Understanding Electrical Drawings
(https://nirvaana.co.in/?p=354)
First step of understanding electric drawing of any equipment or panel is
understanding different symbols used for different equipment like C.T,
C.B,C.V.T,L.A, terminal block, Buzzer etc and next is understanding what ferrule
(tag) written on several wires mean. In the diagram shown below most of the
symbols of different equipment have been mentioned. Single line or three line
diagram can also be drawn using these symbols.
Understanding different ferrules :
Several wires run from control room to different equipment in the switchyard of a
substation to operate and monitor these equipment from remote i.e from the
control room. These wires are laid usually through underground cable trenches
.These wires are also tagged for identification as well as rectification of fault if any
, faulty cable or wire can be traced easily with name tags on it. Tags are also
called ferrule and they appear on wires as K1,C11,D33,U11,E31 etc .The first
Alphabet K,C,D,U,E etc of these tags have specific meaning and one can know for
what specific purpose they are being used.
Following is Ferrule numbering standards:
Ferrule “A” used for: CT circuit -Main Protection
Ferrule “B” used for : CT circuit -Busbar Protection
Ferrule “C” used for : CT circuit -Backup Protection
Ferrule “D” used for : CT circuit-Metering circuit
Ferrule “E” used for : PT circuit-Protection/Metering circuit
Ferrule “G” used for: PT circuit-Synchronizing
Ferrule “H” used for: Auxiliary AC circuit
Ferrule “J” used for: Auxiliary DC circuit
Ferrule “K” used for: Control circuit (DC)
Ferrule “L” used for: Alarm and Indication circuit
Ferrule “P” used for: DC circuit-Busbar Protection
Ferrule “S” used for: Event logger/SCADA/BCU circuits
Ferrule “U” used for: Spare Cont
Now that we have understanding of different symbols and ferrules ,let us try to
understand the diagram below which is of circuit breaker closing circuit from
remote i.e from control panel :
52 CB in the drawing below is a Circuit Breaker which is usua
switchyard and 195,295, 86 relays etc are housed in a control and relay panel
which is located in Control room.
From the diagram it is clear that +Ve DC supply for remote closing is taken from
Circuit breaker itself ,it first enters the panel in the terminal block(T.B) shown as
HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of
this T.B. A terminal block looks like this and it is numbered serially from 1 to its
max capacity:
Ferrule “S” used for: Event logger/SCADA/BCU circuits
Ferrule “U” used for: Spare Contacts
Now that we have understanding of different symbols and ferrules ,let us try to
understand the diagram below which is of circuit breaker closing circuit from
remote i.e from control panel :
52 CB in the drawing below is a Circuit Breaker which is usually located in the
switchyard and 195,295, 86 relays etc are housed in a control and relay panel
which is located in Control room.
From the diagram it is clear that +Ve DC supply for remote closing is taken from
first enters the panel in the terminal block(T.B) shown as
HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of
this T.B. A terminal block looks like this and it is numbered serially from 1 to its
Now that we have understanding of different symbols and ferrules ,let us try to
understand the diagram below which is of circuit breaker closing circuit from
lly located in the
switchyard and 195,295, 86 relays etc are housed in a control and relay panel
From the diagram it is clear that +Ve DC supply for remote closing is taken from
first enters the panel in the terminal block(T.B) shown as
HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of
this T.B. A terminal block looks like this and it is numbered serially from 1 to its
From the mentioned T.B ,ferrule K310 is the wire which carries +Ve DC supply
ahead and it connects with the DC fuse shown as FS27-6A , after this fuse it
enters into protective relays -195,295 & 86 relay and then further to Trip and
Close (TNC) switch of the Panel. Only when the relay contacts of 86 HV ,86 LV
&195 is closed , +Ve DC supply will reach TNC switch terminal for closing the
breaker. When any relay is in operated condition, the relay contacts will open and
it will not allow DC voltage to pass through it and close the C.B. Therefore for
closing the C.B all relays should be reset. As soon as the +Ve DC voltage is
available on ferrule K314 , it will be available on one end of TNC switch, and when
this switch is moved to close position ,+Ve DC voltage reaches the closing coil in
the Circuit breaker which turns on the breaker. It is to be noted that trip and
closing coil of breaker is given -Ve supply at all times and +Ve supply is extended
through relays and TNC switch.
For understanding more about testing & commissioning ,please visit:
https://nirvaana.co.in/?p=354

Weitere ähnliche Inhalte

Ähnlich wie electrical drawings.pdf

Small signal analysis based closed loop control of buck converter
Small signal analysis based closed loop control of buck converterSmall signal analysis based closed loop control of buck converter
Small signal analysis based closed loop control of buck converterRamaraochowdary Kantipudi
 
Lecture 07 transistor re model
Lecture 07 transistor re modelLecture 07 transistor re model
Lecture 07 transistor re modelIsmael Cayo Apaza
 
Iaetsd a transformerless single-stage
Iaetsd a transformerless single-stageIaetsd a transformerless single-stage
Iaetsd a transformerless single-stageIaetsd Iaetsd
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report ravi kant
 
Cellphone based voting machine project report
Cellphone based voting machine project reportCellphone based voting machine project report
Cellphone based voting machine project reportDiLip ChauDhary
 
E-stress power generation system
E-stress power generation systemE-stress power generation system
E-stress power generation systemharisingh
 
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfL-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfsatyam jha
 
Construction of digital voltmeter by Bapi Kumar Das
Construction of digital voltmeter by Bapi Kumar DasConstruction of digital voltmeter by Bapi Kumar Das
Construction of digital voltmeter by Bapi Kumar DasB.k. Das
 
Comm Engg mod & demod
Comm Engg mod & demod Comm Engg mod & demod
Comm Engg mod & demod rmkrva
 

Ähnlich wie electrical drawings.pdf (20)

Small signal analysis based closed loop control of buck converter
Small signal analysis based closed loop control of buck converterSmall signal analysis based closed loop control of buck converter
Small signal analysis based closed loop control of buck converter
 
Lecture 07 transistor re model
Lecture 07 transistor re modelLecture 07 transistor re model
Lecture 07 transistor re model
 
Iaetsd a transformerless single-stage
Iaetsd a transformerless single-stageIaetsd a transformerless single-stage
Iaetsd a transformerless single-stage
 
Timer IC-555.pptx
Timer IC-555.pptxTimer IC-555.pptx
Timer IC-555.pptx
 
Lecture 11.pptx
Lecture 11.pptxLecture 11.pptx
Lecture 11.pptx
 
theorem.pdf
theorem.pdftheorem.pdf
theorem.pdf
 
buck converter
buck converterbuck converter
buck converter
 
grid sub-station training Report
grid sub-station training Report grid sub-station training Report
grid sub-station training Report
 
Plc intro
Plc introPlc intro
Plc intro
 
Plc intro
Plc introPlc intro
Plc intro
 
Plc intro
Plc introPlc intro
Plc intro
 
Cellphone based voting machine project report
Cellphone based voting machine project reportCellphone based voting machine project report
Cellphone based voting machine project report
 
E-stress power generation system
E-stress power generation systemE-stress power generation system
E-stress power generation system
 
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfL-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
 
Construction of digital voltmeter by Bapi Kumar Das
Construction of digital voltmeter by Bapi Kumar DasConstruction of digital voltmeter by Bapi Kumar Das
Construction of digital voltmeter by Bapi Kumar Das
 
ESDEMC CDE IEEE Symposium 2014
ESDEMC CDE IEEE Symposium 2014ESDEMC CDE IEEE Symposium 2014
ESDEMC CDE IEEE Symposium 2014
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 
000647
000647000647
000647
 
938 k eletrico w8k
938 k eletrico w8k938 k eletrico w8k
938 k eletrico w8k
 
Comm Engg mod & demod
Comm Engg mod & demod Comm Engg mod & demod
Comm Engg mod & demod
 

Kürzlich hochgeladen

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Kürzlich hochgeladen (20)

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

electrical drawings.pdf

  • 1. Understanding Electrical Drawings (https://nirvaana.co.in/?p=354) First step of understanding electric drawing of any equipment or panel is understanding different symbols used for different equipment like C.T, C.B,C.V.T,L.A, terminal block, Buzzer etc and next is understanding what ferrule (tag) written on several wires mean. In the diagram shown below most of the symbols of different equipment have been mentioned. Single line or three line diagram can also be drawn using these symbols.
  • 2. Understanding different ferrules : Several wires run from control room to different equipment in the switchyard of a substation to operate and monitor these equipment from remote i.e from the control room. These wires are laid usually through underground cable trenches .These wires are also tagged for identification as well as rectification of fault if any , faulty cable or wire can be traced easily with name tags on it. Tags are also called ferrule and they appear on wires as K1,C11,D33,U11,E31 etc .The first Alphabet K,C,D,U,E etc of these tags have specific meaning and one can know for what specific purpose they are being used. Following is Ferrule numbering standards: Ferrule “A” used for: CT circuit -Main Protection Ferrule “B” used for : CT circuit -Busbar Protection Ferrule “C” used for : CT circuit -Backup Protection Ferrule “D” used for : CT circuit-Metering circuit Ferrule “E” used for : PT circuit-Protection/Metering circuit Ferrule “G” used for: PT circuit-Synchronizing Ferrule “H” used for: Auxiliary AC circuit Ferrule “J” used for: Auxiliary DC circuit Ferrule “K” used for: Control circuit (DC) Ferrule “L” used for: Alarm and Indication circuit Ferrule “P” used for: DC circuit-Busbar Protection
  • 3. Ferrule “S” used for: Event logger/SCADA/BCU circuits Ferrule “U” used for: Spare Cont Now that we have understanding of different symbols and ferrules ,let us try to understand the diagram below which is of circuit breaker closing circuit from remote i.e from control panel : 52 CB in the drawing below is a Circuit Breaker which is usua switchyard and 195,295, 86 relays etc are housed in a control and relay panel which is located in Control room. From the diagram it is clear that +Ve DC supply for remote closing is taken from Circuit breaker itself ,it first enters the panel in the terminal block(T.B) shown as HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of this T.B. A terminal block looks like this and it is numbered serially from 1 to its max capacity: Ferrule “S” used for: Event logger/SCADA/BCU circuits Ferrule “U” used for: Spare Contacts Now that we have understanding of different symbols and ferrules ,let us try to understand the diagram below which is of circuit breaker closing circuit from remote i.e from control panel : 52 CB in the drawing below is a Circuit Breaker which is usually located in the switchyard and 195,295, 86 relays etc are housed in a control and relay panel which is located in Control room. From the diagram it is clear that +Ve DC supply for remote closing is taken from first enters the panel in the terminal block(T.B) shown as HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of this T.B. A terminal block looks like this and it is numbered serially from 1 to its Now that we have understanding of different symbols and ferrules ,let us try to understand the diagram below which is of circuit breaker closing circuit from lly located in the switchyard and 195,295, 86 relays etc are housed in a control and relay panel From the diagram it is clear that +Ve DC supply for remote closing is taken from first enters the panel in the terminal block(T.B) shown as HV52TB4.03 , name of T.B is HV52TB4 and the wire connects in no.03 position of this T.B. A terminal block looks like this and it is numbered serially from 1 to its
  • 4. From the mentioned T.B ,ferrule K310 is the wire which carries +Ve DC supply ahead and it connects with the DC fuse shown as FS27-6A , after this fuse it enters into protective relays -195,295 & 86 relay and then further to Trip and Close (TNC) switch of the Panel. Only when the relay contacts of 86 HV ,86 LV &195 is closed , +Ve DC supply will reach TNC switch terminal for closing the breaker. When any relay is in operated condition, the relay contacts will open and it will not allow DC voltage to pass through it and close the C.B. Therefore for closing the C.B all relays should be reset. As soon as the +Ve DC voltage is available on ferrule K314 , it will be available on one end of TNC switch, and when this switch is moved to close position ,+Ve DC voltage reaches the closing coil in the Circuit breaker which turns on the breaker. It is to be noted that trip and closing coil of breaker is given -Ve supply at all times and +Ve supply is extended through relays and TNC switch. For understanding more about testing & commissioning ,please visit: https://nirvaana.co.in/?p=354