SlideShare ist ein Scribd-Unternehmen logo
1 von 8
®
PROFESSIONAL SUMMARY
Arnold T Casquejo
Control Systems – Director I
EDUCATION
Bachelor of Science in Electrical Engineering
Central Colleges of the Philippines, 1988
Quezon City, Philippines
PROFESSIONAL LICENSES/CERTIFICATIONS
Certified Lead Auditor to ISO 9000, and ASME NQA-1
SUMMARY OF EXPERIENCE
Has had Twenty four(24) in the field of Engineering mainly as Instrument Design Engineer and a
Instrument Lead Engineer. In several occasion, has function as an Interface Person or was involved in
Project Engineering activies.
Was also involved on all estimating / proposal effort done in the office by providing lean and mean
estimate to the office proposal team. Has continiuosly monitors all project in the discipline involved by
conducting quality audits on all phases of the project.
Has functioned as Engineering Mnager on Projects on both E&C and Power projects and has executed
projects involving Utilities and Offsites, Process, and Power Distribution. Has also functioned as the main
interface person involving all discipline on a project ensuring alignment and achieving a single goal.
Knowledgeable in AutoCAD 200(I), 10, 11, 12, and 14, Intergraph Microstation, Microsoft Access, and
all Microsoft Office related software, and all versions of Intools. Has attended in-house seminar on
various fields of engineering practices and work related courses such as process engineering basic design
training, control system, detail engineering training, calibration of instruments.
Has conducted training on Basic Instrumentation, Intools (versions 5, 6, 7, and SPI)) Basic and Advance,
Inline building of instrument utilizing the Reference Database of the PDS Model. Office Intools
administrator responsible for all Intools related activities on all Control Systems project in the office.
Was tasked by the office to be a part of the Control Systems knowledge Community core group which is
tasked to promote the use of knowledge based depository located at the company established website
which is aimed to have every member of the department globally to be a member and aware of it’s use.
Also and active member of the Intools core group which is tasked to promote the use of Intools
application on all Control Systems project in all offices. Currently assigned as the office champion on
Intools application on all project executed in the office. Do conduct audits on projects inline with the ISO
external body who conducts surveillance audit for continuous accreditation in ISO. Also an active
member of Toastmaster’s club. Recently passed the certification for Leads auditors for ISO 9001.
Currently active on supporting E&CS department on it’s manpower hiring and project distribution.
AV240680bd-d9c4-4a0d-be55-656b72af11e2-150908001743-lva1-app6891.doc (9/8/2015 9/8/2015)
Arnold T Casquejo Page 2 of 8
SPECIFIC EXPERIENCE
FLUOR DANIEL, INC. (MAY 2015 - Present)
Project Manager IV / Project Manager
Assigned as project Manager on a distributed execution project for Greensville County Power
with Fluor Charlotte office. Tasked to perform smooth execution ensuring alignment of scope
amongst discipline with their respective counterparts in Charlotte. Also, currently supporting
Duke Lee / Citrus Power projects as a Engineering Manager for the Manila execution.
FLUOR DANIEL, INC. (JAN - APRIL 2015)
Director I / Project Proposal Manager
Was tasked to perform as a proposal Manager for ENI Mozambique On Shore LNG Project
supporting the Houston office in the completion of the Manila estimate hours for a detailed
design engineering Distributed Execution between Farnborough and Manila.
Currently supporting Duke Lee / Citrus Power projects as a Engineering Manager for the Manila
execution.
FLUOR DANIEL, INC. (2008 to 2014)
Director I / Department Manager
Has functioned as the Department Manager for both Electrical and Control Systems with the
main function of hiring and developing people within the group, support projects by developing
competent engineers and designer thru extensive training and enhancement and maintaining
quality on all projects deliverables.
Was also assigned as a member of the Risk group in the office as part of my portfolio ensuring all
projects done in Manila has it’s BRMF established, monitored, and closed in a timely manner.
Has also supported the Project Management and Buss development on all estimate and proposal
effort.
Has acted as Project Engineer on the following proposal projects for the office;
Columbian Carbon Block Project – FEED Verification and MTO
BASF Crude MDI2 – FEED Verification and MTO
Lake Charles Liquefaction Project - A Fluor / AG&P proposal for Fabrication of Main Piperack
and Pipe spools.
Exxon Mobil DCU Project – A Fluor / AG&P proposal for the fabrication of Main Piperack, Pipe
Spools, Equipment platforms, and dresses vessels.
Arnold T Casquejo Page 3 of 8
FLUOR DANIEL, INC. (2000 to 2008)
INSTRUMENT – SENIOR DESIGN ENGINEER
LDK Solar Project
Xinyu, China
(Dec 2007 – Present)
Was assigned as Control Systems Lead / Project Interface person for LDK – Solar Project. A
workshare vertical split With Fluor-Greenville wherein Manila is responsible for TCS(Tri
chlorosilane) part.
Manila’s scope for engineering includes commodity engineering (Inline and Offline), Technical
Bid evaluation, and purchase requisition. Intools population of instrument tags
Design Scope includes 3D Modelling, Instrument Location Plan and other 2D related
deliverables, Schematics, Schedules, wiring diagrams, Loop Diagrams, Loop folders, and MTO
(Matman). Has supported Main Automation Vendor by executing bot FAT and SAT at MAV
fabrication facility and at site.
Leading a peak manpower of 27, project was able to achieve part of the goal of delivering most of
the engineering deliverables and now focus of completing all deliverables in time.
As the project approaches 60%, I was assigned as the over all interface person for the
Manila portion of the scope ensuring continiuos alignment of all deliverables involve and
Resolving outstanding issues involving all discipline.
YANSAB Petrochemical project
Yanbu, Saudi Arabia
(Aug 2005 – Dec 2007)
Was assigned as Control Systems Lead for United – Yansab project (Yanbu, Saudi Arabia), a
workshare project with Fluor in Camberley, UK. Tasked to execute both Engineering and Detail
Design on the Utilities Part of the project.
Manila’s scope for engineering includes commodity engineering (Inline and Offline), Technical
Bid evaluation, and purchase requisition. Was also involved on PCIMS (Plant Control and
Information Management Systems) as a support for DCS/PLC configuration on FAT (Field
Acceptance test).
Design Scope includes 3D Modelling, Instrument Location Plan and other 2D related
deliverables, Schematics, Schedules, wiring diagrams, Loop Diagrams, Loop folders, and MTO
(Matman).
Leading a peak manpower of 52, project was able to achieve part of the goal of delivering most of
the engineering deliverables and now focus of completing all deliverables in time.
United – Utilities Expansion project
(2005)
Was assigned as Control Systems Lead for United – Utilities Expansion project, a workshare
project with Fluor in Houston, Texas. Tasked to execute Detail Design mainly Instrument
Specsheet generation and development(via Intools), Instrument Offline Modelling activities(PDS
v7), Wiring, Thermowell calculation, and Vessel sketches for bridle Level devices.
Arnold T Casquejo Page 4 of 8
Was assigned as Instrument checker for Conoco – Phillips Zsorb project which a workshare
project with Houston office. Tasked to perform detailed checking of the Instrument Model
including Offline Instrument, Panel, and Inline Instruments to ensure preparedness for the
upcoming 90% client model review. Has set upped the groups current execution of the all 2d
drawings including completion of Hook-up drawings for Intools application, application of all
cable type for Intools application on the wiring module.
Ultramar – Low Sulfur Diesel - Project
(2004 - 2005)
Was assigned as Control Systems Lead for Ultramar Clean Fuels, a works hare project with
Calgary, Canada. Will be tasked to execute both Engineering and Detail Design mainly
Instrument Spec sheet generation and development(via Intools), Instrument Offline Modeling
activities(PDS v7), Wiring, Thermowell calculation, and Vessel sketches for bridle Level devices.
Was assigned as Instrument checker for Conoco – Phillips Zsorb project which a workshare
project with Houston office. Tasked to perform detailed checking of the Instrument Model
including Offline Instrument, Panel, and Inline Instruments to ensure preparedness for the
upcoming 90% client model review. Has set upped the groups current execution of the all 2d
drawings including completion of Hook-up drawings for Intools application, application of all
cable type for Intools application on the wiring module.
Integrated Isocyanates Project – Huntsman BASF
(2003)
Was assigned as Control Systems Supervisor for IIP-Huntsman Project in Caojing Chemical
Industry Park Shanghai, China. Tasked to do Engineering and Design set-up including Detailed
technical support to the detail design contractors which are Local base chinese design Institute
with 3 office location(China, Korea, and Taiwan), set-up of all database and design application
such as Intools(application and database), Oracle Server, Citrix Server(for worksharing), PDS,
Inline Table for Inline Instruments(Intools to PDS), Material Manager for Instrument
materials(Intools to PDS). Was able to develop several Engineering and Design Specification
such as Instrument Cable Specs, Intools Implementation Procedure, Instrument Air Consumtion
Specification, Instrument signal and loop diagram spec, and Instrument Equipment and Cable
Numbering System Specification. Has acted as the Intools Administrator for the whole project
with a peak of 30 end users. Has provided preparatory engineering and design documents such
Control Systems wiring philosophy, Engineering and Design Specification, Instrument Design
Index, Instrument spec form.
Bayer PC(Polycarbonate) Project
(2001-2003)
Was assigned as Control Systems Engineering and Design lead for Bayer PC Project in Caojing
Chemical Industry Park Caojing Shanghai, China. Tasked to work with Bayer Management side
As Control Systems Lead and a Project Engineer providing Detailed Technical support /
Schedule to the detail design contractor which is a local base Design Institute.
Has provided preparatory engineering design documents such as Control System Wiring
Philosophy, Instrument Junction Box / Air Header Location and DCS System philosophy,
Instrument / IO assignment to Junction box and DCS respectively and Specification.
Continued work on Instrument Specification and Technical/ Engineering communication with
Bayer selected vendor. Providing Intools support by conducting continuos training on Design
Contractor prior to the execution of detail design.
Arnold T Casquejo Page 5 of 8
Was assigned as Control Systems Lead Engineer for Bayer PC Extended Engineering Project
located at Caojing Chemical and Industry Park – Caojing Shanghai, China. Leads the group of
Local Design Institute Engineers on completing Instrument Specification of Inline and Offline
Instruments including Technical Bid Analysis of Instrument vendor quotes. Perform Instrument
calculation of Inline instruments such as valves, orifices, and Venturi Tube. Develop preparatory
design documents for bid package such as Instrument, Cable, and Foundation Field Bus
Specification. Instrument Drawing Index, Instrument Hook-up details and typical Assembly,
Instrument Junction Box and Air Header location, Control Room and Instrument Rack Room
equipment arrangement. Works with Electrical on the preliminary cable tray arrangement.
Conducts initial review on PDS model on instrument equipment utilizing Smartplant review
application.
Utilize Intools application (ver 5.2.8.1) providing output documents on Instrument Datasheet,
generic wiring schedule on Junction Box, Marshalling DCS Racks, Foundation Fieldbus
application, segment wiring calculation and Hook-up, and Loop module. Acted as the Intools
administrator and has provided training to the work group including electrical engineering and
design application.
Supervision of Chinese design contractor located at the Shanghai Office and continiuos
communacation with the 2 other located outside china to ensure good quality of delivarables.
INSTRUMENT – DESIGN ENGINEER 3
Hamaca Project
(1999 TO 2001)
Was assigned as a Control Systems Lead Engineer for Hamaca Crude Upgrade Project. An Oil
and Gas - Crude Upgrade to be constructed in Jose, Venezuela. It is a workshare effort between
three offices namely, The Caracas(Jose, Venezuela) which scope covers the Tank Farm. Manila
office which is tasked to worked on the Process and utility Area and the Fluor Daniel – Aliso
Viejo which serves as the main office and the focal point of Engineering. Manila’s scope on the
Process and Utility plant is to built the 2D model utilizing Intergraph – Plant Design
Systems(PDS). Underground layout of Fiber Optic System for Honeywell’s Distributed Control
System(DCS), Fire and Gas Systems(FGS), and Safety on Instrument System(SIS). Above
ground conduit layout of field instruments utilizing the HPM’s, FGS’s, and SIS’s cabinet
strtegically located on different areas on the process area. Such cabinets, will be linked to the
remote input output cabinet located in the Field Interface Cabinet(FIC) with redundant signals on
the remote Input Output cabinet on all substation. Part of the aboveground layout is the Fire and
Gas drawings and will be Develop thru Microstation SE upon extraction from the model.
Included on the scope is the development of Wiring Schedule, point to point loop Diagram,
Instrument Design Index, and Input Output Assignment and all will be done Intools 5.1. Cable
and Conduit Schedule will be done thru Cablapp(Cable Application Software) which are being
shared by the three offices.
As a Area Project Engineering Back Up person, my primary responsibilities is to established
communication and interface with other discipline and office and resolve issues concerning
technical querries which affect the work. Established plan on work sequence and manpower to
cope up with the project schedule and target milestone. Timely monitoring of work progress thru
Control Level Schedule(CLS) in preparation for the Project Status Review which is being done
monthly.
Arnold T Casquejo Page 6 of 8
Was assigned Fluor Daniel – Aliso Viejo to established alignment and early engineering in
preparation for the model and production stage in Manila.
INSTRUMENT - DESIGN ENGINEER 2
Irving Oil Upgrade Project
(1997 – 1998)
Was assigned as Lead Engineer for Control System in a work share effort with Fluor Daniel-
Aliso Viejo on Irving Oil Upgrade Project, and oil and Gas upgrade project located at Calgary,
Canada. Manila’s scope mainly on the Process Area and was tasked to built the 2D model
utilizing Intergraph – Plant Design System location all offline instrument in space. Aboveround
Conduit layout of all field instrument to Junction Boxes to include all DCS and shutdown
systems. Instrument Wiring Schedule to include all junction boxes on the field and Marshalling
Boxes in the Control Room and will be develop thru Microstation J.
Was assigned in Fluor Daniel-Aliso Viejo, USA to finalize and agree with the control systems
counterpart the Manila scope of work and also familiarize with the work procedures, standards,
and execution and be applied in Manila. Works primarily on all communication, documentation,
production design and engineering lead responsibilities for the fast completion of the project.
Member of ISO Core Group (ISO 9001, Fluor Daniel Inc.-Philippines) with a task of
disseminating all necessary information’s to all the members of the company with regards to ISO
awareness. Helped the Team on conducting seminars and training on all aspects of standards and
procedure and conducted Internal Audits on various projects of the company.
INSTRUMENT - DESIGN ENGINEER 2
Exxon Lubes Upgrade Project
(1996 – 1997)
Was assigned as Lead Engineer for Control Systems on a work share effort with Fluor Daniel
Houston in Exxon Lubes Upgrade Project located at Baytown Texas, USA. Scope include Inline
and Offline building of Instruments utilizing Intergraph PDS – Equipment model. Aboveground
conduit layout of field instruments to include all Junction Boxes, Marshalling racks, vendor
provide instrument skids, Instrument wiring drawings and utilized the use of Microstation
SE.Was sent to Fluor Daniel in Houston to help partly the Engineering team on it's preliminary
works such as the model setup, preliminary Inline model setup and instrument design index setup
and be able to familiarize on how the job will be executed using the client’s (Exxon) Standards.
Works Primarily on all communication, Documentation, Design and Engineering lead
responsibilities for the fast completion of the task.
INSTRUMENT - DESIGN SUPERVISOR
Procter and Gamble
(1995-1996)
Was assigned to handle small projects of P&G in Cabuyao, Laguna, Philippines working on its
perfume upgrade unit. Responsible on developing and updating elementary wiring diagram, all
instrument plan involved and additional requisition of Instrument for the upgraded unit. Has also
conducted several site surveys to determine the extent of the upgrade.
Arnold T Casquejo Page 7 of 8
Assigned to lead Control Systems group in Shell Tabangao Renewal (STAR) As-Built
Project, Tabangao, Batangas City, Philippines to work on as-built task being provided by the site
construction
INSTRUMENT – SENIOR DESIGNER
Saudi Chevron Petrochemical – Aromax Benzene and Cyclohexane Project
(1994 – 1995)
Assigned as Area Lead Designer and works primarily on Detail Design in Fluor Daniel Arabia
Ltd., Dhahran, Saudi Arabia for the Saudi Chevron Petrochemical - Aromax Benzene and
Cyclohexane Project, which covers the development of all deliverable construction drawings
such as Control and Communication Philosophy, Location Plans, Wiring diagrams, Loop
Diagram, Logic drawings, Wiring Philosophy, Instrument Specification, DCS / ESD
Architecture, Installation Schedule, and Installation Detail.
INSTRUMENT - SENIOR DESIGNER
1993 – 1994
Was assigned as Detail Design Checker in Hoechst Celanese Acrylic Monomer Expansion
Project. Works primarily on checking instrument design index, instrument load and wiring
diagrams.
Was assigned in Union Carbide (UC-THAI) Monomer Relocation Project involved in the
development of instrument location plan, instrument design index, load diagrams and instrument
wiring schedule.
Was assigned to Procter and Gamble- Syndet Bar Project as Instrument Designer. As such,
work involve primarily on developing/updating of process and instrument diagrams, developing
I/O list, developing instrument specifications on flow and level instruments as well as reviewing
instrument process diagrams, project design basis and definitions for developing/back checking
logic diagrams. Also work involve preparations of instrument logic diagrams and process and
instrument data sheet for flow and pressure instruments and development of instrument plan
layout. Was assigned at jobsite as part of the commissioning group involves in developing ladder
program.
Was also assigned at the jobsite of Pilipinas Shell Petroleum Corporation STAR Project as
part of the engineering support and construction group. Work involved primarily on the
modification of field installed instruments, cable assignments on junction boxes, instrument loop
diagrams, etc., based on actual installation. Also conduct field supervision, track instrument
material availability for field installation and work on As-built drawings.
INSTRUMENT - ASSISTANT DESIGNER
(1991-1993)
Was assigned to Pilipinas Shell Petroleum Corporation STAR Project as Control System
Designer. Worked in the preparation of construction drawings, detailed drawings, detailed
drawings of various engineering layout, instrument wiring connection diagram/cable schedule on
both aboveground and underground, material take-off, etc., Conduct site survey.
Also, was assigned to work with Singapore Aeromatic's Project. Took part on estimating
works for bidding purposes.
Arnold T Casquejo Page 8 of 8
ATLANTIC GULF AND PACIFIC CO., INC. (1998 - 1991
ELECTRICAL FIELD ENGINEER
(1990 – 1991)
Work involved in preparation of material take-off as per plan, change order material listing and
cost involved for field implementation, monitor electrical progress and submit accomplishment of
report for billing purposes 6750 Project which is tasked to built a 28 storey building in Makati,
Philippines. Also, prepared electrical shape drawings such as conduit layout and installation
details.
INSTRUMENT TECHNICIAN
1988 - 1990
Performed pneumatic and electronic calibration such as transmitters, measuring gauges, switches,
etc.
INSTRUMENT FITTER
1988
Work involved fabrication and installation of supports such as stanchions, local panel, junction
boxes and miscellaneous piping supports for Unocal Erawan Compression Platform Project in
Thailand. Work includes Installation of process instruments of different variables, installation of
free standing conventional control panel, etc. Also prepared fabrication drawings for field
installation requirements.
TRAINING
ISO 9000 Auditors Training
Intools 4 / 5
AutoCadd 10 / 12
PDS Intergraph
Leads Auditors Training
Smartplant Electrical
Managing your Project
PLC – 5 Basic
Electrical Heat Tracing

Weitere ähnliche Inhalte

Was ist angesagt?

Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14
Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14
Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14p6academy
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3Elbert Speed III
 
A Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology AssessmentA Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology Assessmentjbci
 
Duane martin 11 21 14 resume
Duane martin 11 21 14 resumeDuane martin 11 21 14 resume
Duane martin 11 21 14 resumeDuane Martin
 
Darin Nelson Resume
Darin Nelson ResumeDarin Nelson Resume
Darin Nelson Resumedarin_nelson
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16Tony Lowery
 
Chapter 4 software project planning
Chapter 4 software project planningChapter 4 software project planning
Chapter 4 software project planningPiyush Gogia
 
mechanical engineer resume
mechanical engineer resumemechanical engineer resume
mechanical engineer resumeAdnan Al shater
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP Robert Romero
 
software project management
software project managementsoftware project management
software project managementdeep sharma
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Dr. Mohamed A. El-Reedy
 
process&models in UML
process&models in UMLprocess&models in UML
process&models in UMLAAshish Ojha
 

Was ist angesagt? (20)

Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14
Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14
Primavera EPPM Case Study - Oracle Primavera P6 Collaborate 14
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
 
A Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology AssessmentA Suite Of Tools For Technology Assessment
A Suite Of Tools For Technology Assessment
 
Epc presentation robert foxpresentation
Epc presentation robert foxpresentationEpc presentation robert foxpresentation
Epc presentation robert foxpresentation
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
MES-SAP-Hemant
MES-SAP-HemantMES-SAP-Hemant
MES-SAP-Hemant
 
Duane martin 11 21 14 resume
Duane martin 11 21 14 resumeDuane martin 11 21 14 resume
Duane martin 11 21 14 resume
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
Darin Nelson Resume
Darin Nelson ResumeDarin Nelson Resume
Darin Nelson Resume
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Chapter 4 software project planning
Chapter 4 software project planningChapter 4 software project planning
Chapter 4 software project planning
 
mechanical engineer resume
mechanical engineer resumemechanical engineer resume
mechanical engineer resume
 
A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP A2) CV - July 2016 incl. EXXON & NES-BHP
A2) CV - July 2016 incl. EXXON & NES-BHP
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
software project management
software project managementsoftware project management
software project management
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
 
process&models in UML
process&models in UMLprocess&models in UML
process&models in UML
 
Donna PetersonPMVBA
Donna PetersonPMVBADonna PetersonPMVBA
Donna PetersonPMVBA
 

Ähnlich wie CASQUEJO, Arnold_Aug 2015

Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila
 
RosselleArnaiz-Cruz_Resume_Updated
RosselleArnaiz-Cruz_Resume_UpdatedRosselleArnaiz-Cruz_Resume_Updated
RosselleArnaiz-Cruz_Resume_UpdatedRosselle Arnaiz-Cruz
 
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...Akshay Joshi
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vincent Winkler
 
Resume - Jeff Mason 09282015
Resume - Jeff Mason 09282015Resume - Jeff Mason 09282015
Resume - Jeff Mason 09282015Jeff Mason
 
Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016pradipd123
 
Tamayo piping engineer up diliman
Tamayo piping engineer up dilimanTamayo piping engineer up diliman
Tamayo piping engineer up dilimanMatthew Tamayo
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer
 
Ronnie Wade resume
Ronnie Wade resumeRonnie Wade resume
Ronnie Wade resumeRonnie Wade
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt
 
Resume - M Ploof - Rev A
Resume - M  Ploof - Rev AResume - M  Ploof - Rev A
Resume - M Ploof - Rev AMike Ploof
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVjasonstephens
 
John Kane Resume v1
John Kane Resume v1John Kane Resume v1
John Kane Resume v1John Kane
 
Cv Fc Nov2009
Cv Fc Nov2009Cv Fc Nov2009
Cv Fc Nov2009fcardinal
 

Ähnlich wie CASQUEJO, Arnold_Aug 2015 (20)

Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
 
RosselleArnaiz-Cruz_Resume_Updated
RosselleArnaiz-Cruz_Resume_UpdatedRosselleArnaiz-Cruz_Resume_Updated
RosselleArnaiz-Cruz_Resume_Updated
 
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...
Senior Business Analyst & Project Manager, 8 + Years of experience in Telco, ...
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
Resume - Jeff Mason 09282015
Resume - Jeff Mason 09282015Resume - Jeff Mason 09282015
Resume - Jeff Mason 09282015
 
Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016Pradip_Architect_Profile_Apr2016
Pradip_Architect_Profile_Apr2016
 
Tamayo piping engineer up diliman
Tamayo piping engineer up dilimanTamayo piping engineer up diliman
Tamayo piping engineer up diliman
 
Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16Roger Spencer Resume revised 9_20_16
Roger Spencer Resume revised 9_20_16
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 
Ronnie Wade resume
Ronnie Wade resumeRonnie Wade resume
Ronnie Wade resume
 
Nonyane - Mathebula Beau - June 2015
Nonyane - Mathebula Beau - June 2015Nonyane - Mathebula Beau - June 2015
Nonyane - Mathebula Beau - June 2015
 
SRN_11
SRN_11SRN_11
SRN_11
 
Chayanisa CV
Chayanisa CVChayanisa CV
Chayanisa CV
 
Resume_ECE
Resume_ECEResume_ECE
Resume_ECE
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
 
Resume - M Ploof - Rev A
Resume - M  Ploof - Rev AResume - M  Ploof - Rev A
Resume - M Ploof - Rev A
 
Jason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CVJason E Stephens’ 2020 Resume/CV
Jason E Stephens’ 2020 Resume/CV
 
John Kane Resume v1
John Kane Resume v1John Kane Resume v1
John Kane Resume v1
 
David Ferguson Resume
David Ferguson ResumeDavid Ferguson Resume
David Ferguson Resume
 
Cv Fc Nov2009
Cv Fc Nov2009Cv Fc Nov2009
Cv Fc Nov2009
 

CASQUEJO, Arnold_Aug 2015

  • 1. ® PROFESSIONAL SUMMARY Arnold T Casquejo Control Systems – Director I EDUCATION Bachelor of Science in Electrical Engineering Central Colleges of the Philippines, 1988 Quezon City, Philippines PROFESSIONAL LICENSES/CERTIFICATIONS Certified Lead Auditor to ISO 9000, and ASME NQA-1 SUMMARY OF EXPERIENCE Has had Twenty four(24) in the field of Engineering mainly as Instrument Design Engineer and a Instrument Lead Engineer. In several occasion, has function as an Interface Person or was involved in Project Engineering activies. Was also involved on all estimating / proposal effort done in the office by providing lean and mean estimate to the office proposal team. Has continiuosly monitors all project in the discipline involved by conducting quality audits on all phases of the project. Has functioned as Engineering Mnager on Projects on both E&C and Power projects and has executed projects involving Utilities and Offsites, Process, and Power Distribution. Has also functioned as the main interface person involving all discipline on a project ensuring alignment and achieving a single goal. Knowledgeable in AutoCAD 200(I), 10, 11, 12, and 14, Intergraph Microstation, Microsoft Access, and all Microsoft Office related software, and all versions of Intools. Has attended in-house seminar on various fields of engineering practices and work related courses such as process engineering basic design training, control system, detail engineering training, calibration of instruments. Has conducted training on Basic Instrumentation, Intools (versions 5, 6, 7, and SPI)) Basic and Advance, Inline building of instrument utilizing the Reference Database of the PDS Model. Office Intools administrator responsible for all Intools related activities on all Control Systems project in the office. Was tasked by the office to be a part of the Control Systems knowledge Community core group which is tasked to promote the use of knowledge based depository located at the company established website which is aimed to have every member of the department globally to be a member and aware of it’s use. Also and active member of the Intools core group which is tasked to promote the use of Intools application on all Control Systems project in all offices. Currently assigned as the office champion on Intools application on all project executed in the office. Do conduct audits on projects inline with the ISO external body who conducts surveillance audit for continuous accreditation in ISO. Also an active member of Toastmaster’s club. Recently passed the certification for Leads auditors for ISO 9001. Currently active on supporting E&CS department on it’s manpower hiring and project distribution. AV240680bd-d9c4-4a0d-be55-656b72af11e2-150908001743-lva1-app6891.doc (9/8/2015 9/8/2015)
  • 2. Arnold T Casquejo Page 2 of 8 SPECIFIC EXPERIENCE FLUOR DANIEL, INC. (MAY 2015 - Present) Project Manager IV / Project Manager Assigned as project Manager on a distributed execution project for Greensville County Power with Fluor Charlotte office. Tasked to perform smooth execution ensuring alignment of scope amongst discipline with their respective counterparts in Charlotte. Also, currently supporting Duke Lee / Citrus Power projects as a Engineering Manager for the Manila execution. FLUOR DANIEL, INC. (JAN - APRIL 2015) Director I / Project Proposal Manager Was tasked to perform as a proposal Manager for ENI Mozambique On Shore LNG Project supporting the Houston office in the completion of the Manila estimate hours for a detailed design engineering Distributed Execution between Farnborough and Manila. Currently supporting Duke Lee / Citrus Power projects as a Engineering Manager for the Manila execution. FLUOR DANIEL, INC. (2008 to 2014) Director I / Department Manager Has functioned as the Department Manager for both Electrical and Control Systems with the main function of hiring and developing people within the group, support projects by developing competent engineers and designer thru extensive training and enhancement and maintaining quality on all projects deliverables. Was also assigned as a member of the Risk group in the office as part of my portfolio ensuring all projects done in Manila has it’s BRMF established, monitored, and closed in a timely manner. Has also supported the Project Management and Buss development on all estimate and proposal effort. Has acted as Project Engineer on the following proposal projects for the office; Columbian Carbon Block Project – FEED Verification and MTO BASF Crude MDI2 – FEED Verification and MTO Lake Charles Liquefaction Project - A Fluor / AG&P proposal for Fabrication of Main Piperack and Pipe spools. Exxon Mobil DCU Project – A Fluor / AG&P proposal for the fabrication of Main Piperack, Pipe Spools, Equipment platforms, and dresses vessels.
  • 3. Arnold T Casquejo Page 3 of 8 FLUOR DANIEL, INC. (2000 to 2008) INSTRUMENT – SENIOR DESIGN ENGINEER LDK Solar Project Xinyu, China (Dec 2007 – Present) Was assigned as Control Systems Lead / Project Interface person for LDK – Solar Project. A workshare vertical split With Fluor-Greenville wherein Manila is responsible for TCS(Tri chlorosilane) part. Manila’s scope for engineering includes commodity engineering (Inline and Offline), Technical Bid evaluation, and purchase requisition. Intools population of instrument tags Design Scope includes 3D Modelling, Instrument Location Plan and other 2D related deliverables, Schematics, Schedules, wiring diagrams, Loop Diagrams, Loop folders, and MTO (Matman). Has supported Main Automation Vendor by executing bot FAT and SAT at MAV fabrication facility and at site. Leading a peak manpower of 27, project was able to achieve part of the goal of delivering most of the engineering deliverables and now focus of completing all deliverables in time. As the project approaches 60%, I was assigned as the over all interface person for the Manila portion of the scope ensuring continiuos alignment of all deliverables involve and Resolving outstanding issues involving all discipline. YANSAB Petrochemical project Yanbu, Saudi Arabia (Aug 2005 – Dec 2007) Was assigned as Control Systems Lead for United – Yansab project (Yanbu, Saudi Arabia), a workshare project with Fluor in Camberley, UK. Tasked to execute both Engineering and Detail Design on the Utilities Part of the project. Manila’s scope for engineering includes commodity engineering (Inline and Offline), Technical Bid evaluation, and purchase requisition. Was also involved on PCIMS (Plant Control and Information Management Systems) as a support for DCS/PLC configuration on FAT (Field Acceptance test). Design Scope includes 3D Modelling, Instrument Location Plan and other 2D related deliverables, Schematics, Schedules, wiring diagrams, Loop Diagrams, Loop folders, and MTO (Matman). Leading a peak manpower of 52, project was able to achieve part of the goal of delivering most of the engineering deliverables and now focus of completing all deliverables in time. United – Utilities Expansion project (2005) Was assigned as Control Systems Lead for United – Utilities Expansion project, a workshare project with Fluor in Houston, Texas. Tasked to execute Detail Design mainly Instrument Specsheet generation and development(via Intools), Instrument Offline Modelling activities(PDS v7), Wiring, Thermowell calculation, and Vessel sketches for bridle Level devices.
  • 4. Arnold T Casquejo Page 4 of 8 Was assigned as Instrument checker for Conoco – Phillips Zsorb project which a workshare project with Houston office. Tasked to perform detailed checking of the Instrument Model including Offline Instrument, Panel, and Inline Instruments to ensure preparedness for the upcoming 90% client model review. Has set upped the groups current execution of the all 2d drawings including completion of Hook-up drawings for Intools application, application of all cable type for Intools application on the wiring module. Ultramar – Low Sulfur Diesel - Project (2004 - 2005) Was assigned as Control Systems Lead for Ultramar Clean Fuels, a works hare project with Calgary, Canada. Will be tasked to execute both Engineering and Detail Design mainly Instrument Spec sheet generation and development(via Intools), Instrument Offline Modeling activities(PDS v7), Wiring, Thermowell calculation, and Vessel sketches for bridle Level devices. Was assigned as Instrument checker for Conoco – Phillips Zsorb project which a workshare project with Houston office. Tasked to perform detailed checking of the Instrument Model including Offline Instrument, Panel, and Inline Instruments to ensure preparedness for the upcoming 90% client model review. Has set upped the groups current execution of the all 2d drawings including completion of Hook-up drawings for Intools application, application of all cable type for Intools application on the wiring module. Integrated Isocyanates Project – Huntsman BASF (2003) Was assigned as Control Systems Supervisor for IIP-Huntsman Project in Caojing Chemical Industry Park Shanghai, China. Tasked to do Engineering and Design set-up including Detailed technical support to the detail design contractors which are Local base chinese design Institute with 3 office location(China, Korea, and Taiwan), set-up of all database and design application such as Intools(application and database), Oracle Server, Citrix Server(for worksharing), PDS, Inline Table for Inline Instruments(Intools to PDS), Material Manager for Instrument materials(Intools to PDS). Was able to develop several Engineering and Design Specification such as Instrument Cable Specs, Intools Implementation Procedure, Instrument Air Consumtion Specification, Instrument signal and loop diagram spec, and Instrument Equipment and Cable Numbering System Specification. Has acted as the Intools Administrator for the whole project with a peak of 30 end users. Has provided preparatory engineering and design documents such Control Systems wiring philosophy, Engineering and Design Specification, Instrument Design Index, Instrument spec form. Bayer PC(Polycarbonate) Project (2001-2003) Was assigned as Control Systems Engineering and Design lead for Bayer PC Project in Caojing Chemical Industry Park Caojing Shanghai, China. Tasked to work with Bayer Management side As Control Systems Lead and a Project Engineer providing Detailed Technical support / Schedule to the detail design contractor which is a local base Design Institute. Has provided preparatory engineering design documents such as Control System Wiring Philosophy, Instrument Junction Box / Air Header Location and DCS System philosophy, Instrument / IO assignment to Junction box and DCS respectively and Specification. Continued work on Instrument Specification and Technical/ Engineering communication with Bayer selected vendor. Providing Intools support by conducting continuos training on Design Contractor prior to the execution of detail design.
  • 5. Arnold T Casquejo Page 5 of 8 Was assigned as Control Systems Lead Engineer for Bayer PC Extended Engineering Project located at Caojing Chemical and Industry Park – Caojing Shanghai, China. Leads the group of Local Design Institute Engineers on completing Instrument Specification of Inline and Offline Instruments including Technical Bid Analysis of Instrument vendor quotes. Perform Instrument calculation of Inline instruments such as valves, orifices, and Venturi Tube. Develop preparatory design documents for bid package such as Instrument, Cable, and Foundation Field Bus Specification. Instrument Drawing Index, Instrument Hook-up details and typical Assembly, Instrument Junction Box and Air Header location, Control Room and Instrument Rack Room equipment arrangement. Works with Electrical on the preliminary cable tray arrangement. Conducts initial review on PDS model on instrument equipment utilizing Smartplant review application. Utilize Intools application (ver 5.2.8.1) providing output documents on Instrument Datasheet, generic wiring schedule on Junction Box, Marshalling DCS Racks, Foundation Fieldbus application, segment wiring calculation and Hook-up, and Loop module. Acted as the Intools administrator and has provided training to the work group including electrical engineering and design application. Supervision of Chinese design contractor located at the Shanghai Office and continiuos communacation with the 2 other located outside china to ensure good quality of delivarables. INSTRUMENT – DESIGN ENGINEER 3 Hamaca Project (1999 TO 2001) Was assigned as a Control Systems Lead Engineer for Hamaca Crude Upgrade Project. An Oil and Gas - Crude Upgrade to be constructed in Jose, Venezuela. It is a workshare effort between three offices namely, The Caracas(Jose, Venezuela) which scope covers the Tank Farm. Manila office which is tasked to worked on the Process and utility Area and the Fluor Daniel – Aliso Viejo which serves as the main office and the focal point of Engineering. Manila’s scope on the Process and Utility plant is to built the 2D model utilizing Intergraph – Plant Design Systems(PDS). Underground layout of Fiber Optic System for Honeywell’s Distributed Control System(DCS), Fire and Gas Systems(FGS), and Safety on Instrument System(SIS). Above ground conduit layout of field instruments utilizing the HPM’s, FGS’s, and SIS’s cabinet strtegically located on different areas on the process area. Such cabinets, will be linked to the remote input output cabinet located in the Field Interface Cabinet(FIC) with redundant signals on the remote Input Output cabinet on all substation. Part of the aboveground layout is the Fire and Gas drawings and will be Develop thru Microstation SE upon extraction from the model. Included on the scope is the development of Wiring Schedule, point to point loop Diagram, Instrument Design Index, and Input Output Assignment and all will be done Intools 5.1. Cable and Conduit Schedule will be done thru Cablapp(Cable Application Software) which are being shared by the three offices. As a Area Project Engineering Back Up person, my primary responsibilities is to established communication and interface with other discipline and office and resolve issues concerning technical querries which affect the work. Established plan on work sequence and manpower to cope up with the project schedule and target milestone. Timely monitoring of work progress thru Control Level Schedule(CLS) in preparation for the Project Status Review which is being done monthly.
  • 6. Arnold T Casquejo Page 6 of 8 Was assigned Fluor Daniel – Aliso Viejo to established alignment and early engineering in preparation for the model and production stage in Manila. INSTRUMENT - DESIGN ENGINEER 2 Irving Oil Upgrade Project (1997 – 1998) Was assigned as Lead Engineer for Control System in a work share effort with Fluor Daniel- Aliso Viejo on Irving Oil Upgrade Project, and oil and Gas upgrade project located at Calgary, Canada. Manila’s scope mainly on the Process Area and was tasked to built the 2D model utilizing Intergraph – Plant Design System location all offline instrument in space. Aboveround Conduit layout of all field instrument to Junction Boxes to include all DCS and shutdown systems. Instrument Wiring Schedule to include all junction boxes on the field and Marshalling Boxes in the Control Room and will be develop thru Microstation J. Was assigned in Fluor Daniel-Aliso Viejo, USA to finalize and agree with the control systems counterpart the Manila scope of work and also familiarize with the work procedures, standards, and execution and be applied in Manila. Works primarily on all communication, documentation, production design and engineering lead responsibilities for the fast completion of the project. Member of ISO Core Group (ISO 9001, Fluor Daniel Inc.-Philippines) with a task of disseminating all necessary information’s to all the members of the company with regards to ISO awareness. Helped the Team on conducting seminars and training on all aspects of standards and procedure and conducted Internal Audits on various projects of the company. INSTRUMENT - DESIGN ENGINEER 2 Exxon Lubes Upgrade Project (1996 – 1997) Was assigned as Lead Engineer for Control Systems on a work share effort with Fluor Daniel Houston in Exxon Lubes Upgrade Project located at Baytown Texas, USA. Scope include Inline and Offline building of Instruments utilizing Intergraph PDS – Equipment model. Aboveground conduit layout of field instruments to include all Junction Boxes, Marshalling racks, vendor provide instrument skids, Instrument wiring drawings and utilized the use of Microstation SE.Was sent to Fluor Daniel in Houston to help partly the Engineering team on it's preliminary works such as the model setup, preliminary Inline model setup and instrument design index setup and be able to familiarize on how the job will be executed using the client’s (Exxon) Standards. Works Primarily on all communication, Documentation, Design and Engineering lead responsibilities for the fast completion of the task. INSTRUMENT - DESIGN SUPERVISOR Procter and Gamble (1995-1996) Was assigned to handle small projects of P&G in Cabuyao, Laguna, Philippines working on its perfume upgrade unit. Responsible on developing and updating elementary wiring diagram, all instrument plan involved and additional requisition of Instrument for the upgraded unit. Has also conducted several site surveys to determine the extent of the upgrade.
  • 7. Arnold T Casquejo Page 7 of 8 Assigned to lead Control Systems group in Shell Tabangao Renewal (STAR) As-Built Project, Tabangao, Batangas City, Philippines to work on as-built task being provided by the site construction INSTRUMENT – SENIOR DESIGNER Saudi Chevron Petrochemical – Aromax Benzene and Cyclohexane Project (1994 – 1995) Assigned as Area Lead Designer and works primarily on Detail Design in Fluor Daniel Arabia Ltd., Dhahran, Saudi Arabia for the Saudi Chevron Petrochemical - Aromax Benzene and Cyclohexane Project, which covers the development of all deliverable construction drawings such as Control and Communication Philosophy, Location Plans, Wiring diagrams, Loop Diagram, Logic drawings, Wiring Philosophy, Instrument Specification, DCS / ESD Architecture, Installation Schedule, and Installation Detail. INSTRUMENT - SENIOR DESIGNER 1993 – 1994 Was assigned as Detail Design Checker in Hoechst Celanese Acrylic Monomer Expansion Project. Works primarily on checking instrument design index, instrument load and wiring diagrams. Was assigned in Union Carbide (UC-THAI) Monomer Relocation Project involved in the development of instrument location plan, instrument design index, load diagrams and instrument wiring schedule. Was assigned to Procter and Gamble- Syndet Bar Project as Instrument Designer. As such, work involve primarily on developing/updating of process and instrument diagrams, developing I/O list, developing instrument specifications on flow and level instruments as well as reviewing instrument process diagrams, project design basis and definitions for developing/back checking logic diagrams. Also work involve preparations of instrument logic diagrams and process and instrument data sheet for flow and pressure instruments and development of instrument plan layout. Was assigned at jobsite as part of the commissioning group involves in developing ladder program. Was also assigned at the jobsite of Pilipinas Shell Petroleum Corporation STAR Project as part of the engineering support and construction group. Work involved primarily on the modification of field installed instruments, cable assignments on junction boxes, instrument loop diagrams, etc., based on actual installation. Also conduct field supervision, track instrument material availability for field installation and work on As-built drawings. INSTRUMENT - ASSISTANT DESIGNER (1991-1993) Was assigned to Pilipinas Shell Petroleum Corporation STAR Project as Control System Designer. Worked in the preparation of construction drawings, detailed drawings, detailed drawings of various engineering layout, instrument wiring connection diagram/cable schedule on both aboveground and underground, material take-off, etc., Conduct site survey. Also, was assigned to work with Singapore Aeromatic's Project. Took part on estimating works for bidding purposes.
  • 8. Arnold T Casquejo Page 8 of 8 ATLANTIC GULF AND PACIFIC CO., INC. (1998 - 1991 ELECTRICAL FIELD ENGINEER (1990 – 1991) Work involved in preparation of material take-off as per plan, change order material listing and cost involved for field implementation, monitor electrical progress and submit accomplishment of report for billing purposes 6750 Project which is tasked to built a 28 storey building in Makati, Philippines. Also, prepared electrical shape drawings such as conduit layout and installation details. INSTRUMENT TECHNICIAN 1988 - 1990 Performed pneumatic and electronic calibration such as transmitters, measuring gauges, switches, etc. INSTRUMENT FITTER 1988 Work involved fabrication and installation of supports such as stanchions, local panel, junction boxes and miscellaneous piping supports for Unocal Erawan Compression Platform Project in Thailand. Work includes Installation of process instruments of different variables, installation of free standing conventional control panel, etc. Also prepared fabrication drawings for field installation requirements. TRAINING ISO 9000 Auditors Training Intools 4 / 5 AutoCadd 10 / 12 PDS Intergraph Leads Auditors Training Smartplant Electrical Managing your Project PLC – 5 Basic Electrical Heat Tracing