PROJECT / TRAINING REPORT
( PROJECT / TRAINING PERIOD MARCH– JUNE )
BTPS, NTPC BADARPUR ,NEW DELHI-110044
Submitted In Partial fulfillment of the requirement for the degree of
BACHELOR OF TECHNOLOGY (B.TECH)
UNDER THE GUIDANCE OF
Internal Suprvisor: External Supervisor:
Dinesh Jhakar Brahm Shanker
H.O.D ME DEPT. (ACME) TRAINER (BTPS)
SUBMITTED BY
VIKAS SINGH
ROLL NO. : 12BTME47
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING
MAHARSHI DAYANAND UNIVERSITY, (ROHTAK-124001)
ABSTRACT
India’s largest power company, NTPC was set up in 1975 to accelerate power development
in India. NTPC is emerging as a diversified power major with presence in the entire value
chain of the power generation business. Apart from power generation, which is the mainstay
of the company, NTPC has already ventured into consultancy, power trading, ash utilization
and coal mining. NTPC ranked 34 in the 2010 Forbes Global 2000 ranking of the World’s
biggest companies. NTPC became a Maharatna company in May, 2010, one of the only four
companies to be awarded this status.
BADARPUR THERMAL POWER STATION was established on 1973 and it was the part
of Central Government. On 01/04/1978 is was given as No Loss No Profit Plant of NTPC.
Since then operating performance of NTPC has been considerably above the national
average. The availability factor for coal stations has increased from 85.03 % in 1997-98 to
90.09 % in 2006-07, which compares favorably with international standards. The PLF has
increased from 75.2% in1997-98 to 89.4% during the year 2006-07 which is the highest since
the inception of NTPC. Badarpur thermal power station started with a single 95 mw unit.
There were 2 more units (95 MW each) installed in next 2 consecutive years. Now it has total five
units with total capacity of 720 MW. Ownership of BTPS was transferred to NTPC with effect from
01.06.2006 through GOIs Gazette Notification . The power is supplied to a 220 KV network
that is a part of the northern grid. The ten circuits through which the power is evacuated from
the plant are:
1. Mehrauli 2. Okhla
3. Ballabgarh 4. Indraprastha
5. UP (Noida) 6. Jaipur
ACKNOWLEDGEMENT
It has been a great honor and privilege to undergo training at NTPC Limited, Badarpur,
DELHI, India. I am very grateful to Mr. A K SINGH (DGM HR) & Mr. BRAHM
SHANKER (SUPERVISOR) for giving their valuable time and constructive guidance
in preparing the internship report for Internship. It would not have been possible to
complete this report in short period of time without their kind encouragement and
valuable guidance.
I am also thankful to PROF. DINESH JAKHAR, H.O.D., Department of Mechanical
Engineering, ACME, for his constant support and encouragement.
I would also like to render heartiest thanks to my brother & sister who’s ever helping nature
and support has helped me complete this present work
VIKAS SINGH
ROLL NO. - 12BTME47
8
th
Semester, B. Tech
TABLE OF CONTENTS
LIST OF FIGURES
CHAPTER 1
1.1 COMPANY AND PROFILE 1
1.2 VISSION AND MISSION 1
1.3 POWER GENERATION IN INDIA 1
1.4 EVOLUTION 3
1.5 NTPC HEADQUARTERS 4
1.6 NTPC PLANTS 5
1.8 FUTURE GOALS 7
1.9 ENVIRONMENTAL MANAGEMENT 7
CHAPTER 2
2.1 ABOUT BADARPUR THERMAL POWER STATION 8
2.2 FROM COAL TO ELECRICITY PROCESS 11
2.3 MAIN GENERATOR 13
2.4 MAIN TURBINE DATA 14
CHAPTER 3
3.1 OPERATION 19
3.2 COAL HANDLING PLANT (C.H.P.) & NEW COAL HANDLING PLANT
(N.C.H.P) 34
3.3 GENERATOR AND AUXILIARIES 40
3.4 TRANSFORMER 47
3.5 INSTRUMENT SEEN 51
3.6 POLLUTION CONTROL SYSTEM 51
3.7 CONTROL AND MONITORING MECHANISM 54
3.8 SOLUTION TO THE PROBLEM 54
REFERENCES
LIST OF FIGURES
Figure 1: Total Power Generation
Figure 2: Top View BTPS
Figure 3: Flow Chart Of Coal To Electricity
Figure 4: Components Of A Coal Fired Thermal Plant
Figure 5: Strategies Of Ntpc
Figure 6: Parts Of Powerplant
Figure7: External View Of Boiler
Figure8: External View Of Id, Pa & Fd Fans
Figure 9: Coal Cycle
Figure 10: Wagon Trippler
Figure 11: Conveyor
Figure 12: Crushers
Figure 13: Cross-Sectional View Of A Generator
Figure 14: A 95 Mw Generator
Figure 15: Transformer
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 1
CHAPTER-1
COMPANY PROFILE
NTPC Limited is the largest thermal power generating company of India. A public sector
company, it was incorporated in the year 1975 to accelerate power development in the
country as a wholly owned company of the Government of India. At present, Government
of India holds 89.5% of the total equity shares of the company and FIIs, Domestic Banks,
Public and others hold the balance 10.5%. Within a span of 31 years, NTPC has emerged
as a truly national power company, with power generating facilities in all the major
regions of the country.
VISION AND MISSION
Vision
“To be the world’s largest and best power producer, powering India’s growth.”
Mission
“Develop and provide reliable power, related products and services at competitive prices,
integrating multiple energy sources with innovative and eco-friendly technologies and
contribute to society.”
POWER GENERATION IN INDIA
NTPC’s core business is engineering, construction and operation of power generating
plants. It also provides consultancy in the area of power plant constructions and power
generation to companies in India and abroad. As on date the installed capacity of NTPC is
27,904 MW through its 15 coal based (22,895 MW), 7 gas based (3,955 MW) and 4 Joint
Venture Projects (1,054 MW). NTPC acquired 50% equity of the SAIL Power Supply
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 2
Corporation Ltd. (SPSCL). This JV Company operates the captive power plants of
Durgapur (120 MW), Rourkela (120 MW) and Bhilai (74 MW). NTPC also has 28.33%
stake in Ratnagiri Gas & Power Private Limited (RGPPL) a joint venture company
between NTPC, GAIL, Indian Financial Institutions and Maharashtra SEB Co Ltd.
Figure 1: TOTAL POWER GENERATION
NTPC has set new benchmarks for the power industry both in the area of power plant
construction and operations. Its providing power at the cheapest average tariff in the
country..
NTPC is committed to the environment, generating power at minimal environmental cost
and preserving the ecology in the vicinity of the plants. NTPC has undertaken massive a
forestation in the vicinity of its plants. Plantations have increased forest area and reduced
barren land. The massive a forestation by NTPC in and around its Ramagundam Power
station (2600 MW) have contributed reducing the temperature in the areas by about 3°c.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 3
NTPC has also taken proactive steps for ash utilization. In 1991, it set up Ash Utilization
Division
A "Centre for Power Efficiency and Environment Protection (CENPEEP)" has been
established in NTPC with the assistance of United States Agency for International
Development (USAID). Cenpeep is efficiency oriented, eco-friendly and eco-nurturing
initiative - a symbol of NTPC's concern towards environmental protection and continued
commitment to sustainable power development in India.
EVOLUTION
NTPC was set up in 1975 in 100% by the ownership of Government
of India. In the last 30 years NTPC has grown into the largest power
utility in India.
In 1997, Government of India granted NTPC status of ‘Navratna’
being one of the nine jewels of India, enhancing the powers to the
Board of directors.
NTPC became a listed company with majority Government
ownership of 89.5%. NTPC becomes third largest by market
capitalisation of listed companies.
The company rechristened as NTPC Limited in line with its
changing business portfolio and transforms itself from a thermal
power utility to an integrated power utility.
National Thermal Power Corporation is the largest power
generation company in India. Forbes Global 2000 for 2008 ranked
it 411th
the world.
National Thermal Power Corporation is the largest power
generation company in India. Forbes Global 2000 for 2008 ranked
it 317th
in the world.
1975
1997
2004
2005
2008
2009
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 4
NTPC has also set up a plan to achieve a target of 50,000 MW
generation capacities.
NTPC has embarked on plans to become a 75,000 MW company
by 2017.
NTPC is the largest power utility in India, accounting for about 20% of India’s installed
capacity.
NTPC HEADQUARTERS
NTPC Limited is divided in 8 Headquarters
S. NO. HEADQUARTERS CITY
1. NCR HQ DELHI
2. ER HEADQUARTER-1 BHUBANESHWAR
3. ER HEADQUARTER-2 PATNA
4. NRHQ LUCKNOW
5. SR HEADQUARTER HYDERABAD
6. WR-1 HEADQUARTER MUMBAI
7. HYDRO HEADQUARTER DELHI
8. WR-2 HEADQUARTER RAIPUR
2012
2017
TABLE:1
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 5
NTPC PLANTS
1.Thermal-Coal based
S. NO. CITY STATE INSTALLED
CAPACITY(MW)
1. SINGRAULI UTTAR PRADESH 2000
2. KORBA CHATTISGHAR 2600
3. RAMAGUNDAM ANDHRA PRADESH 2600
4. FARAKKA WEST BENGAL 2100
5. VINDHYACHAL MADHYA PRADESH 3260
6. RIHAND UTTAR PRADESH 2500
7. KAHALGAON BIHAR 2300
8. DADRI UTTAR PRADESH 1820
9. TALCHER ORISSA 3000
10. UNCHAHAR UTTAR PRADESH 1050
11. TALCHER ORISSA 460
12. SIMHADRI ANDHRA PRADESH 1500
13. TANDA UTTAR PRADESH 440
14. BADARPUR DELHI 705
15. SIPAT CHHATTISGHAR 2320
16. SIPAT CHHATTISGHAR 1980
17. BONGAIGAON ASSAM 750
18. MOUDA MAHARASHTRA 1000(2*500MW)
19. RIHAND UTTAR PRADESH 2*500MW
20. BARH BIHAR 3300(5*660)
TOTAL 31495MW
TABLE:2
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 6
2. COAL BASED (Owned by JVs)
S.NO. NAME OF THE
JV
CITY STATE INSTALLED
CAPACITY(MW)
1. NSPCL DURGAPUR WEST BENGAL 120
2. NSPCL ROURKELA ORISSA 120
3. NSPCL BHILAI CHHATTISGHAR 574
4. NPGC AURANGABAD BIHAR 1980
5. M.T.P.S. KANTI BIHAR 110
6. BRBCL NABINAGAR BIHAR 1000
TOTAL 3904MW
TABLE:3
1. GAS Based
S.NO. CITY STATE INSTALLED
CAPACITY(MW)
1. ANTA RAJSTHAN 419
2. AURAIYA UTTAR PRADESH 652
3. KAWAS GUJARAT 645
4. DADRI UTTAR PRADESH 817
5. JHANOR GUJARAT 648
6. KAYAMKULAM KERALA 350
7. FARIDABAD HARYANA 430
TOTAL 3995MW
TABLE:4
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 7
NTPC HYDEL
The company has also stepped up its hydroelectric power (hydel) projects
implementation. Currently the company is mainly interested in the North-east India
wherein the Ministry of Power in India has projected a hydel power feasibility of 3000
MW.Loharinag Pala Hydro Power Project by NTPC Ltd: In Loharinag Pala Hydro Power
Project with a capacity of 600 MW (150 MW x 4 Units). The main package has been
awarded. The present executives' strength is 100+. The project is located on river
Bhagirathi (a tributory of the Ganges) in Uttarkashi district of Uttarakhand state. This is
the first project downstream from the origin of the Ganges at Gangotri.Tapovan
Vishnugad 520MW Hydro Power Project by NTPC Ltd: In Joshimath town.#Lata
Tapovan 130MW Hydro Power Project by NTPC Ltd: is further upstream to Joshimath
(under environmental revision) Koldam Hydro Power Project 800 MW in Himachal
Pradesh .
FUTURE GOALS
The company has also set a serious goal of having 50000 MW of installed capacity by
2012 and 75000 MW by 2017. NTPC will invest about Rs 20,000 crore to set up a 3,900-
megawatt (MW) coal-based power project in Madhya Pradesh. Company will also start
coal production from its captive mine in Jharkhand in 2011–12, for which the company
will be investing about 18 billion. ALSTOM would be a part of its 660-MW supercritical
projects for Solapur II and Mouda II in Maharashtra.ALSTOM would execute turnkey
station control and instrumentation (C&I) for this project.
ENVIRONMET MANAGEMENT, OCCUPATIONAL
HEALTH and SAFETY SYSTEMS
NTPC has actively gone for adoption of best international practices on environment,
occupational health and safety areas. The organization has pursued the Environmental
Management System (EMS) ISO 14001 and the Occupational Health and Safety
Assessment System OHSAS 18001 at its different establishments. As a result of pursuing
these practices, all NTPC power stations have been certified for ISO 14001 & OHSAS
18001 by reputed national and international Certifying Agencies.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 8
CHAPTER 2
ABOUT BADARPUR THERMAL POWER STATION
Figure 2: Top View BTPS
Badarpur Thermal Power Station is located at Badarpur area in NCT Delhi. The power
plant is one of the coal based power plants of NTPC. The National Power Training
Institute (NPTI) for North India Region under Ministry of Power, Government of India
was established at Badarpur in 1974, within the Badarpur Thermal power plant (BTPS)
complex.It is situated in south east corner of Delhi on Mathura Road near Faridabad. It
was the first central sector power plant conceived in India, in 1965. It was originally
conceived to provide power to neighbouring states of Haryana, Punjab, Jammu and
Kashmir,U.P., Rajasthan, and Delhi.But since year 1987 Delhi has become its sole
beneficiary.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 9
The power is supplied to a 220 KV network that is a part of the northern grid. The ten
circuits through which the power is evacuated from the plant are:
1. Mehrauli 2. Okhla
3. Ballabgarh 4. Indraprastha
5. UP (Noida) 6. Jaipur
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 10
Badarpur is situated only 20 km away from Delhi. The plant is located on the left side of
the National Highway (Delhi-Mathura Road) and it comprises of 430 hectares (678 acres)
bordered by the Agra Canal from East and by Mathura-Delhi Road from West. However,
the area for ash disposal is done in the Delhi Municipal limit and is maintained with the
help of Delhi Development Authority.
Basic Steps of Electricity Generation
a) Coal to steam
b) Steam to mechanical power
c) Mechanical power to electrical power
No of
plants
Capacity (MW)
NTPC Owned
1. Coal 16 31,855
2. Gas / Liquid Fuel 7 3,955
Total 23 35,810
Owned by Joint Ventures
3. Coal & Gas 7 5364
Grand Total 30 41,174
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 11
FROM COAL TO ELECTRICITY PROCESS
Figure 3: FLOW CHART of COAL TO ELECTRICITY
Coal to Steam
Coal from the coal wagons is unloaded in the coal handling plant. This Coal is
transported up to the raw coal bunkers with the help of belt conveyors. Coal is
transported to Bowl mills by Coal Feeders. The coal is pulverized in the Bowl Mill,
where it is ground to powder form. The mill consists of a round metallic table on
which coal particles fall. This table is rotated with the help of a motor. There are
three large steel rollers, which are spaced 120 apart. When there is no coal, these
rollers do not rotate but when the coal is fed to the table it pack up between roller
and the table and ths forces the rollers to rotate. Coal is crushed by the crushing
action between the rollers and the rotating table. This crushed coal is taken away to
the furnace through coal pipes with the help of hot and cold air mixture from P.A. Fan.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 12
P.A. Fan takes atmospheric air, a part of which is sent to Air-Preheaters for heating
while a part goes directly to the mill for temperature control. Atmospheric air from F.D.
Fan is heated in the air heaters and sent to the furnace as combustion air.
Water from the boiler feed pump passes through economizer and reaches the boiler
drum. Water from the drum passes through down comers and goes to the bottom ring
header. Water from the bottom ring header is divided to all the four sides of the
furnace. Due to heat and density difference, the water rises up in the water wall tubes.
Water is partly converted to steam as it rises up in the furnace. This steam and water
mixture is again taken to thee boiler drum where the steam is separated from water.
water follows the same path while the steam is sent to superheaters for superheating.
The superheaters are located inside the furnace and the steam is superheated (540 o
C)
and finally it goes to the turbine.Flue gases from the furnace are extracted by induced
draft fan, which maintains balance draft in the furnace (-5 to –10 mm of wcl) with
forced draft fan. These flue gases emit their heat energy to various super heaters in the
pent house and finally pass through air-preheaters and goes to electrostatic precipitators
where the ash particles are extracted. Electrostatic Precipitator consists of metal
plates, which are electrically charged. Ash particles are attracted on to these
plates, so that they do not pass through the chimney to pollute t he atmosphere.
Regular mechanical hammer blows cause the accumulation of ash to fall to the bottom
of the precipitator where they are collected in a hopper for disposal.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 13
Steam to Mechanical Power
From the boiler, a steam pipe conveys steam to the turbine through a stop valve
(which can be used to shut-off the steam in case of emergency) and through control
valves that automatically regulate the supply of steam to the turbine. Stop valve and
control valves are located in a steam chest and a governor, driven from the main
turbine shaft, operates the control valves to regulate the amount of steam used. (This
depends upon the speed of the turbine and the amount of electricity required from the
generator).
Steam from the control valves enters the high pressure cylinder of the turbine, where it
passes through a ring of stationary blades fixed to the cylinder wall. These act as
nozzles and direct the steam into a second ring of moving blades mounted on a disc
secured to the turbine shaft. The second ring turns the shafts as a result of the force of
steam. The stationary and moving blades together constitute a „stage‟ of turbine and in
practice many stages are necessary, so that the cylinder contains a number of rings of
stationary blades with rings of moving blades arranged between them. The steam passes
through each stage in turn until it reaches the end of the high-pressure cylinder and in
its passage some of its heat energy is changed into mechanical energy.
The steam leaving the high pressure cylinder goes back to the boiler for reheating and
returns by a further pipe to the intermediate pressure cylinder. Here it passes through
another series of stationary and moving blades.
Finally, the steam is taken to the low-pressure cylinders, each of which enters at the
centre flowing outwards in opposite directions through the rows of turbine blades
through an arrangement called the „double flow‟- to the extremities of the cylinder. As
the steam gives up its heat energy to drive the turbine, its temperature and pressure
fall and it expands. Because of this expansion the blades are much larger and longer
towards the low pressure ends of the turbine.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 14
Mechanical Power to Electrical Power
As the blades of turbine rotate, the shaft of the generator, which is coupled to tha
of t he turbine, also rotates. It results in rotation of the coil of the generator, which
causes induced electricity to be produced.
Basic Power Plant Cycle
Figure 4: COMPONENTS OF A COAL FIRED THERMAL PLANT
The thermal (steam) power plant uses a dual (vapour+ liquid) phase cycle. It is a close
cycle to enable the working fluid (water) to be used again and again. The cycle used
is Rankine Cycle modified to include superheating of steam, regenerative feed water
heating and reheating of steam. On large turbines, it becomes economical to increase
the cycle efficiency by using reheat, which is a way of partially overcoming
temperature limitations. By returning partially expanded steam, to a reheat, the
average temperature at which the heat is added, is increased and, by expanding this
reheated steam to the remaining stages of the turbine, the exhaust wetness is
considerably less than it would otherwise be conversely, if the maximum tolerable
wetness is allowed, the initial pressure of the steam can be appreciably increased.
Bleed Steam Extraction: For regenerative system, nos. of non-regulated extractions is
taken from HP, IP turbine. Regenerative heating of the boiler feed water is widely
used in modern power plants; the effect being to increase the average temperature
at which heat is added to the cycle, thus improving the cycle efficiency.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 15
On large turbines, it becomes economical to increase the cycle efficiency by using
reheat, which is a way of partially overcoming temperature limitations. By returning
partially expanded steam, to a reheat, the average temperature at which the heat is
added, is increased and, by expanding this reheated steam to the remaining stages of
the turbine, the exhaust wetness is considerably less than it would otherwise be
conversely, if the maximum tolerable wetness is allowed, the initial pressure of the steam
can be appreciably increased.
Bleed Steam Extraction: For regenerative system, nos. of non-regulated extractions is
taken from HP, IP turbine. Regenerative heating of the boiler feed water is widely used
in modern power plants; the effect being to increase the average temperature at which
heat is added to the cycle, thus improving the cycle efficiency.
TABLE: 6
MAIN TURBINE DATA
Rated output of Turbine 210 MW
Rated speed of turbine 3000 rpm
Rated pressure of steam before emergency 130 kg/cm^2
Stop valve rated live steam temperature 535 o
Celsius
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 16
Rated steam temperature after reheat at inlet to receptor valve 535 o
Celsius
Steam flow at valve wide open condition 670 tons/hour
Rated quantity of circulating water through condenser 27000 cm/hour
1. For cooling water temperature (o
Celsius) 24,27,30,33
2. Steam flow required for 210 MW in ton/hour 68,645,652,662
MAIN GENERATOR
Maximum continuous KVA rating 24700KVA
Maximum continuous KW 210000KW
Rated terminal voltage 15750V
Rated Stator current 9050 A
Rated Power Factor 0.85 lag
Excitation current at MCR Condition 2600 A
Slip-ring Voltage at MCR Condition 310 V
Rated Speed 3000 rpm
Rated Frequency 50 Hz
Short circuit ratio 0.49
Direction of rotation viewed Anti Clockwise
Phase Connection Double Star
Number of terminals brought out 9(6 neutral and 3 phases)
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 17
STRATEGIES OF NTPC
Figure 5: STRATEGIES OF NTPC
Technological Initiatives
a) Introduction of steam generators (boilers) of the size of 800 MW.
b) Integrated Gasification Combined Cycle (IGCC) Technology.
c) Launch of Energy Technology Centre -A new initiative for development of technologies
with focus on fundamental R&D.
d) The company sets aside up to 0.5% of the profits for R&D.
e) Roadmap developed for adopting µClean Development. Mechanism to help get / earn
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 18
µCertified Emission Reduction.
Corporate Social Responsibility
As a responsible corporate citizen NTPC has taken up number of CSR initiatives.
a) NTPC Foundation formed to address Social issues at national level
b) NTPC has framed Corporate Social Responsibility Guidelines committing up to0.5% of
net profit annually for Community Welfare.
c) The welfare of project affected persons and the local population around
NTPC projects are taken care of through well drawn Rehabilitation and Resettlement policies.
d) The company has also taken up distributed generation for remote rural areas.
Partnering government in various initiatives
a) Consultant role to modernize and improvise several plants across the country.
b) Disseminate technologies to other players in the sector.
c) Consultant role ³Partnership in Excellence´ Programme for improvement of PLF of 15
Power Stations of SEBs.
d) Rural Electrification work under Rajiv Gandhi Garmin Vidyutikaran.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 19
CHAPTER 3
OPERATION OF POWER PLANT/ (PROJECT)
BASIC PRINCIPLE
As per FARADAY‟s Law-“Whenever the amount of magnetic flux linked with a circuit
changes, an EMF is produced in the circuit. Generator works on the principle of
producing electricity. To change the flux in the generator turbine is moved in a great
speed with steam.” To produce steam, water is heated in the boilers by burning the coal.
In a Badarpur Thermal PowerStation, steam is produced and used to spin a turbine that
operates a generator. Water is heated, turns into steam and spins a steam turbine which
drives an electrical generator. After it passes through the turbine, the steam is condensed
in a condenser; this is known as a Rankine cycle.
The electricity generated at the plant is sent to consumers through high-voltage power
lines The Badarpur Thermal Power Plant has Steam Turbine-Driven Generators which
has a collective capacity of 705MW. The fuel being used is Coal which is supplied from
the Jharia Coal Field in Jharkhand. Water supply is given from the Agra Canal.
THERMAL POWER PLANT
A Thermal Power Station comprises all of the equipment and a subsystem required to
produce electricity by using a steam generating boiler fired with fossil fuels or biofuels to
drive an electrical generator. Some prefer to use the term ENERGY CENTER because such
facilities convert forms of energy, like nuclear energy, gravitational potential energy or heat
energy (derived from the combustion of fuel) into electrical energy. However, POWER
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 20
PLANT is the most common term in the united state; While POWER STATION prevails in
many Commonwealth countries and especially in the United Kingdom.
Such power stations are most usually constructed on a very large scale and designed for
continuous operation.
Figure 6: parts of powerplant
Typical elements of a coal fired thermal power station
1. cooling tower
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 21
2. Cooling water pump
3. Three -phase transmission line
4. Step up transformer
5. Electrical Generator
6. Low pressure turbine
7. Boiler feed water pump
8. Surface condenser
9. Intermediate pressure steam turbine
10. Steam control valve
11. High pressure steam turbine
12. Deaerator
13.Feed water heater
14. Coal conveyor
15. Coal hopper
16. Coal pulverizer
17. Boiler drum
18. Bottom ash hoper
19. Super heater
20. Forced draught (draft) fan
21. Reheater
22. Combustion air intake
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 22
23. Economizer
24. Air preheater
25. Precipitator
26. Induced draught (draft) fan
27. Fuel gas stack
The description of some of the components written above is described as follows:
1. Cooling towers
Cooling Towers are evaporative coolers used for cooling water or other working medium to
near the ambivalent web-bulb air temperature. Cooling towers use evaporation of water to
reject heat from processes such as cooling the circulating water used in oil refineries,
Chemical plants, power plants and building cooling, for example. The tower vary in size
from small roof-top units to very large hyperboloid structures that can be up to 200 meters
tall and 100 meters in diameter, or rectangular structure that can be over 40 meters tall and 80
meters long. Smaller towers are normally factory built, while larger ones are constructed on
site.
The primary use of large, industrial cooling tower system is to remove the heat absorbed in
the circulating cooling water systems used in power plants, petroleum refineries,
petrochemical and chemical plants, natural gas processing plants and other industrial
facilities. The absorbed heat is rejected to the atmosphere by the evaporation of some of the
cooling water in mechanical forced-draft or induced draft towers or in natural draft
hyperbolic shaped cooling towers as seen at most nuclear power plants.
2. Cooling Water Pump
it pumps the water from the cooling tower which goes to the condenser
3. Three phase transmission line
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 23
Three phase electric power is a common method of electric power transmission. It is a type
of polyphase system mainly used to power motors and many other devices. A Three phase
system uses less conductor material to transmit electric power than equivalent single phase,
two phase, or direct current system at the same voltage. In a three phase system, three circuits
reach their instantaneous peak values at different times. Taking one conductor as the
reference, the other two current are delayed in time by one-third and two-third of one cycle
of the electrical current. This delay between “phases” has the effect of giving constant power
transfer over each cycle of the current and also makes it possible to produce a rotating
magnetic field in an electric motor.
At the power station, an electric generator converts mechanical power into a set of electric
currents, one from each electromagnetic coil or winding of the generator. The current are
sinusoidal functions of time, all at the same frequency but offset in time to give different
phases. In a three phase system the phases are spaced equally, giving a phase separation of
one-third one cycle. Generators output at a voltage that ranges from hundreds of volts to
30,000 volts. At the power station, transformers: step-up” this voltage to one more suitable
for transmission.
4. Unit transformer (3-phase)
At the power station, transformers step-up this voltage to one more suitable for
transmission. After numerous further conversions in the transmission and distribution
network the power is finally transformed to the standard mains voltage (i.e. the
“household” voltage). The power may already have been split into single phase at this
point or it may still be three phase. Where the step-down is 3 phase, the output of this
transformer is usually star connected with the standard mains voltage being the phase-
neutral voltage. Another system commonly seen in North America is to have a delta
connected secondary with a center tap on one of the windings supplying the ground and
neutral. This allows for 240 V three phase as well as three different single phase voltages(
120 Vbetween two of the phases and neutral , 208 V between the third phase ( or wild leg)
and neutral and 240 V between any two phase) to be available from the same supply.
5. Electrical generator
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 24
An Electrical generator is a device that converts kinetic energy to electrical energy, generally
using electromagnetic induction. The task of converting the electrical energy into mechanical
energy is accomplished by using a motor. The source of mechanical energy may be a
reciprocating or turbine steam engine, , water falling through the turbine are made in a
variety of sizes ranging from small 1 hp (0.75 kW) units (rare) used as mechanical drives for
pumps, compressors and other shaft driven equipment , to 2,000,000 hp(1,500,000 kW)
turbines used to generate electricity. There are several classifications for modern steam
turbines.
Steam turbines are used in all of our major coal fired power stations to drive the generators or
alternators, which produce electricity. The turbines themselves are driven by steam generated
in ‘Boilers’ or ‘steam generators’ as they are sometimes called.
Electrical power stations use large steam turbines driving electric generators to produce most
(about 86%) of the world’s electricity. These centralized stations are of two types: fossil fuel
power plants and nuclear power plants. The turbines used for electric power generation are
most often directly coupled to their-generators .As the generators must rotate at constant
synchronous speeds according to the frequency of the electric power system, the most
common speeds are 3000 r/min for 50 Hz systems, and 3600 r/min for 60 Hz systems. Most
large nuclear sets rotate at half those speeds, and have a 4-pole generator rather than the more
common 2-pole one.
Energy in the steam after it leaves the boiler is converted into rotational energy as it passes
through the turbine. The turbine normally consists of several stage with each stages
consisting of a stationary blade (or nozzle) and a rotating blade. Stationary blades convert the
potential energy of the steam into kinetic energy into forces, caused by pressure drop, which
results in the rotation of the turbine shaft. The turbine shaft is connected to a generator,
which produces the electrical energy.
6. Low Pressure Turbine
Energy in the steam after it leaves the boiler is converted into rotational energy as it
passes through the turbine. The turbine normally consists of several stages with each
stages consisting of a stationary blade (or nozzle) and a rotating blade. Stationary blades
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 25
convert the potential energy of the steam into kinetic energy and direct the flow onto the
rotating blades. The rotating blades convert the kinetic energy into impulse and reaction
forces, caused by pressure drop, which results in the rotation of the turbine shaft. The
turbine shaft is connected to a generator, which produces the electrical energy.
Low Pressure Turbine (LPT) consists of 4x2 stages. After passing through Intermediate
Pressure Turbine steam is passed through LPT which is made up of two parts- LPC
REAR & LPC FRONT. As water gets cooler here it gathers into a HOTWELL placed in
lower parts of turbine.
7. Condensation Extraction Pump
A Boiler feed water pump is a specific type of pump used to pump water into a steam
boiler. The water may be freshly supplied or returning condensation of the steam
produced by the boiler. These pumps are normally high pressure units that use suction
from a condensate return system and can be of the centrifugal pump type or positive
displacement type.
Construction and operation:
Feed water pumps range in size up to many horsepower and the electric motor is usually
separated from the pump body by some form of mechanical coupling. Large industrial
condensate pumps may also serve as the feed water pump. In either case, to force the
water into the boiler, the pump must generate sufficient pressure to overcome the steam
pressure developed by the boiler. This is usually accomplished through the use of a
centrifugal pump. Feed water pumps usually run intermittently and are controlled by a
float switch or other similar level-sensing device energizing the pump when it detects a
lowered liquid level in the boiler. Some pumps contain a two-stage switch. As liquid
lowers to the trigger point of the first stage, the pump is activated. If the liquid continues
to drop, (perhaps because the pump has failed, its supply has been cut off or exhausted, or
its discharge is blocked) the second stage will be triggered. This stage may switch off the
boiler equipment (preventing the boiler from running dry and overheating), trigger an
alarm, or both.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 26
8. Condenser
The steam coming out from the Low Pressure Turbine (a little above its boiling pump) is
brought into thermal contact with cold water (pumped in from the cooling tower) in the
condenser, where it condenses rapidly back into water, creating near Vacuum-like
conditions inside the condenser chest.
9. Intermediate Pressure Turbine
Intermediate Pressure Turbine (IPT) consists of 11 stages. When the steam has been passed
through HPT it enters into IPT. IPT has two ends named as FRONT & REAR.
Steam enters through front end and leaves from Rear end.
10. Steam Governor Valve
Steam locomotives and the steam engines used on ships and stationary applications such
as power plants also required feed water pumps. In this situation, though, the pump was
often powered using a small steam engine that ran using the steam produced by the boiler
a means had to be provided, of course, to put the initial charge of water into the boiler
(before steam power was available to operate the steam-powered feed water pump).The
pump was often a positive displacement pump that had steam valves and cylinders at one
end and feed water cylinders at the other end; no crankshaft was required. In thermal
plants, the primary purpose of surface condenser is to condense the exhaust steam from a
steam turbine to obtain maximum efficiency and also to convert the turbine exhaust
steam into pure water so that it may be reused in the steam generator or boiler as boiler
feed water. By condensing the exhaust steam of a turbine at a pressure below atmospheric
pressure, the steam pressure drop between the inlet and exhaust of the turbine is
increased, which increases the amount heat available for conversion to mechanical
power.
11.High Pressure Turbine
Steam coming from Boiler directly feeds into HPT at a temperature of 540°C and at a
pressure of 136 kg/cm2. Here it passes through 12 different stages due to which its
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 27
temperature goes down to 329°C and pressure as 27 kg/cm2. This line is also called as
CRH – COLD REHEAT LINE. It is now passed to a REHEATER where its temperature
rises to 540°C and called as HRH-HOT REHEATED LINE.
12. Deaerator
A Deaerator is a device for air removal and used to remove dissolved gases (an alternate
would be the use of water treatment chemicals) from boiler feed water to make it non-
corrosive. A dearator typically includes a vertical domed deaeration section as the
deaeration boiler feed water tank. A Steam generating boiler requires that the circulating
steam, condensate, and feed water should be devoid of dissolved gases, particularly
corrosive ones and dissolved or suspended solids. The gases will give rise to corrosion of
the metal. The solids will deposit on the heating surfaces giving rise to localized heating
and tube ruptures due to overheating. Under some conditions it may give rise to stress
corrosion cracking. Deaerator level and pressure must be controlled by adjusting control
valves the level by regulating condensate flow and the pressure by regulating steam flow.
13. Feed water heater
A Feed water heater is a power plant component used to pre-heat water delivered to a
steam generating boiler. Preheating the feed water reduces the irreversibility involved in
steam generation and therefore improves the thermodynamic efficiency of the system.
This reduces plant operating costs and also helps to avoid thermal shock to the boiler
metal when the feed water is introduced back into the steam cycle. In a steam power
(usually modelled as a modified Rankine cycle), feed water heaters allow the feed water
to be brought up to the saturation temperature very gradually. This minimizes the
inevitable irreversibility associated with heat transfer to the working fluid (water).
14. Coal conveyor
Coal conveyors are belts which are used to transfer coal from its storage place to Coal
Hopper. A belt conveyor consists of two pulleys, with a continuous loop of material- the
conveyor Belt – that rotates about them. The pulleys are powered, moving the belt and
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 28
the material on the belt forward.Conveyor belts are extensively used to transport industrial
and agricultural material, such as grain, coal, ores etc.
15. Coal Hopper
Coal Hoppers are the places which are used to feed coal to Fuel Mill. It also has the
arrangement of entering Hot Air at 200°C inside it which solves our two purposes:-
1. If our Coal has moisture content then it dries it so that a proper combustion takes place.
2. It raises the temperature of coal so that its temperature is more near to its Ignite
Temperature so that combustion is easy
16. Pulverized Fuel Mill
A pulveriser is a device for grinding coal for combustion in a furnace in a fossil fuel
power plant.
17. Boiler feed water pump
A Boiler feed water pump is a specific type of pump used to pump water into a steam
boiler. The water may be freshly supplied or retuning condensation of the steam produced
by the boiler. These pumps are normally high pressure units that use suction from a
condensate return system and can be of the centrifugal pump type or positive displacement
type.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 29
Figure7: EXTERNAL VIEW OF BOILER
Construction and operation:
Feed water pumps range in size up to many horsepower and the electric motor is usually
separated from the pump body by some form of mechanical coupling. Large industrial
condensate pumps may also serve as the feed water pump. In either case, to force the
water into the boiler; the pump must generate sufficient pressure to overcome the steam
pressure developed by the boiler. This is usually accomplished through the use of a
centrifugal pump.
Feed water pumps usually run intermittently and are controlled by a float switch or other
similar level-sensing device energizing the pump when it detects a lowered liquid level in
the boiler is substantially increased. Some pumps contain a two-stage switch. As liquid
lowers to the trigger point of the first stage, the pump is activated. I f the liquid continues to
drop (perhaps because the pump has failed, its supply has been cut off or exhausted, or its
discharge is blocked); the second stage will be triggered.
18. Ash Hopper
A steam drum is used in the company of a mud-drum/feed water drum which is located at
a lower level.So that it acts as a sump for the sludge or sediments which have a tendency to
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 30
accumulate at the bottom.
19. Super Heater
A Super heater is a device in a steam engine that heats the steam generated by the boiler
again increasing its thermal energy. Super heaters increase the efficiency of the steam
engine, and were widely adopted. Steam which has been superheated is logically known
as superheated steam; non- superheated steam is called saturated steam or wet steam.
Super heaters were applied to steam locomotives in quantity from the early 20th century,
to most steam vehicles, and also stationary steam engines including power stations.
20. Force Draught Fan
External fans are provided to give sufficient air for combustion. The forced draught fan
takes air from the atmosphere and, warms it in the air preheater for better combustion,
injects it via the air nozzles on the furnace wall.
21. Reheater
Reheater is a heater which is used to raise the temperature of steam which has fallen from
the intermediate pressure turbine.
22. Air Intake
Air is taken from the environment by an air intake tower which is fed to the fuel.
23. Economizers
Economizer, or in the UK economizer, are mechanical devices intended to reduce energy
consumption, or to perform another useful function like preheating a fluid. The term
economizer is used for other purposes as well-Boiler, power plant, heating, ventilating
and air-conditioning. In boilers, economizer are heat exchange devices that heat fluids ,
usually water, up to but not normally beyond the boiling point of the fluid. Economizers
are so named because they can make use of the enthalpy and improving the boiler‟s
efficiency. They are devices fitted to a boiler which save energy by using the exhaust
gases from the boiler to preheat the cold water used to fill it (the feed water). Modern day
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 31
boilers, such as those in cold fired power stations, are still fitted with economizer which
is decedents of Green‟s original design. In this context there are turbines before it is
pumped to the boilers. A common application of economizer in steam power plants is to
capture the waste heat from boiler stack gases (flue gas) and transfer thus it to the boiler
feed water thus lowering the needed energy input , in turn reducing the firing rates to
accomplish the rated boiler output . Economizer lower stack temperatures which may
cause condensation of acidic combustion gases and serious equipment corrosion damage
if care is not taken in their design and material selection.
24. Air Preheater
Air preheater is a general term to describe any device designed to heat air before another
process (for example, combustion in a boiler). The purpose of the air preheater is to
recover the heat from the boiler flue gas which increases the thermal efficiency of the
boiler by reducing the useful heat lost in the flue gas. As a consequence, the flue gases
are also sent to the flue gas stack (or chimney) at a lower temperature allowing simplified
design of the ducting and the flue gas stack. It also allows control over the temperature of
gases leaving the stack.
25. Precipitator
An Electrostatic precipitator (ESP) or electrostatic air cleaner is a particulate device that
removes particles from a flowing gas (such As air) using the force of an induced electrostatic
charge. Electrostatic precipitators are highly efficient filtration devices, and can easily
remove fine particulate matter such as dust and smoke from the air steam.
ESP’s o ti ue to e e elle t de i es for o trol of a i dustrial parti ulate e issio s,
including smoke from electricity-generating utilities (coal and oil fired), salt cake collection
from black liquor boilers in pump mills, and catalyst collection from fluidized bed catalytic
crackers from several hundred thousand ACFM in the largest coal-fired boiler application.
The original parallel plate-Weighted wire design (described above) has evolved as more
efficient ( and robust) discharge electrode designs were developed, today focusing on rigid
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 32
discharge electrodes to which many sharpened spikes are attached , maximizing corona
production. Transformer –rectifier systems apply voltages of 50-100 Kilovolts at relatively
high current densities. Modern controls minimize sparking and prevent arcing, avoiding
damage to the components. Automatic rapping systems and hopper evacuation systems
remove the collected parti ulate atter hile o li e allo i g ESP’s to sta i operatio for
years at a time.
26. Induced Draught Fan
The induced draft fan assists the FD fan by drawing out combustible gases from the
furnace, maintaining a slightly negative pressure in the furnace to avoid backfiring
through any opening. At the furnace outlet and before the furnace gases are handled by
the ID fan, fine dust carried by the outlet gases is removed to avoid atmospheric
pollution. This is an environmental limitation prescribed by law, which additionally
minimizes erosion of the ID fan.
Figure8: EXTERNAL VIEW OF ID, PA & FD FANS
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 33
27. Fuel gas stack
A Fuel gas stack is a type of chimney, a vertical pipe, channel or similar structure through
which combustion product gases called fuel gases are exhausted to the outside air. Fuel gases
are produced when coal, oil, natural gas, wood or any other large combustion device. Fuel
gas is usually composed of carbon dioxide (CO2) and water vapor as well as nitrogen and
excess oxygen remaining from the intake combustion air. It also contains a small percentage
of pollutants such as particulates matter, carbon mono oxide, nitrogen oxides and sulfur
oxides. The flue gas stacks are often quite tall, up to 400 meters (1300 feet) or more, so as to
disperse the exhaust pollutants over a greater aria and thereby reduce the concentration of the
pollutants to the levels required by governmental environmental policies and regulations.
When the fuel gases exhausted from stoves, ovens, fireplaces or other small sources within
residential abodes, restaurants , hotels or other stacks are referred to as chimneys.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 34
COAL HANDLING PLANT (C.H.P) & NEW COAL HANDLING
PLANT (N.C.H.P)
The old coal handling plant caters to the need of units 2,3,4,5 and 1 whereas the latter
supplies coal to units 4 and V.O.C.H.P. supplies coal to second and third stages in the advent
coal to usable form to (crushed) form its raw form and send it to bunkers, from where it is
send to furnace.
Figure 9: COAL CYCLE
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 35
Major Components
1.Wagon Tippler: - Wagons from the coal yard come to the tippler and are emptied here.
The process is performed by a slip –ring motor of rating: 55 KW, 415V, 1480 RPM. This
motor turns the wagon by 135 degrees and coal falls directly on the conveyor through
vibrators. Tippler has raised lower system which enables is to switch off motor when
required till is wagon back to its original position. It is titled by weight balancing principle.
The motor lowers the hanging balancing weights, which in turn tilts the conveyor. Estimate
of the weight of the conveyor is made through hydraulic weighing machine.
Motor Specification
1. (i) H.P 75 HP
2. (ii) Voltage 415, 3 phase
3. (iii) Speed 1480 rpm
4. (iv) Frequency 50 Hz
5. (v) Current rating 102 A
Figure 10: WAGON TRIPPLER
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 36
2.Conveyor: - There are 14 conveyors in the plant. They are numbered so that their function
can be easily demarcated. Conveyors are made of rubber and more with a speed of 250-
300m/min. Motors employed for conveyors has a capacity of 150 HP. Conveyors have a
capacity of carrying coal at the rate of 400 tons per hour. Few conveyors are double belt, this
is done for imp. Conveyors so that if a belt develops any problem the process is not stalled.
The conveyor belt has a switch after every 25-30 m on both sides so stop the belt in case of
emergency. The conveyors are 1m wide, 3 cm thick and made of chemically treated
vulcanized rubber. The max angular elevation of conveyor is designed such as never to
exceed half of the angle of response and comes out to be around 20 degrees.
Conveyors:-
10A, 10B
11A, 11B
12A, 12B
13A, 13B
14A, 14B
15A, 15B
16A, 16B
17A, 17B
18A, 18B
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 37
FIGURE 11: CONVEYOR
3. Metal Separators: - As the belt takes coal to the crusher, No metal pieces should go along
with coal. To achieve this objective, we use metal separators. When coal is dropped to the
crusher hoots, the separator drops metal pieces ahead of coal. It has a magnet and a belt
and the belt is moving, the pieces are thrown away. The capacity of this device is around 50
kg. .The CHP is supposed to transfer 600 tons of coal/hr, but practically only 300-400 tons
coal is transfer.
4. Crusher: - Both the plants use TATA crushers powered by BHEL. Motors. The crusher is of
ring type and motor ratings are 400 HP, 606 KV. Crusher is designed to crush the pieces to
20 mm size i.e. practically considered as the optimum size of transfer via conveyor.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 38
FIGURE 12: CRUSHERS
5. Rotatory Breaker: - OCHP employs mesh type of filters and allows particles of 20mm size
to go directly to RC bunker, larger particles are sent to crushes. This leads to frequent
clogging. NCHP uses a technique that crushes the larger of harder substance like metal
impurities easing the load on the magnetic separators.
6. Rotary components
(a) ID Fans: - Located between electrostatic precipitator and chimney.
Type-radical
Speed-1490 rpm
Rating-300 KW
Voltage-6.6 KV
Lubrication-by oil
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 39
(b) FD Fans: - Designed to handle secondary air for boiler. 2 in number and provide ignition
of coal.
Type-axial
Speed-990 rpm
Rating-440 KW
Voltage-6.6 KV
(c)Primary Air Fans: - Designed for handling the atmospheric air up to 50 degrees Celsius, 2
in numberAnd they transfer the powered coal to burners to firing.
Type-Double suction radial
Rating-300 KW
Voltage-6.6 KV
Lubrication-by oil
Type of operation-continuous
7. Coal feed to plant:
Feeder motor specification
(i) Horse power 15 HP
(ii) Voltage 415V, 3 phase
(iii) Speed 1480 rpm
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 40
Generator and Auxiliaries
Generator Fundamentals
The transformation of mechanical energy into electrical energy is carried out by the
Generator. This Chapter seeks to provide basic understanding about the working principles
and development of Generator.
Figure 13: CROSS-SECTIONAL VIEW OF A GENERATOR
Working Principle
The A.C. Generator or alternator is based upon the principle of electromagnetic induction
and consists generally of a stationary part called stator and a rotating part called rotor. The
stator housed the armature windings. The rotor houses the field windings. D.C. voltage is
applied to the field windings through slip rings. When the rotor is rotated, the lines of
magnetic flux (i.e. magnetic field) cut through the stator windings. This induces an
electromagnetic force (EMF) in the stator windings. The magnitude of this EMF is given by
the following expression.
E = 4.44 /O FN volts
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 41
0 = Stre gth of ag eti field i We er’s.
F = Frequency in cycles per second or Hertz.
N = Number of turns in a coil of stator winding
F = Frequency = P*n/120
Where P = Number of poles
n = revolutions per second of rotor.
From the expression it is clear that for the same frequency, number of poles increases with
decrease in speed and vice versa. Therefore, low speed hydro turbine drives generators
have 14 to 20 poles were as high speed steam turbine driven generators have generally 2
poles.
Figure 14: A 95 MW GENERATOR
Generator component
This deals with the two main components of the Generator viz. Rotor, its winding &
balancing and stator, its frame, core & windings.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 42
Rotor
The electrical rotor is the most difficult part of the generator to design. It revolves in most
modern generators at a speed of 3,000 revolutions per minute. The problem of
guaranteeing the dynamic strength and operating stability of such a rotor is complicated by
the fact that a massive non-uniform shaft subjected to a multiplicity of differential stresses
must operate in oil lubricated sleeve bearings supported by a structure mounted on
foundations all of which possess complex dynamic be behavior peculiar to them. It is also an
electromagnet and to give it the necessary magnetic strength
The windings must carry a fairly high current. The passage of the current through the
windings generates heat but the temperature must not be allowed to become so high,
otherwise difficulties will be experienced with insulation. To keep the temperature down,
the cross section of the conductor could not be increased but this would introduce another
problems. In order to make room for the large conductors, body and this would cause
mechanical weakness. The problem is really to get the maximum amount of copper into the
windings without reducing the mechanical strength. With good design and great care in
construction this can be achieved. The rotor is a cast steel ingot, and it is further forged and
machined. Very often a hole is bored through the centre of the rotor axially from one end of
the other for inspection. Slots are then machined for windings and ventilation.
Rotor winding
Silver bearing copper is used for the winding with mica as the insulation between
conductors. A mechanically strong insulator such as micanite is used for lining the slots.
Later designs of windings for large rotor incorporate combination of hollow conductors with
slots or holes arranged to provide for circulation of the cooling gas through the actual
conductors. When rotating at high speed. Centrifugal force tries to lift the windings out of
the slots and they are contained by wedges. The end rings are secured to a turned recess in
the rotor body, by shrinking or screwing and supported at the other end by fittings carried
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 43
by the rotor body. The two ends of windings are connected to slip rings, usually made of
forged steel, and mounted on insulated sleeves.
Stator
Stator frame: The stator is the heaviest load to be transported. The major part of this load is
the stator core. This comprises an inner frame and outer frame. The outer frame is a rigid
fabricated structure of welded steel plates, within this shell is a fixed cage of girder built
circular and axial ribs. The ribs divide the yoke in the compartments through which
hydrogen flows into radial ducts in the stator core and circulate through the gas coolers
housed in the frame. The inner cage is usually fixed in to the yoke by an arrangement of
springs to dampen the double frequency vibrations inherent in 2 pole generators. The end
shields of hydrogen cooled generators must be strong enough to carry shaft seals. In large
generators the frame is constructed as two separate parts. The fabricated inner cage is
inserted in the outer frame after the stator core has been constructed and the winding
completed. Stator core: The stator core is built up from a large number of 'punching" or
sections of thin steel plates. The use of cold rolled grain-oriented steel can contribute to
reduction in the weight of stator core for two main reasons:
a) There is an increase in core stacking factor with improvement in lamination cold Rolling
and in cold buildings techniques.
b) The advantage can be taken of the high magnetic permeance of grain-oriented steels of
work the stator core at comparatively high magnetic saturation without fear or excessive
iron loss of two heavy a demand for excitation ampere turns from the generator rotor.
Stator Windings
Each stator conductor must be capable of carrying the rated current without overheating.
The insulation must be sufficient to prevent leakage currents flowing between the phases to
earth. Windings for the stator are made up from copper strips wound with insulated tape
which is impregnated with varnish, dried under vacuum and hot pressed to form a solid
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 44
insulation bar. These bars are then place in the stator slots and held in with wedges to form
the complete winding which is connected together at each end of the core forming the end
turns. These end turns are rigidly braced and packed with blocks of insulation material to
withstand the heavy forces which might result from a short circuit or other fault conditions.
The generator terminals are usually arranged below the stator. On recent generators (210
MW) the windings are made up from copper tubes instead of strips through which water is
circulated for cooling purposes. The water is fed to the windings through plastic tubes.
Generator Cooling System
The 200/210 MW Generator is provided with an efficient cooling system to avoid excessive
heating and consequent wear and tear of its main components during operation. This
Chapter deals with the rotor-hydrogen cooling system and stator water cooling system
along with the shaft sealing and bearing cooling systems.
Rotor Cooling System
The rotor is cooled by means of gap pick-up cooling, wherein the hydrogen gas in the air gap
is sucked through the scoops on the rotor wedges and is directed to flow along the
ventilating canals milled on the sides of the rotor coil, to the bottom of the slot where it
takes a turn and comes out on the similar canal milled on the other side of the rotor coil to
the hot zone of the rotor. Due to the rotation of the rotor, a positive suction as well as
discharge is created due to which a certain quantity of gas flows and cools the rotor. This
method of cooling gives uniform distribution of temperature. Also, this method has an
inherent advantage of eliminating the deformation of copper due to varying temperatures.
Hydrogen Cooling System
Hydrogen is used as a cooling medium in large capacity generator in view of its high heat
arr i g apa it a d lo de sit . But i ie of it’s for i g a e plosi e i ture ith
oxygen, proper arrangement for filling, purging and maintaining its purity inside the
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 45
generator have to be made. Also, in order to prevent escape of hydrogen from the
generator casing, shaft sealing system is used to provide oil sealing.
The hydrogen cooling system mainly comprises of a gas control stand, a drier, an liquid level
indicator, hydrogen control panel, gas purity measuring and indicating instruments,
The system is capable of performing the following functions:
I. Filling in and purging of hydrogen safely without bringing in contact with air.
II. Maintaining the gas pressure inside the machine at the desired value at all the times.
III. Provide indication to the operator about the condition of the gas inside the machine
i.e. its pressure, temperature and purity.
IV. Continuous circulation of gas inside the machine through a drier in order to remove
any water vapor that may be present in it.
V. Indication of liquid level in the generator and alarm in case of high level.
Stator Cooling System
The stator winding is cooled by distillate.
Turbo generators require water cooling arrangement over and above the usual hydrogen
cooling arrangement. The stator winding is cooled in this system by circulating
demineralised water (DM water) through hollow conductors. The cooling water used for
cooling stator winding calls for the use of very high quality of cooling water. For this
purpose DM water of proper specific resistance is selected. Generator is to be loaded within
a very short period if the specific resistance of the cooling DM water goes beyond certain
preset values. The system is designed to maintain a constant rate of cooling water flow to
the stator winding at a nominal inlet water temperature of 400
C.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 46
Rating of 95 MW Generator-
Manufacture by Bharat heavy electrical Limited (BHEL)
Capacity - 117500 KVA
Voltage - 10500V
Speed - 3000 rpm
Hydrogen - 2.5 Kg/cm2
Power factor - 0.85 (lagging)
Stator current - 6475 A
Frequency - 50 Hz
Stator winding connection - 3 phase
Rating of 210 MW Generator-
Manufacture by Bharat heavy electrical Limited (BHEL)
Capacity - 247000 KVA
Voltage (stator) - 15750 V
Current (stator) - 9050 A
Voltage (rotor) - 310 V
Current (rotor) - 2600 V
Speed - 3000 rpm
Power factor - 0.85
Frequency - 50 Hz
Hydrogen - 3.5 Kg/cm2
Stator winding connection - 3 phase star connection
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 47
TRANSFORMER
A transformer is a device that transfers electrical energy from one circuit to another by
magnetic coupling without requiring relative motion between its parts. It usually comprises
two or more coupled windings, and in most cases, a core to concentrate magnetic flux. An
alternating voltage applied to one winding creates a time-varying magnetic flux in the core,
which includes a voltage in the other windings. Varying the relative number of turns
between primary and secondary windings determines the ratio of the input and output
voltages, thus transforming the voltage by stepping it up or down between circuits. By
transforming electrical power to a high-voltage, _low-current form and back again, the
transformer greatly reduces energy losses and so enables the economic transmission of
power over long distances. It has thus shape the electricity supply industry, permitting
generation to be located remotely from point of demand.
FIGURE 15: TRANSFORMER
WORKING PRINCIPLE:
It works on FARADAY‟S LAW OF ELECTROMAGNETIC INDUCTION (self
or mutual induction depending on the type of transformer).
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 48
MAIN PARTS
CONSERVATOR
It is used generally to conserve the insulating property of the oil from deterioration&
protect the transformer against failure on account of bad quality of oil.
SILICAGEL DEHYDRATING BREATHER
It is used to prevent entry of moisture inside the transformer tank. The breather
consists of silica gel.
GAS OPERATED RALAY
It is a gas actuated relay used for protecting oil immersed transformer against all
types of faults. It indicates presence of gases in case of some minor fault & take
out the transformer out of circuit in case of serious fault.
BUSHING
It is made from highly insulating material to insulate & to bring out the terminals
of the transformer from the container. The bushings are of 3 types:
a). Porcelain bushings used for low voltage transformer
b). Oil filled bushings used for voltage up to 33KV.
c). Condensed type bushings used for voltage above 33KV
OIL GAUGE
Every transformer with an oil guage to indicate the oil level. The oil guage may be
provided with the alarm contacts which gave an alarm the oil level has dropped
beyond permissible height due to oil leak etc.
TAPPINGS
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 49
The transformer are usually provided with few tappings on secondary side so
that output voltage can be varied for constant input voltage.
RADIATOR
It increases the surface area of the tank & more heat is thus radiated in less time.
CONSTRUCTIONAL FEATURES
a) 3 phase transformer is constructed in the core type construction
b) For reducing losses a smaller thickness of lamination is used.
c) For the above reason it is also called cold-rolled steel instead hot-rolled steel is
used.
d) High flux densities (1.4 to 1.7 Wb/sq m) are used in the core of power transformer
which carry load throughout.
e)For high voltage winding, disc type coils are used.
CLASSIFICATION
(I) ACCORDING TO THE CORE
a)Core type transformer
b)Shell type transformer
c)Berry type transformer
(II) ACCORDING TO THE PHASES
a)1phase transformer
b)3phase transformer
COOLING OF TRANSFORMERS :
As size of transformer becomes large, the rate of the oil circulating becomes insufficient
to dissipate all the heat produced & artificial means of increasing the circulation by
electric pumps. In very large transformers, special coolers with water circulation may
have to be employed.
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 50
TYPES OF COOLING
AIR COOLING
a) Air Natural
b)Air Forced
OIL IMMERSED COOLING
a) Oil Natural Air Cooling
b)Oil Natural Force Cooling
c)Oil Forced Air Natural Cooling
d) Oil Forced Air Forced Cooling
MAIN PARTS OF TRANSFORMER
1.Primary Winding
2.Secondry Winding
3.Oil Level
4.Conservator
5.Breather
6.Drain Cocks
7.Cooling Tubes
8.Transformer Oil
9.Earth Point
10.Explosion Vent
11.Temperature Gauge
12.Secondary Terminal
13.Primary Terminal
14.Buchholz Relay
Rating of transformer
No load voltage (HV) - 229 KV
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 51
No load Voltage (LV) -10.5 KV
Line current (HV) -315.2 A
Line current (LV) - 873.2 A
Temp rise - 45 Celsius
Oil quantity - 40180 lit
Weight of oil - 34985 Kg
Total weight - 147725 Kg
Core & winding - 84325 Kg
Phase -3
Frequency - 50 Hz
INSTRUMENTS SEEN
1. MICROMETER
This instrument is used for measuring inside as well as outside diameter of bearing.
2. MEGGAR
This instrument is used for measuring insulation resistance.
3. VIBRATION TESTER
It measures the vibration of the motor. It is measured in three dimensions-axial, vertical and
horizontal.
POLLUTION CONTROL SYSTEMS:
While deciding the appropriate technology for its projects, NTPC integrates many
environmental provisions into the plant design. In order to ensure that NTPC complies
with all the stipulated environment norms, various state-of-the-art pollution control
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 52
systems / devices as discussed below have been installed to control air and water
pollution.
Electrostatic Precipitators:
The ash left behind after combustion of coal is arrested in high efficiency Electrostatic
Precipitators (ESPs) and particulate emission is controlled well within the stipulated
norms. The ash collected in the ESPs is disposed to Ash Ponds in slurry form.
Flue Gas Stacks:
Tall Flue Gas Stacks have been provided for wide dispersion of the gaseous emissions
(SOX, NOX etc.) into the atmosphere.
Low-NOX Burners:
In gas based NTPC power stations, NOX emissions are controlled by provision of Low-
NOX Burners (Dry or wet type) and in coal fired stations, by adopting best combustion
practices.
Neutralization Pits:
Neutralization pits have been provided in the Water Treatment Plant (WTP) for pH
correction of the Effluents before discharge into Effluent Treatment Plant (ETP) for
further treatment and use.
Coal Settling Pits / Oil Settling Pits:
In these Pits, coal dust and oil are removed from the effluents emanating from the Coal
Handling Plant (CHP), coal yard and Fuel Oil Handling areas before discharge into ETP.
DE & DS Systems:
Dust Extraction (DE) and Dust Suppression (DS) systems have been installed in all coal
fired power stations in NTPC to contain and extract the fugitive dust released in the Coal
Handling Plant (CHP).
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 53
Cooling Towers:
Cooling Towers have been provided for cooling the hot Condenser cooling water in
closed cycle, Condenser Cooling Water (CCW) Systems. This helps in reduction in
thermal pollution and conservation of fresh water.
Ash Dykes & Ash Disposal systems:
Ash ponds have been provided at all coal based stations except Dadri where Dry Ash
Disposal System has been provided. Ash Ponds have been divided into lagoons and
provided with garlanding arrangement for changeover of the ash slurry feed points for
even filling of the pond and for effective settlement of the ash particles.
Ash in slurry form is discharged into the lagoons where ash particles get settled from the
slurry and clear effluent water is discharged from the ash pond. The discharged effluents
conform to standards specified by CPCB and the same is regularly monitored.
At its Dadri Power Station, NTPC has set up a unique system for dry ash collection and
disposal facility with Ash Mound formation. This has been envisaged for the first time in
Asia which has resulted in progressive development of green belt besides far less
requirement of land and less water requirement as compared to the wet ash disposal
system.
Ash Water Recycling System:
Further, in a number of NTPC stations, as a proactive measure, Ash Water Recycling
System (AWRS) has been provided. In the AWRS, the effluent from ash pond is
circulated back to the station for further ash sluicing to the ash pond. This helps in
savings of fresh water requirements for transportation of ash from the plant.
The ash water recycling system has already been installed and is in operation at
Ramagundam, Simhadri, Rihand, Talcher Kaniha, Talcher Thermal, Kahalgaon, Korba
and Vindhyachal. The scheme has helped stations to save huge quantity of fresh water
required as make-up water for disposal of ash.
Liquid Waste Treatment Plants & Management System:
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 54
The objective of industrial liquid effluent treatment plant (ETP) is to discharge lesser and
cleaner effluent from the power plants to meet environmental regulations. After primary
treatment at the source of their generation, the effluents are sent to the ETP for further
treatment. The composite liquid effluent treatment plant has been designed to treat all
liquid effluents which originate within the power station e.g. Water Treatment Plant
(WTP), Condensate Polishing Unit (CPU) effluent, Coal Handling Plant (CHP) effluent,
floor washings, service water drains etc. The scheme involves collection of various
effluents and their appropriate treatment centrally and re-circulation of the treated
effluent for various plant uses.
NTPC has implemented such systems in a number of its power stations such as
Ramagundam, Simhadri, Kayamkulam, Singrauli, Rihand, Vindhyachal, Korba, Jhanor
Gandhar, Faridabad, Farakka, Kahalgaon and Talcher Kaniha. These plants have helped
to control quality and quantity of the effluents discharged from the stations.
Sewage Treatment Plants & Facilities:
Sewage Treatment Plants (STPs) sewage treatment facilities have been provided at all
NTPC stations to take care of Sewage Effluent from Plant and township areas. In a
number of NTPC projects modern type STPs with Clarifloculators, Mechanical Agitators,
sludge drying beds, Gas Collection Chambers etc. have been provided to improve the
effluent quality. The effluent quality is monitored regularly and treated effluent
conforming to the prescribed limit is discharged from the station. At several stations
treated effluents of STPs are being used for horticulture purpose.
CONTROL & MONITORING MECHANISMS
SOLUTION TO THE PROBLEMS
There are basically two types of Problems faced in a Power Plant
1. Metallurgical
2. Mechanical
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 55
Mechanical Problem can be related to Turbines that is the max speed permissible for a
turbine is3000 rpm so speed should be monitored and maintained at that level.
Metallurgical Problem can be view as the max Inlet Temperature for Turbine is 1060°
C so temperature should be below the limit. Monitoring of all the parameters is necessary
for the safety of both:
1. Employees
2. Machines
So the Parameters to be monitored are
1. Speed
2. Temperature
3. Current
4. Voltage
5. Pressure
6. Eccentricity
7. Flow of Gases
8. Vacuum Pressure
9. Valves
10. Level
11. Vibration
Industrial Training Report 2016
APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 56
REFERNCES
1.Library of BTPS
2.Supporting Staff
3.Books

Weitere ähnliche Inhalte

Was ist angesagt?

Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC Shivam Singh
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTAnubhav Ghosh
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training pptanuj_kumar57
 
Performance-management-system-at-ntpc
 Performance-management-system-at-ntpc Performance-management-system-at-ntpc
Performance-management-system-at-ntpcAmrita Singh
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpcLalitGoyal27
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 

Was ist angesagt? (20)

Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORT
 
Report ntpc
Report ntpcReport ntpc
Report ntpc
 
Ntpc badarpur training ppt
Ntpc badarpur training pptNtpc badarpur training ppt
Ntpc badarpur training ppt
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Ntpc.ppt
Ntpc.pptNtpc.ppt
Ntpc.ppt
 
ntpc
ntpcntpc
ntpc
 
Performance-management-system-at-ntpc
 Performance-management-system-at-ntpc Performance-management-system-at-ntpc
Performance-management-system-at-ntpc
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
Ntpc
NtpcNtpc
Ntpc
 
ntpc
ntpcntpc
ntpc
 
Reports ntpc
Reports ntpcReports ntpc
Reports ntpc
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpc
 
gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 

Andere mochten auch

Analysis of Toa Payoh New Launch
Analysis of Toa Payoh New LaunchAnalysis of Toa Payoh New Launch
Analysis of Toa Payoh New LaunchAlice Yeo
 
Resume_Anuj Arora
Resume_Anuj AroraResume_Anuj Arora
Resume_Anuj AroraAnuj Arora
 
4 things you probably didn't know you can do on LinkedIn
4 things you probably didn't know you can do on LinkedIn4 things you probably didn't know you can do on LinkedIn
4 things you probably didn't know you can do on LinkedInJames Boynton
 
Curriculum Vitae of Roth Channy
Curriculum Vitae of Roth ChannyCurriculum Vitae of Roth Channy
Curriculum Vitae of Roth ChannyRoth Channy
 
Pci humberto 2015
Pci humberto 2015Pci humberto 2015
Pci humberto 2015sarcecesar
 
Static CMS for web professionals and their clients
Static CMS for web professionals and their clientsStatic CMS for web professionals and their clients
Static CMS for web professionals and their clientsMichael Frankland
 
L'éducation du cœur(4) (French)
L'éducation du cœur(4) (French)L'éducation du cœur(4) (French)
L'éducation du cœur(4) (French)Hitoshi Tsuchiyama
 
Diapo Saint Brieuc
Diapo Saint BrieucDiapo Saint Brieuc
Diapo Saint BrieucMademoizelle
 
Robert R E S U M E2
Robert  R E S U M E2Robert  R E S U M E2
Robert R E S U M E2Funraise
 

Andere mochten auch (15)

Analysis of Toa Payoh New Launch
Analysis of Toa Payoh New LaunchAnalysis of Toa Payoh New Launch
Analysis of Toa Payoh New Launch
 
S3.1_TRSJ
S3.1_TRSJS3.1_TRSJ
S3.1_TRSJ
 
Resume_Anuj Arora
Resume_Anuj AroraResume_Anuj Arora
Resume_Anuj Arora
 
4 things you probably didn't know you can do on LinkedIn
4 things you probably didn't know you can do on LinkedIn4 things you probably didn't know you can do on LinkedIn
4 things you probably didn't know you can do on LinkedIn
 
Curriculum Vitae of Roth Channy
Curriculum Vitae of Roth ChannyCurriculum Vitae of Roth Channy
Curriculum Vitae of Roth Channy
 
Mohammed afroz cv
Mohammed afroz cvMohammed afroz cv
Mohammed afroz cv
 
Spark Project - Data Science para negócios
Spark Project - Data Science para negóciosSpark Project - Data Science para negócios
Spark Project - Data Science para negócios
 
Pci humberto 2015
Pci humberto 2015Pci humberto 2015
Pci humberto 2015
 
presentation-dokkanah
presentation-dokkanahpresentation-dokkanah
presentation-dokkanah
 
Static CMS for web professionals and their clients
Static CMS for web professionals and their clientsStatic CMS for web professionals and their clients
Static CMS for web professionals and their clients
 
Hrm unit ii
Hrm unit   iiHrm unit   ii
Hrm unit ii
 
Oferta educativa cism
Oferta educativa cismOferta educativa cism
Oferta educativa cism
 
L'éducation du cœur(4) (French)
L'éducation du cœur(4) (French)L'éducation du cœur(4) (French)
L'éducation du cœur(4) (French)
 
Diapo Saint Brieuc
Diapo Saint BrieucDiapo Saint Brieuc
Diapo Saint Brieuc
 
Robert R E S U M E2
Robert  R E S U M E2Robert  R E S U M E2
Robert R E S U M E2
 

Ähnlich wie Vikas

Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report Study Hub
 
Training & devlopment shreya gupta
Training & devlopment shreya guptaTraining & devlopment shreya gupta
Training & devlopment shreya guptaTarun Aggarwal
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpcRanjeet1501
 
Vikas ntpc report complete
Vikas ntpc report completeVikas ntpc report complete
Vikas ntpc report completeVikas Singh
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report94600banti
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ankit Kumar
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj PatidarNeeraj Patidar
 
Ntpc project ( mba)
Ntpc project ( mba)Ntpc project ( mba)
Ntpc project ( mba)viggy vanshi
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportNemish Kanwar
 

Ähnlich wie Vikas (20)

NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Ntpc tranning report
Ntpc tranning report Ntpc tranning report
Ntpc tranning report
 
Training & devlopment shreya gupta
Training & devlopment shreya guptaTraining & devlopment shreya gupta
Training & devlopment shreya gupta
 
report2
report2report2
report2
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
177683808 case-study
177683808 case-study177683808 case-study
177683808 case-study
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpc
 
Vikas ntpc report complete
Vikas ntpc report completeVikas ntpc report complete
Vikas ntpc report complete
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Zorays Inc.
Zorays Inc.Zorays Inc.
Zorays Inc.
 
project_001.docx
project_001.docxproject_001.docx
project_001.docx
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 
Training report btps
Training report btpsTraining report btps
Training report btps
 
Ntpc project ( mba)
Ntpc project ( mba)Ntpc project ( mba)
Ntpc project ( mba)
 
Adani Power, Tirora- Project Report
Adani Power, Tirora- Project ReportAdani Power, Tirora- Project Report
Adani Power, Tirora- Project Report
 

Kürzlich hochgeladen

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 

Kürzlich hochgeladen (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 

Vikas

  • 1. PROJECT / TRAINING REPORT ( PROJECT / TRAINING PERIOD MARCH– JUNE ) BTPS, NTPC BADARPUR ,NEW DELHI-110044 Submitted In Partial fulfillment of the requirement for the degree of BACHELOR OF TECHNOLOGY (B.TECH) UNDER THE GUIDANCE OF Internal Suprvisor: External Supervisor: Dinesh Jhakar Brahm Shanker H.O.D ME DEPT. (ACME) TRAINER (BTPS) SUBMITTED BY VIKAS SINGH ROLL NO. : 12BTME47 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING MAHARSHI DAYANAND UNIVERSITY, (ROHTAK-124001)
  • 2. ABSTRACT India’s largest power company, NTPC was set up in 1975 to accelerate power development in India. NTPC is emerging as a diversified power major with presence in the entire value chain of the power generation business. Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilization and coal mining. NTPC ranked 34 in the 2010 Forbes Global 2000 ranking of the World’s biggest companies. NTPC became a Maharatna company in May, 2010, one of the only four companies to be awarded this status. BADARPUR THERMAL POWER STATION was established on 1973 and it was the part of Central Government. On 01/04/1978 is was given as No Loss No Profit Plant of NTPC. Since then operating performance of NTPC has been considerably above the national average. The availability factor for coal stations has increased from 85.03 % in 1997-98 to 90.09 % in 2006-07, which compares favorably with international standards. The PLF has increased from 75.2% in1997-98 to 89.4% during the year 2006-07 which is the highest since the inception of NTPC. Badarpur thermal power station started with a single 95 mw unit. There were 2 more units (95 MW each) installed in next 2 consecutive years. Now it has total five units with total capacity of 720 MW. Ownership of BTPS was transferred to NTPC with effect from 01.06.2006 through GOIs Gazette Notification . The power is supplied to a 220 KV network that is a part of the northern grid. The ten circuits through which the power is evacuated from the plant are: 1. Mehrauli 2. Okhla 3. Ballabgarh 4. Indraprastha 5. UP (Noida) 6. Jaipur
  • 3. ACKNOWLEDGEMENT It has been a great honor and privilege to undergo training at NTPC Limited, Badarpur, DELHI, India. I am very grateful to Mr. A K SINGH (DGM HR) & Mr. BRAHM SHANKER (SUPERVISOR) for giving their valuable time and constructive guidance in preparing the internship report for Internship. It would not have been possible to complete this report in short period of time without their kind encouragement and valuable guidance. I am also thankful to PROF. DINESH JAKHAR, H.O.D., Department of Mechanical Engineering, ACME, for his constant support and encouragement. I would also like to render heartiest thanks to my brother & sister who’s ever helping nature and support has helped me complete this present work VIKAS SINGH ROLL NO. - 12BTME47 8 th Semester, B. Tech
  • 4. TABLE OF CONTENTS LIST OF FIGURES CHAPTER 1 1.1 COMPANY AND PROFILE 1 1.2 VISSION AND MISSION 1 1.3 POWER GENERATION IN INDIA 1 1.4 EVOLUTION 3 1.5 NTPC HEADQUARTERS 4 1.6 NTPC PLANTS 5 1.8 FUTURE GOALS 7 1.9 ENVIRONMENTAL MANAGEMENT 7 CHAPTER 2 2.1 ABOUT BADARPUR THERMAL POWER STATION 8 2.2 FROM COAL TO ELECRICITY PROCESS 11 2.3 MAIN GENERATOR 13 2.4 MAIN TURBINE DATA 14 CHAPTER 3 3.1 OPERATION 19 3.2 COAL HANDLING PLANT (C.H.P.) & NEW COAL HANDLING PLANT (N.C.H.P) 34 3.3 GENERATOR AND AUXILIARIES 40
  • 5. 3.4 TRANSFORMER 47 3.5 INSTRUMENT SEEN 51 3.6 POLLUTION CONTROL SYSTEM 51 3.7 CONTROL AND MONITORING MECHANISM 54 3.8 SOLUTION TO THE PROBLEM 54 REFERENCES
  • 6. LIST OF FIGURES Figure 1: Total Power Generation Figure 2: Top View BTPS Figure 3: Flow Chart Of Coal To Electricity Figure 4: Components Of A Coal Fired Thermal Plant Figure 5: Strategies Of Ntpc Figure 6: Parts Of Powerplant Figure7: External View Of Boiler Figure8: External View Of Id, Pa & Fd Fans Figure 9: Coal Cycle Figure 10: Wagon Trippler Figure 11: Conveyor Figure 12: Crushers Figure 13: Cross-Sectional View Of A Generator Figure 14: A 95 Mw Generator Figure 15: Transformer
  • 7. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 1 CHAPTER-1 COMPANY PROFILE NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. At present, Government of India holds 89.5% of the total equity shares of the company and FIIs, Domestic Banks, Public and others hold the balance 10.5%. Within a span of 31 years, NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country. VISION AND MISSION Vision “To be the world’s largest and best power producer, powering India’s growth.” Mission “Develop and provide reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contribute to society.” POWER GENERATION IN INDIA NTPC’s core business is engineering, construction and operation of power generating plants. It also provides consultancy in the area of power plant constructions and power generation to companies in India and abroad. As on date the installed capacity of NTPC is 27,904 MW through its 15 coal based (22,895 MW), 7 gas based (3,955 MW) and 4 Joint Venture Projects (1,054 MW). NTPC acquired 50% equity of the SAIL Power Supply
  • 8. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 2 Corporation Ltd. (SPSCL). This JV Company operates the captive power plants of Durgapur (120 MW), Rourkela (120 MW) and Bhilai (74 MW). NTPC also has 28.33% stake in Ratnagiri Gas & Power Private Limited (RGPPL) a joint venture company between NTPC, GAIL, Indian Financial Institutions and Maharashtra SEB Co Ltd. Figure 1: TOTAL POWER GENERATION NTPC has set new benchmarks for the power industry both in the area of power plant construction and operations. Its providing power at the cheapest average tariff in the country.. NTPC is committed to the environment, generating power at minimal environmental cost and preserving the ecology in the vicinity of the plants. NTPC has undertaken massive a forestation in the vicinity of its plants. Plantations have increased forest area and reduced barren land. The massive a forestation by NTPC in and around its Ramagundam Power station (2600 MW) have contributed reducing the temperature in the areas by about 3°c.
  • 9. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 3 NTPC has also taken proactive steps for ash utilization. In 1991, it set up Ash Utilization Division A "Centre for Power Efficiency and Environment Protection (CENPEEP)" has been established in NTPC with the assistance of United States Agency for International Development (USAID). Cenpeep is efficiency oriented, eco-friendly and eco-nurturing initiative - a symbol of NTPC's concern towards environmental protection and continued commitment to sustainable power development in India. EVOLUTION NTPC was set up in 1975 in 100% by the ownership of Government of India. In the last 30 years NTPC has grown into the largest power utility in India. In 1997, Government of India granted NTPC status of ‘Navratna’ being one of the nine jewels of India, enhancing the powers to the Board of directors. NTPC became a listed company with majority Government ownership of 89.5%. NTPC becomes third largest by market capitalisation of listed companies. The company rechristened as NTPC Limited in line with its changing business portfolio and transforms itself from a thermal power utility to an integrated power utility. National Thermal Power Corporation is the largest power generation company in India. Forbes Global 2000 for 2008 ranked it 411th the world. National Thermal Power Corporation is the largest power generation company in India. Forbes Global 2000 for 2008 ranked it 317th in the world. 1975 1997 2004 2005 2008 2009
  • 10. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 4 NTPC has also set up a plan to achieve a target of 50,000 MW generation capacities. NTPC has embarked on plans to become a 75,000 MW company by 2017. NTPC is the largest power utility in India, accounting for about 20% of India’s installed capacity. NTPC HEADQUARTERS NTPC Limited is divided in 8 Headquarters S. NO. HEADQUARTERS CITY 1. NCR HQ DELHI 2. ER HEADQUARTER-1 BHUBANESHWAR 3. ER HEADQUARTER-2 PATNA 4. NRHQ LUCKNOW 5. SR HEADQUARTER HYDERABAD 6. WR-1 HEADQUARTER MUMBAI 7. HYDRO HEADQUARTER DELHI 8. WR-2 HEADQUARTER RAIPUR 2012 2017 TABLE:1
  • 11. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 5 NTPC PLANTS 1.Thermal-Coal based S. NO. CITY STATE INSTALLED CAPACITY(MW) 1. SINGRAULI UTTAR PRADESH 2000 2. KORBA CHATTISGHAR 2600 3. RAMAGUNDAM ANDHRA PRADESH 2600 4. FARAKKA WEST BENGAL 2100 5. VINDHYACHAL MADHYA PRADESH 3260 6. RIHAND UTTAR PRADESH 2500 7. KAHALGAON BIHAR 2300 8. DADRI UTTAR PRADESH 1820 9. TALCHER ORISSA 3000 10. UNCHAHAR UTTAR PRADESH 1050 11. TALCHER ORISSA 460 12. SIMHADRI ANDHRA PRADESH 1500 13. TANDA UTTAR PRADESH 440 14. BADARPUR DELHI 705 15. SIPAT CHHATTISGHAR 2320 16. SIPAT CHHATTISGHAR 1980 17. BONGAIGAON ASSAM 750 18. MOUDA MAHARASHTRA 1000(2*500MW) 19. RIHAND UTTAR PRADESH 2*500MW 20. BARH BIHAR 3300(5*660) TOTAL 31495MW TABLE:2
  • 12. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 6 2. COAL BASED (Owned by JVs) S.NO. NAME OF THE JV CITY STATE INSTALLED CAPACITY(MW) 1. NSPCL DURGAPUR WEST BENGAL 120 2. NSPCL ROURKELA ORISSA 120 3. NSPCL BHILAI CHHATTISGHAR 574 4. NPGC AURANGABAD BIHAR 1980 5. M.T.P.S. KANTI BIHAR 110 6. BRBCL NABINAGAR BIHAR 1000 TOTAL 3904MW TABLE:3 1. GAS Based S.NO. CITY STATE INSTALLED CAPACITY(MW) 1. ANTA RAJSTHAN 419 2. AURAIYA UTTAR PRADESH 652 3. KAWAS GUJARAT 645 4. DADRI UTTAR PRADESH 817 5. JHANOR GUJARAT 648 6. KAYAMKULAM KERALA 350 7. FARIDABAD HARYANA 430 TOTAL 3995MW TABLE:4
  • 13. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 7 NTPC HYDEL The company has also stepped up its hydroelectric power (hydel) projects implementation. Currently the company is mainly interested in the North-east India wherein the Ministry of Power in India has projected a hydel power feasibility of 3000 MW.Loharinag Pala Hydro Power Project by NTPC Ltd: In Loharinag Pala Hydro Power Project with a capacity of 600 MW (150 MW x 4 Units). The main package has been awarded. The present executives' strength is 100+. The project is located on river Bhagirathi (a tributory of the Ganges) in Uttarkashi district of Uttarakhand state. This is the first project downstream from the origin of the Ganges at Gangotri.Tapovan Vishnugad 520MW Hydro Power Project by NTPC Ltd: In Joshimath town.#Lata Tapovan 130MW Hydro Power Project by NTPC Ltd: is further upstream to Joshimath (under environmental revision) Koldam Hydro Power Project 800 MW in Himachal Pradesh . FUTURE GOALS The company has also set a serious goal of having 50000 MW of installed capacity by 2012 and 75000 MW by 2017. NTPC will invest about Rs 20,000 crore to set up a 3,900- megawatt (MW) coal-based power project in Madhya Pradesh. Company will also start coal production from its captive mine in Jharkhand in 2011–12, for which the company will be investing about 18 billion. ALSTOM would be a part of its 660-MW supercritical projects for Solapur II and Mouda II in Maharashtra.ALSTOM would execute turnkey station control and instrumentation (C&I) for this project. ENVIRONMET MANAGEMENT, OCCUPATIONAL HEALTH and SAFETY SYSTEMS NTPC has actively gone for adoption of best international practices on environment, occupational health and safety areas. The organization has pursued the Environmental Management System (EMS) ISO 14001 and the Occupational Health and Safety Assessment System OHSAS 18001 at its different establishments. As a result of pursuing these practices, all NTPC power stations have been certified for ISO 14001 & OHSAS 18001 by reputed national and international Certifying Agencies.
  • 14. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 8 CHAPTER 2 ABOUT BADARPUR THERMAL POWER STATION Figure 2: Top View BTPS Badarpur Thermal Power Station is located at Badarpur area in NCT Delhi. The power plant is one of the coal based power plants of NTPC. The National Power Training Institute (NPTI) for North India Region under Ministry of Power, Government of India was established at Badarpur in 1974, within the Badarpur Thermal power plant (BTPS) complex.It is situated in south east corner of Delhi on Mathura Road near Faridabad. It was the first central sector power plant conceived in India, in 1965. It was originally conceived to provide power to neighbouring states of Haryana, Punjab, Jammu and Kashmir,U.P., Rajasthan, and Delhi.But since year 1987 Delhi has become its sole beneficiary.
  • 15. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 9 The power is supplied to a 220 KV network that is a part of the northern grid. The ten circuits through which the power is evacuated from the plant are: 1. Mehrauli 2. Okhla 3. Ballabgarh 4. Indraprastha 5. UP (Noida) 6. Jaipur
  • 16. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 10 Badarpur is situated only 20 km away from Delhi. The plant is located on the left side of the National Highway (Delhi-Mathura Road) and it comprises of 430 hectares (678 acres) bordered by the Agra Canal from East and by Mathura-Delhi Road from West. However, the area for ash disposal is done in the Delhi Municipal limit and is maintained with the help of Delhi Development Authority. Basic Steps of Electricity Generation a) Coal to steam b) Steam to mechanical power c) Mechanical power to electrical power No of plants Capacity (MW) NTPC Owned 1. Coal 16 31,855 2. Gas / Liquid Fuel 7 3,955 Total 23 35,810 Owned by Joint Ventures 3. Coal & Gas 7 5364 Grand Total 30 41,174
  • 17. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 11 FROM COAL TO ELECTRICITY PROCESS Figure 3: FLOW CHART of COAL TO ELECTRICITY Coal to Steam Coal from the coal wagons is unloaded in the coal handling plant. This Coal is transported up to the raw coal bunkers with the help of belt conveyors. Coal is transported to Bowl mills by Coal Feeders. The coal is pulverized in the Bowl Mill, where it is ground to powder form. The mill consists of a round metallic table on which coal particles fall. This table is rotated with the help of a motor. There are three large steel rollers, which are spaced 120 apart. When there is no coal, these rollers do not rotate but when the coal is fed to the table it pack up between roller and the table and ths forces the rollers to rotate. Coal is crushed by the crushing action between the rollers and the rotating table. This crushed coal is taken away to the furnace through coal pipes with the help of hot and cold air mixture from P.A. Fan.
  • 18. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 12 P.A. Fan takes atmospheric air, a part of which is sent to Air-Preheaters for heating while a part goes directly to the mill for temperature control. Atmospheric air from F.D. Fan is heated in the air heaters and sent to the furnace as combustion air. Water from the boiler feed pump passes through economizer and reaches the boiler drum. Water from the drum passes through down comers and goes to the bottom ring header. Water from the bottom ring header is divided to all the four sides of the furnace. Due to heat and density difference, the water rises up in the water wall tubes. Water is partly converted to steam as it rises up in the furnace. This steam and water mixture is again taken to thee boiler drum where the steam is separated from water. water follows the same path while the steam is sent to superheaters for superheating. The superheaters are located inside the furnace and the steam is superheated (540 o C) and finally it goes to the turbine.Flue gases from the furnace are extracted by induced draft fan, which maintains balance draft in the furnace (-5 to –10 mm of wcl) with forced draft fan. These flue gases emit their heat energy to various super heaters in the pent house and finally pass through air-preheaters and goes to electrostatic precipitators where the ash particles are extracted. Electrostatic Precipitator consists of metal plates, which are electrically charged. Ash particles are attracted on to these plates, so that they do not pass through the chimney to pollute t he atmosphere. Regular mechanical hammer blows cause the accumulation of ash to fall to the bottom of the precipitator where they are collected in a hopper for disposal.
  • 19. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 13 Steam to Mechanical Power From the boiler, a steam pipe conveys steam to the turbine through a stop valve (which can be used to shut-off the steam in case of emergency) and through control valves that automatically regulate the supply of steam to the turbine. Stop valve and control valves are located in a steam chest and a governor, driven from the main turbine shaft, operates the control valves to regulate the amount of steam used. (This depends upon the speed of the turbine and the amount of electricity required from the generator). Steam from the control valves enters the high pressure cylinder of the turbine, where it passes through a ring of stationary blades fixed to the cylinder wall. These act as nozzles and direct the steam into a second ring of moving blades mounted on a disc secured to the turbine shaft. The second ring turns the shafts as a result of the force of steam. The stationary and moving blades together constitute a „stage‟ of turbine and in practice many stages are necessary, so that the cylinder contains a number of rings of stationary blades with rings of moving blades arranged between them. The steam passes through each stage in turn until it reaches the end of the high-pressure cylinder and in its passage some of its heat energy is changed into mechanical energy. The steam leaving the high pressure cylinder goes back to the boiler for reheating and returns by a further pipe to the intermediate pressure cylinder. Here it passes through another series of stationary and moving blades. Finally, the steam is taken to the low-pressure cylinders, each of which enters at the centre flowing outwards in opposite directions through the rows of turbine blades through an arrangement called the „double flow‟- to the extremities of the cylinder. As the steam gives up its heat energy to drive the turbine, its temperature and pressure fall and it expands. Because of this expansion the blades are much larger and longer towards the low pressure ends of the turbine.
  • 20. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 14 Mechanical Power to Electrical Power As the blades of turbine rotate, the shaft of the generator, which is coupled to tha of t he turbine, also rotates. It results in rotation of the coil of the generator, which causes induced electricity to be produced. Basic Power Plant Cycle Figure 4: COMPONENTS OF A COAL FIRED THERMAL PLANT The thermal (steam) power plant uses a dual (vapour+ liquid) phase cycle. It is a close cycle to enable the working fluid (water) to be used again and again. The cycle used is Rankine Cycle modified to include superheating of steam, regenerative feed water heating and reheating of steam. On large turbines, it becomes economical to increase the cycle efficiency by using reheat, which is a way of partially overcoming temperature limitations. By returning partially expanded steam, to a reheat, the average temperature at which the heat is added, is increased and, by expanding this reheated steam to the remaining stages of the turbine, the exhaust wetness is considerably less than it would otherwise be conversely, if the maximum tolerable wetness is allowed, the initial pressure of the steam can be appreciably increased. Bleed Steam Extraction: For regenerative system, nos. of non-regulated extractions is taken from HP, IP turbine. Regenerative heating of the boiler feed water is widely used in modern power plants; the effect being to increase the average temperature at which heat is added to the cycle, thus improving the cycle efficiency.
  • 21. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 15 On large turbines, it becomes economical to increase the cycle efficiency by using reheat, which is a way of partially overcoming temperature limitations. By returning partially expanded steam, to a reheat, the average temperature at which the heat is added, is increased and, by expanding this reheated steam to the remaining stages of the turbine, the exhaust wetness is considerably less than it would otherwise be conversely, if the maximum tolerable wetness is allowed, the initial pressure of the steam can be appreciably increased. Bleed Steam Extraction: For regenerative system, nos. of non-regulated extractions is taken from HP, IP turbine. Regenerative heating of the boiler feed water is widely used in modern power plants; the effect being to increase the average temperature at which heat is added to the cycle, thus improving the cycle efficiency. TABLE: 6 MAIN TURBINE DATA Rated output of Turbine 210 MW Rated speed of turbine 3000 rpm Rated pressure of steam before emergency 130 kg/cm^2 Stop valve rated live steam temperature 535 o Celsius
  • 22. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 16 Rated steam temperature after reheat at inlet to receptor valve 535 o Celsius Steam flow at valve wide open condition 670 tons/hour Rated quantity of circulating water through condenser 27000 cm/hour 1. For cooling water temperature (o Celsius) 24,27,30,33 2. Steam flow required for 210 MW in ton/hour 68,645,652,662 MAIN GENERATOR Maximum continuous KVA rating 24700KVA Maximum continuous KW 210000KW Rated terminal voltage 15750V Rated Stator current 9050 A Rated Power Factor 0.85 lag Excitation current at MCR Condition 2600 A Slip-ring Voltage at MCR Condition 310 V Rated Speed 3000 rpm Rated Frequency 50 Hz Short circuit ratio 0.49 Direction of rotation viewed Anti Clockwise Phase Connection Double Star Number of terminals brought out 9(6 neutral and 3 phases)
  • 23. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 17 STRATEGIES OF NTPC Figure 5: STRATEGIES OF NTPC Technological Initiatives a) Introduction of steam generators (boilers) of the size of 800 MW. b) Integrated Gasification Combined Cycle (IGCC) Technology. c) Launch of Energy Technology Centre -A new initiative for development of technologies with focus on fundamental R&D. d) The company sets aside up to 0.5% of the profits for R&D. e) Roadmap developed for adopting µClean Development. Mechanism to help get / earn
  • 24. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 18 µCertified Emission Reduction. Corporate Social Responsibility As a responsible corporate citizen NTPC has taken up number of CSR initiatives. a) NTPC Foundation formed to address Social issues at national level b) NTPC has framed Corporate Social Responsibility Guidelines committing up to0.5% of net profit annually for Community Welfare. c) The welfare of project affected persons and the local population around NTPC projects are taken care of through well drawn Rehabilitation and Resettlement policies. d) The company has also taken up distributed generation for remote rural areas. Partnering government in various initiatives a) Consultant role to modernize and improvise several plants across the country. b) Disseminate technologies to other players in the sector. c) Consultant role ³Partnership in Excellence´ Programme for improvement of PLF of 15 Power Stations of SEBs. d) Rural Electrification work under Rajiv Gandhi Garmin Vidyutikaran.
  • 25. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 19 CHAPTER 3 OPERATION OF POWER PLANT/ (PROJECT) BASIC PRINCIPLE As per FARADAY‟s Law-“Whenever the amount of magnetic flux linked with a circuit changes, an EMF is produced in the circuit. Generator works on the principle of producing electricity. To change the flux in the generator turbine is moved in a great speed with steam.” To produce steam, water is heated in the boilers by burning the coal. In a Badarpur Thermal PowerStation, steam is produced and used to spin a turbine that operates a generator. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator. After it passes through the turbine, the steam is condensed in a condenser; this is known as a Rankine cycle. The electricity generated at the plant is sent to consumers through high-voltage power lines The Badarpur Thermal Power Plant has Steam Turbine-Driven Generators which has a collective capacity of 705MW. The fuel being used is Coal which is supplied from the Jharia Coal Field in Jharkhand. Water supply is given from the Agra Canal. THERMAL POWER PLANT A Thermal Power Station comprises all of the equipment and a subsystem required to produce electricity by using a steam generating boiler fired with fossil fuels or biofuels to drive an electrical generator. Some prefer to use the term ENERGY CENTER because such facilities convert forms of energy, like nuclear energy, gravitational potential energy or heat energy (derived from the combustion of fuel) into electrical energy. However, POWER
  • 26. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 20 PLANT is the most common term in the united state; While POWER STATION prevails in many Commonwealth countries and especially in the United Kingdom. Such power stations are most usually constructed on a very large scale and designed for continuous operation. Figure 6: parts of powerplant Typical elements of a coal fired thermal power station 1. cooling tower
  • 27. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 21 2. Cooling water pump 3. Three -phase transmission line 4. Step up transformer 5. Electrical Generator 6. Low pressure turbine 7. Boiler feed water pump 8. Surface condenser 9. Intermediate pressure steam turbine 10. Steam control valve 11. High pressure steam turbine 12. Deaerator 13.Feed water heater 14. Coal conveyor 15. Coal hopper 16. Coal pulverizer 17. Boiler drum 18. Bottom ash hoper 19. Super heater 20. Forced draught (draft) fan 21. Reheater 22. Combustion air intake
  • 28. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 22 23. Economizer 24. Air preheater 25. Precipitator 26. Induced draught (draft) fan 27. Fuel gas stack The description of some of the components written above is described as follows: 1. Cooling towers Cooling Towers are evaporative coolers used for cooling water or other working medium to near the ambivalent web-bulb air temperature. Cooling towers use evaporation of water to reject heat from processes such as cooling the circulating water used in oil refineries, Chemical plants, power plants and building cooling, for example. The tower vary in size from small roof-top units to very large hyperboloid structures that can be up to 200 meters tall and 100 meters in diameter, or rectangular structure that can be over 40 meters tall and 80 meters long. Smaller towers are normally factory built, while larger ones are constructed on site. The primary use of large, industrial cooling tower system is to remove the heat absorbed in the circulating cooling water systems used in power plants, petroleum refineries, petrochemical and chemical plants, natural gas processing plants and other industrial facilities. The absorbed heat is rejected to the atmosphere by the evaporation of some of the cooling water in mechanical forced-draft or induced draft towers or in natural draft hyperbolic shaped cooling towers as seen at most nuclear power plants. 2. Cooling Water Pump it pumps the water from the cooling tower which goes to the condenser 3. Three phase transmission line
  • 29. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 23 Three phase electric power is a common method of electric power transmission. It is a type of polyphase system mainly used to power motors and many other devices. A Three phase system uses less conductor material to transmit electric power than equivalent single phase, two phase, or direct current system at the same voltage. In a three phase system, three circuits reach their instantaneous peak values at different times. Taking one conductor as the reference, the other two current are delayed in time by one-third and two-third of one cycle of the electrical current. This delay between “phases” has the effect of giving constant power transfer over each cycle of the current and also makes it possible to produce a rotating magnetic field in an electric motor. At the power station, an electric generator converts mechanical power into a set of electric currents, one from each electromagnetic coil or winding of the generator. The current are sinusoidal functions of time, all at the same frequency but offset in time to give different phases. In a three phase system the phases are spaced equally, giving a phase separation of one-third one cycle. Generators output at a voltage that ranges from hundreds of volts to 30,000 volts. At the power station, transformers: step-up” this voltage to one more suitable for transmission. 4. Unit transformer (3-phase) At the power station, transformers step-up this voltage to one more suitable for transmission. After numerous further conversions in the transmission and distribution network the power is finally transformed to the standard mains voltage (i.e. the “household” voltage). The power may already have been split into single phase at this point or it may still be three phase. Where the step-down is 3 phase, the output of this transformer is usually star connected with the standard mains voltage being the phase- neutral voltage. Another system commonly seen in North America is to have a delta connected secondary with a center tap on one of the windings supplying the ground and neutral. This allows for 240 V three phase as well as three different single phase voltages( 120 Vbetween two of the phases and neutral , 208 V between the third phase ( or wild leg) and neutral and 240 V between any two phase) to be available from the same supply. 5. Electrical generator
  • 30. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 24 An Electrical generator is a device that converts kinetic energy to electrical energy, generally using electromagnetic induction. The task of converting the electrical energy into mechanical energy is accomplished by using a motor. The source of mechanical energy may be a reciprocating or turbine steam engine, , water falling through the turbine are made in a variety of sizes ranging from small 1 hp (0.75 kW) units (rare) used as mechanical drives for pumps, compressors and other shaft driven equipment , to 2,000,000 hp(1,500,000 kW) turbines used to generate electricity. There are several classifications for modern steam turbines. Steam turbines are used in all of our major coal fired power stations to drive the generators or alternators, which produce electricity. The turbines themselves are driven by steam generated in ‘Boilers’ or ‘steam generators’ as they are sometimes called. Electrical power stations use large steam turbines driving electric generators to produce most (about 86%) of the world’s electricity. These centralized stations are of two types: fossil fuel power plants and nuclear power plants. The turbines used for electric power generation are most often directly coupled to their-generators .As the generators must rotate at constant synchronous speeds according to the frequency of the electric power system, the most common speeds are 3000 r/min for 50 Hz systems, and 3600 r/min for 60 Hz systems. Most large nuclear sets rotate at half those speeds, and have a 4-pole generator rather than the more common 2-pole one. Energy in the steam after it leaves the boiler is converted into rotational energy as it passes through the turbine. The turbine normally consists of several stage with each stages consisting of a stationary blade (or nozzle) and a rotating blade. Stationary blades convert the potential energy of the steam into kinetic energy into forces, caused by pressure drop, which results in the rotation of the turbine shaft. The turbine shaft is connected to a generator, which produces the electrical energy. 6. Low Pressure Turbine Energy in the steam after it leaves the boiler is converted into rotational energy as it passes through the turbine. The turbine normally consists of several stages with each stages consisting of a stationary blade (or nozzle) and a rotating blade. Stationary blades
  • 31. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 25 convert the potential energy of the steam into kinetic energy and direct the flow onto the rotating blades. The rotating blades convert the kinetic energy into impulse and reaction forces, caused by pressure drop, which results in the rotation of the turbine shaft. The turbine shaft is connected to a generator, which produces the electrical energy. Low Pressure Turbine (LPT) consists of 4x2 stages. After passing through Intermediate Pressure Turbine steam is passed through LPT which is made up of two parts- LPC REAR & LPC FRONT. As water gets cooler here it gathers into a HOTWELL placed in lower parts of turbine. 7. Condensation Extraction Pump A Boiler feed water pump is a specific type of pump used to pump water into a steam boiler. The water may be freshly supplied or returning condensation of the steam produced by the boiler. These pumps are normally high pressure units that use suction from a condensate return system and can be of the centrifugal pump type or positive displacement type. Construction and operation: Feed water pumps range in size up to many horsepower and the electric motor is usually separated from the pump body by some form of mechanical coupling. Large industrial condensate pumps may also serve as the feed water pump. In either case, to force the water into the boiler, the pump must generate sufficient pressure to overcome the steam pressure developed by the boiler. This is usually accomplished through the use of a centrifugal pump. Feed water pumps usually run intermittently and are controlled by a float switch or other similar level-sensing device energizing the pump when it detects a lowered liquid level in the boiler. Some pumps contain a two-stage switch. As liquid lowers to the trigger point of the first stage, the pump is activated. If the liquid continues to drop, (perhaps because the pump has failed, its supply has been cut off or exhausted, or its discharge is blocked) the second stage will be triggered. This stage may switch off the boiler equipment (preventing the boiler from running dry and overheating), trigger an alarm, or both.
  • 32. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 26 8. Condenser The steam coming out from the Low Pressure Turbine (a little above its boiling pump) is brought into thermal contact with cold water (pumped in from the cooling tower) in the condenser, where it condenses rapidly back into water, creating near Vacuum-like conditions inside the condenser chest. 9. Intermediate Pressure Turbine Intermediate Pressure Turbine (IPT) consists of 11 stages. When the steam has been passed through HPT it enters into IPT. IPT has two ends named as FRONT & REAR. Steam enters through front end and leaves from Rear end. 10. Steam Governor Valve Steam locomotives and the steam engines used on ships and stationary applications such as power plants also required feed water pumps. In this situation, though, the pump was often powered using a small steam engine that ran using the steam produced by the boiler a means had to be provided, of course, to put the initial charge of water into the boiler (before steam power was available to operate the steam-powered feed water pump).The pump was often a positive displacement pump that had steam valves and cylinders at one end and feed water cylinders at the other end; no crankshaft was required. In thermal plants, the primary purpose of surface condenser is to condense the exhaust steam from a steam turbine to obtain maximum efficiency and also to convert the turbine exhaust steam into pure water so that it may be reused in the steam generator or boiler as boiler feed water. By condensing the exhaust steam of a turbine at a pressure below atmospheric pressure, the steam pressure drop between the inlet and exhaust of the turbine is increased, which increases the amount heat available for conversion to mechanical power. 11.High Pressure Turbine Steam coming from Boiler directly feeds into HPT at a temperature of 540°C and at a pressure of 136 kg/cm2. Here it passes through 12 different stages due to which its
  • 33. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 27 temperature goes down to 329°C and pressure as 27 kg/cm2. This line is also called as CRH – COLD REHEAT LINE. It is now passed to a REHEATER where its temperature rises to 540°C and called as HRH-HOT REHEATED LINE. 12. Deaerator A Deaerator is a device for air removal and used to remove dissolved gases (an alternate would be the use of water treatment chemicals) from boiler feed water to make it non- corrosive. A dearator typically includes a vertical domed deaeration section as the deaeration boiler feed water tank. A Steam generating boiler requires that the circulating steam, condensate, and feed water should be devoid of dissolved gases, particularly corrosive ones and dissolved or suspended solids. The gases will give rise to corrosion of the metal. The solids will deposit on the heating surfaces giving rise to localized heating and tube ruptures due to overheating. Under some conditions it may give rise to stress corrosion cracking. Deaerator level and pressure must be controlled by adjusting control valves the level by regulating condensate flow and the pressure by regulating steam flow. 13. Feed water heater A Feed water heater is a power plant component used to pre-heat water delivered to a steam generating boiler. Preheating the feed water reduces the irreversibility involved in steam generation and therefore improves the thermodynamic efficiency of the system. This reduces plant operating costs and also helps to avoid thermal shock to the boiler metal when the feed water is introduced back into the steam cycle. In a steam power (usually modelled as a modified Rankine cycle), feed water heaters allow the feed water to be brought up to the saturation temperature very gradually. This minimizes the inevitable irreversibility associated with heat transfer to the working fluid (water). 14. Coal conveyor Coal conveyors are belts which are used to transfer coal from its storage place to Coal Hopper. A belt conveyor consists of two pulleys, with a continuous loop of material- the conveyor Belt – that rotates about them. The pulleys are powered, moving the belt and
  • 34. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 28 the material on the belt forward.Conveyor belts are extensively used to transport industrial and agricultural material, such as grain, coal, ores etc. 15. Coal Hopper Coal Hoppers are the places which are used to feed coal to Fuel Mill. It also has the arrangement of entering Hot Air at 200°C inside it which solves our two purposes:- 1. If our Coal has moisture content then it dries it so that a proper combustion takes place. 2. It raises the temperature of coal so that its temperature is more near to its Ignite Temperature so that combustion is easy 16. Pulverized Fuel Mill A pulveriser is a device for grinding coal for combustion in a furnace in a fossil fuel power plant. 17. Boiler feed water pump A Boiler feed water pump is a specific type of pump used to pump water into a steam boiler. The water may be freshly supplied or retuning condensation of the steam produced by the boiler. These pumps are normally high pressure units that use suction from a condensate return system and can be of the centrifugal pump type or positive displacement type.
  • 35. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 29 Figure7: EXTERNAL VIEW OF BOILER Construction and operation: Feed water pumps range in size up to many horsepower and the electric motor is usually separated from the pump body by some form of mechanical coupling. Large industrial condensate pumps may also serve as the feed water pump. In either case, to force the water into the boiler; the pump must generate sufficient pressure to overcome the steam pressure developed by the boiler. This is usually accomplished through the use of a centrifugal pump. Feed water pumps usually run intermittently and are controlled by a float switch or other similar level-sensing device energizing the pump when it detects a lowered liquid level in the boiler is substantially increased. Some pumps contain a two-stage switch. As liquid lowers to the trigger point of the first stage, the pump is activated. I f the liquid continues to drop (perhaps because the pump has failed, its supply has been cut off or exhausted, or its discharge is blocked); the second stage will be triggered. 18. Ash Hopper A steam drum is used in the company of a mud-drum/feed water drum which is located at a lower level.So that it acts as a sump for the sludge or sediments which have a tendency to
  • 36. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 30 accumulate at the bottom. 19. Super Heater A Super heater is a device in a steam engine that heats the steam generated by the boiler again increasing its thermal energy. Super heaters increase the efficiency of the steam engine, and were widely adopted. Steam which has been superheated is logically known as superheated steam; non- superheated steam is called saturated steam or wet steam. Super heaters were applied to steam locomotives in quantity from the early 20th century, to most steam vehicles, and also stationary steam engines including power stations. 20. Force Draught Fan External fans are provided to give sufficient air for combustion. The forced draught fan takes air from the atmosphere and, warms it in the air preheater for better combustion, injects it via the air nozzles on the furnace wall. 21. Reheater Reheater is a heater which is used to raise the temperature of steam which has fallen from the intermediate pressure turbine. 22. Air Intake Air is taken from the environment by an air intake tower which is fed to the fuel. 23. Economizers Economizer, or in the UK economizer, are mechanical devices intended to reduce energy consumption, or to perform another useful function like preheating a fluid. The term economizer is used for other purposes as well-Boiler, power plant, heating, ventilating and air-conditioning. In boilers, economizer are heat exchange devices that heat fluids , usually water, up to but not normally beyond the boiling point of the fluid. Economizers are so named because they can make use of the enthalpy and improving the boiler‟s efficiency. They are devices fitted to a boiler which save energy by using the exhaust gases from the boiler to preheat the cold water used to fill it (the feed water). Modern day
  • 37. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 31 boilers, such as those in cold fired power stations, are still fitted with economizer which is decedents of Green‟s original design. In this context there are turbines before it is pumped to the boilers. A common application of economizer in steam power plants is to capture the waste heat from boiler stack gases (flue gas) and transfer thus it to the boiler feed water thus lowering the needed energy input , in turn reducing the firing rates to accomplish the rated boiler output . Economizer lower stack temperatures which may cause condensation of acidic combustion gases and serious equipment corrosion damage if care is not taken in their design and material selection. 24. Air Preheater Air preheater is a general term to describe any device designed to heat air before another process (for example, combustion in a boiler). The purpose of the air preheater is to recover the heat from the boiler flue gas which increases the thermal efficiency of the boiler by reducing the useful heat lost in the flue gas. As a consequence, the flue gases are also sent to the flue gas stack (or chimney) at a lower temperature allowing simplified design of the ducting and the flue gas stack. It also allows control over the temperature of gases leaving the stack. 25. Precipitator An Electrostatic precipitator (ESP) or electrostatic air cleaner is a particulate device that removes particles from a flowing gas (such As air) using the force of an induced electrostatic charge. Electrostatic precipitators are highly efficient filtration devices, and can easily remove fine particulate matter such as dust and smoke from the air steam. ESP’s o ti ue to e e elle t de i es for o trol of a i dustrial parti ulate e issio s, including smoke from electricity-generating utilities (coal and oil fired), salt cake collection from black liquor boilers in pump mills, and catalyst collection from fluidized bed catalytic crackers from several hundred thousand ACFM in the largest coal-fired boiler application. The original parallel plate-Weighted wire design (described above) has evolved as more efficient ( and robust) discharge electrode designs were developed, today focusing on rigid
  • 38. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 32 discharge electrodes to which many sharpened spikes are attached , maximizing corona production. Transformer –rectifier systems apply voltages of 50-100 Kilovolts at relatively high current densities. Modern controls minimize sparking and prevent arcing, avoiding damage to the components. Automatic rapping systems and hopper evacuation systems remove the collected parti ulate atter hile o li e allo i g ESP’s to sta i operatio for years at a time. 26. Induced Draught Fan The induced draft fan assists the FD fan by drawing out combustible gases from the furnace, maintaining a slightly negative pressure in the furnace to avoid backfiring through any opening. At the furnace outlet and before the furnace gases are handled by the ID fan, fine dust carried by the outlet gases is removed to avoid atmospheric pollution. This is an environmental limitation prescribed by law, which additionally minimizes erosion of the ID fan. Figure8: EXTERNAL VIEW OF ID, PA & FD FANS
  • 39. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 33 27. Fuel gas stack A Fuel gas stack is a type of chimney, a vertical pipe, channel or similar structure through which combustion product gases called fuel gases are exhausted to the outside air. Fuel gases are produced when coal, oil, natural gas, wood or any other large combustion device. Fuel gas is usually composed of carbon dioxide (CO2) and water vapor as well as nitrogen and excess oxygen remaining from the intake combustion air. It also contains a small percentage of pollutants such as particulates matter, carbon mono oxide, nitrogen oxides and sulfur oxides. The flue gas stacks are often quite tall, up to 400 meters (1300 feet) or more, so as to disperse the exhaust pollutants over a greater aria and thereby reduce the concentration of the pollutants to the levels required by governmental environmental policies and regulations. When the fuel gases exhausted from stoves, ovens, fireplaces or other small sources within residential abodes, restaurants , hotels or other stacks are referred to as chimneys.
  • 40. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 34 COAL HANDLING PLANT (C.H.P) & NEW COAL HANDLING PLANT (N.C.H.P) The old coal handling plant caters to the need of units 2,3,4,5 and 1 whereas the latter supplies coal to units 4 and V.O.C.H.P. supplies coal to second and third stages in the advent coal to usable form to (crushed) form its raw form and send it to bunkers, from where it is send to furnace. Figure 9: COAL CYCLE
  • 41. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 35 Major Components 1.Wagon Tippler: - Wagons from the coal yard come to the tippler and are emptied here. The process is performed by a slip –ring motor of rating: 55 KW, 415V, 1480 RPM. This motor turns the wagon by 135 degrees and coal falls directly on the conveyor through vibrators. Tippler has raised lower system which enables is to switch off motor when required till is wagon back to its original position. It is titled by weight balancing principle. The motor lowers the hanging balancing weights, which in turn tilts the conveyor. Estimate of the weight of the conveyor is made through hydraulic weighing machine. Motor Specification 1. (i) H.P 75 HP 2. (ii) Voltage 415, 3 phase 3. (iii) Speed 1480 rpm 4. (iv) Frequency 50 Hz 5. (v) Current rating 102 A Figure 10: WAGON TRIPPLER
  • 42. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 36 2.Conveyor: - There are 14 conveyors in the plant. They are numbered so that their function can be easily demarcated. Conveyors are made of rubber and more with a speed of 250- 300m/min. Motors employed for conveyors has a capacity of 150 HP. Conveyors have a capacity of carrying coal at the rate of 400 tons per hour. Few conveyors are double belt, this is done for imp. Conveyors so that if a belt develops any problem the process is not stalled. The conveyor belt has a switch after every 25-30 m on both sides so stop the belt in case of emergency. The conveyors are 1m wide, 3 cm thick and made of chemically treated vulcanized rubber. The max angular elevation of conveyor is designed such as never to exceed half of the angle of response and comes out to be around 20 degrees. Conveyors:- 10A, 10B 11A, 11B 12A, 12B 13A, 13B 14A, 14B 15A, 15B 16A, 16B 17A, 17B 18A, 18B
  • 43. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 37 FIGURE 11: CONVEYOR 3. Metal Separators: - As the belt takes coal to the crusher, No metal pieces should go along with coal. To achieve this objective, we use metal separators. When coal is dropped to the crusher hoots, the separator drops metal pieces ahead of coal. It has a magnet and a belt and the belt is moving, the pieces are thrown away. The capacity of this device is around 50 kg. .The CHP is supposed to transfer 600 tons of coal/hr, but practically only 300-400 tons coal is transfer. 4. Crusher: - Both the plants use TATA crushers powered by BHEL. Motors. The crusher is of ring type and motor ratings are 400 HP, 606 KV. Crusher is designed to crush the pieces to 20 mm size i.e. practically considered as the optimum size of transfer via conveyor.
  • 44. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 38 FIGURE 12: CRUSHERS 5. Rotatory Breaker: - OCHP employs mesh type of filters and allows particles of 20mm size to go directly to RC bunker, larger particles are sent to crushes. This leads to frequent clogging. NCHP uses a technique that crushes the larger of harder substance like metal impurities easing the load on the magnetic separators. 6. Rotary components (a) ID Fans: - Located between electrostatic precipitator and chimney. Type-radical Speed-1490 rpm Rating-300 KW Voltage-6.6 KV Lubrication-by oil
  • 45. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 39 (b) FD Fans: - Designed to handle secondary air for boiler. 2 in number and provide ignition of coal. Type-axial Speed-990 rpm Rating-440 KW Voltage-6.6 KV (c)Primary Air Fans: - Designed for handling the atmospheric air up to 50 degrees Celsius, 2 in numberAnd they transfer the powered coal to burners to firing. Type-Double suction radial Rating-300 KW Voltage-6.6 KV Lubrication-by oil Type of operation-continuous 7. Coal feed to plant: Feeder motor specification (i) Horse power 15 HP (ii) Voltage 415V, 3 phase (iii) Speed 1480 rpm
  • 46. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 40 Generator and Auxiliaries Generator Fundamentals The transformation of mechanical energy into electrical energy is carried out by the Generator. This Chapter seeks to provide basic understanding about the working principles and development of Generator. Figure 13: CROSS-SECTIONAL VIEW OF A GENERATOR Working Principle The A.C. Generator or alternator is based upon the principle of electromagnetic induction and consists generally of a stationary part called stator and a rotating part called rotor. The stator housed the armature windings. The rotor houses the field windings. D.C. voltage is applied to the field windings through slip rings. When the rotor is rotated, the lines of magnetic flux (i.e. magnetic field) cut through the stator windings. This induces an electromagnetic force (EMF) in the stator windings. The magnitude of this EMF is given by the following expression. E = 4.44 /O FN volts
  • 47. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 41 0 = Stre gth of ag eti field i We er’s. F = Frequency in cycles per second or Hertz. N = Number of turns in a coil of stator winding F = Frequency = P*n/120 Where P = Number of poles n = revolutions per second of rotor. From the expression it is clear that for the same frequency, number of poles increases with decrease in speed and vice versa. Therefore, low speed hydro turbine drives generators have 14 to 20 poles were as high speed steam turbine driven generators have generally 2 poles. Figure 14: A 95 MW GENERATOR Generator component This deals with the two main components of the Generator viz. Rotor, its winding & balancing and stator, its frame, core & windings.
  • 48. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 42 Rotor The electrical rotor is the most difficult part of the generator to design. It revolves in most modern generators at a speed of 3,000 revolutions per minute. The problem of guaranteeing the dynamic strength and operating stability of such a rotor is complicated by the fact that a massive non-uniform shaft subjected to a multiplicity of differential stresses must operate in oil lubricated sleeve bearings supported by a structure mounted on foundations all of which possess complex dynamic be behavior peculiar to them. It is also an electromagnet and to give it the necessary magnetic strength The windings must carry a fairly high current. The passage of the current through the windings generates heat but the temperature must not be allowed to become so high, otherwise difficulties will be experienced with insulation. To keep the temperature down, the cross section of the conductor could not be increased but this would introduce another problems. In order to make room for the large conductors, body and this would cause mechanical weakness. The problem is really to get the maximum amount of copper into the windings without reducing the mechanical strength. With good design and great care in construction this can be achieved. The rotor is a cast steel ingot, and it is further forged and machined. Very often a hole is bored through the centre of the rotor axially from one end of the other for inspection. Slots are then machined for windings and ventilation. Rotor winding Silver bearing copper is used for the winding with mica as the insulation between conductors. A mechanically strong insulator such as micanite is used for lining the slots. Later designs of windings for large rotor incorporate combination of hollow conductors with slots or holes arranged to provide for circulation of the cooling gas through the actual conductors. When rotating at high speed. Centrifugal force tries to lift the windings out of the slots and they are contained by wedges. The end rings are secured to a turned recess in the rotor body, by shrinking or screwing and supported at the other end by fittings carried
  • 49. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 43 by the rotor body. The two ends of windings are connected to slip rings, usually made of forged steel, and mounted on insulated sleeves. Stator Stator frame: The stator is the heaviest load to be transported. The major part of this load is the stator core. This comprises an inner frame and outer frame. The outer frame is a rigid fabricated structure of welded steel plates, within this shell is a fixed cage of girder built circular and axial ribs. The ribs divide the yoke in the compartments through which hydrogen flows into radial ducts in the stator core and circulate through the gas coolers housed in the frame. The inner cage is usually fixed in to the yoke by an arrangement of springs to dampen the double frequency vibrations inherent in 2 pole generators. The end shields of hydrogen cooled generators must be strong enough to carry shaft seals. In large generators the frame is constructed as two separate parts. The fabricated inner cage is inserted in the outer frame after the stator core has been constructed and the winding completed. Stator core: The stator core is built up from a large number of 'punching" or sections of thin steel plates. The use of cold rolled grain-oriented steel can contribute to reduction in the weight of stator core for two main reasons: a) There is an increase in core stacking factor with improvement in lamination cold Rolling and in cold buildings techniques. b) The advantage can be taken of the high magnetic permeance of grain-oriented steels of work the stator core at comparatively high magnetic saturation without fear or excessive iron loss of two heavy a demand for excitation ampere turns from the generator rotor. Stator Windings Each stator conductor must be capable of carrying the rated current without overheating. The insulation must be sufficient to prevent leakage currents flowing between the phases to earth. Windings for the stator are made up from copper strips wound with insulated tape which is impregnated with varnish, dried under vacuum and hot pressed to form a solid
  • 50. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 44 insulation bar. These bars are then place in the stator slots and held in with wedges to form the complete winding which is connected together at each end of the core forming the end turns. These end turns are rigidly braced and packed with blocks of insulation material to withstand the heavy forces which might result from a short circuit or other fault conditions. The generator terminals are usually arranged below the stator. On recent generators (210 MW) the windings are made up from copper tubes instead of strips through which water is circulated for cooling purposes. The water is fed to the windings through plastic tubes. Generator Cooling System The 200/210 MW Generator is provided with an efficient cooling system to avoid excessive heating and consequent wear and tear of its main components during operation. This Chapter deals with the rotor-hydrogen cooling system and stator water cooling system along with the shaft sealing and bearing cooling systems. Rotor Cooling System The rotor is cooled by means of gap pick-up cooling, wherein the hydrogen gas in the air gap is sucked through the scoops on the rotor wedges and is directed to flow along the ventilating canals milled on the sides of the rotor coil, to the bottom of the slot where it takes a turn and comes out on the similar canal milled on the other side of the rotor coil to the hot zone of the rotor. Due to the rotation of the rotor, a positive suction as well as discharge is created due to which a certain quantity of gas flows and cools the rotor. This method of cooling gives uniform distribution of temperature. Also, this method has an inherent advantage of eliminating the deformation of copper due to varying temperatures. Hydrogen Cooling System Hydrogen is used as a cooling medium in large capacity generator in view of its high heat arr i g apa it a d lo de sit . But i ie of it’s for i g a e plosi e i ture ith oxygen, proper arrangement for filling, purging and maintaining its purity inside the
  • 51. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 45 generator have to be made. Also, in order to prevent escape of hydrogen from the generator casing, shaft sealing system is used to provide oil sealing. The hydrogen cooling system mainly comprises of a gas control stand, a drier, an liquid level indicator, hydrogen control panel, gas purity measuring and indicating instruments, The system is capable of performing the following functions: I. Filling in and purging of hydrogen safely without bringing in contact with air. II. Maintaining the gas pressure inside the machine at the desired value at all the times. III. Provide indication to the operator about the condition of the gas inside the machine i.e. its pressure, temperature and purity. IV. Continuous circulation of gas inside the machine through a drier in order to remove any water vapor that may be present in it. V. Indication of liquid level in the generator and alarm in case of high level. Stator Cooling System The stator winding is cooled by distillate. Turbo generators require water cooling arrangement over and above the usual hydrogen cooling arrangement. The stator winding is cooled in this system by circulating demineralised water (DM water) through hollow conductors. The cooling water used for cooling stator winding calls for the use of very high quality of cooling water. For this purpose DM water of proper specific resistance is selected. Generator is to be loaded within a very short period if the specific resistance of the cooling DM water goes beyond certain preset values. The system is designed to maintain a constant rate of cooling water flow to the stator winding at a nominal inlet water temperature of 400 C.
  • 52. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 46 Rating of 95 MW Generator- Manufacture by Bharat heavy electrical Limited (BHEL) Capacity - 117500 KVA Voltage - 10500V Speed - 3000 rpm Hydrogen - 2.5 Kg/cm2 Power factor - 0.85 (lagging) Stator current - 6475 A Frequency - 50 Hz Stator winding connection - 3 phase Rating of 210 MW Generator- Manufacture by Bharat heavy electrical Limited (BHEL) Capacity - 247000 KVA Voltage (stator) - 15750 V Current (stator) - 9050 A Voltage (rotor) - 310 V Current (rotor) - 2600 V Speed - 3000 rpm Power factor - 0.85 Frequency - 50 Hz Hydrogen - 3.5 Kg/cm2 Stator winding connection - 3 phase star connection
  • 53. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 47 TRANSFORMER A transformer is a device that transfers electrical energy from one circuit to another by magnetic coupling without requiring relative motion between its parts. It usually comprises two or more coupled windings, and in most cases, a core to concentrate magnetic flux. An alternating voltage applied to one winding creates a time-varying magnetic flux in the core, which includes a voltage in the other windings. Varying the relative number of turns between primary and secondary windings determines the ratio of the input and output voltages, thus transforming the voltage by stepping it up or down between circuits. By transforming electrical power to a high-voltage, _low-current form and back again, the transformer greatly reduces energy losses and so enables the economic transmission of power over long distances. It has thus shape the electricity supply industry, permitting generation to be located remotely from point of demand. FIGURE 15: TRANSFORMER WORKING PRINCIPLE: It works on FARADAY‟S LAW OF ELECTROMAGNETIC INDUCTION (self or mutual induction depending on the type of transformer).
  • 54. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 48 MAIN PARTS CONSERVATOR It is used generally to conserve the insulating property of the oil from deterioration& protect the transformer against failure on account of bad quality of oil. SILICAGEL DEHYDRATING BREATHER It is used to prevent entry of moisture inside the transformer tank. The breather consists of silica gel. GAS OPERATED RALAY It is a gas actuated relay used for protecting oil immersed transformer against all types of faults. It indicates presence of gases in case of some minor fault & take out the transformer out of circuit in case of serious fault. BUSHING It is made from highly insulating material to insulate & to bring out the terminals of the transformer from the container. The bushings are of 3 types: a). Porcelain bushings used for low voltage transformer b). Oil filled bushings used for voltage up to 33KV. c). Condensed type bushings used for voltage above 33KV OIL GAUGE Every transformer with an oil guage to indicate the oil level. The oil guage may be provided with the alarm contacts which gave an alarm the oil level has dropped beyond permissible height due to oil leak etc. TAPPINGS
  • 55. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 49 The transformer are usually provided with few tappings on secondary side so that output voltage can be varied for constant input voltage. RADIATOR It increases the surface area of the tank & more heat is thus radiated in less time. CONSTRUCTIONAL FEATURES a) 3 phase transformer is constructed in the core type construction b) For reducing losses a smaller thickness of lamination is used. c) For the above reason it is also called cold-rolled steel instead hot-rolled steel is used. d) High flux densities (1.4 to 1.7 Wb/sq m) are used in the core of power transformer which carry load throughout. e)For high voltage winding, disc type coils are used. CLASSIFICATION (I) ACCORDING TO THE CORE a)Core type transformer b)Shell type transformer c)Berry type transformer (II) ACCORDING TO THE PHASES a)1phase transformer b)3phase transformer COOLING OF TRANSFORMERS : As size of transformer becomes large, the rate of the oil circulating becomes insufficient to dissipate all the heat produced & artificial means of increasing the circulation by electric pumps. In very large transformers, special coolers with water circulation may have to be employed.
  • 56. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 50 TYPES OF COOLING AIR COOLING a) Air Natural b)Air Forced OIL IMMERSED COOLING a) Oil Natural Air Cooling b)Oil Natural Force Cooling c)Oil Forced Air Natural Cooling d) Oil Forced Air Forced Cooling MAIN PARTS OF TRANSFORMER 1.Primary Winding 2.Secondry Winding 3.Oil Level 4.Conservator 5.Breather 6.Drain Cocks 7.Cooling Tubes 8.Transformer Oil 9.Earth Point 10.Explosion Vent 11.Temperature Gauge 12.Secondary Terminal 13.Primary Terminal 14.Buchholz Relay Rating of transformer No load voltage (HV) - 229 KV
  • 57. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 51 No load Voltage (LV) -10.5 KV Line current (HV) -315.2 A Line current (LV) - 873.2 A Temp rise - 45 Celsius Oil quantity - 40180 lit Weight of oil - 34985 Kg Total weight - 147725 Kg Core & winding - 84325 Kg Phase -3 Frequency - 50 Hz INSTRUMENTS SEEN 1. MICROMETER This instrument is used for measuring inside as well as outside diameter of bearing. 2. MEGGAR This instrument is used for measuring insulation resistance. 3. VIBRATION TESTER It measures the vibration of the motor. It is measured in three dimensions-axial, vertical and horizontal. POLLUTION CONTROL SYSTEMS: While deciding the appropriate technology for its projects, NTPC integrates many environmental provisions into the plant design. In order to ensure that NTPC complies with all the stipulated environment norms, various state-of-the-art pollution control
  • 58. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 52 systems / devices as discussed below have been installed to control air and water pollution. Electrostatic Precipitators: The ash left behind after combustion of coal is arrested in high efficiency Electrostatic Precipitators (ESPs) and particulate emission is controlled well within the stipulated norms. The ash collected in the ESPs is disposed to Ash Ponds in slurry form. Flue Gas Stacks: Tall Flue Gas Stacks have been provided for wide dispersion of the gaseous emissions (SOX, NOX etc.) into the atmosphere. Low-NOX Burners: In gas based NTPC power stations, NOX emissions are controlled by provision of Low- NOX Burners (Dry or wet type) and in coal fired stations, by adopting best combustion practices. Neutralization Pits: Neutralization pits have been provided in the Water Treatment Plant (WTP) for pH correction of the Effluents before discharge into Effluent Treatment Plant (ETP) for further treatment and use. Coal Settling Pits / Oil Settling Pits: In these Pits, coal dust and oil are removed from the effluents emanating from the Coal Handling Plant (CHP), coal yard and Fuel Oil Handling areas before discharge into ETP. DE & DS Systems: Dust Extraction (DE) and Dust Suppression (DS) systems have been installed in all coal fired power stations in NTPC to contain and extract the fugitive dust released in the Coal Handling Plant (CHP).
  • 59. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 53 Cooling Towers: Cooling Towers have been provided for cooling the hot Condenser cooling water in closed cycle, Condenser Cooling Water (CCW) Systems. This helps in reduction in thermal pollution and conservation of fresh water. Ash Dykes & Ash Disposal systems: Ash ponds have been provided at all coal based stations except Dadri where Dry Ash Disposal System has been provided. Ash Ponds have been divided into lagoons and provided with garlanding arrangement for changeover of the ash slurry feed points for even filling of the pond and for effective settlement of the ash particles. Ash in slurry form is discharged into the lagoons where ash particles get settled from the slurry and clear effluent water is discharged from the ash pond. The discharged effluents conform to standards specified by CPCB and the same is regularly monitored. At its Dadri Power Station, NTPC has set up a unique system for dry ash collection and disposal facility with Ash Mound formation. This has been envisaged for the first time in Asia which has resulted in progressive development of green belt besides far less requirement of land and less water requirement as compared to the wet ash disposal system. Ash Water Recycling System: Further, in a number of NTPC stations, as a proactive measure, Ash Water Recycling System (AWRS) has been provided. In the AWRS, the effluent from ash pond is circulated back to the station for further ash sluicing to the ash pond. This helps in savings of fresh water requirements for transportation of ash from the plant. The ash water recycling system has already been installed and is in operation at Ramagundam, Simhadri, Rihand, Talcher Kaniha, Talcher Thermal, Kahalgaon, Korba and Vindhyachal. The scheme has helped stations to save huge quantity of fresh water required as make-up water for disposal of ash. Liquid Waste Treatment Plants & Management System:
  • 60. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 54 The objective of industrial liquid effluent treatment plant (ETP) is to discharge lesser and cleaner effluent from the power plants to meet environmental regulations. After primary treatment at the source of their generation, the effluents are sent to the ETP for further treatment. The composite liquid effluent treatment plant has been designed to treat all liquid effluents which originate within the power station e.g. Water Treatment Plant (WTP), Condensate Polishing Unit (CPU) effluent, Coal Handling Plant (CHP) effluent, floor washings, service water drains etc. The scheme involves collection of various effluents and their appropriate treatment centrally and re-circulation of the treated effluent for various plant uses. NTPC has implemented such systems in a number of its power stations such as Ramagundam, Simhadri, Kayamkulam, Singrauli, Rihand, Vindhyachal, Korba, Jhanor Gandhar, Faridabad, Farakka, Kahalgaon and Talcher Kaniha. These plants have helped to control quality and quantity of the effluents discharged from the stations. Sewage Treatment Plants & Facilities: Sewage Treatment Plants (STPs) sewage treatment facilities have been provided at all NTPC stations to take care of Sewage Effluent from Plant and township areas. In a number of NTPC projects modern type STPs with Clarifloculators, Mechanical Agitators, sludge drying beds, Gas Collection Chambers etc. have been provided to improve the effluent quality. The effluent quality is monitored regularly and treated effluent conforming to the prescribed limit is discharged from the station. At several stations treated effluents of STPs are being used for horticulture purpose. CONTROL & MONITORING MECHANISMS SOLUTION TO THE PROBLEMS There are basically two types of Problems faced in a Power Plant 1. Metallurgical 2. Mechanical
  • 61. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 55 Mechanical Problem can be related to Turbines that is the max speed permissible for a turbine is3000 rpm so speed should be monitored and maintained at that level. Metallurgical Problem can be view as the max Inlet Temperature for Turbine is 1060° C so temperature should be below the limit. Monitoring of all the parameters is necessary for the safety of both: 1. Employees 2. Machines So the Parameters to be monitored are 1. Speed 2. Temperature 3. Current 4. Voltage 5. Pressure 6. Eccentricity 7. Flow of Gases 8. Vacuum Pressure 9. Valves 10. Level 11. Vibration
  • 62. Industrial Training Report 2016 APPLIED COLLEGE OF MANAGEMENT AND ENGINEERING Page 56 REFERNCES 1.Library of BTPS 2.Supporting Staff 3.Books