The document discusses two hospital projects in Germany designed by woernerundpartner architects. The first is the new Klinikum Offenbach hospital, which includes 729 beds, 12 operating theaters, and various medical departments across a 59,050 square meter building. The second is the Kreiskrankenhaus Schotten district hospital, which includes a new 4,050 square meter building and refurbished areas, totaling 140 beds and costing 25 million euros. Both projects aimed to provide efficient, flexible, and sustainable facilities that maximize available resources and space.
Kurla Call Girls Pooja Nehwalđ 9892124323 â Vashi Call Service Available Nea...
Â
Modern Healthcare Architecture with Maximum Efficiency
1. 1
How can we do more with less
Architects for Health
2. woernerundpartner | Office
woernerundpartner is one of Germany's leading architectural practices for health care, with
about 120 employees based at four offices in Germany: Frankfurt am Main, Dresden,
MĂŒnchen and Hamburg. Founded in 1971 by the architect Heinrich Wörner, the practice
worked towards the principle that good architecture improves recovery, work ethic and
society. woernerundpartner covers a very broad spectrum of expertise including
architecture, masterplanning, urban design, landscape and interior design.
woernerundpartner accompanies its clients from the first preliminary design sketch,
through the development of a technically sophisticated conception up to its effective
implementation. Through the successful participation in international architectural
competitions woernerundpartner regularly reviews its own performance and competence.
Social and cultural responsibilities are dealt with membership in several different
committees. Every building implemented by woernerundpartner according to its individual
task, represents a unicum, a unique, innovative architectural solution. Its dimensioning and
design evolves from the operatorsâ and usersâ demands. Its shape, materiality and colour
conception result from the specifics of its given location.
For the protection of the environment and dedicated to a sense for sustainability, all
woernerundpartner planning conceptions excel in utilising the full potential of the complete
given resources, flexible layouts, process oriented facilities, durable, aesthetically aging,
maintenance proof materials, and the abdication of an exaggerated mechanisation.
The equipment counts more than 120 PC workstations, CAD software and additional
software for office, project planning software, GIS, 3D rendering, video editing and desktop
publishing
Owners and CEO are Petra Wörner, Stefan Traxler, Martin Richter and Petra Cleven,
Office Managers: Christian Strauss, Sven Nebgen, Lutz Steuernagel
www.woernerundpartner.de
p.woerner@woernerundpartner.de
i.traxler@woernerundpartner.de
3. Klinikum Offenbach GmbH â Offenbach Clinics
Focused efficancy - Healthcare Facility providing maximum medical care and benefit regarding the
urban development of Offenbach, a town next to Frankfurt am Main (Airport)
.
4. Klinikum Offenbach GmbH â Offenbach Clinics
New construction: Useable Area: 29 040 mÂČ Gross Floor Area: 59 050 mÂČ
729 beds, 12 operation theatres, 18 clinics, institutes and in-patient departments cover almost all
medical diciplines, Euro 160 million total construction costs.
.
5. Klinikum Offenbach GmbH â Offenbach Clinics
The new clinic - a comb-shaped building composed of four wings â provides space for several
competence centres, areas designated for general care, intensive care, surgery, diagnosis and
treatment as well as a technical equipment, installations centre and a heliport to a population of
about 450,000 people. The hospital takes about 32,000 in-patient and about 40,000 out-patients
annually.
.
6. Klinikum Offenbach GmbH â Offenbach Clinics
The clinic is Offenbachâs biggest financial investment since the end of World War II. The decision for
the new construction brought one of the most modern clinics to Offenbach and also a benefit
regarding the urban development and potential development of the city district. Former situation:
.
7. Klinikum Offenbach GmbH â Offenbach Clinics
After relocation to the new building, several buildings on the clinic premises were deconstructed,
among them an area-dominating 17-storey central building .
.
8. Klinikum Offenbach GmbH â Offenbach Clinics
This provides a spacious campus and forecourt situation to the entrance, cafeteria and Tommyhall
and enables construction of clinical-related buildings in the future.
.
9. Klinikum Offenbach GmbH â Offenbach Clinics
The flexible layout of the new house can be adapted to changing work flows and is offering con-
veniently short routes for patients, staff and visitors. Even the âhardware structureâ can be adapted
to future requirements by adding another âtooth to the left or the right of the back of the combâ.
.
10. Klinikum Offenbach GmbH â Offenbach Clinics
The entire clinical centre is housed in a seven-storey building : The examination and treatment
areas are located in the lower floors, the patient areas in the upper floors.
.
11. Klinikum Offenbach GmbH â Offenbach Clinics
The public area in front of the building includes a generous entrance hall, a gym, a two-storey
cafeteria with outer terrace, shops, a chapel and a muslim prayer room.
.
Cafeteria Entrance Tommy-Hall
12. Klinikum Offenbach GmbH â Offenbach Clinics
.
public zone Medical zone
patient /
private zone
13. Klinikum Offenbach GmbH â Offenbach Clinics
Warm colours and lots of light â these are the central design elements used in Offenbach â
out-and inside.
.
14. Klinikum Offenbach GmbH â Offenbach Clinics
A specially designed system based on attractive coloured patterns helps patients and visitors to find
their way to their destination in the huge facility.
.
15. Klinikum Offenbach GmbH â Offenbach Clinics
Without any need for words the system takes over the guidiance through the house and creates at
the same time a form of art in architecture.
.
16. Klinikum Offenbach GmbH â Offenbach Clinics
Staff, visitors and patients find their way and reach their destination.
.
17. Klinikum Offenbach GmbH â Offenbach Clinics
That may be the emergency room, an information desk, a care base, a door, a waiting area or the
washrooms.
.
18. Klinikum Offenbach GmbH â Offenbach Clinics
Orientation and structuring in this big building is also faciliated by the different designed inner
courtyards of the strucure. All of them vary in design and colour. The red, yellow or green of the
plants used offer a constantly changing play of colours depending on the time of day and year.
.
19. Klinikum Offenbach GmbH â Offenbach Clinics
In the childrenâs ward secured play areas are integrated into the inner courtyards.
.
20. Klinikum Offenbach GmbH â Offenbach Clinics
The central op area involves 8 interdisciplinary theatres, 4 more specialized are in other areas.
.
.
22. Klnikum Offenbach GmbH â Offenbach Clinics
100 intenisve care beds for cardiac patients, for surgical, for interdisciplines, for burn center
patients, dialysis patients.
.
23. Klinikum Offenbach GmbH â Offenbach Clinics
Wards and patient rooms: The structure of the building enables the creation of flexible station sizes
and the consequent adaption to the respective patient volume. The rooms located in the connection
areas can be assigned to different nursing bases.
.
24. Klnikum Offenbach GmbH â Offenbach Clinics
In order to create comfortable patient rooms with an hotel character, particular attention has been
paid to lighting design, colours and materials. Low parapets enable the lying patient to view the
nature or the cityâs szenery, the windowsills serve as seating places.
.
25. Klnikum Offenbach GmbH â Offenbach Clinics
The patient rooms are bright and friendly, with high-quality, made-to-measure fittings that also
incorporate the medical supply system. The adult patient rooms are decorated in warm, homely
sand and earth tones, âŠâŠâŠâŠ
.
26. Klnikum Offenbach GmbH â Offenbach Clinics
âŠâŠâŠâŠ while in the childrenâs wards and areas are partly brightly coloured
.
28. Klnikum Offenbach GmbH â Offenbach Clinics
Heath Care to a population over 450,000 people. The hospital takes about 32,000 in-patient and
about 40,000 out-patients annually. 300 doctors and 900 employees in the care and service support
Groundbraking ceremony in 8.2007, opening in 4.2010, overall cost per mÂČ 5,500.- âŹ
.
29. Klinikum Offenbach GmbH â Offenbach Clinics
Klinikum Offenbach and itâs tight budget
âŠâŠâŠ.. disciplined, without pathos, but not without poetryâŠâŠâŠâŠâŠâŠ..
.
30. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
Modern architectural solutions for effective planning of costs, resources and energy
40 km from Frankfurt am Main (Airport)
.
31. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH â District Hospital Schotten
New construction: Useable Area: 4 050 mÂČ Gross Floor Area: 9 060 mÂČ
and refurbishment Useable Area: 1 120 mÂČ Gross Floor Area: 2 750 mÂČ
Euro 25 million total construction costs.
.
32. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH â District Hospital Schotten
Offering: Internal MedicineâąSurgery and TraumatologyâąTrauma centerâąOncologyâąHematologyâąENT
140 beds; also outpatient facilities. 240 doctors, nurses and administrative staff; approximately 5 000
inpatients and 7 000 outpatients per year.
.
33. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
Groundbreaking ceremony took place on 10 September 2009. The five-storey building, with its three
levels of care, was placed on a southern slope of the landscape using the sloping terrain for a light-
filled building with pleasant terrace and park access. The overall project consists of two phases. The
first was completed in May 2011.
.
34. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The shell of the new construction was developed from small elements in aluminum. In its various
shades of green the facade pay tribute to the situation and atmosphere of the wooded site and
reflect it back through the vertical arrangement. Apart from this very own aesthetics this design of
the façade offer a second advantage, a protective shell for the rooms behind and the entire building.
.
35. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The second phase involves the deconstruction of the upper floors of an existing building and its
reconstruction to build up the new main entrance of the hospital and a spacious, landscaped
forecourt situation - as well as a new building for the management until 2013.
.
36. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The Wetterau gGmbH is the operator of the district hospital Schotten. The philosophy of the operator
for its health care buildings demands modern architectural solutions, resource, energy and cost-
effective planning, and buildings with people-centered dimensions and aesthetics.
Contruction phases
2009-2013
.
37. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The first phase is completed. A five-storey building with cozy two-bed rooms, rooms with wonderful
views, bright and full of light, modern diagnostic and treatment facilities in direct connection to the
operating theatres and emergency room, a large, interdisciplinary intensive care, attractive lab
workstations, physical therapy, a new patient and employee cafeteria and a spacious entree.
.
38. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The exterior and interior design of the new building reflects its beautiful location on a hill in the
woods. The site situation and the benefits of the topography allowed the construction of a light-filled
building with pleasant terrace and park access.
.
39. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
On the ground floor is the department of internal medicine, as well as the intensive care with up to
ten beds and a recovery room with direct access to the operating theatres.
.
40. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
On the garden level are laboratories and the physical therapy with access to the park as well as the
generously glazed cafeteria, with outdoor terrace.
.
41. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
The interiour design of the three ward levels above follow different concepts realized by the
combination of equipment, colors, materials, lighting and decoration. They concepts consider the
needs of sick people to feel protected and secure, and ensure the activation of the reconvalescents.
Each patient room gains light, air and landscape by floor to ceiling windows. The en suite shower
rooms are also subject to the interiour color and material concept
.
42. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotte.
Nurses and doctors work at ergonomic designed and attractive workplaces. None of the rooms fail
natural light and outdoor situations since all rooms inside the building are located at a centrally
located courtyard, a small green oasis
.
43. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
Like the facade elements in their spring colors correspond with the surrounding forest, the design
of the interiour follows the idea to copy seasonal colors of the outside world into the inner world by
the choice of materials, patterns and colorations.
.
44. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotte.
The arrangement of the functions correspond to the standards of modern work processes. In the
entrance hall on the ground floor the reception and the information point are located at a central
location. The lifts are located close by. For orientation there is a color coding system that is
designed differently in different levels. It copies the colors of the natural surroundings of the house,
using more intensive colors level by level..
.
45. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
After destrucion and partly reconstruction of the old bedhouse in the back of the new construction, a
further new building at the hospital will give home to the management, medical services and the
meeting rooms of the doctors.
.
46. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
Second phase: new construction of the management department and medical services
-ground level
.
47. Kreiskrankenhaus Schotten Gesundheitszentrum Wetterau gGmbH - District Hospital Schotten
.Second phase: new construction of the management department and medical services
-first level
.
49. Architects for Health
Thank you for your attention
Petra Wörner
www.woernerundpartner.de
p.woerner@woernerundpartner.de
i.traxler@woernerundpartner.de
How can we do more with less