SlideShare ist ein Scribd-Unternehmen logo
1 von 10
Downloaden Sie, um offline zu lesen
Site Name : BARAUN
Site ID : I-MP-SIUR-ENB-6002
1 Initial On Air
Rev. No Date Reason for issue Samsung Signature RJIL Signature
Appendix -B
DATE:
I-MP-SIUR-ENB-6002 MP5SRMR003B-36 I-MP-SIUR-ENB-6002
BARAUN Baraun BARAUN
2008-06-28 2015-07-27
24.74846 24.74846 24.74846
81.28663 81.28661 81.28663
GBT GBT GBT
(m) 0.0 0.0 0.0
(m) 31.0 35.0 31.0
FDD LTE GSM TDD LTE
(MHz) 1823.6 941.2 2342.5
1 4 1
ACE,XXDWH-17-65I-VT
XAHT-XAHT-
HTDBSW086517
ACE,XXDWH-17-65I-VT
(dBi) 16.4 17.5 16.4
(deg) 2.0 3.0 4.0
(deg) 7.7 7.0 7.2
(dB) 15.0 15.0 15.0
(dBm) 46.0 43.0 46.0
(dB) 0.0 1.5 0.0
(m) 2.0 42.0 2.0
(dB/100m) 15.5 3.62 18.2
(W) 1545.25 559.71 1512.17
1.0 0.9 1.0
1.0 0.9 1.0
(W) 0 1360.1 0
(W) 1545.25 1919.81 1512.17
Date of first radiation in respect of BTS ID I-MP-SIUR-ENB-6002 is 15/12/2015
TECHNICALPARAMETER
System Type (GSM/CDMA/UMTS/LTE)
Base Channel Frequency
Carriers /Sector (worst)
Make and model of Antenna
Antenna Gain
Total Tilt
Vertical Beamwidth
Side Lobe Attenuation
TxPower
Combiner Loss
EIRP (Total)
Unit Loss
RF Cable Length
EIRP (TCH) incl DTX, ATPC
ATPC Factor
Item Units
SITEDATA
Site ID
Name
Date of Commissioning
Building Heights AGL
Antenna Height AGL
Address
B - I : SITE DATA & TECHNICAL PARAMETERS
NAME OF THE TSP: RJIL 4G
NAME OF THE BTS: BARAUN
FORMAT FOR CERTIFICATION OF BTS FOR COMPLIANCE OF THE EMF EXPOSURE LEVELS (CALCULATION OF EIRP/EIRPth)
Reliance Jio FDD LTE RTL Reliance Jio TDD LTE
Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSIL
EIRP Base Channel
DTX Factor
Latitude
Longitude
RTT/GBT
4/10
B-II : EIRP/EIRPth CALCULATION
Lat Long
24.74846 81.28663 C1 Remark
Not-Applicable
ComputationofEIRP/EIRPthat
adjacent
Reliance Jio TDD LTE 59848.37
Overall EIRP/EIRPth 0.09
Normally Compliant (YES/NO) YES
EIRPth on ground EIRPth on ground
Reliance Jio FDD LTE 69970.59
RTL 45001.96
Building (B0) EIRPth at the Building Roof Top Corners and other points on the periphery of exclusion
Building Top Corners
5/10
Corner/Accessible Location Distance (m) Height (m)
N/A N/A N/A
SITE LAYOUT
BARAUN
I-MP-SIUR-ENB-6002
Site Name
Site ID
SITE ID -
I-MP-SIUR-ENB-6002_0 I-MP-SIUR-ENB-6002_30 I-MP-SIUR-ENB-6002_60
I-MP-SIUR-ENB-6002_90 I-MP-SIUR-ENB-6002_120 I-MP-SIUR-ENB-6002_150
I-MP-SIUR-ENB-6002_180 I-MP-SIUR-ENB-6002_210 I-MP-SIUR-ENB-6002_240
I-MP-SIUR-ENB-6002_270 I-MP-SIUR-ENB-6002_300 I-MP-SIUR-ENB-6002_330
I-MP-SIUR-ENB-6002_EXISTING TOWER I-MP-SIUR-ENB-6002_EXISTING BUILDING I-MP-SIUR-ENB-6002_GPS
I-MP-SIUR-ENB-6002
PANAROMIC PHOTOS
EXISTING TOWER, EXISTING BUILDING & GPS PHOTO
I-MP-SIUR-ENB-6002_CAUTION I-MP-SIUR-ENB-6002_WARNING I-MP-SIUR-ENB-6002_DANGER
I-MP-SIUR-ENB-6002_ALPHA I-MP-SIUR-ENB-6002_BETA I-MP-SIUR-ENB-6002_GAMMA
SIGNAGE PHOTOS
SECTOR PHOTO
Site Name :
Site ID :
Latitude :
Longitude :
Adjacent
building
Latitude Longitude Height (m) No. of floor
Azimuth from the
Tower
Distance from
Tower (m)
Any Neighbour Towers within 20m Radius:
Format for collecting Adjacent building / General Public access area data
BARAUN
I-MP-SIUR-ENB-6002
24.74846
81.28663
Site ID : I-MP-SIUR-ENB-6002Site Name : BARAUN
State : Madhya Pradesh
First Radiation date & time : 2015-12-15 14:33:38
Description :
: Service OFF notification means services of eNB are OFF i.e. eNB is locked.
: Loading Start notification means eNB System parameters, configurations and software download started in eNB from OSS i.e. eNB commissioning started.
: Loading End notification means eNB System parameters, configurations and software download completed. i.e. eNB Commissioning completed
Proof of Commissioning Date & Time
Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSILSite Address :

Weitere ähnliche Inhalte

Was ist angesagt?

Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish BhattacharyaVarun Chandra
 
Finnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDRFinnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDRJuha Mattila
 
Iai rca sra4_r_specsheet
Iai rca sra4_r_specsheetIai rca sra4_r_specsheet
Iai rca sra4_r_specsheetElectromate
 
Macron mini6 28-specsheet
Macron mini6 28-specsheetMacron mini6 28-specsheet
Macron mini6 28-specsheetElectromate
 
Diagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benzDiagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benzabsolute scan
 
Iai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheetIai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheetElectromate
 
GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01robin huang
 
EMBEDDED PROJECTS BASED COMPONANTS
 EMBEDDED PROJECTS BASED COMPONANTS EMBEDDED PROJECTS BASED COMPONANTS
EMBEDDED PROJECTS BASED COMPONANTSDURGA ELECTRONICS
 
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS CircuitsMd. Saifur Rahman
 
Iai rca a4_r_specsheet
Iai rca a4_r_specsheetIai rca a4_r_specsheet
Iai rca a4_r_specsheetElectromate
 
ComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data SheetComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data SheetJMAC Supply
 
EU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel WirelessEU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel WirelessParallel Wireless, Inc.
 
Iai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheetIai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheetElectromate
 
ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018Alon Zheltkov
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyAnna Bancroft
 

Was ist angesagt? (20)

Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish Bhattacharya
 
ZXSDR Trainning
ZXSDR TrainningZXSDR Trainning
ZXSDR Trainning
 
UMTS
UMTS UMTS
UMTS
 
Finnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDRFinnish Land forces C4I development based on SDR
Finnish Land forces C4I development based on SDR
 
Iai rca sra4_r_specsheet
Iai rca sra4_r_specsheetIai rca sra4_r_specsheet
Iai rca sra4_r_specsheet
 
Macron mini6 28-specsheet
Macron mini6 28-specsheetMacron mini6 28-specsheet
Macron mini6 28-specsheet
 
MultiDyne Products & Technology V14
MultiDyne Products & Technology V14MultiDyne Products & Technology V14
MultiDyne Products & Technology V14
 
Diagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benzDiagnóstico y programación de mercedes benz
Diagnóstico y programación de mercedes benz
 
Dvt500
Dvt500Dvt500
Dvt500
 
Iai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheetIai rca2 ta5_c_specsheet
Iai rca2 ta5_c_specsheet
 
GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01GPS GSM GPRS Car Tracker UT01
GPS GSM GPRS Car Tracker UT01
 
EMBEDDED PROJECTS BASED COMPONANTS
 EMBEDDED PROJECTS BASED COMPONANTS EMBEDDED PROJECTS BASED COMPONANTS
EMBEDDED PROJECTS BASED COMPONANTS
 
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
98 mW 10 Gbps Wireless Transceiver Chipset With D-Band CMOS Circuits
 
Iai rca a4_r_specsheet
Iai rca a4_r_specsheetIai rca a4_r_specsheet
Iai rca a4_r_specsheet
 
Pannel antenna
Pannel antennaPannel antenna
Pannel antenna
 
ComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data SheetComNet FVT160M1 Data Sheet
ComNet FVT160M1 Data Sheet
 
EU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel WirelessEU Declaration of Conformity - Parallel Wireless
EU Declaration of Conformity - Parallel Wireless
 
Iai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheetIai rca rgd4_d_specsheet
Iai rca rgd4_d_specsheet
 
ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018ITU Workshop on Satellite Communications; Minsk 23.05.2018
ITU Workshop on Satellite Communications; Minsk 23.05.2018
 
Outdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case StudyOutdoor - Bright Green Technology - IMAX Case Study
Outdoor - Bright Green Technology - IMAX Case Study
 

Andere mochten auch

Marketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community EngagementMarketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community EngagementGreater Bridgeport Transit
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsIOSR Journals
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower projectXingYue0907
 
Radiation from the Mobile tower
Radiation from the Mobile towerRadiation from the Mobile tower
Radiation from the Mobile towerMUNEESH NK NK
 
Notes on optical fiber communication unit7
Notes on optical fiber communication unit7Notes on optical fiber communication unit7
Notes on optical fiber communication unit7Jagadish M
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Girinimay1
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4gVijay Anand
 
GBM package in r
GBM package in rGBM package in r
GBM package in rmark_landry
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...THANDAIAH PRABU
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.pptAIRTEL
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
Optical tech
Optical techOptical tech
Optical techcoolateeq
 

Andere mochten auch (20)

EMF Survey
EMF SurveyEMF Survey
EMF Survey
 
LOS Survey
LOS SurveyLOS Survey
LOS Survey
 
Rf survey
Rf surveyRf survey
Rf survey
 
Rf survey
Rf surveyRf survey
Rf survey
 
GSM Link Budget
GSM Link BudgetGSM Link Budget
GSM Link Budget
 
Marketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community EngagementMarketing for Transit - GBT Community Engagement
Marketing for Transit - GBT Community Engagement
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM Systems
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower project
 
Radiation from the Mobile tower
Radiation from the Mobile towerRadiation from the Mobile tower
Radiation from the Mobile tower
 
Notes on optical fiber communication unit7
Notes on optical fiber communication unit7Notes on optical fiber communication unit7
Notes on optical fiber communication unit7
 
Cooling tower
Cooling towerCooling tower
Cooling tower
 
Tl book
Tl bookTl book
Tl book
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Giri
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
 
GBM package in r
GBM package in rGBM package in r
GBM package in r
 
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
Link Power Budget Calculation and Propagation Factors for Satellite COmmunica...
 
Bts installation & commisioning.ppt
Bts installation & commisioning.pptBts installation & commisioning.ppt
Bts installation & commisioning.ppt
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
Optical tech
Optical techOptical tech
Optical tech
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Ähnlich wie EMF calculation sample report

Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend3G4G
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendSylvia Lu
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introductionJed Lee
 
Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016ewin aulia
 
QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34Electromate
 
Xexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manualXexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manualxxgpstraker
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Yasas Anuradha
 
RF Optimization Slide deck.pptx
RF Optimization Slide deck.pptxRF Optimization Slide deck.pptx
RF Optimization Slide deck.pptxssuser2b76bb
 
Handheld Point of Sale Terminal
Handheld Point of Sale TerminalHandheld Point of Sale Terminal
Handheld Point of Sale TerminalPremier Farnell
 
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...ddslideshare99
 
robot-brochure-en.pdf
robot-brochure-en.pdfrobot-brochure-en.pdf
robot-brochure-en.pdfprzemlat
 
FANUC robots overview
FANUC robots overviewFANUC robots overview
FANUC robots overviewFANUC Europe
 
Tems investigation 16.3.2 connectable devices
Tems investigation 16.3.2   connectable devicesTems investigation 16.3.2   connectable devices
Tems investigation 16.3.2 connectable devicesmysritech
 
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...Dien Ha The
 
1SS272 PSpice Model (Free SPICE Model)
1SS272 PSpice Model (Free SPICE Model)1SS272 PSpice Model (Free SPICE Model)
1SS272 PSpice Model (Free SPICE Model)Tsuyoshi Horigome
 

Ähnlich wie EMF calculation sample report (20)

SCFT report
SCFT reportSCFT report
SCFT report
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
 
Overview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trendOverview of standardisation status and 3GPP technology evolution trend
Overview of standardisation status and 3GPP technology evolution trend
 
WaveIN introduction
WaveIN introductionWaveIN introduction
WaveIN introduction
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
 
Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016Rf atp nibong tebal p00128 rev 1 30 nov2016
Rf atp nibong tebal p00128 rev 1 30 nov2016
 
QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34QuickSilver Controls QCI-DS009 QCI-A34
QuickSilver Controls QCI-DS009 QCI-A34
 
Xexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manualXexun gps vehicle tracker xt009 user manual
Xexun gps vehicle tracker xt009 user manual
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
 
RF Optimization Slide deck.pptx
RF Optimization Slide deck.pptxRF Optimization Slide deck.pptx
RF Optimization Slide deck.pptx
 
Handheld Point of Sale Terminal
Handheld Point of Sale TerminalHandheld Point of Sale Terminal
Handheld Point of Sale Terminal
 
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...
A 3G Femtocell Radio - Analog Devices VON Boston Networking Conference Oct 29...
 
robot-brochure-en.pdf
robot-brochure-en.pdfrobot-brochure-en.pdf
robot-brochure-en.pdf
 
FANUC robots overview
FANUC robots overviewFANUC robots overview
FANUC robots overview
 
Day 11 eigrp
Day 11 eigrpDay 11 eigrp
Day 11 eigrp
 
Foo
FooFoo
Foo
 
Tems investigation 16.3.2 connectable devices
Tems investigation 16.3.2   connectable devicesTems investigation 16.3.2   connectable devices
Tems investigation 16.3.2 connectable devices
 
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
Mitsubishi cnc drive system general catalog (mds d-dm series, mds-d-svj3-spj3...
 
Course_List S Raisey-Skeats[1]
Course_List S Raisey-Skeats[1]Course_List S Raisey-Skeats[1]
Course_List S Raisey-Skeats[1]
 
1SS272 PSpice Model (Free SPICE Model)
1SS272 PSpice Model (Free SPICE Model)1SS272 PSpice Model (Free SPICE Model)
1SS272 PSpice Model (Free SPICE Model)
 

Kürzlich hochgeladen

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 

Kürzlich hochgeladen (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

EMF calculation sample report

  • 1.
  • 2. Site Name : BARAUN Site ID : I-MP-SIUR-ENB-6002 1 Initial On Air Rev. No Date Reason for issue Samsung Signature RJIL Signature
  • 3.
  • 4. Appendix -B DATE: I-MP-SIUR-ENB-6002 MP5SRMR003B-36 I-MP-SIUR-ENB-6002 BARAUN Baraun BARAUN 2008-06-28 2015-07-27 24.74846 24.74846 24.74846 81.28663 81.28661 81.28663 GBT GBT GBT (m) 0.0 0.0 0.0 (m) 31.0 35.0 31.0 FDD LTE GSM TDD LTE (MHz) 1823.6 941.2 2342.5 1 4 1 ACE,XXDWH-17-65I-VT XAHT-XAHT- HTDBSW086517 ACE,XXDWH-17-65I-VT (dBi) 16.4 17.5 16.4 (deg) 2.0 3.0 4.0 (deg) 7.7 7.0 7.2 (dB) 15.0 15.0 15.0 (dBm) 46.0 43.0 46.0 (dB) 0.0 1.5 0.0 (m) 2.0 42.0 2.0 (dB/100m) 15.5 3.62 18.2 (W) 1545.25 559.71 1512.17 1.0 0.9 1.0 1.0 0.9 1.0 (W) 0 1360.1 0 (W) 1545.25 1919.81 1512.17 Date of first radiation in respect of BTS ID I-MP-SIUR-ENB-6002 is 15/12/2015 TECHNICALPARAMETER System Type (GSM/CDMA/UMTS/LTE) Base Channel Frequency Carriers /Sector (worst) Make and model of Antenna Antenna Gain Total Tilt Vertical Beamwidth Side Lobe Attenuation TxPower Combiner Loss EIRP (Total) Unit Loss RF Cable Length EIRP (TCH) incl DTX, ATPC ATPC Factor Item Units SITEDATA Site ID Name Date of Commissioning Building Heights AGL Antenna Height AGL Address B - I : SITE DATA & TECHNICAL PARAMETERS NAME OF THE TSP: RJIL 4G NAME OF THE BTS: BARAUN FORMAT FOR CERTIFICATION OF BTS FOR COMPLIANCE OF THE EMF EXPOSURE LEVELS (CALCULATION OF EIRP/EIRPth) Reliance Jio FDD LTE RTL Reliance Jio TDD LTE Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSIL EIRP Base Channel DTX Factor Latitude Longitude RTT/GBT 4/10
  • 5. B-II : EIRP/EIRPth CALCULATION Lat Long 24.74846 81.28663 C1 Remark Not-Applicable ComputationofEIRP/EIRPthat adjacent Reliance Jio TDD LTE 59848.37 Overall EIRP/EIRPth 0.09 Normally Compliant (YES/NO) YES EIRPth on ground EIRPth on ground Reliance Jio FDD LTE 69970.59 RTL 45001.96 Building (B0) EIRPth at the Building Roof Top Corners and other points on the periphery of exclusion Building Top Corners 5/10
  • 6. Corner/Accessible Location Distance (m) Height (m) N/A N/A N/A SITE LAYOUT BARAUN I-MP-SIUR-ENB-6002 Site Name Site ID
  • 7. SITE ID - I-MP-SIUR-ENB-6002_0 I-MP-SIUR-ENB-6002_30 I-MP-SIUR-ENB-6002_60 I-MP-SIUR-ENB-6002_90 I-MP-SIUR-ENB-6002_120 I-MP-SIUR-ENB-6002_150 I-MP-SIUR-ENB-6002_180 I-MP-SIUR-ENB-6002_210 I-MP-SIUR-ENB-6002_240 I-MP-SIUR-ENB-6002_270 I-MP-SIUR-ENB-6002_300 I-MP-SIUR-ENB-6002_330 I-MP-SIUR-ENB-6002_EXISTING TOWER I-MP-SIUR-ENB-6002_EXISTING BUILDING I-MP-SIUR-ENB-6002_GPS I-MP-SIUR-ENB-6002 PANAROMIC PHOTOS EXISTING TOWER, EXISTING BUILDING & GPS PHOTO
  • 8. I-MP-SIUR-ENB-6002_CAUTION I-MP-SIUR-ENB-6002_WARNING I-MP-SIUR-ENB-6002_DANGER I-MP-SIUR-ENB-6002_ALPHA I-MP-SIUR-ENB-6002_BETA I-MP-SIUR-ENB-6002_GAMMA SIGNAGE PHOTOS SECTOR PHOTO
  • 9. Site Name : Site ID : Latitude : Longitude : Adjacent building Latitude Longitude Height (m) No. of floor Azimuth from the Tower Distance from Tower (m) Any Neighbour Towers within 20m Radius: Format for collecting Adjacent building / General Public access area data BARAUN I-MP-SIUR-ENB-6002 24.74846 81.28663
  • 10. Site ID : I-MP-SIUR-ENB-6002Site Name : BARAUN State : Madhya Pradesh First Radiation date & time : 2015-12-15 14:33:38 Description : : Service OFF notification means services of eNB are OFF i.e. eNB is locked. : Loading Start notification means eNB System parameters, configurations and software download started in eNB from OSS i.e. eNB commissioning started. : Loading End notification means eNB System parameters, configurations and software download completed. i.e. eNB Commissioning completed Proof of Commissioning Date & Time Rajmani Patel, Khas-1130/2, PH- 20 Sirmour+ Distt.- Rewa (MP) PIN CODE TEHSILSite Address :