SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
1 | P a g e
ANNA RIYELL ARRABIS DE LARA
QUANTITY SURVEYOR
Lapoblacion ph3C b14 l10 Muzon
City of San Jose Del Monte, Bulacan
0905-696-6902
lleyir@yahoo.com
PERSONAL SUMMARY:
A results driven, enthusiastic and resourceful quantity surveyor working as part of a busy team
effectively and efficiently managing all the costs relating to building projects. Having a proven track
record of minimizing the costs of a project and enhancing value for money, while still achieving the
required standards and quality. Possessing excellent sagacity & the aptitude to plan ahead when
working on construction projects. Can communicate effectively with developers / contractors &
would be an asset to any employer who respects loyalty & responsibility.
Currently looking for an opportunity to join a dynamic, ambitious and growing company to forge a
career as a first class quantity surveyor.
PERSONAL DATA
Date of Birth : November 01, 1989
Civil Status : Single
Religion : Roman Catholic
Height : 5’1.5”
Weight : 111.33lbs.
Citizenship : Filipino
Gender : Female
Language : Filipino and English
EDUCATIONAL BACKGROUND
Tertiary : Bachelor of Science in Civil Engineering
Bulacan State University
Malolos City, Bulacan
June 2006-April 2011
Secondary : Salvador Araneta Memorial Institute
San Jose Del Monte Bulacan
June 2002-March 2006
Elementary : Muzon Elementary School
San Jose Del Monte Bulacan
June 1995-March 2002
2 | P a g e
SEMINARS AND TRAININGS ATTENDED:
 EmergenCE Plan Natural Disaster Risk Management in the Philippines
Film Inst.,University of the Philippines Diliman Quezon City
July 17 2010
 Geotechnical Engineering:Profession-Equipment-Disasters
Bulacan State University Malolos Bulacan
By Dr. Jonathan Dungca, Geotechnical Engineer
March 19 2011
 Evolution of Structural Design & Designing Efficiency
Bulacan State University Malolos Bulacan
By Engr. Anthony Vladimir Pimentel, ASEP-President
January 8 2011
 Integrated Management System Series
Unit 2E Queensland Bldg. Cagayan St. Bago Bantay
Quezon City
By Engr. Martin Arellano
June 30, 2012
 On the job training
Freyssinet Filipinas, Project: One Global at Taguig City Metro Manila
April 19 2010 - May 22 of 2010
 SAP MM Training
Training Room, Building 5
July 01, 2015
PROFESSIONAL EXPERIENCE:
Makati Development Corporation
Sr. Quantity Surveyor
May 2013 – Present
Working as part of a busy team, taking responsibility for several schemes at differing stages and
working with limited supervision. The workload includes Enabling, Civil / Structural, Architectural
and MEFPS works for infrastructure, new car parks, retail areas and condominiums.
Duties:
 Complete Pre Contract & Post Contract management from the point of Kick off meeting
 Studying the tender documents & BOQ and raising for variations.
 Calculating complete Project Quantity Take off and preparing the Contract BOQ comparing
with Tendered BOQ for variations.
 Calculate and Cost Planning for Formworks, Concreting, Rebar Cutting list, Structural steel,
Block works, Plastering, Painting, Architectural Works, Mechanical, Electrical Plumbing,
Fire Protection, FDAS & Security System.
 Preparation of (CTCs) Cost to Completes and (CVRs) Cost Value Reconciliations for the
completed Projects with monthly updates to check tendered margin vs. target margin %.
 Following up with the client business department to receive the advance / progress payments
in time.
 Updating Contract Performance Reports (CPRs) monthly for management review.
3 | P a g e
 Identifying, managing and processing of Change Order to Owner and to Sub-contractors.
 Dealing with the System of Site Instructions (SI) – Change Request (CR) - Change
Proposal (CP)–CHANGE ORDERs (CO).
 Maintaining the Payment Tracking Log for all the variations works / Change Orders
 Raising requests /reminders for obtaining Practical Completion Certificates (PCC) or Final
Take over Certificates for Retention amount claims and request for payments
correspondences clients.
 Reviewing the material specifications to be within allowable budget prior to material approval
transmittal/ before client approvals.
 Timely submission of Interim Payment applications with Valuations Report to Clients and
expedite timely receipt of certificates and payments.
 Maintain or obtain site record photographs to support variations, extras or claims.
 Keen attention on Escalations, Fixed prices, Payment Claims, Variations, Retentions, Bank
Guarantees, Back Charges, Liquidated Ascertain Damages, etc.
 Coordinate with procurement & accounting department for all resemblance of documents such
as LPOs, invoice, Payments, Cheques etc.
 To undertake accurate Quantity take offs and Preparing Bills of Quantity from CD to FCD
Drawings for Variations.
 Evaluation and Certification of Subcontractor Payments Invoices.
 Subcontractor Payment Certification & issuing Interim payment certificates (IPC) by
retaining as per the contract conditions like Advance Payments, retentions, discounts and Tax
Holdings etc.
 Preparing the Statement of Final Accounting to Subcontractor considering all the variations.
 To manage all contractual matters relating to the Main Contract and Subcontracts and to keep
the
Commercial Manager Review concerning such contractual matters.
 To liaise with proposed nominated subcontractors, prepare risk/vendor analysis for
management review based on previous performances.
 To reconcile actual bulk material quantities against Tender and Contract documents and
Preparation of Reconciliations for Client vs. Sub-contractor paid quantities, all major Bulk
Materials.
 To monitor site expenditure and advice on risk areas or cost over-run items by complete
 Forecasting for Preliminary, Manpower, Material, Plant & Machinery Cost.
 Obtaining daily reports from site and converting to Weekly/ Monthly progress reports for
management review.
 Prepare and maintain budgets, estimates, cash flow forecasts, cost reports.
 Resources Cost vs. Value: Labor, equipment, materials, subcontractors, and any other cost
detail items.
 Verify and approve Sub-Contractors measurement sheet.
 Sound Knowledge on pre and post contract administration for different contract types
 Ensure the submission of insurances/bonds in accordance with the contract
 Having professional knowledge and skills in using relevant computer software.
 Maintain proper logs for subcontracts; purchase orders, subcontractors and suppliers payment
certificates, prepared/submitted/approved calculation sheets, subcontractors variations etc.
 Identify possible areas of dispute among the Contractor and Sub Contractor(s) and take the
necessary proactive measures.
 Monitoring of actual material, labor cost spent against forecasted materials and man hour
usages.
4 | P a g e
PROJECT DETAILS
PROJECT TITLE DESCRIPTION
LOCATIO
N
CLIENT
COMMENCEME
NT DATE
COMPLETION
DATE
CONTRACT
AMOUNT
(PHP)
AYALA
REDEVELOPME
NT
STREETSCAPE
PRIORITY C & D
Civil works,
Road
expansion &
restoration,
Installation of
Traffic
Lighting and
PED Signal
System,
Pavement
Markings,
Granite works
and
Wayfinding
Pylon
AYALA
CENTER,
MAKATI
CITY
AYALA LAND
INC.
01-May-13 01-Dec-13 114,576,721.3
9
LOT H TRANSIT
TERMINAL
STRUCTURAL
STEEL CAR
PARK WITH
RETAIL AREA
A.
ARNAIZ
AVENUE,
AYALA
CENTER,
MAKATI
CITY
AYALA LAND
INC.
25-Jun-13 31-Mar-14 412,557,669.3
5
& STEEL
PARKING
BUILDING
TWO ROXAS
TRIANGLE
PROJECT
55 FLOORS
CONDUMINIU
M W/ 4
BASEMENT
AREAS
PASEO
DE
ROXAS,
CRUZAD
A
STREET,
MAKATI
AVE.,
MAKATI
CITY
AYALA LAND
INC. & ROXAS
LAND
INC/HONGKO
NG LAND
02-Nov-13 30-Jun-18 5,288,195,086.
73
T.N. Ramos Const. Dev. & Corp.
Project Engineer/Office Engineer
July 2011 – May 2013
Ensuring that all engineering work is carried out in accordance with specifications, statutory
requirements, laws, rules, regulations and other contractual requirements. With due regards to safety,
operability and maintainability. The workload includes pipe laying and road restoration works under
Maynilad Water Services.
Duties:
 Prepare BQ and cost all the quantities.
 Detailed and accurate quantity and measurement take-off.
 Identifying, managing and processing of Change Order to Owner and to Sub-contractors.
 Processing of Interim Valuation to Owner and to Sub-contractors.
 Preparation of Progress and As-Built Drawings.
5 | P a g e
 Managing projects from conception, pre-production through to completion.
 Providing technical support to the project team.
 Responsible for overseeing the review, initiation and execution of contracts.
 Managing project budgets and keeping costs down.
 Overseeing the maintenance of projects after completion.
 Responsible for the completion of all documentation.
 Producing Test Plans and reports.
 Prepare contract documentation for procurement services and materials.
 Carrying out effective client liaison for all projects undertaken.
 Liaising with customers on a regular basis to ensure the successful design and manufacture of
products to agreed budgets and time frames.
PROJECT DETAILS
CONTRACT NO. LOCATION PROJECT TITLE NTP
COMPLETION
DATE AMOUNT
3R-11-CL-HA32-Z05-09 BF RESORT
2011 PIPE EXPANSION
PROJECT FOR (HA-32,
CLP-Z5) SUPPLY LINES
FOR BF RESORT SUBD.
UNDER CAVITE-LAS
PINAS BA 9/21/2011 2/11/2012 120,494,541.40
3R-12-CL-HA28-Z01-02
ANIBAN-
MOLINO
PROPOSED 2012 PIPE
EXPANSION PROJ. FOR
(HA-28, CLP-Z1)
UNDER CAVITE-LAS
PIÑAS B.A. (OPEN
COMMUNITY)
PACKAGE 2 5/7/2012 01/15/2013 37,000,000.00
KEY SKILLS AND COMPETENCIES
 Experience of the tender stage & of dealing with procurement issues.
 Experience of working on civil engineering projects.
 Experience at Section QS level.
 Comprehensive understanding of statutory building regulations.
 Excellent working knowledge of commercial procedures.
 Knowledge of SAP, computerized cost capture & value monitoring systems.
 Thorough knowledge of Company health, safety, quality and environment procedures.
 Knowledge in Auto Cad operation.
 Knowledge in MS Project
 Knowledge in Basic Surveying
AREAS OF EXPERTISE
 Value management
 Cost control
 Procurement strategy
 Building Substructure
6 | P a g e
ANNA RIYELL A. DE LARA
Signature Over Printed Name
 Change control
 Infrastructure
 Project management
 Water-related schemes
PERSONAL SKILLS
 Strategic planner
 Organized
 Analytical
CHARCTER REFERENCES:
Engr. Kristine C. Geronimo
Quantity Surveyor – Makati Development Corp.
425 Bambang, Bocaue,
Bulacan
09363425727 / 09335744333
Mr. Ryan Joseph R. Capuno
PHR Supervisor – Makati Development Corp.
Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave.,
Makati City
09058603881 / (02) 975-69-62
Engr. Mara Rosa B. Verdan
Q.A. Engineer - Makati Development Corp.
Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave.,
Makati City
09256882542 / 09271290452 / (02) 975-69-62
I HEREBY CERTIFY that the above information is true and correct to the best of my knowledge and
belief.

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
151213CS2426993.2 (1)
151213CS2426993.2 (1)151213CS2426993.2 (1)
151213CS2426993.2 (1)
 
Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015
 
Unnikrishnan_CV-
Unnikrishnan_CV-Unnikrishnan_CV-
Unnikrishnan_CV-
 
Deepak Grover
Deepak GroverDeepak Grover
Deepak Grover
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
William keane. 03.25.2016 final
William keane. 03.25.2016 finalWilliam keane. 03.25.2016 final
William keane. 03.25.2016 final
 
Homer CV - CA2
Homer CV - CA2Homer CV - CA2
Homer CV - CA2
 
Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
 
Mar Dedal Portfolio
Mar Dedal PortfolioMar Dedal Portfolio
Mar Dedal Portfolio
 
cv 2015
cv 2015cv 2015
cv 2015
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)Resume-1- Ashraf Khan (1)
Resume-1- Ashraf Khan (1)
 
Abdul Muqeet CV Latest
Abdul Muqeet CV LatestAbdul Muqeet CV Latest
Abdul Muqeet CV Latest
 
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUARCV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
CV August 2016 - WAN MUHAMMAD ISA B. WAN AHMAD ANUAR
 
Resume - R1.Docx
Resume - R1.DocxResume - R1.Docx
Resume - R1.Docx
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 
111
111111
111
 
Khaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 FinalKhaled Last updated CV 15-9-2014 Final
Khaled Last updated CV 15-9-2014 Final
 

Andere mochten auch

Entrenamiento aerobico da menos calorias
Entrenamiento aerobico da menos caloriasEntrenamiento aerobico da menos calorias
Entrenamiento aerobico da menos caloriasJavier Capucho Cardenas
 
Central Park Fleur Villas
Central Park Fleur VillasCentral Park Fleur Villas
Central Park Fleur VillasManish Kumar
 
Predict future-make-decision
Predict future-make-decisionPredict future-make-decision
Predict future-make-decisionderosaMSKCC
 
portfolio Ellen basisschoollessen
portfolio Ellen basisschoollessenportfolio Ellen basisschoollessen
portfolio Ellen basisschoollessenEllenWelschen
 
මාස-60-කින-අලුත-රටක
මාස-60-කින-අලුත-රටකමාස-60-කින-අලුත-රටක
මාස-60-කින-අලුත-රටකsinhalasongs
 
Alloy Cybersecurity Intro
Alloy Cybersecurity IntroAlloy Cybersecurity Intro
Alloy Cybersecurity IntroMark Stockman
 
LTspice getting started guide [2011]
LTspice getting started guide [2011]LTspice getting started guide [2011]
LTspice getting started guide [2011]Sunu Pradana
 
Panel 2 - Goods & Services Tax (GST)
Panel 2 - Goods & Services Tax (GST)Panel 2 - Goods & Services Tax (GST)
Panel 2 - Goods & Services Tax (GST)taxsutra
 
Penggunaan layanan Google
Penggunaan layanan GooglePenggunaan layanan Google
Penggunaan layanan GoogleSunu Pradana
 
Benami transaction amendments comparison 2016
Benami transaction amendments comparison 2016 Benami transaction amendments comparison 2016
Benami transaction amendments comparison 2016 GAURAV KR SHARMA
 

Andere mochten auch (17)

Lima-Zarate
Lima-ZarateLima-Zarate
Lima-Zarate
 
Entrenamiento aerobico da menos calorias
Entrenamiento aerobico da menos caloriasEntrenamiento aerobico da menos calorias
Entrenamiento aerobico da menos calorias
 
Central Park Fleur Villas
Central Park Fleur VillasCentral Park Fleur Villas
Central Park Fleur Villas
 
Trust Issues
Trust IssuesTrust Issues
Trust Issues
 
jhkj
jhkjjhkj
jhkj
 
Predict future-make-decision
Predict future-make-decisionPredict future-make-decision
Predict future-make-decision
 
portfolio Ellen basisschoollessen
portfolio Ellen basisschoollessenportfolio Ellen basisschoollessen
portfolio Ellen basisschoollessen
 
scilab
scilabscilab
scilab
 
Observaciones sobre la Prueba Nacional...
Observaciones sobre la Prueba Nacional...Observaciones sobre la Prueba Nacional...
Observaciones sobre la Prueba Nacional...
 
මාස-60-කින-අලුත-රටක
මාස-60-කින-අලුත-රටකමාස-60-කින-අලුත-රටක
මාස-60-කින-අලුත-රටක
 
Alloy Cybersecurity Intro
Alloy Cybersecurity IntroAlloy Cybersecurity Intro
Alloy Cybersecurity Intro
 
Aquaponics Egypt
Aquaponics EgyptAquaponics Egypt
Aquaponics Egypt
 
LTspice getting started guide [2011]
LTspice getting started guide [2011]LTspice getting started guide [2011]
LTspice getting started guide [2011]
 
Panel 2 - Goods & Services Tax (GST)
Panel 2 - Goods & Services Tax (GST)Panel 2 - Goods & Services Tax (GST)
Panel 2 - Goods & Services Tax (GST)
 
Penggunaan layanan Google
Penggunaan layanan GooglePenggunaan layanan Google
Penggunaan layanan Google
 
Benami transaction amendments comparison 2016
Benami transaction amendments comparison 2016 Benami transaction amendments comparison 2016
Benami transaction amendments comparison 2016
 
Office of CFO
Office of CFOOffice of CFO
Office of CFO
 

Ähnlich wie Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)

Ähnlich wie Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16) (20)

Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2Luvuyo Sankqela CV rev 2
Luvuyo Sankqela CV rev 2
 
Resume 082516
Resume 082516Resume 082516
Resume 082516
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Resume 12-10-14
Resume 12-10-14Resume 12-10-14
Resume 12-10-14
 
OLANREWAJU'S CV
OLANREWAJU'S CVOLANREWAJU'S CV
OLANREWAJU'S CV
 
Compliance_Manager_C.V.
Compliance_Manager_C.V.Compliance_Manager_C.V.
Compliance_Manager_C.V.
 
2015 CV
2015 CV 2015 CV
2015 CV
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
Karen Sevillano CV QS
Karen Sevillano CV QSKaren Sevillano CV QS
Karen Sevillano CV QS
 
Wilson Bentonio
Wilson BentonioWilson Bentonio
Wilson Bentonio
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Paulette Shuttleworth CV - 21.09.15 (LinkedIn)
Paulette Shuttleworth CV - 21.09.15 (LinkedIn)Paulette Shuttleworth CV - 21.09.15 (LinkedIn)
Paulette Shuttleworth CV - 21.09.15 (LinkedIn)
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Anil Resume
Anil ResumeAnil Resume
Anil Resume
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Resume
ResumeResume
Resume
 
Curriculum Vitae Suzette 20160726
Curriculum Vitae Suzette 20160726Curriculum Vitae Suzette 20160726
Curriculum Vitae Suzette 20160726
 
Updated aded cv 4-12-2017
Updated aded cv 4-12-2017Updated aded cv 4-12-2017
Updated aded cv 4-12-2017
 

Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)

  • 1. 1 | P a g e ANNA RIYELL ARRABIS DE LARA QUANTITY SURVEYOR Lapoblacion ph3C b14 l10 Muzon City of San Jose Del Monte, Bulacan 0905-696-6902 lleyir@yahoo.com PERSONAL SUMMARY: A results driven, enthusiastic and resourceful quantity surveyor working as part of a busy team effectively and efficiently managing all the costs relating to building projects. Having a proven track record of minimizing the costs of a project and enhancing value for money, while still achieving the required standards and quality. Possessing excellent sagacity & the aptitude to plan ahead when working on construction projects. Can communicate effectively with developers / contractors & would be an asset to any employer who respects loyalty & responsibility. Currently looking for an opportunity to join a dynamic, ambitious and growing company to forge a career as a first class quantity surveyor. PERSONAL DATA Date of Birth : November 01, 1989 Civil Status : Single Religion : Roman Catholic Height : 5’1.5” Weight : 111.33lbs. Citizenship : Filipino Gender : Female Language : Filipino and English EDUCATIONAL BACKGROUND Tertiary : Bachelor of Science in Civil Engineering Bulacan State University Malolos City, Bulacan June 2006-April 2011 Secondary : Salvador Araneta Memorial Institute San Jose Del Monte Bulacan June 2002-March 2006 Elementary : Muzon Elementary School San Jose Del Monte Bulacan June 1995-March 2002
  • 2. 2 | P a g e SEMINARS AND TRAININGS ATTENDED:  EmergenCE Plan Natural Disaster Risk Management in the Philippines Film Inst.,University of the Philippines Diliman Quezon City July 17 2010  Geotechnical Engineering:Profession-Equipment-Disasters Bulacan State University Malolos Bulacan By Dr. Jonathan Dungca, Geotechnical Engineer March 19 2011  Evolution of Structural Design & Designing Efficiency Bulacan State University Malolos Bulacan By Engr. Anthony Vladimir Pimentel, ASEP-President January 8 2011  Integrated Management System Series Unit 2E Queensland Bldg. Cagayan St. Bago Bantay Quezon City By Engr. Martin Arellano June 30, 2012  On the job training Freyssinet Filipinas, Project: One Global at Taguig City Metro Manila April 19 2010 - May 22 of 2010  SAP MM Training Training Room, Building 5 July 01, 2015 PROFESSIONAL EXPERIENCE: Makati Development Corporation Sr. Quantity Surveyor May 2013 – Present Working as part of a busy team, taking responsibility for several schemes at differing stages and working with limited supervision. The workload includes Enabling, Civil / Structural, Architectural and MEFPS works for infrastructure, new car parks, retail areas and condominiums. Duties:  Complete Pre Contract & Post Contract management from the point of Kick off meeting  Studying the tender documents & BOQ and raising for variations.  Calculating complete Project Quantity Take off and preparing the Contract BOQ comparing with Tendered BOQ for variations.  Calculate and Cost Planning for Formworks, Concreting, Rebar Cutting list, Structural steel, Block works, Plastering, Painting, Architectural Works, Mechanical, Electrical Plumbing, Fire Protection, FDAS & Security System.  Preparation of (CTCs) Cost to Completes and (CVRs) Cost Value Reconciliations for the completed Projects with monthly updates to check tendered margin vs. target margin %.  Following up with the client business department to receive the advance / progress payments in time.  Updating Contract Performance Reports (CPRs) monthly for management review.
  • 3. 3 | P a g e  Identifying, managing and processing of Change Order to Owner and to Sub-contractors.  Dealing with the System of Site Instructions (SI) – Change Request (CR) - Change Proposal (CP)–CHANGE ORDERs (CO).  Maintaining the Payment Tracking Log for all the variations works / Change Orders  Raising requests /reminders for obtaining Practical Completion Certificates (PCC) or Final Take over Certificates for Retention amount claims and request for payments correspondences clients.  Reviewing the material specifications to be within allowable budget prior to material approval transmittal/ before client approvals.  Timely submission of Interim Payment applications with Valuations Report to Clients and expedite timely receipt of certificates and payments.  Maintain or obtain site record photographs to support variations, extras or claims.  Keen attention on Escalations, Fixed prices, Payment Claims, Variations, Retentions, Bank Guarantees, Back Charges, Liquidated Ascertain Damages, etc.  Coordinate with procurement & accounting department for all resemblance of documents such as LPOs, invoice, Payments, Cheques etc.  To undertake accurate Quantity take offs and Preparing Bills of Quantity from CD to FCD Drawings for Variations.  Evaluation and Certification of Subcontractor Payments Invoices.  Subcontractor Payment Certification & issuing Interim payment certificates (IPC) by retaining as per the contract conditions like Advance Payments, retentions, discounts and Tax Holdings etc.  Preparing the Statement of Final Accounting to Subcontractor considering all the variations.  To manage all contractual matters relating to the Main Contract and Subcontracts and to keep the Commercial Manager Review concerning such contractual matters.  To liaise with proposed nominated subcontractors, prepare risk/vendor analysis for management review based on previous performances.  To reconcile actual bulk material quantities against Tender and Contract documents and Preparation of Reconciliations for Client vs. Sub-contractor paid quantities, all major Bulk Materials.  To monitor site expenditure and advice on risk areas or cost over-run items by complete  Forecasting for Preliminary, Manpower, Material, Plant & Machinery Cost.  Obtaining daily reports from site and converting to Weekly/ Monthly progress reports for management review.  Prepare and maintain budgets, estimates, cash flow forecasts, cost reports.  Resources Cost vs. Value: Labor, equipment, materials, subcontractors, and any other cost detail items.  Verify and approve Sub-Contractors measurement sheet.  Sound Knowledge on pre and post contract administration for different contract types  Ensure the submission of insurances/bonds in accordance with the contract  Having professional knowledge and skills in using relevant computer software.  Maintain proper logs for subcontracts; purchase orders, subcontractors and suppliers payment certificates, prepared/submitted/approved calculation sheets, subcontractors variations etc.  Identify possible areas of dispute among the Contractor and Sub Contractor(s) and take the necessary proactive measures.  Monitoring of actual material, labor cost spent against forecasted materials and man hour usages.
  • 4. 4 | P a g e PROJECT DETAILS PROJECT TITLE DESCRIPTION LOCATIO N CLIENT COMMENCEME NT DATE COMPLETION DATE CONTRACT AMOUNT (PHP) AYALA REDEVELOPME NT STREETSCAPE PRIORITY C & D Civil works, Road expansion & restoration, Installation of Traffic Lighting and PED Signal System, Pavement Markings, Granite works and Wayfinding Pylon AYALA CENTER, MAKATI CITY AYALA LAND INC. 01-May-13 01-Dec-13 114,576,721.3 9 LOT H TRANSIT TERMINAL STRUCTURAL STEEL CAR PARK WITH RETAIL AREA A. ARNAIZ AVENUE, AYALA CENTER, MAKATI CITY AYALA LAND INC. 25-Jun-13 31-Mar-14 412,557,669.3 5 & STEEL PARKING BUILDING TWO ROXAS TRIANGLE PROJECT 55 FLOORS CONDUMINIU M W/ 4 BASEMENT AREAS PASEO DE ROXAS, CRUZAD A STREET, MAKATI AVE., MAKATI CITY AYALA LAND INC. & ROXAS LAND INC/HONGKO NG LAND 02-Nov-13 30-Jun-18 5,288,195,086. 73 T.N. Ramos Const. Dev. & Corp. Project Engineer/Office Engineer July 2011 – May 2013 Ensuring that all engineering work is carried out in accordance with specifications, statutory requirements, laws, rules, regulations and other contractual requirements. With due regards to safety, operability and maintainability. The workload includes pipe laying and road restoration works under Maynilad Water Services. Duties:  Prepare BQ and cost all the quantities.  Detailed and accurate quantity and measurement take-off.  Identifying, managing and processing of Change Order to Owner and to Sub-contractors.  Processing of Interim Valuation to Owner and to Sub-contractors.  Preparation of Progress and As-Built Drawings.
  • 5. 5 | P a g e  Managing projects from conception, pre-production through to completion.  Providing technical support to the project team.  Responsible for overseeing the review, initiation and execution of contracts.  Managing project budgets and keeping costs down.  Overseeing the maintenance of projects after completion.  Responsible for the completion of all documentation.  Producing Test Plans and reports.  Prepare contract documentation for procurement services and materials.  Carrying out effective client liaison for all projects undertaken.  Liaising with customers on a regular basis to ensure the successful design and manufacture of products to agreed budgets and time frames. PROJECT DETAILS CONTRACT NO. LOCATION PROJECT TITLE NTP COMPLETION DATE AMOUNT 3R-11-CL-HA32-Z05-09 BF RESORT 2011 PIPE EXPANSION PROJECT FOR (HA-32, CLP-Z5) SUPPLY LINES FOR BF RESORT SUBD. UNDER CAVITE-LAS PINAS BA 9/21/2011 2/11/2012 120,494,541.40 3R-12-CL-HA28-Z01-02 ANIBAN- MOLINO PROPOSED 2012 PIPE EXPANSION PROJ. FOR (HA-28, CLP-Z1) UNDER CAVITE-LAS PIÑAS B.A. (OPEN COMMUNITY) PACKAGE 2 5/7/2012 01/15/2013 37,000,000.00 KEY SKILLS AND COMPETENCIES  Experience of the tender stage & of dealing with procurement issues.  Experience of working on civil engineering projects.  Experience at Section QS level.  Comprehensive understanding of statutory building regulations.  Excellent working knowledge of commercial procedures.  Knowledge of SAP, computerized cost capture & value monitoring systems.  Thorough knowledge of Company health, safety, quality and environment procedures.  Knowledge in Auto Cad operation.  Knowledge in MS Project  Knowledge in Basic Surveying AREAS OF EXPERTISE  Value management  Cost control  Procurement strategy  Building Substructure
  • 6. 6 | P a g e ANNA RIYELL A. DE LARA Signature Over Printed Name  Change control  Infrastructure  Project management  Water-related schemes PERSONAL SKILLS  Strategic planner  Organized  Analytical CHARCTER REFERENCES: Engr. Kristine C. Geronimo Quantity Surveyor – Makati Development Corp. 425 Bambang, Bocaue, Bulacan 09363425727 / 09335744333 Mr. Ryan Joseph R. Capuno PHR Supervisor – Makati Development Corp. Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave., Makati City 09058603881 / (02) 975-69-62 Engr. Mara Rosa B. Verdan Q.A. Engineer - Makati Development Corp. Two Roxas Triangle, Paseo De Roxas, Cruzada St. Makati Ave., Makati City 09256882542 / 09271290452 / (02) 975-69-62 I HEREBY CERTIFY that the above information is true and correct to the best of my knowledge and belief.