PERSONAL SUMMARY:
A results driven, enthusiastic and resourceful quantity surveyor working as part of a busy team
effectively and efficiently managing all the costs relating to building projects. Having a proven track
record of minimizing the costs of a project and enhancing value for money, while still achieving the
required standards and quality. Possessing excellent sagacity & the aptitude to plan ahead when
working on construction projects. Can communicate effectively with developers / contractors &
would be an asset to any employer who respects loyalty & responsibility.
Currently looking for an opportunity to join a dynamic, ambitious and growing company to forge a
career as a first class quantity surveyor.
PERSONAL DATA
Date of Birth : November 01, 1989
Civil Status : Single
Religion : Roman Catholic
Height : 5’1.5”
Weight : 111.33lbs.
Citizenship : Filipino
Gender : Female
Language : Filipino and English
EDUCATIONAL BACKGROUND
Tertiary : Bachelor of Science in Civil Engineering
Bulacan State University
Malolos City, Bulacan
June 2006-April 2011
Secondary : Salvador Araneta Memorial Institute
San Jose Del Monte Bulacan
June 2002-March 2006
Elementary : Muzon Elementary School
San Jose Del Monte Bulacan
June 1995-March 2002
2. 2 | P a g e
SEMINARS AND TRAININGS ATTENDED:
EmergenCE Plan Natural Disaster Risk Management in the Philippines
Film Inst.,University of the Philippines Diliman Quezon City
July 17 2010
Geotechnical Engineering:Profession-Equipment-Disasters
Bulacan State University Malolos Bulacan
By Dr. Jonathan Dungca, Geotechnical Engineer
March 19 2011
Evolution of Structural Design & Designing Efficiency
Bulacan State University Malolos Bulacan
By Engr. Anthony Vladimir Pimentel, ASEP-President
January 8 2011
Integrated Management System Series
Unit 2E Queensland Bldg. Cagayan St. Bago Bantay
Quezon City
By Engr. Martin Arellano
June 30, 2012
On the job training
Freyssinet Filipinas, Project: One Global at Taguig City Metro Manila
April 19 2010 - May 22 of 2010
SAP MM Training
Training Room, Building 5
July 01, 2015
PROFESSIONAL EXPERIENCE:
Makati Development Corporation
Sr. Quantity Surveyor
May 2013 – Present
Working as part of a busy team, taking responsibility for several schemes at differing stages and
working with limited supervision. The workload includes Enabling, Civil / Structural, Architectural
and MEFPS works for infrastructure, new car parks, retail areas and condominiums.
Duties:
Complete Pre Contract & Post Contract management from the point of Kick off meeting
Studying the tender documents & BOQ and raising for variations.
Calculating complete Project Quantity Take off and preparing the Contract BOQ comparing
with Tendered BOQ for variations.
Calculate and Cost Planning for Formworks, Concreting, Rebar Cutting list, Structural steel,
Block works, Plastering, Painting, Architectural Works, Mechanical, Electrical Plumbing,
Fire Protection, FDAS & Security System.
Preparation of (CTCs) Cost to Completes and (CVRs) Cost Value Reconciliations for the
completed Projects with monthly updates to check tendered margin vs. target margin %.
Following up with the client business department to receive the advance / progress payments
in time.
Updating Contract Performance Reports (CPRs) monthly for management review.
3. 3 | P a g e
Identifying, managing and processing of Change Order to Owner and to Sub-contractors.
Dealing with the System of Site Instructions (SI) – Change Request (CR) - Change
Proposal (CP)–CHANGE ORDERs (CO).
Maintaining the Payment Tracking Log for all the variations works / Change Orders
Raising requests /reminders for obtaining Practical Completion Certificates (PCC) or Final
Take over Certificates for Retention amount claims and request for payments
correspondences clients.
Reviewing the material specifications to be within allowable budget prior to material approval
transmittal/ before client approvals.
Timely submission of Interim Payment applications with Valuations Report to Clients and
expedite timely receipt of certificates and payments.
Maintain or obtain site record photographs to support variations, extras or claims.
Keen attention on Escalations, Fixed prices, Payment Claims, Variations, Retentions, Bank
Guarantees, Back Charges, Liquidated Ascertain Damages, etc.
Coordinate with procurement & accounting department for all resemblance of documents such
as LPOs, invoice, Payments, Cheques etc.
To undertake accurate Quantity take offs and Preparing Bills of Quantity from CD to FCD
Drawings for Variations.
Evaluation and Certification of Subcontractor Payments Invoices.
Subcontractor Payment Certification & issuing Interim payment certificates (IPC) by
retaining as per the contract conditions like Advance Payments, retentions, discounts and Tax
Holdings etc.
Preparing the Statement of Final Accounting to Subcontractor considering all the variations.
To manage all contractual matters relating to the Main Contract and Subcontracts and to keep
the
Commercial Manager Review concerning such contractual matters.
To liaise with proposed nominated subcontractors, prepare risk/vendor analysis for
management review based on previous performances.
To reconcile actual bulk material quantities against Tender and Contract documents and
Preparation of Reconciliations for Client vs. Sub-contractor paid quantities, all major Bulk
Materials.
To monitor site expenditure and advice on risk areas or cost over-run items by complete
Forecasting for Preliminary, Manpower, Material, Plant & Machinery Cost.
Obtaining daily reports from site and converting to Weekly/ Monthly progress reports for
management review.
Prepare and maintain budgets, estimates, cash flow forecasts, cost reports.
Resources Cost vs. Value: Labor, equipment, materials, subcontractors, and any other cost
detail items.
Verify and approve Sub-Contractors measurement sheet.
Sound Knowledge on pre and post contract administration for different contract types
Ensure the submission of insurances/bonds in accordance with the contract
Having professional knowledge and skills in using relevant computer software.
Maintain proper logs for subcontracts; purchase orders, subcontractors and suppliers payment
certificates, prepared/submitted/approved calculation sheets, subcontractors variations etc.
Identify possible areas of dispute among the Contractor and Sub Contractor(s) and take the
necessary proactive measures.
Monitoring of actual material, labor cost spent against forecasted materials and man hour
usages.
4. 4 | P a g e
PROJECT DETAILS
PROJECT TITLE DESCRIPTION
LOCATIO
N
CLIENT
COMMENCEME
NT DATE
COMPLETION
DATE
CONTRACT
AMOUNT
(PHP)
AYALA
REDEVELOPME
NT
STREETSCAPE
PRIORITY C & D
Civil works,
Road
expansion &
restoration,
Installation of
Traffic
Lighting and
PED Signal
System,
Pavement
Markings,
Granite works
and
Wayfinding
Pylon
AYALA
CENTER,
MAKATI
CITY
AYALA LAND
INC.
01-May-13 01-Dec-13 114,576,721.3
9
LOT H TRANSIT
TERMINAL
STRUCTURAL
STEEL CAR
PARK WITH
RETAIL AREA
A.
ARNAIZ
AVENUE,
AYALA
CENTER,
MAKATI
CITY
AYALA LAND
INC.
25-Jun-13 31-Mar-14 412,557,669.3
5
& STEEL
PARKING
BUILDING
TWO ROXAS
TRIANGLE
PROJECT
55 FLOORS
CONDUMINIU
M W/ 4
BASEMENT
AREAS
PASEO
DE
ROXAS,
CRUZAD
A
STREET,
MAKATI
AVE.,
MAKATI
CITY
AYALA LAND
INC. & ROXAS
LAND
INC/HONGKO
NG LAND
02-Nov-13 30-Jun-18 5,288,195,086.
73
T.N. Ramos Const. Dev. & Corp.
Project Engineer/Office Engineer
July 2011 – May 2013
Ensuring that all engineering work is carried out in accordance with specifications, statutory
requirements, laws, rules, regulations and other contractual requirements. With due regards to safety,
operability and maintainability. The workload includes pipe laying and road restoration works under
Maynilad Water Services.
Duties:
Prepare BQ and cost all the quantities.
Detailed and accurate quantity and measurement take-off.
Identifying, managing and processing of Change Order to Owner and to Sub-contractors.
Processing of Interim Valuation to Owner and to Sub-contractors.
Preparation of Progress and As-Built Drawings.
5. 5 | P a g e
Managing projects from conception, pre-production through to completion.
Providing technical support to the project team.
Responsible for overseeing the review, initiation and execution of contracts.
Managing project budgets and keeping costs down.
Overseeing the maintenance of projects after completion.
Responsible for the completion of all documentation.
Producing Test Plans and reports.
Prepare contract documentation for procurement services and materials.
Carrying out effective client liaison for all projects undertaken.
Liaising with customers on a regular basis to ensure the successful design and manufacture of
products to agreed budgets and time frames.
PROJECT DETAILS
CONTRACT NO. LOCATION PROJECT TITLE NTP
COMPLETION
DATE AMOUNT
3R-11-CL-HA32-Z05-09 BF RESORT
2011 PIPE EXPANSION
PROJECT FOR (HA-32,
CLP-Z5) SUPPLY LINES
FOR BF RESORT SUBD.
UNDER CAVITE-LAS
PINAS BA 9/21/2011 2/11/2012 120,494,541.40
3R-12-CL-HA28-Z01-02
ANIBAN-
MOLINO
PROPOSED 2012 PIPE
EXPANSION PROJ. FOR
(HA-28, CLP-Z1)
UNDER CAVITE-LAS
PIÑAS B.A. (OPEN
COMMUNITY)
PACKAGE 2 5/7/2012 01/15/2013 37,000,000.00
KEY SKILLS AND COMPETENCIES
Experience of the tender stage & of dealing with procurement issues.
Experience of working on civil engineering projects.
Experience at Section QS level.
Comprehensive understanding of statutory building regulations.
Excellent working knowledge of commercial procedures.
Knowledge of SAP, computerized cost capture & value monitoring systems.
Thorough knowledge of Company health, safety, quality and environment procedures.
Knowledge in Auto Cad operation.
Knowledge in MS Project
Knowledge in Basic Surveying
AREAS OF EXPERTISE
Value management
Cost control
Procurement strategy
Building Substructure
6. 6 | P a g e
ANNA RIYELL A. DE LARA
Signature Over Printed Name
Change control
Infrastructure
Project management
Water-related schemes
PERSONAL SKILLS
Strategic planner
Organized
Analytical
CHARCTER REFERENCES:
Engr. Kristine C. Geronimo
Quantity Surveyor – Makati Development Corp.
425 Bambang, Bocaue,
Bulacan
09363425727 / 09335744333
Mr. Ryan Joseph R. Capuno
PHR Supervisor – Makati Development Corp.
Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave.,
Makati City
09058603881 / (02) 975-69-62
Engr. Mara Rosa B. Verdan
Q.A. Engineer - Makati Development Corp.
Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave.,
Makati City
09256882542 / 09271290452 / (02) 975-69-62
I HEREBY CERTIFY that the above information is true and correct to the best of my knowledge and