SlideShare ist ein Scribd-Unternehmen logo
1 von 20
Downloaden Sie, um offline zu lesen
Proactive Asset Management Survey
Creates Roadmap to Parts Inventory
and Obsolescence Plan
Session: 1B-5133
Photography & Video Recording Policy
Photography and audio/video recording is not permitted in any sessions or in the
exhibition areas without press credentials or written permission from the Emerson
Exchange Board of Directors. Inquiries should be directed to:
EmersonExchange@Emerson.com
Thank you.
Presenters
 Angelo Angeleri
 Joe Hawkins
 Zachary White
Agenda
 Presentation Overview
 APS: Palo Verde Nuclear Generating Station
 Drivers for Building Asset Database
 Objectives and Requirements
 Challenges
 Data Gathering
 Database Utilization
 Results and Benefits
 Summary
 More Information Services
Presentation Overview
 Inconsistent installed base data was impacting service
and parts inventory requirements.
 Storage reduction forced parts consolidation, illustrating
the importance of an asset management program for
proper inventory planning.
 A comprehensive asset survey done by Caltrol and
Emerson provided the asset benchmark needed to allow
data driven parts inventory and outage planning.
 Survey data utilized for inventory reduction, parts
procurement, and outage planning.
 Asset survey paved the way to a proactive management
program for process control assets.
APS: Palo Verde Nuclear Generating Station
 Owned by consortium of seven Southwest utilities and operated by
Arizona Public Service Co. (APS)
 Member of STARS Alliance
– Promotes consistency and implement best
practices across 7 member nuclear facilities
 Palo Verde Nuclear Generating Station
is the largest power producer in the US.
– 3 Pressurized Water Reactors on 4,000 acres
– Generates 30 million megawatt-hours annually
– Serves more than 1.1 million customers
– Recycles 20 billion gallons of wastewater annually
Drivers for Building Asset Database
 Inconsistent data
 Obsolete product - obsolescence planning
– Older technology affecting efficiency and reliability
• Moving from reactive to proactive maintenance program
 Extensive parts lead time
 Inventory management – reduce footprint of warehouse
 Target maintenance budget for best use, planning,
technology upgrades and optimization
 Data driven decisions
 Strategic reduction of taxable
inventory over 12 month period
Objectives & Requirements
 Comprehensive asset database
– Turnkey system networked into existing
digital infrastructure
– “As-Found” images of equipment
– Serial records
– RSPPLs
– Bill of Materials (BOM)
– Flagging obsolete equipment for upgrades and optimization
 Documenting plant instituted modifications
• Cross reference to serial cards as updates occur - evergreen
Challenges
 Inconsistent asset data was impacting service and parts
inventory requirements and
– Proper inventory planning required accurate asset database
– Reaction to unplanned downtime was inefficient and labor
intensive
 A storage reduction forced a parts
consolidation
 Comprehensive asset survey
needed to provide installed base
benchmark
 Data driven decisions for parts
inventory and outage planning
 40-60 week delivery on key safety related parts
– Stepping up pre-outage planning
Challenges
 Proactive maintenance and timely parts ordering for future
outages
 Repetitive parts ordering hard and soft costs
 Nuclear facility
 Nuclear qualified and badged technicians
with proper safety and security clearances
 Potential radiation exposure in plant hot areas
 Baseline set of deliverables changed once value
recognized, deliverables were increased at
request of Palo Verde
 Setup and usability of data set
FieldSource - iPads
 Internal tool developed by Caltrol IT Group
– No paper, enter data straight from the field
 Remote data gathering using iPads
– Private logons to update data from service
and maintenance activities
 Navigation and menus with pull-downs streamlines
data entry and minimizes key strokes and human error
 Nightly uploads from iPads
 Fisher®
serial records, BOM, RSPPLs provided
 Field survey and outage planning
Data Gathering
Valve Database
Full accessibility to view or update valve data 24/7/365.
Data Gathering
 Walk-down of plant for Fisher equipment (initially)
– Scope expansion to include all assets (Phase 2)
 “As-Found” images of equipment
 Serial records pulled, reviewed and updated
 Recommended Spare Price Parts Lists - RSPPLs
 Bill of Materials (BOM)
 Obsolete equipment flagged
for upgrades and optimization
during future outages
Database Utilization
 More efficient outage planning and scheduling
– Calendar reminders for planning and key parts pre-ordering
for tags in each future outage
 Obsolescence program
– Strategically planned plant-wide
upgrades and optimization
 Support for plant modification
– Detailed and documented asset database
 “Best Practice” for increasing efficiency
of future outages
Business Results Expectations
 Proactive approach to maintenance and repair
 Database access anywhere using iPad or iPhone
– Private access to secure web-portal
(https:service.caltrol.com/CompanyName)
 Database helped identify control valves to receive
new part numbers and update serial cards
 Data-driven proactive approach to parts ordering,
outage and obsolescence planning
– Simplification of recommended spare parts inventory
– Live access to replacement parts lists
Business Results Expectations
 Database substantially increases interdepartmental
communication and coordination of asset information
– Ability to view data in multiple formats
 Single data source creates alignment and
standardization of product information
– Live field updates directly into asset database
 Maximization of plant reliability for optimal uptime
– Ability to send email for parts directly from iPad or iPhone
 Reallocation of capital budget savings from inventory and
obsolescence planning
Where Are The Potential Cost Savings
 Where are the cost savings?
– Better Planning
– Obsolete product replacement
– Obsolete inventory
– Labor searching data
– Engineering, maintenance and supply chain collaboration
– Pricing agreements – identify high use parts and provide
fixed costs reducing internal PO processing costs by 50%
 Reduction in state taxes paid on obsolete inventory
– State taxes = 15%
– $50 Million in inventory
– Current estimation of savings $4-6 Million
Where To Get More Information
 Visit the Fisher and Instrument & Valve Services stand
inside the Emerson Exchange
 www.APS.com
 www.Caltrol.com
 www.EmersonProcess.com/IVS
 www.EmersonProcess.com/Fisher
 Caltrol provides this service as part of service agreements
to manage or survey process control equipment
Thank You for Attending!
Enjoy the rest of the conference. Remember to stop by and
go through the featured stand on Integrated Turnarounds.

Weitere ähnliche Inhalte

Andere mochten auch

Asset Management Leading Practices
Asset Management Leading PracticesAsset Management Leading Practices
Asset Management Leading Practicesjohnnyg14
 
Best Practices - Barcode Strategy
Best Practices - Barcode StrategyBest Practices - Barcode Strategy
Best Practices - Barcode Strategyjohnnyg14
 
Leveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily UseLeveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily Usejohnnyg14
 
IBM Maximo Asset Management 7.5 Add-ons
IBM Maximo Asset Management 7.5 Add-onsIBM Maximo Asset Management 7.5 Add-ons
IBM Maximo Asset Management 7.5 Add-onsAlok Chander
 
Meters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementMeters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementRobert Zientara
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementRobert Zientara
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricksjohnnyg14
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Julie Rampello
 

Andere mochten auch (9)

Asset Management Leading Practices
Asset Management Leading PracticesAsset Management Leading Practices
Asset Management Leading Practices
 
Best Practices - Barcode Strategy
Best Practices - Barcode StrategyBest Practices - Barcode Strategy
Best Practices - Barcode Strategy
 
Leveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily UseLeveraging Your CMMS - From Selection to Daily Use
Leveraging Your CMMS - From Selection to Daily Use
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 
IBM Maximo Asset Management 7.5 Add-ons
IBM Maximo Asset Management 7.5 Add-onsIBM Maximo Asset Management 7.5 Add-ons
IBM Maximo Asset Management 7.5 Add-ons
 
Meters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementMeters in IBM Maximo Asset Management
Meters in IBM Maximo Asset Management
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset Management
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricks
 
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
 

Ähnlich wie Proactive Asset Mgmt

Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case StudiesIntegration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case StudiesRajeev Shukla
 
Erp introduction
Erp introductionErp introduction
Erp introductionGoa App
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka PathmendraJanaka Pathmendra
 
Case study linear asset insp optimization 002 161104 jimc
Case study linear asset insp optimization 002 161104 jimcCase study linear asset insp optimization 002 161104 jimc
Case study linear asset insp optimization 002 161104 jimcJames (Jim) Charboneau
 
Turn your Data into Knowledge
Turn your Data into KnowledgeTurn your Data into Knowledge
Turn your Data into KnowledgeAd Ghauri
 
0903 pacific gas and electric companys bpc projects
0903 pacific gas and electric companys bpc projects0903 pacific gas and electric companys bpc projects
0903 pacific gas and electric companys bpc projectsSilas Musakali
 
Internet of things industrial view
Internet of things   industrial viewInternet of things   industrial view
Internet of things industrial viewNilesh Trivedi
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsBarcoding, Inc.
 
Asset Management Software | Asset Management Company | Asset Monitoring Syste...
Asset Management Software | Asset Management Company | Asset Monitoring Syste...Asset Management Software | Asset Management Company | Asset Monitoring Syste...
Asset Management Software | Asset Management Company | Asset Monitoring Syste...50 Hertz Limited
 
Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance ProgramRobert Denk
 
Failure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveFailure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveDavin Abraham
 
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...Chain Sys Corporation
 
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiK3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiFujitsu India
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 

Ähnlich wie Proactive Asset Mgmt (20)

Spumaint anchor.ppt
Spumaint anchor.pptSpumaint anchor.ppt
Spumaint anchor.ppt
 
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case StudiesIntegration of Manufacturing Execution Systems - Harsh Infotech Case Studies
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
 
Erp introduction
Erp introductionErp introduction
Erp introduction
 
Connecting assets and facilities with IoT
Connecting assets and facilities with IoTConnecting assets and facilities with IoT
Connecting assets and facilities with IoT
 
Pm key user presentation- Harith senarath/Janaka Pathmendra
Pm   key user presentation- Harith senarath/Janaka PathmendraPm   key user presentation- Harith senarath/Janaka Pathmendra
Pm key user presentation- Harith senarath/Janaka Pathmendra
 
Case study linear asset insp optimization 002 161104 jimc
Case study linear asset insp optimization 002 161104 jimcCase study linear asset insp optimization 002 161104 jimc
Case study linear asset insp optimization 002 161104 jimc
 
Turn your Data into Knowledge
Turn your Data into KnowledgeTurn your Data into Knowledge
Turn your Data into Knowledge
 
0903 pacific gas and electric companys bpc projects
0903 pacific gas and electric companys bpc projects0903 pacific gas and electric companys bpc projects
0903 pacific gas and electric companys bpc projects
 
Stephen Kennett
Stephen KennettStephen Kennett
Stephen Kennett
 
Stephen Kennett presentation
Stephen Kennett   presentationStephen Kennett   presentation
Stephen Kennett presentation
 
Internet of things industrial view
Internet of things   industrial viewInternet of things   industrial view
Internet of things industrial view
 
The Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management SystemsThe Key Challenges in Implementing Enterprise Asset Management Systems
The Key Challenges in Implementing Enterprise Asset Management Systems
 
Asset Management Software | Asset Management Company | Asset Monitoring Syste...
Asset Management Software | Asset Management Company | Asset Monitoring Syste...Asset Management Software | Asset Management Company | Asset Monitoring Syste...
Asset Management Software | Asset Management Company | Asset Monitoring Syste...
 
xdoc.pl_meb.pdf
xdoc.pl_meb.pdfxdoc.pl_meb.pdf
xdoc.pl_meb.pdf
 
Enterprise Asset Management
Enterprise Asset ManagementEnterprise Asset Management
Enterprise Asset Management
 
Maintenance Program
Maintenance ProgramMaintenance Program
Maintenance Program
 
Failure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveFailure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archive
 
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...
Collaborate 2012-capturing real-and_lasting_benefits_from_your_enterprise_ass...
 
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, DelhiK3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
K3.Fujitsu World Tour India 2016-Customer Presentation, Delhi
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 

Proactive Asset Mgmt

  • 1. Proactive Asset Management Survey Creates Roadmap to Parts Inventory and Obsolescence Plan Session: 1B-5133
  • 2. Photography & Video Recording Policy Photography and audio/video recording is not permitted in any sessions or in the exhibition areas without press credentials or written permission from the Emerson Exchange Board of Directors. Inquiries should be directed to: EmersonExchange@Emerson.com Thank you.
  • 3. Presenters  Angelo Angeleri  Joe Hawkins  Zachary White
  • 4. Agenda  Presentation Overview  APS: Palo Verde Nuclear Generating Station  Drivers for Building Asset Database  Objectives and Requirements  Challenges  Data Gathering  Database Utilization  Results and Benefits  Summary  More Information Services
  • 5. Presentation Overview  Inconsistent installed base data was impacting service and parts inventory requirements.  Storage reduction forced parts consolidation, illustrating the importance of an asset management program for proper inventory planning.  A comprehensive asset survey done by Caltrol and Emerson provided the asset benchmark needed to allow data driven parts inventory and outage planning.  Survey data utilized for inventory reduction, parts procurement, and outage planning.  Asset survey paved the way to a proactive management program for process control assets.
  • 6. APS: Palo Verde Nuclear Generating Station  Owned by consortium of seven Southwest utilities and operated by Arizona Public Service Co. (APS)  Member of STARS Alliance – Promotes consistency and implement best practices across 7 member nuclear facilities  Palo Verde Nuclear Generating Station is the largest power producer in the US. – 3 Pressurized Water Reactors on 4,000 acres – Generates 30 million megawatt-hours annually – Serves more than 1.1 million customers – Recycles 20 billion gallons of wastewater annually
  • 7. Drivers for Building Asset Database  Inconsistent data  Obsolete product - obsolescence planning – Older technology affecting efficiency and reliability • Moving from reactive to proactive maintenance program  Extensive parts lead time  Inventory management – reduce footprint of warehouse  Target maintenance budget for best use, planning, technology upgrades and optimization  Data driven decisions  Strategic reduction of taxable inventory over 12 month period
  • 8. Objectives & Requirements  Comprehensive asset database – Turnkey system networked into existing digital infrastructure – “As-Found” images of equipment – Serial records – RSPPLs – Bill of Materials (BOM) – Flagging obsolete equipment for upgrades and optimization  Documenting plant instituted modifications • Cross reference to serial cards as updates occur - evergreen
  • 9. Challenges  Inconsistent asset data was impacting service and parts inventory requirements and – Proper inventory planning required accurate asset database – Reaction to unplanned downtime was inefficient and labor intensive  A storage reduction forced a parts consolidation  Comprehensive asset survey needed to provide installed base benchmark  Data driven decisions for parts inventory and outage planning  40-60 week delivery on key safety related parts – Stepping up pre-outage planning
  • 10. Challenges  Proactive maintenance and timely parts ordering for future outages  Repetitive parts ordering hard and soft costs  Nuclear facility  Nuclear qualified and badged technicians with proper safety and security clearances  Potential radiation exposure in plant hot areas  Baseline set of deliverables changed once value recognized, deliverables were increased at request of Palo Verde  Setup and usability of data set
  • 11. FieldSource - iPads  Internal tool developed by Caltrol IT Group – No paper, enter data straight from the field  Remote data gathering using iPads – Private logons to update data from service and maintenance activities  Navigation and menus with pull-downs streamlines data entry and minimizes key strokes and human error  Nightly uploads from iPads  Fisher® serial records, BOM, RSPPLs provided  Field survey and outage planning
  • 12. Data Gathering Valve Database Full accessibility to view or update valve data 24/7/365.
  • 13. Data Gathering  Walk-down of plant for Fisher equipment (initially) – Scope expansion to include all assets (Phase 2)  “As-Found” images of equipment  Serial records pulled, reviewed and updated  Recommended Spare Price Parts Lists - RSPPLs  Bill of Materials (BOM)  Obsolete equipment flagged for upgrades and optimization during future outages
  • 14. Database Utilization  More efficient outage planning and scheduling – Calendar reminders for planning and key parts pre-ordering for tags in each future outage  Obsolescence program – Strategically planned plant-wide upgrades and optimization  Support for plant modification – Detailed and documented asset database  “Best Practice” for increasing efficiency of future outages
  • 15. Business Results Expectations  Proactive approach to maintenance and repair  Database access anywhere using iPad or iPhone – Private access to secure web-portal (https:service.caltrol.com/CompanyName)  Database helped identify control valves to receive new part numbers and update serial cards  Data-driven proactive approach to parts ordering, outage and obsolescence planning – Simplification of recommended spare parts inventory – Live access to replacement parts lists
  • 16. Business Results Expectations  Database substantially increases interdepartmental communication and coordination of asset information – Ability to view data in multiple formats  Single data source creates alignment and standardization of product information – Live field updates directly into asset database  Maximization of plant reliability for optimal uptime – Ability to send email for parts directly from iPad or iPhone  Reallocation of capital budget savings from inventory and obsolescence planning
  • 17. Where Are The Potential Cost Savings  Where are the cost savings? – Better Planning – Obsolete product replacement – Obsolete inventory – Labor searching data – Engineering, maintenance and supply chain collaboration – Pricing agreements – identify high use parts and provide fixed costs reducing internal PO processing costs by 50%  Reduction in state taxes paid on obsolete inventory – State taxes = 15% – $50 Million in inventory – Current estimation of savings $4-6 Million
  • 18.
  • 19. Where To Get More Information  Visit the Fisher and Instrument & Valve Services stand inside the Emerson Exchange  www.APS.com  www.Caltrol.com  www.EmersonProcess.com/IVS  www.EmersonProcess.com/Fisher  Caltrol provides this service as part of service agreements to manage or survey process control equipment
  • 20. Thank You for Attending! Enjoy the rest of the conference. Remember to stop by and go through the featured stand on Integrated Turnarounds.