SlideShare ist ein Scribd-Unternehmen logo
1 von 20
Environmental and Social Values - Implementing
the new EU Public Procurement Directives :
Possibilities and Challenges’
Professor Peter Kunzlik
May 7, 2014
The New Approach
A new approach:
Public procurement as an instrument of EU economic
policy – the Europe 2020 Strategy (‘smart, sustainable
and inclusive growth’) ; and
The goal of increasing the efficiency of public spending
and supporting common societal goals.’
Recital 2
Member States’ duty to ensure compliance with
applicable social & environmental laws, and Annex X
Conventions; Art 18(2) (hereafter ‘Article 18(2)
obligations’)
Note however that applicable obligations must be
consistent with the TFEU and the Posted Workers
Directive.
May 7, 2014
Possibilities (1) Ensuring compliance
with applicable laws
Article 18(2) Social Obligations
Annex X Social Conventions:
Convention 87 on Freedom of Association and the Protection of the
Right to Organise;
Convention 98 on the Right to Organise and Collective Bargaining;
Convention 29 on Forced Labour;
Convention 105 on the Abolition of Forced Labour;
Convention 138 on Minimum Age;
Convention 111 on Discrimination (Employment and Occupation);
Convention 100 on Equal Remuneration;
Convention 182 on Worst Forms of Child Labour.
May 7, 2014
Article 18(2) Environmental
Obligations
Annex X Environmental Conventions:
Vienna Convention for the protection of the Ozone Layer and its
Montreal Protocol on substances that deplete the Ozone Layer;
Basel Convention on the Control of Transboundary Movements of
Hazardous Wastes and their Disposal;
Stockholm Convention on Persistent Organic Pollutants;
Convention on the Prior Informed Consent procedure for Certain
Hazardous Chemicals and Pesticides in International Trade.
May 7, 2014
Using procurement practice to ensure
compliance with Article 18(2)
obligations
Non-compliance with an applicable Art 18(2) obligation is a
non-compulsory ground for exclusion of bidders; Art 57(4)(a).
The Single European Procurement Document; must certify that
none of the applicable grounds of exclusion apply; Art 59(1)(a).
Duty (after investigation) to reject tenders that are abnormally
low because the do not comply with applicable obligations
Art 18(2); Art 69 (3), second para.
Power not to award to best tender if the tender does not
comply with Art 18(2); Art 57(1), second para.
May 7, 2014
Ensuring compliance with Article 18(2)
obligations by sub-contractors
Competent authorities to ensure compliance by sub-
contractors; Art 71(1) & Art 71(6)(a).
May 7, 2014
Accessibility:
Specifications must take into account accessibility
criteria for persons with disabilities or design for all users;
Art 42(1), fourth para;
Specifications must be framed by reference to
mandatory EU accessibility rules where they exist; Art
43(1), fifth para.
May 7, 2014
Possibilities – (2)Technical
specifications
Technical specifications
Production & Process Methods (‘PPMs’):
Specifications may include PPM requirements ‘linked
to the subject matter of the contract’ even if not affecting
the material substance of the thing purchased
PROVIDED that such requirements are ‘proportionate
to its value and its objectives’
Annex VII(1) (a) & (b), Art 42(1) second para; Art 40(3)
(a).Cf C-513/99, Concordia Bus; C-448/01, EVN; and C-
368/10, Commission v Netherlands
May 7, 2014
Possibilities (3) Selection – attestation
of compliance with quality standards
Attestation of standards ‘including on accessibility
for disabled persons’; Art 62(1).
Attestation re environmental management systems
European Union Eco-Management and Audit Scheme
(EMAS) etc.; Art 62(2).
May 7, 2014
Possibilities (4) Exclusion
Compulsory grounds for exclusion now include
conviction for use of child labour and ‘other forms of
trafficking in human beings’; Art 57(1)(f);
Non-compliance with applicable obligations under Art
18(2) is a non-compulsory ground of exclusion (see
above).
May 7, 2014
Possibilities (5) Basis of award
May 7, 2014
The only basis of award is award to the bidder offering the
‘most economically advantageous tender from the point of
view of the contracting authority’ but contracting authorities
may define MEAT in one of three ways;
best price;
best cost, using a cost-effectiveness approach such as
life-cycle costing in accordance with Article 68; or
best price-quality ratio, ‘which shall be assessed on the
basis of – criteria including qualitative, environmental and/or
social aspects linked to the subject-matter of the public
contract in question.’
Art 67(1) & (2)
Best price-quality ratio
Qualitative criteria must be ‘linked to the subject-matter
of the contract’:
As well as price or cost, criteria they may relate to
‘qualitative environmental and/or social aspects linked to
the subject-matter of the contract, including ‘for
instance’:
‘quality, including technical merit, aesthetic and
functional characteristics, accessibility, design for all
users, social, environmental and innovation
characteristics, trading and its conditions.’
Art 67(2)(a).
May 7, 2014
Best price-quality ratio
Award criteria are linked to the subject-matter of the contract
‘where they relate to works, supplies or services to be
provided under that contract in any respect and at any stage
of their life cycle, including factors involved in
(a) the specific process of production, provision or trading of
those works, supplies or services, or
(b) (in a specific process for another stage of their life cycle
even where such factors do not form part of their material
substance’; Art 67(3).
May 7, 2014
Possibilities (6) Contract performance
conditions
‘Contracting authorities may lay down special conditions
relating to the performance of a contract, provided that
they are linked to the subject-matter of the contract
…and indicated in the call for competition or in the
procurement documents. Those conditions may include
economic, innovation-related, environmental, social
or employment related considerations’; Art 70.
These may include PPM requirements linked to the
subject-mater of the contract even those which do not
form part of the material substance of the works,
supplies or services purchased ; Recital 97
May 7, 2014
Possibilities (7) Reserved contracts
  ‘Member States may reserve contracts for ‘sheltered
workshops and economic operators whose main aim is
the social and professional integration of disabled and
disadvantaged persons or provide for such contracts to
be performed in the context of sheltered employment
programme’
PROVIDED that at least 30% of the employees of
those workshops, economic operators or programmes
are disabled or disadvantaged workers.
Art 20
May 7, 2014
Possibilities (8) Eco and fair trade
labels
Specifications, award criteria, contract performance
conditions can require eco / fair trade labels in
specifications so long as five conditions are satisfied
(including that the label criteria are ‘linked to the
subject-matter of the contract)’; Art 43(1).
May 7, 2014
The duty to comply with the Treaty on the
Functioning of the European Union and principles
derived therefrom;
The principles of procurement:
‘Contracting authorities shall treat economic operators
equally and without discrimination and shall act in a
transparent and proportionate manner….’; Art 18(1);
The duty of precision:
Specifications: Art 42(3)(a). 
Specifications and award criteria): C-368/10,
Commission Netherlands 
May 7, 2014
Challenges (1) Practicalities
Challenges – Practicalities
Award criteria
must not confer an unrestricted freedom of choice
on the contracting authority;
must ensure the possibility of effective competition;
and
must be shall be accompanied by specifications that
allow the information provided by the tenderers to be
effectively verified in order to assess how well the
tenders meet the award criteria.
Art 67(4). See also Recitals 90-99
May 7, 2014
The
Challenges (2) Taxation
Taxation of economic undertakings carrying out
public contracts, especially major, long-term contracts
such as public private partnerships;
Can contracting authorities favour firms that will pay
taxes on the profits of the public contract in question?
MEAT contract award criteria;
Contract performance conditions.
In each case: would the factor be ‘linked to the
subject matter of the contact’? Discrimination?
May 7, 2014

Weitere ähnliche Inhalte

Andere mochten auch

Receta pinxto banderilla olmeda origenes
Receta pinxto banderilla olmeda origenesReceta pinxto banderilla olmeda origenes
Receta pinxto banderilla olmeda origenesOlmeda Orígenes
 
Daily Newsletter: 15th December, 2010
Daily Newsletter: 15th December, 2010Daily Newsletter: 15th December, 2010
Daily Newsletter: 15th December, 2010Fullerton Securities
 
Scaling mondrian
Scaling mondrianScaling mondrian
Scaling mondrianlucboudreau
 
Story Testimonial Pitch
Story Testimonial PitchStory Testimonial Pitch
Story Testimonial PitchGaurav Gaur
 
From Macro to Micro: Greening Your Campus HANDOUT
From Macro to Micro: Greening Your Campus HANDOUTFrom Macro to Micro: Greening Your Campus HANDOUT
From Macro to Micro: Greening Your Campus HANDOUTPaul Brown
 
Infografik: Wie fit ist Deutschland für die Zukunft?
Infografik: Wie fit ist Deutschland für die Zukunft?Infografik: Wie fit ist Deutschland für die Zukunft?
Infografik: Wie fit ist Deutschland für die Zukunft?Bertelsmann Stiftung
 
8th grade list 2014
8th grade list 20148th grade list 2014
8th grade list 2014Liz Slavens
 
Prueba de portada
Prueba de portadaPrueba de portada
Prueba de portadapatricio
 
Developing sustainable business models for institutions’ provision of open ed...
Developing sustainable business models for institutions’ provision of open ed...Developing sustainable business models for institutions’ provision of open ed...
Developing sustainable business models for institutions’ provision of open ed...Dr Patrina Law
 
Revolutionising the Journal through Big Data Computational Research
Revolutionising the Journal through Big Data Computational ResearchRevolutionising the Journal through Big Data Computational Research
Revolutionising the Journal through Big Data Computational ResearchAmye Kenall
 
presentation for BPC
presentation for BPCpresentation for BPC
presentation for BPCjjoyce
 
Information Architecture class13 04 10
Information Architecture class13 04 10Information Architecture class13 04 10
Information Architecture class13 04 10Marti Gukeisen
 
In grammars we trust: LeadMine, a knowledge driven solution
In grammars we trust: LeadMine, a knowledge driven solutionIn grammars we trust: LeadMine, a knowledge driven solution
In grammars we trust: LeadMine, a knowledge driven solutionNextMove Software
 
Applying testing mindset to software development
Applying testing mindset to software developmentApplying testing mindset to software development
Applying testing mindset to software developmentAndrii Dzynia
 

Andere mochten auch (18)

Receta pinxto banderilla olmeda origenes
Receta pinxto banderilla olmeda origenesReceta pinxto banderilla olmeda origenes
Receta pinxto banderilla olmeda origenes
 
Daily Newsletter: 15th December, 2010
Daily Newsletter: 15th December, 2010Daily Newsletter: 15th December, 2010
Daily Newsletter: 15th December, 2010
 
Scaling mondrian
Scaling mondrianScaling mondrian
Scaling mondrian
 
Story Testimonial Pitch
Story Testimonial PitchStory Testimonial Pitch
Story Testimonial Pitch
 
From Macro to Micro: Greening Your Campus HANDOUT
From Macro to Micro: Greening Your Campus HANDOUTFrom Macro to Micro: Greening Your Campus HANDOUT
From Macro to Micro: Greening Your Campus HANDOUT
 
Infografik: Wie fit ist Deutschland für die Zukunft?
Infografik: Wie fit ist Deutschland für die Zukunft?Infografik: Wie fit ist Deutschland für die Zukunft?
Infografik: Wie fit ist Deutschland für die Zukunft?
 
8th grade list 2014
8th grade list 20148th grade list 2014
8th grade list 2014
 
Prueba de portada
Prueba de portadaPrueba de portada
Prueba de portada
 
Developing sustainable business models for institutions’ provision of open ed...
Developing sustainable business models for institutions’ provision of open ed...Developing sustainable business models for institutions’ provision of open ed...
Developing sustainable business models for institutions’ provision of open ed...
 
asdfasdf
asdfasdfasdfasdf
asdfasdf
 
Revolutionising the Journal through Big Data Computational Research
Revolutionising the Journal through Big Data Computational ResearchRevolutionising the Journal through Big Data Computational Research
Revolutionising the Journal through Big Data Computational Research
 
presentation for BPC
presentation for BPCpresentation for BPC
presentation for BPC
 
API-diskusjonen
API-diskusjonenAPI-diskusjonen
API-diskusjonen
 
Narmada Kannan_Resume
Narmada Kannan_ResumeNarmada Kannan_Resume
Narmada Kannan_Resume
 
Information Architecture class13 04 10
Information Architecture class13 04 10Information Architecture class13 04 10
Information Architecture class13 04 10
 
National and global public inclusive infrastructures
National and global public inclusive infrastructuresNational and global public inclusive infrastructures
National and global public inclusive infrastructures
 
In grammars we trust: LeadMine, a knowledge driven solution
In grammars we trust: LeadMine, a knowledge driven solutionIn grammars we trust: LeadMine, a knowledge driven solution
In grammars we trust: LeadMine, a knowledge driven solution
 
Applying testing mindset to software development
Applying testing mindset to software developmentApplying testing mindset to software development
Applying testing mindset to software development
 

Ähnlich wie Peter Kunzlik

Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Carina Risvig Hamer
 
How will legislation shape procurement in the coming years?
How will legislation shape procurement in the coming years?How will legislation shape procurement in the coming years?
How will legislation shape procurement in the coming years?Procurement For Housing
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSProf Handley Mpoki Mafwenga
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...Florence Shool of Regulation
 
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)Fund KIS
 
Recent ECJ public procurement case law on selected topics
Recent ECJ public procurement case law on selected topicsRecent ECJ public procurement case law on selected topics
Recent ECJ public procurement case law on selected topicsAlbert Sanchez Graells
 
Joao Costa, Legal and Compliance Counsel, Medtronic
Joao Costa, Legal and Compliance Counsel, MedtronicJoao Costa, Legal and Compliance Counsel, Medtronic
Joao Costa, Legal and Compliance Counsel, MedtronicIMSTA
 
Procuring Community Services and Outcome Based Commissioning
Procuring Community Services and Outcome Based CommissioningProcuring Community Services and Outcome Based Commissioning
Procuring Community Services and Outcome Based CommissioningClever Together
 
When does competition end? A staged approach to procurement modifications
When does competition end? A staged approach to procurement modificationsWhen does competition end? A staged approach to procurement modifications
When does competition end? A staged approach to procurement modificationsAlbert Sanchez Graells
 
EU regulatory agenda 2018 2019
EU regulatory agenda 2018 2019EU regulatory agenda 2018 2019
EU regulatory agenda 2018 2019Roger Coenen
 
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdf
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdfSTANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdf
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdfMohammedBilal554495
 
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, JapanOECD Environment
 
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...Helix Nebula The Science Cloud
 
Presentation sidig med-jts
Presentation sidig med-jtsPresentation sidig med-jts
Presentation sidig med-jtsAnna Codazzi
 
Agreement on Technical Barriers to Trade
Agreement on Technical Barriers to TradeAgreement on Technical Barriers to Trade
Agreement on Technical Barriers to TradeEdgard Carneiro Vieira
 

Ähnlich wie Peter Kunzlik (20)

Def ppt ippc vogel
Def ppt ippc vogelDef ppt ippc vogel
Def ppt ippc vogel
 
Dariusz Koba, Poland, third regional conference on public procurement for ENP...
Dariusz Koba, Poland, third regional conference on public procurement for ENP...Dariusz Koba, Poland, third regional conference on public procurement for ENP...
Dariusz Koba, Poland, third regional conference on public procurement for ENP...
 
Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...Major changes in the new Public Procurement Directives, June 2014, Universida...
Major changes in the new Public Procurement Directives, June 2014, Universida...
 
How will legislation shape procurement in the coming years?
How will legislation shape procurement in the coming years?How will legislation shape procurement in the coming years?
How will legislation shape procurement in the coming years?
 
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTSTUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
TUDARCO-PROCUREMENT ISSUES IN OIL AND GAS CONTRACTS
 
How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...How far can Member States go to derogate from Third Package obligations and m...
How far can Member States go to derogate from Third Package obligations and m...
 
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)
ESMA PRIIPS KID Regulatory Technical Standards (Final draft 31/03/2016)
 
Recent ECJ public procurement case law on selected topics
Recent ECJ public procurement case law on selected topicsRecent ECJ public procurement case law on selected topics
Recent ECJ public procurement case law on selected topics
 
Joao Costa, Legal and Compliance Counsel, Medtronic
Joao Costa, Legal and Compliance Counsel, MedtronicJoao Costa, Legal and Compliance Counsel, Medtronic
Joao Costa, Legal and Compliance Counsel, Medtronic
 
Procuring Community Services and Outcome Based Commissioning
Procuring Community Services and Outcome Based CommissioningProcuring Community Services and Outcome Based Commissioning
Procuring Community Services and Outcome Based Commissioning
 
When does competition end? A staged approach to procurement modifications
When does competition end? A staged approach to procurement modificationsWhen does competition end? A staged approach to procurement modifications
When does competition end? A staged approach to procurement modifications
 
File download,15592,en
File download,15592,enFile download,15592,en
File download,15592,en
 
EU regulatory agenda 2018 2019
EU regulatory agenda 2018 2019EU regulatory agenda 2018 2019
EU regulatory agenda 2018 2019
 
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
 
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdf
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdfSTANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdf
STANDARD-PROCEDURE-FOR-PRICE-ADJUSTMENT.pdf
 
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan
8th Strategic Dialogue of the CMP - Takayuki Shigematsu, Japan
 
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
 
Horizon 2020 ga
Horizon 2020 gaHorizon 2020 ga
Horizon 2020 ga
 
Presentation sidig med-jts
Presentation sidig med-jtsPresentation sidig med-jts
Presentation sidig med-jts
 
Agreement on Technical Barriers to Trade
Agreement on Technical Barriers to TradeAgreement on Technical Barriers to Trade
Agreement on Technical Barriers to Trade
 

Mehr von Arenagruppen

Dags för en ny europeisk politik - ABF 070514
Dags för en ny europeisk politik - ABF 070514Dags för en ny europeisk politik - ABF 070514
Dags för en ny europeisk politik - ABF 070514Arenagruppen
 
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.Arenagruppen
 
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic Profiling
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic ProfilingPaul Lappalainen 2014-02-15 Reva - Litigating Ethnic Profiling
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic ProfilingArenagruppen
 
Kommunals Spanarnätverk
Kommunals SpanarnätverkKommunals Spanarnätverk
Kommunals SpanarnätverkArenagruppen
 
Case kommunal arena_idé_130122_slut 14.23.57
Case kommunal arena_idé_130122_slut 14.23.57Case kommunal arena_idé_130122_slut 14.23.57
Case kommunal arena_idé_130122_slut 14.23.57Arenagruppen
 

Mehr von Arenagruppen (6)

Dags för en ny europeisk politik - ABF 070514
Dags för en ny europeisk politik - ABF 070514Dags för en ny europeisk politik - ABF 070514
Dags för en ny europeisk politik - ABF 070514
 
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.
Maxime Ferschtman, senior legal adviser at the Open Society Justice Initiative.
 
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic Profiling
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic ProfilingPaul Lappalainen 2014-02-15 Reva - Litigating Ethnic Profiling
Paul Lappalainen 2014-02-15 Reva - Litigating Ethnic Profiling
 
Kommunals Spanarnätverk
Kommunals SpanarnätverkKommunals Spanarnätverk
Kommunals Spanarnätverk
 
Case kommunal arena_idé_130122_slut 14.23.57
Case kommunal arena_idé_130122_slut 14.23.57Case kommunal arena_idé_130122_slut 14.23.57
Case kommunal arena_idé_130122_slut 14.23.57
 
Aldrefr
AldrefrAldrefr
Aldrefr
 

Kürzlich hochgeladen

如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书Fs Las
 
Debt Collection in India - General Procedure
Debt Collection in India  - General ProcedureDebt Collection in India  - General Procedure
Debt Collection in India - General ProcedureBridgeWest.eu
 
如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书Fir L
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptjudeplata
 
Essentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmmEssentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmm2020000445musaib
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxRRR Chambers
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书Fir L
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notesPRATIKNAYAK31
 
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaLegal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaFinlaw Consultancy Pvt Ltd
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书Fir L
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书Fir L
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书FS LS
 
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhaiShashankKumar441258
 
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书Sir Lt
 
Chp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptChp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptzainabbkhaleeq123
 
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxAudience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxMollyBrown86
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsAurora Consulting
 
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书Fir L
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书E LSS
 

Kürzlich hochgeladen (20)

如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
如何办理(SFSta文凭证书)美国旧金山州立大学毕业证学位证书
 
Debt Collection in India - General Procedure
Debt Collection in India  - General ProcedureDebt Collection in India  - General Procedure
Debt Collection in India - General Procedure
 
如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书如何办理美国波士顿大学(BU)毕业证学位证书
如何办理美国波士顿大学(BU)毕业证学位证书
 
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.pptFINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
FINALTRUEENFORCEMENT OF BARANGAY SETTLEMENT.ppt
 
Essentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmmEssentials of a Valid Transfer.pptxmmmmmm
Essentials of a Valid Transfer.pptxmmmmmm
 
PPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptxPPT- Voluntary Liquidation (Under section 59).pptx
PPT- Voluntary Liquidation (Under section 59).pptx
 
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
如何办理新加坡南洋理工大学毕业证(本硕)NTU学位证书
 
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Greater Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Mediation ppt for study materials. notes
Mediation ppt for study materials. notesMediation ppt for study materials. notes
Mediation ppt for study materials. notes
 
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in IndiaLegal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
Legal Risks and Compliance Considerations for Cryptocurrency Exchanges in India
 
如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书如何办理澳洲南澳大学(UniSA)毕业证学位证书
如何办理澳洲南澳大学(UniSA)毕业证学位证书
 
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
如何办理普利茅斯大学毕业证(本硕)Plymouth学位证书
 
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
如何办理伦敦南岸大学毕业证(本硕)LSBU学位证书
 
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
6th sem cpc notes for 6th semester students samjhe. Padhlo bhai
 
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书 如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
如何办理(Michigan文凭证书)密歇根大学毕业证学位证书
 
Chp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .pptChp 1- Contract and its kinds-business law .ppt
Chp 1- Contract and its kinds-business law .ppt
 
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxxAudience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
Audience profile - SF.pptxxxxxxxxxxxxxxxxxxxxxxxxxxx
 
CAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction FailsCAFC Chronicles: Costly Tales of Claim Construction Fails
CAFC Chronicles: Costly Tales of Claim Construction Fails
 
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
如何办理美国加州大学欧文分校毕业证(本硕)UCI学位证书
 
一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书一比一原版牛津布鲁克斯大学毕业证学位证书
一比一原版牛津布鲁克斯大学毕业证学位证书
 

Peter Kunzlik

  • 1. Environmental and Social Values - Implementing the new EU Public Procurement Directives : Possibilities and Challenges’ Professor Peter Kunzlik
  • 2. May 7, 2014 The New Approach A new approach: Public procurement as an instrument of EU economic policy – the Europe 2020 Strategy (‘smart, sustainable and inclusive growth’) ; and The goal of increasing the efficiency of public spending and supporting common societal goals.’ Recital 2
  • 3. Member States’ duty to ensure compliance with applicable social & environmental laws, and Annex X Conventions; Art 18(2) (hereafter ‘Article 18(2) obligations’) Note however that applicable obligations must be consistent with the TFEU and the Posted Workers Directive. May 7, 2014 Possibilities (1) Ensuring compliance with applicable laws
  • 4. Article 18(2) Social Obligations Annex X Social Conventions: Convention 87 on Freedom of Association and the Protection of the Right to Organise; Convention 98 on the Right to Organise and Collective Bargaining; Convention 29 on Forced Labour; Convention 105 on the Abolition of Forced Labour; Convention 138 on Minimum Age; Convention 111 on Discrimination (Employment and Occupation); Convention 100 on Equal Remuneration; Convention 182 on Worst Forms of Child Labour. May 7, 2014
  • 5. Article 18(2) Environmental Obligations Annex X Environmental Conventions: Vienna Convention for the protection of the Ozone Layer and its Montreal Protocol on substances that deplete the Ozone Layer; Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal; Stockholm Convention on Persistent Organic Pollutants; Convention on the Prior Informed Consent procedure for Certain Hazardous Chemicals and Pesticides in International Trade. May 7, 2014
  • 6. Using procurement practice to ensure compliance with Article 18(2) obligations Non-compliance with an applicable Art 18(2) obligation is a non-compulsory ground for exclusion of bidders; Art 57(4)(a). The Single European Procurement Document; must certify that none of the applicable grounds of exclusion apply; Art 59(1)(a). Duty (after investigation) to reject tenders that are abnormally low because the do not comply with applicable obligations Art 18(2); Art 69 (3), second para. Power not to award to best tender if the tender does not comply with Art 18(2); Art 57(1), second para. May 7, 2014
  • 7. Ensuring compliance with Article 18(2) obligations by sub-contractors Competent authorities to ensure compliance by sub- contractors; Art 71(1) & Art 71(6)(a). May 7, 2014
  • 8. Accessibility: Specifications must take into account accessibility criteria for persons with disabilities or design for all users; Art 42(1), fourth para; Specifications must be framed by reference to mandatory EU accessibility rules where they exist; Art 43(1), fifth para. May 7, 2014 Possibilities – (2)Technical specifications
  • 9. Technical specifications Production & Process Methods (‘PPMs’): Specifications may include PPM requirements ‘linked to the subject matter of the contract’ even if not affecting the material substance of the thing purchased PROVIDED that such requirements are ‘proportionate to its value and its objectives’ Annex VII(1) (a) & (b), Art 42(1) second para; Art 40(3) (a).Cf C-513/99, Concordia Bus; C-448/01, EVN; and C- 368/10, Commission v Netherlands May 7, 2014
  • 10. Possibilities (3) Selection – attestation of compliance with quality standards Attestation of standards ‘including on accessibility for disabled persons’; Art 62(1). Attestation re environmental management systems European Union Eco-Management and Audit Scheme (EMAS) etc.; Art 62(2). May 7, 2014
  • 11. Possibilities (4) Exclusion Compulsory grounds for exclusion now include conviction for use of child labour and ‘other forms of trafficking in human beings’; Art 57(1)(f); Non-compliance with applicable obligations under Art 18(2) is a non-compulsory ground of exclusion (see above). May 7, 2014
  • 12. Possibilities (5) Basis of award May 7, 2014 The only basis of award is award to the bidder offering the ‘most economically advantageous tender from the point of view of the contracting authority’ but contracting authorities may define MEAT in one of three ways; best price; best cost, using a cost-effectiveness approach such as life-cycle costing in accordance with Article 68; or best price-quality ratio, ‘which shall be assessed on the basis of – criteria including qualitative, environmental and/or social aspects linked to the subject-matter of the public contract in question.’ Art 67(1) & (2)
  • 13. Best price-quality ratio Qualitative criteria must be ‘linked to the subject-matter of the contract’: As well as price or cost, criteria they may relate to ‘qualitative environmental and/or social aspects linked to the subject-matter of the contract, including ‘for instance’: ‘quality, including technical merit, aesthetic and functional characteristics, accessibility, design for all users, social, environmental and innovation characteristics, trading and its conditions.’ Art 67(2)(a). May 7, 2014
  • 14. Best price-quality ratio Award criteria are linked to the subject-matter of the contract ‘where they relate to works, supplies or services to be provided under that contract in any respect and at any stage of their life cycle, including factors involved in (a) the specific process of production, provision or trading of those works, supplies or services, or (b) (in a specific process for another stage of their life cycle even where such factors do not form part of their material substance’; Art 67(3). May 7, 2014
  • 15. Possibilities (6) Contract performance conditions ‘Contracting authorities may lay down special conditions relating to the performance of a contract, provided that they are linked to the subject-matter of the contract …and indicated in the call for competition or in the procurement documents. Those conditions may include economic, innovation-related, environmental, social or employment related considerations’; Art 70. These may include PPM requirements linked to the subject-mater of the contract even those which do not form part of the material substance of the works, supplies or services purchased ; Recital 97 May 7, 2014
  • 16. Possibilities (7) Reserved contracts   ‘Member States may reserve contracts for ‘sheltered workshops and economic operators whose main aim is the social and professional integration of disabled and disadvantaged persons or provide for such contracts to be performed in the context of sheltered employment programme’ PROVIDED that at least 30% of the employees of those workshops, economic operators or programmes are disabled or disadvantaged workers. Art 20 May 7, 2014
  • 17. Possibilities (8) Eco and fair trade labels Specifications, award criteria, contract performance conditions can require eco / fair trade labels in specifications so long as five conditions are satisfied (including that the label criteria are ‘linked to the subject-matter of the contract)’; Art 43(1). May 7, 2014
  • 18. The duty to comply with the Treaty on the Functioning of the European Union and principles derived therefrom; The principles of procurement: ‘Contracting authorities shall treat economic operators equally and without discrimination and shall act in a transparent and proportionate manner….’; Art 18(1); The duty of precision: Specifications: Art 42(3)(a).  Specifications and award criteria): C-368/10, Commission Netherlands  May 7, 2014 Challenges (1) Practicalities
  • 19. Challenges – Practicalities Award criteria must not confer an unrestricted freedom of choice on the contracting authority; must ensure the possibility of effective competition; and must be shall be accompanied by specifications that allow the information provided by the tenderers to be effectively verified in order to assess how well the tenders meet the award criteria. Art 67(4). See also Recitals 90-99 May 7, 2014 The
  • 20. Challenges (2) Taxation Taxation of economic undertakings carrying out public contracts, especially major, long-term contracts such as public private partnerships; Can contracting authorities favour firms that will pay taxes on the profits of the public contract in question? MEAT contract award criteria; Contract performance conditions. In each case: would the factor be ‘linked to the subject matter of the contact’? Discrimination? May 7, 2014

Hinweis der Redaktion

  1. Title slide
  2. Text slide