, New Delhi  ETAB v 9.7 analysis reference manual, Computers and Structures, Inc., Berkeley. S.R. Damodarasamy and S. Kavitha book name Basics of Structural Dynamics and a seismic Design is referred for the load calculation and other Purpose. Image reference for progressive collapse and its URL is (http://911review.com/coverup/fantasy/progressive.html) Image reference for Domino effect and its URL is  (https://speakzeasy.wordpress.com/tag/domino-effect/) 43
  • 44. 44