Extraction of Locked Up Coal by
Alternate Mining Method in India
Presented By
Arnab Show & Anurag Jha
HIGHWALL MINING
Extraction of Locked Up Coal by Alternate Mining Method
Extraction of Locked Up Coal by Alternate Mining Method
What is Locked up Coal?
- Coal which is not possible to extract economically by
conventional mining method
1. Opencast
2. Underground
3. Longwall
Extraction of Locked Up Coal by Alternate Mining Method
Total Coal Reserve 239.50 Billion Tonne
Proved 49%
indicated
40%
20% of Total Reserve
Extraction of Locked Up Coal by Alternate Mining Method
Total Coal Reserve 239.50 Billion Tonne
Proved 49%
indicated
40%
Highwall
20% of Total Reserve
• Cannot be Economically extracted by conventional Mining Methods
• Has a huge risk of working in terms of safety.
• Stripping ratio is very poor
• Uneconomic to imply heavy machinery
• Grade of coal may be unsatisfactory in terms of investment.
Thus to deal with all this issues, Highwall Mining Method is Adopted
What is Highwall ?
• Highwall mining is a remote controlled mining method which extracts coal
from the base of an exposed highwall via a series of parallel entries driven
to a significant depth within the coal horizon.
• Most Safe Method
• Highwall Production Potential
• Higher Productivity
• Conservation of coal
• Mobility
METHOD OF MINING
 Generally four types of method are being practiced for creating highwall mining
under different mining conditions.
i) Contour Mining
ii) Trench Mining
iii) Bench Mining
iv) Highwall Mining Method
The technology is quite flexible depending upon the availability of the coal block.
CONTOUR MINING
 In a mountainous area, the highwall mining system can follow
a coal seam along the side of the hill.
TRENCH MINING
 The unit mines coal from both sides of a purpose-prepared trench;
this mining method is used when an open pit is not an option.
BENCH MINING
 Mining by preparation of benches in each seam for multi-seam
working is called bench mining.
 For working multi seam deposit, a bench is prepared in the
top seam and mining operation is taken top downwards.
 Highwall mining can also be done by preparation of
benches from bottom upwards but there is a possibility of
damages to the coal of upper seams if there is any failure
of web pillars at the bottom seams.
Bench Mining
Mine Floor Coal
Highwall Mine Seam
Highwall Mine Seam
Blast 2nd Bench
Blast 2nd Bench
Mine Floor Coal Bench 2
Highwall Mine Seam 2
Highwall Mine Seam 2
Strip Seam 3
Strip Seam 3
Strip Seam 3
Strip Seam 3
Strip Seam 3
Ready!
HIGHWALL MINING METHOD
 When the open pit mining has reached beyond the stripping ratio, the
coal Highwall can be taken out economically and safely by this
method.
.
DIFFERENT METHODS
HIGHWALL MINER MACHINE
 Miniature form of the continuous miner
 Operates at the highwall face and sits at the pit bottom
 The total operation from coal cutting to despatch of coal is done by the single machine
 Remotely controlled
 Minimum manpower of only 3-4 persons
PARTS OF A HIGHWALL MINER
 Base Unit
 Reels and Chains
 Push beams
 Cutter module
 Controls
 Anchoring
 Right angle conveyor
 Generator
HEALTH AND ENVIRONMENT
MONITORING
VENTILATION
 No man will be inside the hole
 Ventilation is not required normally
 Possibility of accumulation of methane cannot be
avoided when the seam is highly gassy
PROTECTION AGAINST METHANE
CONCENTRATION
 Continuous monitoring of the methane by DGMS
approved methane Sensors
 Intrinsically safe
 Methane sensor device interlocked with PLC control
system
PROTECTION AGAINST METHANE
CONCENTRATION
Power to UG will be “ON” only if:
 The Methane sensor is “ON”
 Working properly
 Methane level is below 1.25%
PROTECTION AGAINST METHANE
CONCENTRATION
When Methane level:
=0.8% Operator get audio-visual alarm
>1.25% U/G part of the machine will be powered “OFF”
In case methane sensor switched off or is in fault mode all electrical
power sources including signal & control will be shut off (fail safe)
COAL DUST SUPPRESSION
Water spraying on the cutter head – at a flow rate of
19 litre per minute at a pressure of approx 20 Bar.
It is interlocked with power supply to the cutter head
LIMITATION OF HIGHWALL
MINING TECHNOLOGY
 Flat seams -5 to 12 degree
 Seams free from geological disturbances
 Seam thickness between 0.8m to 1.5m
 Strong roof and floor
 Moderate make of water
SUPPORT
WEB AND BARRIER PILLAR
 Web pillars ensure support of OB
 Barrier pillars prevents Cascading Collapse
 Barrier pillar typically every 10-20 drives
CONCLUSION
 Highwall is most promising in India
 According to the present scenario of coal mines in India,
 Our 80% coal is produced by Opencast nowadays
 Most of the opencast mine will reach to its limiting value in 10-20 years
 Number of locked up seam will increase in future
 Highwall is most promising in India
 Introduced by Coal India in Singareni (SCCL)
 Adaptation is gradually increasing in other subsidiaries of Coal India
Highwall Mining

Weitere ähnliche Inhalte

Was ist angesagt?

Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in miningRishabh Ranjan
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Minesajeetkm
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
Underground metal mining methods
Underground metal mining methodsUnderground metal mining methods
Underground metal mining methodsSafdar Ali
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OCAbdul Mujeeb
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELAIndrajeetKumar110
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerSafdar Ali
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof supportUlimella Siva Sankar
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLAnkit Narain
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coalSafdar Ali
 

Was ist angesagt? (20)

Conventional support system
Conventional support systemConventional support system
Conventional support system
 
Highwall mining
Highwall miningHighwall mining
Highwall mining
 
Highwall mining – a new approach in india
Highwall mining – a new approach in indiaHighwall mining – a new approach in india
Highwall mining – a new approach in india
 
Different Raising Techniques in mining
Different Raising Techniques in miningDifferent Raising Techniques in mining
Different Raising Techniques in mining
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
Haulage system in Mines
Haulage system in MinesHaulage system in Mines
Haulage system in Mines
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Underground metal mining methods
Underground metal mining methodsUnderground metal mining methods
Underground metal mining methods
 
Conversion of UG to OC
Conversion of UG to OCConversion of UG to OC
Conversion of UG to OC
 
depllaring in coal mines
depllaring in coal minesdepllaring in coal mines
depllaring in coal mines
 
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELALongwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
Longwall mining (Multisling mining - Horizontal slicing) NIT ROURKELA
 
Longwall machinery
Longwall  machineryLongwall  machinery
Longwall machinery
 
Surface miner
Surface minerSurface miner
Surface miner
 
Lpdt
LpdtLpdt
Lpdt
 
Study of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous minerStudy of strata control in an ug coal mine being worked by continuous miner
Study of strata control in an ug coal mine being worked by continuous miner
 
Methane drainage
Methane drainageMethane drainage
Methane drainage
 
Selection of longwall powered roof support
Selection of longwall powered roof supportSelection of longwall powered roof support
Selection of longwall powered roof support
 
Bord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDLBord and pillar working with LHD/SDL
Bord and pillar working with LHD/SDL
 
Method of working of continuous miner in underground coal
Method of working of     continuous miner in underground coalMethod of working of     continuous miner in underground coal
Method of working of continuous miner in underground coal
 
Underground mine
Underground mineUnderground mine
Underground mine
 

Andere mochten auch

Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesAnurag Jha
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
La aplicacion de las redes sociales en la educación
La aplicacion de las redes sociales en la educaciónLa aplicacion de las redes sociales en la educación
La aplicacion de las redes sociales en la educaciónejroldan
 
MY Updated Resume-Jaffer Ansari
MY Updated Resume-Jaffer AnsariMY Updated Resume-Jaffer Ansari
MY Updated Resume-Jaffer AnsariJaffer Ekbal
 
Service Users’ Involvement and Engagement in Interprofessional Care
Service Users’ Involvement and Engagement in Interprofessional CareService Users’ Involvement and Engagement in Interprofessional Care
Service Users’ Involvement and Engagement in Interprofessional CareBachchu Kailash Kaini
 
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_Lead
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_LeadUmesh_Pacholi_ORPOS_Consultant_9yrs_Team_Lead
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_LeadUmesh Pacholi
 

Andere mochten auch (10)

Optimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast minesOptimization of Blasting Parameters in open cast mines
Optimization of Blasting Parameters in open cast mines
 
Topic 4- mining methods
Topic 4- mining methodsTopic 4- mining methods
Topic 4- mining methods
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Michelle Irelands CV
Michelle Irelands CVMichelle Irelands CV
Michelle Irelands CV
 
La aplicacion de las redes sociales en la educación
La aplicacion de las redes sociales en la educaciónLa aplicacion de las redes sociales en la educación
La aplicacion de las redes sociales en la educación
 
MY Updated Resume-Jaffer Ansari
MY Updated Resume-Jaffer AnsariMY Updated Resume-Jaffer Ansari
MY Updated Resume-Jaffer Ansari
 
Service Users’ Involvement and Engagement in Interprofessional Care
Service Users’ Involvement and Engagement in Interprofessional CareService Users’ Involvement and Engagement in Interprofessional Care
Service Users’ Involvement and Engagement in Interprofessional Care
 
ngbv
ngbvngbv
ngbv
 
Sparta athens
Sparta  athensSparta  athens
Sparta athens
 
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_Lead
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_LeadUmesh_Pacholi_ORPOS_Consultant_9yrs_Team_Lead
Umesh_Pacholi_ORPOS_Consultant_9yrs_Team_Lead
 

Ähnlich wie Highwall Mining

Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall MiningShantanu kumar
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningSerena Fu
 
Highwall mining, a new approach in india revised
Highwall mining, a new approach in india  revisedHighwall mining, a new approach in india  revised
Highwall mining, a new approach in india revisedTIKESHWAR MAHTO
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam miningSafdar Ali
 
Underground mining method natural support and caving
Underground mining method natural support and cavingUnderground mining method natural support and caving
Underground mining method natural support and cavingrazaullahwazir
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningJasmeet Singh Saluja
 
coal mining training report
coal mining training report coal mining training report
coal mining training report VIKRAMSINGH1231
 
Training
TrainingTraining
Trainingkulrao
 
Khalaspir coal field
Khalaspir coal fieldKhalaspir coal field
Khalaspir coal fieldredwanislam14
 
Coal mining brief alpha sophie
Coal mining brief alpha sophieCoal mining brief alpha sophie
Coal mining brief alpha sophie★ Sophie Guan
 
Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology PresentationThames Global Consultants
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit miningSATYANARAYANA I
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...AMIT SAHU
 

Ähnlich wie Highwall Mining (20)

HIGHWALL MINING
HIGHWALL MININGHIGHWALL MINING
HIGHWALL MINING
 
Design and Performance of Highwall Mining
Design and Performance of Highwall MiningDesign and Performance of Highwall Mining
Design and Performance of Highwall Mining
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
 
Highwall mining, a new approach in india revised
Highwall mining, a new approach in india  revisedHighwall mining, a new approach in india  revised
Highwall mining, a new approach in india revised
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Continuous miner
Continuous minerContinuous miner
Continuous miner
 
Underground mining method natural support and caving
Underground mining method natural support and cavingUnderground mining method natural support and caving
Underground mining method natural support and caving
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
longwall mining
longwall mininglongwall mining
longwall mining
 
coal mining training report
coal mining training report coal mining training report
coal mining training report
 
Training
TrainingTraining
Training
 
Khalaspir coal field
Khalaspir coal fieldKhalaspir coal field
Khalaspir coal field
 
Coal mining brief alpha sophie
Coal mining brief alpha sophieCoal mining brief alpha sophie
Coal mining brief alpha sophie
 
Coal Lectures Series Mining Technology Presentation
Coal Lectures Series   Mining Technology PresentationCoal Lectures Series   Mining Technology Presentation
Coal Lectures Series Mining Technology Presentation
 
Coal Lectures Series Mining Technology
Coal Lectures Series   Mining TechnologyCoal Lectures Series   Mining Technology
Coal Lectures Series Mining Technology
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit mining
 
Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...Adoption of advanced coal mining practices for production augmentation by und...
Adoption of advanced coal mining practices for production augmentation by und...
 
Tipong report
Tipong report Tipong report
Tipong report
 

Mehr von Anurag Jha

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and DevelopmentAnurag Jha
 
Traning report on Khetri Copper Mine
Traning report on Khetri Copper MineTraning report on Khetri Copper Mine
Traning report on Khetri Copper MineAnurag Jha
 
Belt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineBelt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineAnurag Jha
 
Sontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalSontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalAnurag Jha
 
Stope Optimization in Metal Mines
Stope Optimization in Metal MinesStope Optimization in Metal Mines
Stope Optimization in Metal MinesAnurag Jha
 
Acid Mine drainage occurrence and its remediation
Acid Mine drainage occurrence and its remediationAcid Mine drainage occurrence and its remediation
Acid Mine drainage occurrence and its remediationAnurag Jha
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEAnurag Jha
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEAnurag Jha
 
Excursion Report of Jhanjhra Coal Mines
Excursion Report of Jhanjhra Coal MinesExcursion Report of Jhanjhra Coal Mines
Excursion Report of Jhanjhra Coal MinesAnurag Jha
 

Mehr von Anurag Jha (9)

Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
Traning report on Khetri Copper Mine
Traning report on Khetri Copper MineTraning report on Khetri Copper Mine
Traning report on Khetri Copper Mine
 
Belt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineBelt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mine
 
Sontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of CoalSontaneous Heating Characteristics of Coal
Sontaneous Heating Characteristics of Coal
 
Stope Optimization in Metal Mines
Stope Optimization in Metal MinesStope Optimization in Metal Mines
Stope Optimization in Metal Mines
 
Acid Mine drainage occurrence and its remediation
Acid Mine drainage occurrence and its remediationAcid Mine drainage occurrence and its remediation
Acid Mine drainage occurrence and its remediation
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
 
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINEDESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
DESIGN OF SUPPORT SYSTEM IN BORD AND PILLAR MINE
 
Excursion Report of Jhanjhra Coal Mines
Excursion Report of Jhanjhra Coal MinesExcursion Report of Jhanjhra Coal Mines
Excursion Report of Jhanjhra Coal Mines
 

Kürzlich hochgeladen

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Kürzlich hochgeladen (20)

Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Highwall Mining

  • 1. Extraction of Locked Up Coal by Alternate Mining Method in India Presented By Arnab Show & Anurag Jha HIGHWALL MINING
  • 2. Extraction of Locked Up Coal by Alternate Mining Method
  • 3. Extraction of Locked Up Coal by Alternate Mining Method What is Locked up Coal? - Coal which is not possible to extract economically by conventional mining method 1. Opencast 2. Underground 3. Longwall
  • 4. Extraction of Locked Up Coal by Alternate Mining Method Total Coal Reserve 239.50 Billion Tonne Proved 49% indicated 40% 20% of Total Reserve
  • 5. Extraction of Locked Up Coal by Alternate Mining Method Total Coal Reserve 239.50 Billion Tonne Proved 49% indicated 40% Highwall 20% of Total Reserve
  • 6. • Cannot be Economically extracted by conventional Mining Methods • Has a huge risk of working in terms of safety. • Stripping ratio is very poor • Uneconomic to imply heavy machinery • Grade of coal may be unsatisfactory in terms of investment. Thus to deal with all this issues, Highwall Mining Method is Adopted
  • 7. What is Highwall ? • Highwall mining is a remote controlled mining method which extracts coal from the base of an exposed highwall via a series of parallel entries driven to a significant depth within the coal horizon.
  • 8. • Most Safe Method • Highwall Production Potential • Higher Productivity • Conservation of coal • Mobility
  • 9. METHOD OF MINING  Generally four types of method are being practiced for creating highwall mining under different mining conditions. i) Contour Mining ii) Trench Mining iii) Bench Mining iv) Highwall Mining Method The technology is quite flexible depending upon the availability of the coal block.
  • 10. CONTOUR MINING  In a mountainous area, the highwall mining system can follow a coal seam along the side of the hill.
  • 11. TRENCH MINING  The unit mines coal from both sides of a purpose-prepared trench; this mining method is used when an open pit is not an option.
  • 12. BENCH MINING  Mining by preparation of benches in each seam for multi-seam working is called bench mining.  For working multi seam deposit, a bench is prepared in the top seam and mining operation is taken top downwards.  Highwall mining can also be done by preparation of benches from bottom upwards but there is a possibility of damages to the coal of upper seams if there is any failure of web pillars at the bottom seams.
  • 19. Mine Floor Coal Bench 2
  • 28. HIGHWALL MINING METHOD  When the open pit mining has reached beyond the stripping ratio, the coal Highwall can be taken out economically and safely by this method. .
  • 30. HIGHWALL MINER MACHINE  Miniature form of the continuous miner  Operates at the highwall face and sits at the pit bottom  The total operation from coal cutting to despatch of coal is done by the single machine  Remotely controlled  Minimum manpower of only 3-4 persons
  • 31. PARTS OF A HIGHWALL MINER  Base Unit  Reels and Chains  Push beams  Cutter module  Controls  Anchoring  Right angle conveyor  Generator
  • 33. VENTILATION  No man will be inside the hole  Ventilation is not required normally  Possibility of accumulation of methane cannot be avoided when the seam is highly gassy
  • 34. PROTECTION AGAINST METHANE CONCENTRATION  Continuous monitoring of the methane by DGMS approved methane Sensors  Intrinsically safe  Methane sensor device interlocked with PLC control system
  • 35. PROTECTION AGAINST METHANE CONCENTRATION Power to UG will be “ON” only if:  The Methane sensor is “ON”  Working properly  Methane level is below 1.25%
  • 36. PROTECTION AGAINST METHANE CONCENTRATION When Methane level: =0.8% Operator get audio-visual alarm >1.25% U/G part of the machine will be powered “OFF” In case methane sensor switched off or is in fault mode all electrical power sources including signal & control will be shut off (fail safe)
  • 37. COAL DUST SUPPRESSION Water spraying on the cutter head – at a flow rate of 19 litre per minute at a pressure of approx 20 Bar. It is interlocked with power supply to the cutter head
  • 38. LIMITATION OF HIGHWALL MINING TECHNOLOGY  Flat seams -5 to 12 degree  Seams free from geological disturbances  Seam thickness between 0.8m to 1.5m  Strong roof and floor  Moderate make of water
  • 40. WEB AND BARRIER PILLAR  Web pillars ensure support of OB  Barrier pillars prevents Cascading Collapse  Barrier pillar typically every 10-20 drives
  • 41.
  • 42. CONCLUSION  Highwall is most promising in India  According to the present scenario of coal mines in India,  Our 80% coal is produced by Opencast nowadays  Most of the opencast mine will reach to its limiting value in 10-20 years  Number of locked up seam will increase in future  Highwall is most promising in India  Introduced by Coal India in Singareni (SCCL)  Adaptation is gradually increasing in other subsidiaries of Coal India