PLASTERING
Plastering
• Process of covering rough walls and uneven
surfaces of a building with a plastic material to
form a durable surface.
• Additives are added to improve the
adhesiveness, water proof, termite resistance
Objectives of plastering
• Provide an even,smooth,regular, clean and durable
finished surface
• Protect the surface from the effects of atmospheric
agencies
• Conceals the defective workmanship
• Covers up the use of inferior quality materials and
joints
• Provides satisfactory base for white washing, color
washing
Characteristic of good plastering
• Should be fire resistant and sound proof
• Should provide a smooth, non-absorbent and
washable surface
• Should adhere to the surface firmly
• Should be weather proof
• Should be free from volumetric changes while
setting and drying
Types of Plastering
Depending upon the binding material
• Cement Plastering
• Mud Plastering
• Lime Plastering
• Lime cement plaster
• Cement plastering
• Mud plastering
Lime plastering
Procedure for cement plastering
• Average thickness of cement plastering is 12-
15mm
• Clean the surface with water and is kept wet till
applying plaster
• Preliminary coat is applied on the surface to fill up
hollow portion of masonry
• First coat is applied with a thickness of 9-10mm
• Second coat is applied after 6hrs and thickness of
second coat is 10mm.
• Surface is polished with a trowel
• Third coat if required is applied with maximum
thickness 3mm
• Completed plaster is allowed to rest for 24hrs and
well watered for at least one week
• Slow setting under higher humidity improves the
strength of plaster
Defects in Plastering
• Cracks-appears on the
plastered surface in the form
of thin lines or wider cracks
• Due to shrinkage of thick
plaster or poor workmanship
• Prevented by proper curing -
10 days and keeping
thickness of plaster uniform
(<15mm)
• Efflorescence- due to soluble salts present
in the brick or mortar
• Avoided by washing the surface with zinc
sulphate solution and water
• Falling out of plaster- due to inadequate water
bondage, water absorption by dry wall
• Avoided by proper cleaning of joints and proper
washing of surface of wall
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Floor finishes
Floor finishesFloor finishes
Floor finishes
 
Fixtures and fastenings in doors and windows
Fixtures and fastenings in doors and windowsFixtures and fastenings in doors and windows
Fixtures and fastenings in doors and windows
 
brick as a building material
brick as a building materialbrick as a building material
brick as a building material
 
Brick masonary
Brick masonaryBrick masonary
Brick masonary
 
Vinyl flooring
Vinyl flooringVinyl flooring
Vinyl flooring
 
Floor finish
Floor finishFloor finish
Floor finish
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Bricks
BricksBricks
Bricks
 
Flooring
FlooringFlooring
Flooring
 
Flooring
FlooringFlooring
Flooring
 
Construction Techniques using clay products
Construction Techniques using clay productsConstruction Techniques using clay products
Construction Techniques using clay products
 
Panelling
PanellingPanelling
Panelling
 
Brickwork bond ppt
Brickwork bond pptBrickwork bond ppt
Brickwork bond ppt
 
flooring
flooring flooring
flooring
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Tiles
TilesTiles
Tiles
 
Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
 
Tile Flooring
Tile FlooringTile Flooring
Tile Flooring
 
Cladding
CladdingCladding
Cladding
 
stone ppt
stone ppt stone ppt
stone ppt
 

Ähnlich wie 5.plastering

Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointingRehmat Kaur
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bondingRAHUL SINHA
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdfAnoHossey
 
Module 4 finishing works
Module 4 finishing worksModule 4 finishing works
Module 4 finishing worksRemya V.R
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish typesAnqaParvez
 
Advanced construction technologies.pptx
Advanced construction technologies.pptxAdvanced construction technologies.pptx
Advanced construction technologies.pptxKalanaWijesinghe
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)Waqas Aslam
 
Chapter 10 wall finishes ( plastering,pointing &amp; painting)
Chapter 10 wall finishes ( plastering,pointing &amp; painting)Chapter 10 wall finishes ( plastering,pointing &amp; painting)
Chapter 10 wall finishes ( plastering,pointing &amp; painting)KHUSHBU SHAH
 
Bricks & Plastering
Bricks & PlasteringBricks & Plastering
Bricks & PlasteringTanvir Araf
 

Ähnlich wie 5.plastering (20)

Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdf
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Module 4 finishing works
Module 4 finishing worksModule 4 finishing works
Module 4 finishing works
 
Plastering by mani
Plastering by maniPlastering by mani
Plastering by mani
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 
Plastering
PlasteringPlastering
Plastering
 
Cons122
Cons122Cons122
Cons122
 
Cons126
Cons126Cons126
Cons126
 
Advanced construction technologies.pptx
Advanced construction technologies.pptxAdvanced construction technologies.pptx
Advanced construction technologies.pptx
 
Plastering
PlasteringPlastering
Plastering
 
Cons123
Cons123Cons123
Cons123
 
Water proofing
Water proofing Water proofing
Water proofing
 
Unit i (1.2)
Unit i (1.2)Unit i (1.2)
Unit i (1.2)
 
porcelain tiles
porcelain tilesporcelain tiles
porcelain tiles
 
Buiding construction (part ii)
Buiding construction (part ii)Buiding construction (part ii)
Buiding construction (part ii)
 
Chapter 10 wall finishes ( plastering,pointing &amp; painting)
Chapter 10 wall finishes ( plastering,pointing &amp; painting)Chapter 10 wall finishes ( plastering,pointing &amp; painting)
Chapter 10 wall finishes ( plastering,pointing &amp; painting)
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Bricks & Plastering
Bricks & PlasteringBricks & Plastering
Bricks & Plastering
 

Mehr von Amynaah Amye

Mehr von Amynaah Amye (10)

Damp proofing course archna
Damp proofing course archnaDamp proofing course archna
Damp proofing course archna
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Chap16 cbm&cw
Chap16 cbm&cwChap16 cbm&cw
Chap16 cbm&cw
 
Cement
CementCement
Cement
 
Bricks (2)
Bricks (2)Bricks (2)
Bricks (2)
 
7.roofs
7.roofs7.roofs
7.roofs
 
2.foundation
2.foundation2.foundation
2.foundation
 
6.painting
6.painting6.painting
6.painting
 
3.bearing capacity of soil
3.bearing capacity of soil3.bearing capacity of soil
3.bearing capacity of soil
 
1.building
1.building1.building
1.building
 

Kürzlich hochgeladen

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Kürzlich hochgeladen (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

5.plastering

  • 2. Plastering • Process of covering rough walls and uneven surfaces of a building with a plastic material to form a durable surface. • Additives are added to improve the adhesiveness, water proof, termite resistance
  • 3. Objectives of plastering • Provide an even,smooth,regular, clean and durable finished surface • Protect the surface from the effects of atmospheric agencies • Conceals the defective workmanship • Covers up the use of inferior quality materials and joints • Provides satisfactory base for white washing, color washing
  • 4. Characteristic of good plastering • Should be fire resistant and sound proof • Should provide a smooth, non-absorbent and washable surface • Should adhere to the surface firmly • Should be weather proof • Should be free from volumetric changes while setting and drying
  • 5. Types of Plastering Depending upon the binding material • Cement Plastering • Mud Plastering • Lime Plastering • Lime cement plaster
  • 9. Procedure for cement plastering • Average thickness of cement plastering is 12- 15mm • Clean the surface with water and is kept wet till applying plaster • Preliminary coat is applied on the surface to fill up hollow portion of masonry • First coat is applied with a thickness of 9-10mm
  • 10. • Second coat is applied after 6hrs and thickness of second coat is 10mm. • Surface is polished with a trowel • Third coat if required is applied with maximum thickness 3mm • Completed plaster is allowed to rest for 24hrs and well watered for at least one week • Slow setting under higher humidity improves the strength of plaster
  • 11. Defects in Plastering • Cracks-appears on the plastered surface in the form of thin lines or wider cracks • Due to shrinkage of thick plaster or poor workmanship • Prevented by proper curing - 10 days and keeping thickness of plaster uniform (<15mm)
  • 12. • Efflorescence- due to soluble salts present in the brick or mortar • Avoided by washing the surface with zinc sulphate solution and water
  • 13. • Falling out of plaster- due to inadequate water bondage, water absorption by dry wall • Avoided by proper cleaning of joints and proper washing of surface of wall