SlideShare ist ein Scribd-Unternehmen logo
1 von 22
1 | P a g e
Multiple Work Center/Resource
Selection and Classification in Master
Recipe for Planning in ECC
By,
Ankit Sharma
SAP PP Consultant
businessconsulting007@gmail.com
+91 – 8888896575 / 8888632763
2 | P a g e
Contents
Introduction ............................................................................................................................................3
Business Scenario....................................................................................................................................3
Create a Characteristic………………………………………………………………………………………………………………………6
Create a Class of type 019………………………………………………………………………………………………………………….8
Assign classification in resource/Work Center………………………………………………………………………………….10
Assign the classification in master recipe and add alternate resources to the operation which can be
used for same activity with same capacity……………………………………………………………………………………….14
Testing the Resource Selection condition…………………………………………………………………………………………19
Error Monitoring & Resolution – Failure Points……………………………………………………………………………….23
3 | P a g e
Summary*
This document is related to Multiple Work Center/Resource Selection during production.
Introduction
Many industries use multiple similar resources to manufacture a product. In industries like
Pharmaceutical, FMCG, chemical industry, there are many Material which can be produced on
different work Center which have the same Capacity. For example, one product can be pack on 9
different packing line.
So the main question arises, should I create 9 routings/Master Recipe and 9 production versions?
OR
Is there any other effective way of dealing with this situation?
Business Scenario: A plant has many Blender, Mixer, and Packing Lines with identical
capacities. A product is chronologically said to be packed on Line 1. Alternatively this product also
can be packed in Line 2 or Line 3 if needed.
On shop-floor, business cannot determine the primary resource to be used until shortly before order
processing. But in mid to long term planning, they want to assign a suitable planning resource to the
operations provisionally.
Please refer the below image for above scenario:
4 | P a g e
The constraint for long term planning needs to be on planning resource. In short term the flexibility
needs to be given for resource selection based on SKU. This can be mapped in different ways in SAP.
1. Multiple production Versions with multiple master recipe
This method is most widely used but requires lengthy master data maintenance as one recipe has to
be created explicitly for each resource and has to be assigned to one production version
respectively.
2. Manual selection in the Order.
The resource is changed manually on the Order. This change requires a single approval process if
ECM to be used. Production Planners will feel as more work and any change which needs a Quality
Approval in GMP environments will take more time to create and release the order for production.
3. Resource Selection through classification.
SAP provides another way of maintaining this alternate resource selection by using resource
classification.
We can use a planning resource as the primary resource and select the alternate resource through
the resource network maintained through work Center classification (type 019). This also works well
with ECM and is a good option for Planners as there is no need of Single Approval from QA
personnel.
5 | P a g e
In this document, we will follow the best approach, i.e. Resource Selection through classification.
We will need to create Characteristic, Class, need to update Work Center, Master Recipe in order to
achieve this solution.
Step 1: Create a Characteristic
Transition Code CT04
You will need to create a Characteristic, which can be assign to the class in Master Recipe and
Resources/Work Center.
Name of Characteristic: SECONDRY_RESOURCE1
Make it as a Character Format and Release the same before saving.
6 | P a g e
**Remember: Under Addnl Data, you will need to define Table Name as CRHD and Field Name as
ARBPL. If you do not define this, you will not be able to assign Resource name under Class in Master
Recipe and Work Center.
Restrict this Characteristic to be only used in Class of type 019
Save the Characteristic.
7 | P a g e
Step 2: Create a Class of type 019
Transition Code CL01
You will need to create Class, to which you can assign Characteristic and later on can assign it to
Master Recipe and Work Center.
Characteristic Name: ZSEC_RES_CLASS
Class Type: 019
Under Keyword tab, write a match code “Selection”. This String is used for finding a class
via match code.
The description you entered on the basic data screen serves as the first keyword.
8 | P a g e
Assign Characteristic to the Class
Save the Class
9 | P a g e
Step 3: Assign classification in resource/Work Center
Transition Code: CRC2
Click on Classification Tab to insert Class or can navigate it from Extra -> Classification
10 | P a g e
You will need to enter the Class ZSEC_RES_CLASS.
11 | P a g e
Press Enter. You will able to see Characteristic assign to Class and Resource/Work Center name.
Save the Resource/Work Center.
12 | P a g e
**Note: All relevant alternative work Centers must contain exactly the same classification and
characteristic value assignment. Work Centers with different classes or characteristic values are
ignored.
In this case, we are assigning same Class (ZSEC_RES_CLASS) to multiple resources/work Center.
13 | P a g e
Step 4: Assign the classification in master recipe and add alternate
resources to the operation which can be used for same activity with
same capacity.
Transaction Code: C202
Go to Operation Tab
Select Operation for which you want to assign Multiple Resource.
Select Go To -> Resource Selection Condition
You will need to assign Class - ZSEC_RES_CLASS
14 | P a g e
15 | P a g e
You will also need to assign Multiple Resource.
16 | P a g e
Same process can be done for other Operations
17 | P a g e
Save the Master Recipe
18 | P a g e
Testing the Resource Selection condition:
After assigning Classification to Master Recipe and Work Center we can test the scenario by creating
a Process Order.
Create Process Order
19 | P a g e
Select Operation for which you want to change your Resource
Currently Operation 0020 is using resource SECPACK5 but if this Resource is already blocked and
used by other Order. We can use other resource SECPACK4 which is available.
Go to Operation.
Select the particular operation for which you want to change Work Center.
Select Operation > Function for Phase/ for Operation -> Resource Selection
You will be able to see multiple resource assigned to the Operation.
20 | P a g e
We will be selecting SECPACK4.
At the same point of time, Resource/Work Center will get change in the Process Order.
You can save the Order and proceed your operation on available Work Center/Resource.
21 | P a g e
We can change the resource from this screen by dragging and dropping it to another resource from
the resource section.
Transaction Code – CM25 (Capacity Planning)
Select Profile - SAPSFCG004 (For Process Order)
22 | P a g e
Resource classification automatically creates multiple modes in APO PDS or PPM, so it can be used in
PPDS while converting SNP Plan orders to PPDS plan orders. And in DS board we can schedule the
order on required resource.
If we want to use different capacities for planning, but for execution purpose we only want to use
one resource. So from many lines in midterm planning to accommodate constraints, but for short
term we use single resource for production execution.
Error Monitoring & Resolution – Failure Points
Image of Error while releasing Process
• Resources allocated to the Operation should have same correct class.
• Classification need to be maintain with Correct Class in Master Recipe.
• Mismatch between resource selection and the resource classification
 If only one resource is relevant for each operation, then resource selection criteria/condition
should not be defined for the resource. If you need multiple resource, then only assign
Resource Selection condition.

Weitere ähnliche Inhalte

Was ist angesagt?

Sap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopSap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopKanapon Gunprom
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-ppLokesh Modem
 
201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docsAbhishek Sarkar
 
Sap User Exit for Functional Consultant
Sap User Exit for Functional ConsultantSap User Exit for Functional Consultant
Sap User Exit for Functional ConsultantAnkit Sharma
 
sap variant-configuration
sap variant-configurationsap variant-configuration
sap variant-configurationRafael Guzman
 
SA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdfSA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdfdarshansksk
 
SAP PI Sheet integration with DMS(Document Management System)
SAP PI Sheet integration with DMS(Document Management System)SAP PI Sheet integration with DMS(Document Management System)
SAP PI Sheet integration with DMS(Document Management System)Ankit Sharma
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order WorkflowArghadip Kar
 
Sales and Operation Planning in SAP
Sales and Operation Planning in SAPSales and Operation Planning in SAP
Sales and Operation Planning in SAPAnkit Sharma
 
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingSCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingAJAY
 
A Guide for pi sheet
A Guide for pi sheetA Guide for pi sheet
A Guide for pi sheetSelf Employed
 
Mto end to end process demo
Mto end to end process demoMto end to end process demo
Mto end to end process demoGopi Ponnala
 
Variant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's GuideVariant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's Guidesapdocs. info
 
ABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infoABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infosapdocs. info
 

Was ist angesagt? (20)

Sap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sopSap pp rough cut capacity planning on sop
Sap pp rough cut capacity planning on sop
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
MRP Live on S/4 HANA
MRP Live on S/4 HANAMRP Live on S/4 HANA
MRP Live on S/4 HANA
 
sap-qm-overview
sap-qm-overviewsap-qm-overview
sap-qm-overview
 
201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs
 
Sap User Exit for Functional Consultant
Sap User Exit for Functional ConsultantSap User Exit for Functional Consultant
Sap User Exit for Functional Consultant
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
 
BPD Design Template
BPD Design TemplateBPD Design Template
BPD Design Template
 
sap variant-configuration
sap variant-configurationsap variant-configuration
sap variant-configuration
 
SA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdfSA FOR SUBCONTRACTING IN SAP MM.pdf
SA FOR SUBCONTRACTING IN SAP MM.pdf
 
SAP PI Sheet integration with DMS(Document Management System)
SAP PI Sheet integration with DMS(Document Management System)SAP PI Sheet integration with DMS(Document Management System)
SAP PI Sheet integration with DMS(Document Management System)
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order Workflow
 
Sales and Operation Planning in SAP
Sales and Operation Planning in SAPSales and Operation Planning in SAP
Sales and Operation Planning in SAP
 
Qm sampling scheme
Qm sampling schemeQm sampling scheme
Qm sampling scheme
 
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed SchedulingSCM-APO-PP/DS-Production Planning and Detailed Scheduling
SCM-APO-PP/DS-Production Planning and Detailed Scheduling
 
A Guide for pi sheet
A Guide for pi sheetA Guide for pi sheet
A Guide for pi sheet
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
Mto end to end process demo
Mto end to end process demoMto end to end process demo
Mto end to end process demo
 
Variant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's GuideVariant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's Guide
 
ABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.infoABAP for Beginners - www.sapdocs.info
ABAP for Beginners - www.sapdocs.info
 

Ähnlich wie Multiple Work Center/Resource Selection and Classification in Master Recipe for Planning in ECC

AG_17 Agile Implementation Methodology...
AG_17 Agile Implementation Methodology...AG_17 Agile Implementation Methodology...
AG_17 Agile Implementation Methodology...JosAugustoLemosNeto2
 
J11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxJ11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxArun Obilisetty
 
backlogStroyGrooming.pdf
backlogStroyGrooming.pdfbacklogStroyGrooming.pdf
backlogStroyGrooming.pdfBoykepaulus1
 
SuccessFactors 2H 2021 Sneak Peek by Deloitte Germany
SuccessFactors 2H 2021 Sneak Peek by Deloitte GermanySuccessFactors 2H 2021 Sneak Peek by Deloitte Germany
SuccessFactors 2H 2021 Sneak Peek by Deloitte GermanyChristoph Pohl
 
SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0Argos
 
Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Kamalaksha Das
 
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Pompee Das
 
Want to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notesWant to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notesMohammed Shafeea Haddad
 
Admin Guiding Query Plans
Admin Guiding Query PlansAdmin Guiding Query Plans
Admin Guiding Query Plansrsnarayanan
 
Performance testing checklist.pdf
Performance testing checklist.pdfPerformance testing checklist.pdf
Performance testing checklist.pdfAnuSelvaraj2
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesVikash Karuna
 
Beginners guide to_optimizer
Beginners guide to_optimizerBeginners guide to_optimizer
Beginners guide to_optimizerMaria Colgan
 
Admm crp oracle payroll
Admm crp oracle payrollAdmm crp oracle payroll
Admm crp oracle payrollFeras Ahmad
 
Explain the explain_plan
Explain the explain_planExplain the explain_plan
Explain the explain_planMaria Colgan
 
J54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docxJ54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docxssuser13b4e6
 

Ähnlich wie Multiple Work Center/Resource Selection and Classification in Master Recipe for Planning in ECC (20)

AG_17 Agile Implementation Methodology...
AG_17 Agile Implementation Methodology...AG_17 Agile Implementation Methodology...
AG_17 Agile Implementation Methodology...
 
J11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxJ11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docx
 
backlogStroyGrooming.pdf
backlogStroyGrooming.pdfbacklogStroyGrooming.pdf
backlogStroyGrooming.pdf
 
Closing cockpit v 1.3
Closing cockpit v 1.3Closing cockpit v 1.3
Closing cockpit v 1.3
 
SuccessFactors 2H 2021 Sneak Peek by Deloitte Germany
SuccessFactors 2H 2021 Sneak Peek by Deloitte GermanySuccessFactors 2H 2021 Sneak Peek by Deloitte Germany
SuccessFactors 2H 2021 Sneak Peek by Deloitte Germany
 
SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0SAP Performance Testing Best Practice Guide v1.0
SAP Performance Testing Best Practice Guide v1.0
 
Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02Sap performance testing best practice guidev1 0-130121141448-phpapp02
Sap performance testing best practice guidev1 0-130121141448-phpapp02
 
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
Sapperformancetestingbestpracticeguidev1 0-130121141448-phpapp02
 
Want to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notesWant to be a (PMP)® with 1250 memorizing notes
Want to be a (PMP)® with 1250 memorizing notes
 
Admin Guiding Query Plans
Admin Guiding Query PlansAdmin Guiding Query Plans
Admin Guiding Query Plans
 
Performance testing checklist.pdf
Performance testing checklist.pdfPerformance testing checklist.pdf
Performance testing checklist.pdf
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization Techniques
 
Beginners guide to_optimizer
Beginners guide to_optimizerBeginners guide to_optimizer
Beginners guide to_optimizer
 
TFS session
TFS sessionTFS session
TFS session
 
Tfs session
Tfs sessionTfs session
Tfs session
 
Admm crp oracle payroll
Admm crp oracle payrollAdmm crp oracle payroll
Admm crp oracle payroll
 
Explain the explain_plan
Explain the explain_planExplain the explain_plan
Explain the explain_plan
 
J54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docxJ54_S4CLD2108_BPD_EN_US.docx
J54_S4CLD2108_BPD_EN_US.docx
 
Achievement Archive
Achievement ArchiveAchievement Archive
Achievement Archive
 
VCP Roadmap
VCP RoadmapVCP Roadmap
VCP Roadmap
 

Mehr von Ankit Sharma

Dynamic Function Call in PI Sheet (XStep)
Dynamic Function Call in PI Sheet (XStep)Dynamic Function Call in PI Sheet (XStep)
Dynamic Function Call in PI Sheet (XStep)Ankit Sharma
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
 
SAP PI Sheet (Xstep) integration with Weighing Machine/Scale
SAP PI Sheet (Xstep) integration with Weighing Machine/ScaleSAP PI Sheet (Xstep) integration with Weighing Machine/Scale
SAP PI Sheet (Xstep) integration with Weighing Machine/ScaleAnkit Sharma
 
Learn Process order confirmation via XStep and PI sheet
Learn Process order confirmation via XStep and PI sheetLearn Process order confirmation via XStep and PI sheet
Learn Process order confirmation via XStep and PI sheetAnkit Sharma
 
SAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPSAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPAnkit Sharma
 
Good Receipt via XStep - Process Management
Good Receipt via XStep - Process ManagementGood Receipt via XStep - Process Management
Good Receipt via XStep - Process ManagementAnkit Sharma
 
Learn good issue via X-step
Learn good issue via X-step Learn good issue via X-step
Learn good issue via X-step Ankit Sharma
 
Create SAP Xstep - SAP PP-PI
Create SAP Xstep - SAP PP-PICreate SAP Xstep - SAP PP-PI
Create SAP Xstep - SAP PP-PIAnkit Sharma
 
SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide Ankit Sharma
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture Ankit Sharma
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
SAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantSAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantAnkit Sharma
 
ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System Ankit Sharma
 

Mehr von Ankit Sharma (14)

Dynamic Function Call in PI Sheet (XStep)
Dynamic Function Call in PI Sheet (XStep)Dynamic Function Call in PI Sheet (XStep)
Dynamic Function Call in PI Sheet (XStep)
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
SAP PI Sheet (Xstep) integration with Weighing Machine/Scale
SAP PI Sheet (Xstep) integration with Weighing Machine/ScaleSAP PI Sheet (Xstep) integration with Weighing Machine/Scale
SAP PI Sheet (Xstep) integration with Weighing Machine/Scale
 
Learn Process order confirmation via XStep and PI sheet
Learn Process order confirmation via XStep and PI sheetLearn Process order confirmation via XStep and PI sheet
Learn Process order confirmation via XStep and PI sheet
 
SAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPSAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOP
 
One Page Resume
One Page ResumeOne Page Resume
One Page Resume
 
Good Receipt via XStep - Process Management
Good Receipt via XStep - Process ManagementGood Receipt via XStep - Process Management
Good Receipt via XStep - Process Management
 
Learn good issue via X-step
Learn good issue via X-step Learn good issue via X-step
Learn good issue via X-step
 
Create SAP Xstep - SAP PP-PI
Create SAP Xstep - SAP PP-PICreate SAP Xstep - SAP PP-PI
Create SAP Xstep - SAP PP-PI
 
SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide SAP GUI and Navigation - Quick Guide
SAP GUI and Navigation - Quick Guide
 
SAP Overview and Architecture
SAP Overview and ArchitectureSAP Overview and Architecture
SAP Overview and Architecture
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
SAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional ConsultantSAP BADI Implementation Learning for Functional Consultant
SAP BADI Implementation Learning for Functional Consultant
 
ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System ASAP Methodology for Implementing SAP System
ASAP Methodology for Implementing SAP System
 

Kürzlich hochgeladen

Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 

Kürzlich hochgeladen (20)

Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 

Multiple Work Center/Resource Selection and Classification in Master Recipe for Planning in ECC

  • 1. 1 | P a g e Multiple Work Center/Resource Selection and Classification in Master Recipe for Planning in ECC By, Ankit Sharma SAP PP Consultant businessconsulting007@gmail.com +91 – 8888896575 / 8888632763
  • 2. 2 | P a g e Contents Introduction ............................................................................................................................................3 Business Scenario....................................................................................................................................3 Create a Characteristic………………………………………………………………………………………………………………………6 Create a Class of type 019………………………………………………………………………………………………………………….8 Assign classification in resource/Work Center………………………………………………………………………………….10 Assign the classification in master recipe and add alternate resources to the operation which can be used for same activity with same capacity……………………………………………………………………………………….14 Testing the Resource Selection condition…………………………………………………………………………………………19 Error Monitoring & Resolution – Failure Points……………………………………………………………………………….23
  • 3. 3 | P a g e Summary* This document is related to Multiple Work Center/Resource Selection during production. Introduction Many industries use multiple similar resources to manufacture a product. In industries like Pharmaceutical, FMCG, chemical industry, there are many Material which can be produced on different work Center which have the same Capacity. For example, one product can be pack on 9 different packing line. So the main question arises, should I create 9 routings/Master Recipe and 9 production versions? OR Is there any other effective way of dealing with this situation? Business Scenario: A plant has many Blender, Mixer, and Packing Lines with identical capacities. A product is chronologically said to be packed on Line 1. Alternatively this product also can be packed in Line 2 or Line 3 if needed. On shop-floor, business cannot determine the primary resource to be used until shortly before order processing. But in mid to long term planning, they want to assign a suitable planning resource to the operations provisionally. Please refer the below image for above scenario:
  • 4. 4 | P a g e The constraint for long term planning needs to be on planning resource. In short term the flexibility needs to be given for resource selection based on SKU. This can be mapped in different ways in SAP. 1. Multiple production Versions with multiple master recipe This method is most widely used but requires lengthy master data maintenance as one recipe has to be created explicitly for each resource and has to be assigned to one production version respectively. 2. Manual selection in the Order. The resource is changed manually on the Order. This change requires a single approval process if ECM to be used. Production Planners will feel as more work and any change which needs a Quality Approval in GMP environments will take more time to create and release the order for production. 3. Resource Selection through classification. SAP provides another way of maintaining this alternate resource selection by using resource classification. We can use a planning resource as the primary resource and select the alternate resource through the resource network maintained through work Center classification (type 019). This also works well with ECM and is a good option for Planners as there is no need of Single Approval from QA personnel.
  • 5. 5 | P a g e In this document, we will follow the best approach, i.e. Resource Selection through classification. We will need to create Characteristic, Class, need to update Work Center, Master Recipe in order to achieve this solution. Step 1: Create a Characteristic Transition Code CT04 You will need to create a Characteristic, which can be assign to the class in Master Recipe and Resources/Work Center. Name of Characteristic: SECONDRY_RESOURCE1 Make it as a Character Format and Release the same before saving.
  • 6. 6 | P a g e **Remember: Under Addnl Data, you will need to define Table Name as CRHD and Field Name as ARBPL. If you do not define this, you will not be able to assign Resource name under Class in Master Recipe and Work Center. Restrict this Characteristic to be only used in Class of type 019 Save the Characteristic.
  • 7. 7 | P a g e Step 2: Create a Class of type 019 Transition Code CL01 You will need to create Class, to which you can assign Characteristic and later on can assign it to Master Recipe and Work Center. Characteristic Name: ZSEC_RES_CLASS Class Type: 019 Under Keyword tab, write a match code “Selection”. This String is used for finding a class via match code. The description you entered on the basic data screen serves as the first keyword.
  • 8. 8 | P a g e Assign Characteristic to the Class Save the Class
  • 9. 9 | P a g e Step 3: Assign classification in resource/Work Center Transition Code: CRC2 Click on Classification Tab to insert Class or can navigate it from Extra -> Classification
  • 10. 10 | P a g e You will need to enter the Class ZSEC_RES_CLASS.
  • 11. 11 | P a g e Press Enter. You will able to see Characteristic assign to Class and Resource/Work Center name. Save the Resource/Work Center.
  • 12. 12 | P a g e **Note: All relevant alternative work Centers must contain exactly the same classification and characteristic value assignment. Work Centers with different classes or characteristic values are ignored. In this case, we are assigning same Class (ZSEC_RES_CLASS) to multiple resources/work Center.
  • 13. 13 | P a g e Step 4: Assign the classification in master recipe and add alternate resources to the operation which can be used for same activity with same capacity. Transaction Code: C202 Go to Operation Tab Select Operation for which you want to assign Multiple Resource. Select Go To -> Resource Selection Condition You will need to assign Class - ZSEC_RES_CLASS
  • 14. 14 | P a g e
  • 15. 15 | P a g e You will also need to assign Multiple Resource.
  • 16. 16 | P a g e Same process can be done for other Operations
  • 17. 17 | P a g e Save the Master Recipe
  • 18. 18 | P a g e Testing the Resource Selection condition: After assigning Classification to Master Recipe and Work Center we can test the scenario by creating a Process Order. Create Process Order
  • 19. 19 | P a g e Select Operation for which you want to change your Resource Currently Operation 0020 is using resource SECPACK5 but if this Resource is already blocked and used by other Order. We can use other resource SECPACK4 which is available. Go to Operation. Select the particular operation for which you want to change Work Center. Select Operation > Function for Phase/ for Operation -> Resource Selection You will be able to see multiple resource assigned to the Operation.
  • 20. 20 | P a g e We will be selecting SECPACK4. At the same point of time, Resource/Work Center will get change in the Process Order. You can save the Order and proceed your operation on available Work Center/Resource.
  • 21. 21 | P a g e We can change the resource from this screen by dragging and dropping it to another resource from the resource section. Transaction Code – CM25 (Capacity Planning) Select Profile - SAPSFCG004 (For Process Order)
  • 22. 22 | P a g e Resource classification automatically creates multiple modes in APO PDS or PPM, so it can be used in PPDS while converting SNP Plan orders to PPDS plan orders. And in DS board we can schedule the order on required resource. If we want to use different capacities for planning, but for execution purpose we only want to use one resource. So from many lines in midterm planning to accommodate constraints, but for short term we use single resource for production execution. Error Monitoring & Resolution – Failure Points Image of Error while releasing Process • Resources allocated to the Operation should have same correct class. • Classification need to be maintain with Correct Class in Master Recipe. • Mismatch between resource selection and the resource classification  If only one resource is relevant for each operation, then resource selection criteria/condition should not be defined for the resource. If you need multiple resource, then only assign Resource Selection condition.