Development of a Field-Scale Research Facility to Assess the
Effects of Sea Level Rise on Freshwater
Bottomland Hardwood Forests
Hudson Adams, Riley Garvey, Alyssa Knight, Rachel Mordovancey,
Mattie Rourk, Alexa Schiazza
Clemson University, Clemson, SC
October 20, 2020
Outline
● Introduction
○ Background
○ Rationale
○ Objective(s)
○ Approaches
● Literature Review
● Materials and Methods
● Results
● Recommendations
● Acknowledgements
Introduction
Background
Role of Wetlands
● Wetlands provide many important ecosystem services
○ Improving and protecting water quality
○ Providing fish and wildlife habitats
○ Storing floodwater
● Wetlands are some of the most productive ecosystems
● The overall global wetland value was estimated to be around
47.4 trillion dollars per year
Background
Climate Impact on Wetlands
● Climate change, and the resulting sea level rise, affect the health and
functionality of tidal wetlands.
● Sea level rise causes the inundation and potential displacement of these
areas.
● Such stressors may disassemble the existing ecosystem of the wetland due
to loss of vegetation, loss of habitat, and biogeochemical changes in the soil.
● Wetlands offer valuable ecosystem services such as erosion control,
bioremediation, and flood protection.
● It is important to be able to predict how these services and ecosystems will
be impacted as sea levels rise.
Background
Wetland Maps
Background
Project Scope
● Freshwater tidal wetlands are wetlands that are influenced by the tides but
do not suffer from saltwater intrusion.
● In the lowlands of South Carolina these are both common and more distant
from the coastline than expected in other areas due to the extremely
gradual elevation changes.
● There are two types of freshwater tidal wetlands, marsh and forest, with
the differences occurring due to the hydroperiod, or the period of time the
wetland is covered by water.
● Ecosystem services can be negatively impacted by environmental/climate
change, therefore it is important to monitor these changes.
Background
Facility Location
● Located in the Santee
Experimental Forest on
the East Branch of the
Cooper River
● Sites are bottomland
hardwood forest
Rationale
● Between a field and a lab facility, a field research facility is needed
because wetlands are so complex that if meaningful data is to be
collected, all of the biogeochemical features would need to be
incorporated into a lab research facility. Thus, a field facility is best in
order to more easily bring together those complex ecosystem functions.
● Wetlands provide many ecosystem services such as improving water
quality and storing flood water. If rising sea level affects the way they
currently function, then they may lose some of these services.
● The models currently used to predict how ecosystem services will be
affected are not useful, as freshwater tidal wetlands have not been
adequately studied.
● The idea for this project is to create a mesocosm to gain critical data by
which to base future models on.
Hypothesis to be tested through the use of the
designed facility:
As sea level rises and
hydroperiods change, these
wetlands will shift in type and
previously nontidal wetlands will
become tidally influenced.
Objectives
Mission
The main objective of this project is to design and model a field scale
research facility to study the impact of climate change on the ecosystem
services provided by wetlands, in particular, to determine the effects of sea
level rise on the hydrologic regime of a freshwater tidal wetland.
Specific Objectives
1. To design impoundment/control water structures and drainage
2. To develop an operational plan
3. To develop a site plan for research site
Client Deliverables
1. Hydrogeomorphic Assessment – this is an integrated assessment of the land
resource data providing a basis for the site selection
a. A detailed analysis of the natural and man-made subcatchments within the
floodplain that could be the mesocosms. This analysis will focus on utilizing
the lidar data to delineate drainage areas and flow paths within the
floodplain.
b. This analysis will consider the current flow paths and hydrologic regimes.
2. Summary on the expected impacts of sea-level rise on the current hydrologic
regime
3. Facility Operational Plan
4. Site Plan
Approaches
Task 1
To determine
a site location
Task 2
To design the
facility
Task 1: To determine a site location
Sub-Tasks:
● To collect hydrological, Lidar, climate, and GIS data for the possible sites.
● To assess references, data, and similar project designs.
● To research sea-level rise modelling done by NOAA or another agency in the
Charleston area.
● To explore water containment and management methods for both options.
● To determine biodiversity of local flora within each option.
● To identify size requirements and necessary site boundaries for both
options.
● To choose an alternative to move forward into design.
Approaches
Site Option 1: Tidally Influenced Sub-Catchment Channel
● Put a weir in “Channel A” to divert
water to “Channel B”
● Put berm at tidally influenced
intersection of “Channel B”
● Use main channel water to flood
“Channel B” area
Site Plan Site Map
Approaches
Site Option 1: Tidally Influenced
Sub-Catchment Channel
A B C
C
A
B
Approaches
Site Option 2: Non-Tidal Controlled Rice Fields
● Retrofit existing berms in rice field
plot
● Install a pump from Nicholson
Creek to the chosen rice field plot
● Construct a weir on the opposite
site of the rice field to let water
escape when necessary
Site Plan Site Map
Approaches
Site Option 2: Non-Tidal
Controlled Rice Fields
A B C
C
A
B
Task 2: To design a facility
Sub-Tasks:
● To evaluate site planning considerations including site access, elevation, and wetland
impact.
● To examine possible methods of passive flow/filling.
● To identify needs to maintain a healthy ecosystem such as water retention rate.
● To determine what additional infrastructure such as water control structures, pipe
networks, pumps, and drainage systems will be required.
● To model hydrologic regimes and design plans by utilizing CAD, HEC-RAS, and SOLIDWORKS.
● To create a design plan draft.
● To develop a final site plan.
● To formulate a facility operations plan by determining how the water control system will
run.
● To assess the cost of the designed field research facility.
Pre-/post-development
modeling and structural
drawings
Developing tidal
regime and
operational plans
CAD site
development
and plan set
Task Management
Team
We collaborated as a group on all aspects
of the project. To ensure that everything
got done, each group member was
assigned a different task to be in charge
of:
● Hudson Adams
○ Structural Drawings using
SolidWorks
● Riley Garvey
○ Pre-development modeling
using Hecras*
● Mattie Rourk
○ Post-development modeling
○ Paper Format
● Alyssa Knight
○ Developing tidal regime
○ Operational Plans
● Rachel Mordavancy
○ Site development using CAD
● Alexa Schiazza
○ Plan Set
Ecology Climate
Science
Engineering
TFW research
center
Maximizing use
of existing
infrastructure
Efficiently
capturing and
manipulating
water flows
Diverse
assemblage of
endemic
species
Literature
Review
Literature Review
Site Hydrology
● Most of the soils have high surface runoff and low infiltration
rates.
● Average annual rainfall: 1370 mm
● The peak discharges for the Turkey Creek watershed:
○ 12.0 m3
/s--2 year return period
○ 22.9 m3
/s--5 year return period
○ 31.5 m3
/s--10 year return period
○ 42.9 m3
/s--25 year return period
○ 53.2 m3
/s--50 year return period
○ 64.2 m3
/s--100 year return period
● Vegetation: pine-hardwood forests.
Literature Review
Parameters
● Going forward with the design, the research parameters that the facility will be used
for are:
○ Vegetation response
■ which will monitor changes in vegetation structure, composition, and
productivity including photosynthesis and transpiration
○ Soil response
■ which will monitor changes in soil biogeochemistry such as redox
conditions, greenhouse gas emissions, carbon storage, nutrient cycling,
also soil microbiology
○ Hydrologic response
■ which will monitor changes in hydrology and water quality
Literature Review
Turkey Creek Water Table Data
We will use Turkey Creek
data in order to estimate
Nicholson Creek flows off a
relative size comparison
since they are both type 3
streams
Literature Review
Sea Level Rise
How high should the water be
raised?
● The relative sea-level rise trend
in Charleston, SC is about 3.32
mm/year based on monthly
mean sea level data spanning
from 1901 to 2019.
● This was determined to be the
equivalent to a 1.09 ft sea level
rise over the span of 100 years.
Literature Review
Sea Level Rise
Literature Review
Mesocosm vs. Large-Scale Experiment
Large Scale Experiment:
● Displayed an increase in
temperature over time.
● An increase in dissolved oxygen
over time.
● Larger scale experiments are
harder to control.
Mesocosm Experiment:
● Became colonized by macrophytes
which caused shading.
○ Lower temperature over time.
● Mesocosms are often more
optimal as they are more
replicable and repeatable.
Both:
● Retain nutrients.
● Showed an increase in pH.
Literature Review
Mesocosm vs. Large-Scale Experiment
How does the complexity of these
two set-ups compare?
Materials
and
Methods
Materials and Methods
Modeling
● To create location and watershed basin maps of the site using ArcGIS
● To measure site hydrologic features, specifically raised water levels, using HEC-RAS
● For site design and plan set development will be created using AutoCAD Civil3D
● To design and model hydraulic structures, such as a weir structure, using SolidWorks
Materials and Methods
Site Needs
● Existing Conditions Evaluation
● Grading Needs (Fill Soils)
● Pump
● Hydraulic Structure: Weir
● Site Access Stair
● Electrical Instrumentation (Beyond Scope of Design)
Results
Results
Site Selection
Rice FieldChannel
Results
Pre-Development Flow Model Utilizing HEC-RAS
● 1-year rain event
● Rice fields are naturally
flooded from large storm
events
○ after 3 hours of this
storm, the average water
depth on the site was 22
cm
● Berms are partially inundated
- creating the need for
increased height and proper
grading
Results
Site Layout
Utilizing AutoCAD
Results
Existing Berm Conditions Utilizing AutoCAD
Results
Post-Development Flow Model Utilizing HEC-RAS
● 1-year rain event
● Rice fields are naturally
flooded from large storm
events
Results
Berm Grading Utilizing AutoCAD
● Due to the deteriorated
condition of the berms,
reinforcement and a raised
height is required.
● Berms will be 3’ top width
with a 3:1 slope down to
the existing grade.
Results
Spillway Grading Utilizing AutoCAD
● The spillway is be
designed to retain
the low tide tide
water level while
the hydraulic weir
will hold the high
tide.
● 3:1 slope down
from berms and
2% down the
spillway through
the berms
Results
Pump Station Location
● Because the site is
located in the
Nicholson Creek
flood plain, the pump
cannot be placed
within the wetland
area.
● The station will be
located off of
Summerhouse Road
adjacent to Nicholson
Creek
Results
Pump Station Site
Grading Utilizing AutoCAD
● The road grade will be extended by
15’ to provide a 15’ ⨯ 15’ flat surface
in order to place the pump station.
● Graded to the existing ground at 3:1
slope
Results
Pipe Alignment Utilizing AutoCAD
● Carbon coated HDPE
pipe will be utilized to
pump water from
Nicholson Creek to the
rice field plot.
Results
Pipe Alignment Profile Utilizing AutoCAD
● In order to avoid the
ecological impact of
burying the pipe, it will
be run over the ground
on stilts supported by
pylons
● Because of the warm
climate of Huger, SC,
temperature related
deflections of the pipe
are of minimal concern.
Results
Pipe Support
● The pylons will be
supported with
compacted fill
material.
● At every turn in the
pipe, an earthen
berm will be placed
to support the bend.
Results
Hydraulic Design Utilizing SolidWorks
● Design includes a gate on the
weir that is operated by a rack
and pinion system powered by
a small motor
● The gate will be operated on a
time schedule to simulate the
coming and going of the tide
each day
Results
Rack and Pinion System
● Pros: Easy to design and
maintain
● Cons: If the rack is misaligned it
may damage the entire gear
box, Can be inaccurate if a
higher quality is not bought
and maintained but this is not
an issue for this project.
Results
Cost Assessment-Labor
Team Member: Hudson
Task Hours
Meetings
-------
PowerPoint
Solidworks
Total
Team Member: Riley
Task Hours
Meetings
PowerPoint
HEC-RAS
Total
Results
Cost Assessment-Labor
Team Member: Alyssa
Task Hours
Meetings
-------
Statistics
HEC-RAS
Total
Team Member: Rachel
Task Hours
Meetings
--------
PowerPoint
AutoCAD
Total
Results
Cost Assessment-Labor
Team Member: Mattie
Task Hours
Meetings
--------
PowerPoint
HEC-RAS
Paper
Total
Team Member: Alexa
Task Hours
Meetings
----------
PowerPoint
HEC-RAS
Paper
Total
Results
Cost Assessment-Hydraulic Design
Results
Cost Assessment-Grading
Results
Cost Assessment-Pump
Recommendations
Recommendations
● We recommend implementing site option 2 - non-tidal
controlled rice fields for the research facility, based on the
criteria outlined in the results section as well as field
observations
● Moving forward, we will provide more detailed
recommendations for developing the facility on this site
Ecology Climate
Science
Engineering
TFW research
center
Acknowledgements
Sincerely,
Alexa, Alyssa, Hudson, Mattie,
Rachel, and Riley
Dr. Darnault,
Thank you for guiding us throughout this
project and giving us helpful feedback
on our presentation and paper.
Dr. Xiao,
Thank you for your help throughout the
project process and giving us helpful
feedback about our powerpoint.
Dr. Trettin,
Thank you for giving us the opportunity to
work alongside you to develop a field-scale
research facility to observe the effects
global warming, specifically sea level rise,
has on bottomland hardwood forests. We
hope this project helps you and the USDA
Forestry service devise a plan to
implement in the future.
Julie,
Thank you for showing us around both the
tidally influenced sub-catchment channel,
and the non-tidal controlled rice fields.
This site visit was extremely helpful in the
completion of our project design.
Thank You!

Weitere ähnliche Inhalte

Was ist angesagt?

Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Nebraska Water Center
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resJane C. Glavan
 
superfund poster final final final
superfund poster final final finalsuperfund poster final final final
superfund poster final final finalEugene Peck
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Dirk Kassenaar M.Sc. P.Eng.
 
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...Dirk Kassenaar M.Sc. P.Eng.
 
Climate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsClimate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsAbhiram Kanigolla
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyTWCA
 
NOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerNOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerTWCA
 
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Dirk Kassenaar M.Sc. P.Eng.
 
Compressed Air Energy Storage Desalination Gulf of Mexico Texas
Compressed Air Energy Storage Desalination Gulf of Mexico Texas Compressed Air Energy Storage Desalination Gulf of Mexico Texas
Compressed Air Energy Storage Desalination Gulf of Mexico Texas Jeffrey Pickett
 
Environmental flow & Fish passes
Environmental flow & Fish passesEnvironmental flow & Fish passes
Environmental flow & Fish passesSHAHANAS6
 
United States Geological Survey, Dr. William Guertal
United States Geological Survey, Dr. William GuertalUnited States Geological Survey, Dr. William Guertal
United States Geological Survey, Dr. William GuertalTWCA
 
Catchment classification: multivariate statistical analyses for physiographic...
Catchment classification: multivariate statistical analyses for physiographic...Catchment classification: multivariate statistical analyses for physiographic...
Catchment classification: multivariate statistical analyses for physiographic...IJERA Editor
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingAdam Nayak
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseYourAlberta
 
Mitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethMitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethYourAlberta
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Dirk Kassenaar M.Sc. P.Eng.
 

Was ist angesagt? (20)

Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
 
AGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low resAGEDI Climate Change Brochure low res
AGEDI Climate Change Brochure low res
 
superfund RSM final
superfund RSM finalsuperfund RSM final
superfund RSM final
 
superfund poster final final final
superfund poster final final finalsuperfund poster final final final
superfund poster final final final
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
 
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
Analysis of Groundwater/Surface Water Interaction at the Site Scale Babcock R...
 
Climate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basinsClimate change impact assessment on hydrology on river basins
Climate change impact assessment on hydrology on river basins
 
SDP120116f
SDP120116fSDP120116f
SDP120116f
 
LCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen BondyLCRA Lane City Reservoir Project, Karen Bondy
LCRA Lane City Reservoir Project, Karen Bondy
 
NOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerNOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory Waller
 
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
 
Compressed Air Energy Storage Desalination Gulf of Mexico Texas
Compressed Air Energy Storage Desalination Gulf of Mexico Texas Compressed Air Energy Storage Desalination Gulf of Mexico Texas
Compressed Air Energy Storage Desalination Gulf of Mexico Texas
 
Environmental flow & Fish passes
Environmental flow & Fish passesEnvironmental flow & Fish passes
Environmental flow & Fish passes
 
Yogyakarta coastal aquifer
Yogyakarta coastal aquiferYogyakarta coastal aquifer
Yogyakarta coastal aquifer
 
United States Geological Survey, Dr. William Guertal
United States Geological Survey, Dr. William GuertalUnited States Geological Survey, Dr. William Guertal
United States Geological Survey, Dr. William Guertal
 
Catchment classification: multivariate statistical analyses for physiographic...
Catchment classification: multivariate statistical analyses for physiographic...Catchment classification: multivariate statistical analyses for physiographic...
Catchment classification: multivariate statistical analyses for physiographic...
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 
Flood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt MachielseFlood and drought mitigation - Matt Machielse
Flood and drought mitigation - Matt Machielse
 
Mitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard LindsethMitigation Symposium - Richard Lindseth
Mitigation Symposium - Richard Lindseth
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
 

Ähnlich wie Capstone

Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...RachelMordovancey
 
ProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishequipeagroplus
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...GavanThomas
 
2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdfEdolatamaFebrinal1
 
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...Janna Ellis Kepley
 
Quantitative water quality survey of wetland habitats at a contaminated brown...
Quantitative water quality survey of wetland habitats at a contaminated brown...Quantitative water quality survey of wetland habitats at a contaminated brown...
Quantitative water quality survey of wetland habitats at a contaminated brown...David Bryan
 
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...Deltares
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Geological Survey of Sweden
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureDave Campbell
 
WATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIWATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIPebri Nurhayati
 
Senior Design Final Presentation
Senior Design Final PresentationSenior Design Final Presentation
Senior Design Final PresentationKatherine Knight
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.aueWater
 
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...Deltares
 
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...Water Quality and Productivity Enhancement in an Irrigated River Basin throug...
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...National Institute of Food and Agriculture
 

Ähnlich wie Capstone (20)

Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
 
ProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_english
 
Thesis_MS
Thesis_MSThesis_MS
Thesis_MS
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...
 
2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf
 
BE 4240 Project.pptx
BE 4240 Project.pptxBE 4240 Project.pptx
BE 4240 Project.pptx
 
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
 
Quantitative water quality survey of wetland habitats at a contaminated brown...
Quantitative water quality survey of wetland habitats at a contaminated brown...Quantitative water quality survey of wetland habitats at a contaminated brown...
Quantitative water quality survey of wetland habitats at a contaminated brown...
 
McKenzie A - UEI Day 1 - Kochi Jan18
McKenzie A - UEI Day 1 - Kochi Jan18McKenzie A - UEI Day 1 - Kochi Jan18
McKenzie A - UEI Day 1 - Kochi Jan18
 
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
Torben Bach-Best-Water-and-Nature-implementing-a-groundwater-decision-support...
 
Duriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring ProjectsDuriancik - Applying Monitoring Projects
Duriancik - Applying Monitoring Projects
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain Future
 
WATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIWATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTI
 
Senior Design Final Presentation
Senior Design Final PresentationSenior Design Final Presentation
Senior Design Final Presentation
 
Catchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.auCatchment Water Quality Management | eWater.com.au
Catchment Water Quality Management | eWater.com.au
 
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
 
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...Water Quality and Productivity Enhancement in an Irrigated River Basin throug...
Water Quality and Productivity Enhancement in an Irrigated River Basin throug...
 

Kürzlich hochgeladen

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 

Kürzlich hochgeladen (20)

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 

Capstone

  • 1. Development of a Field-Scale Research Facility to Assess the Effects of Sea Level Rise on Freshwater Bottomland Hardwood Forests Hudson Adams, Riley Garvey, Alyssa Knight, Rachel Mordovancey, Mattie Rourk, Alexa Schiazza Clemson University, Clemson, SC October 20, 2020
  • 2. Outline ● Introduction ○ Background ○ Rationale ○ Objective(s) ○ Approaches ● Literature Review ● Materials and Methods ● Results ● Recommendations ● Acknowledgements
  • 4. Background Role of Wetlands ● Wetlands provide many important ecosystem services ○ Improving and protecting water quality ○ Providing fish and wildlife habitats ○ Storing floodwater ● Wetlands are some of the most productive ecosystems ● The overall global wetland value was estimated to be around 47.4 trillion dollars per year
  • 5. Background Climate Impact on Wetlands ● Climate change, and the resulting sea level rise, affect the health and functionality of tidal wetlands. ● Sea level rise causes the inundation and potential displacement of these areas. ● Such stressors may disassemble the existing ecosystem of the wetland due to loss of vegetation, loss of habitat, and biogeochemical changes in the soil. ● Wetlands offer valuable ecosystem services such as erosion control, bioremediation, and flood protection. ● It is important to be able to predict how these services and ecosystems will be impacted as sea levels rise.
  • 7. Background Project Scope ● Freshwater tidal wetlands are wetlands that are influenced by the tides but do not suffer from saltwater intrusion. ● In the lowlands of South Carolina these are both common and more distant from the coastline than expected in other areas due to the extremely gradual elevation changes. ● There are two types of freshwater tidal wetlands, marsh and forest, with the differences occurring due to the hydroperiod, or the period of time the wetland is covered by water. ● Ecosystem services can be negatively impacted by environmental/climate change, therefore it is important to monitor these changes.
  • 8. Background Facility Location ● Located in the Santee Experimental Forest on the East Branch of the Cooper River ● Sites are bottomland hardwood forest
  • 9. Rationale ● Between a field and a lab facility, a field research facility is needed because wetlands are so complex that if meaningful data is to be collected, all of the biogeochemical features would need to be incorporated into a lab research facility. Thus, a field facility is best in order to more easily bring together those complex ecosystem functions. ● Wetlands provide many ecosystem services such as improving water quality and storing flood water. If rising sea level affects the way they currently function, then they may lose some of these services. ● The models currently used to predict how ecosystem services will be affected are not useful, as freshwater tidal wetlands have not been adequately studied. ● The idea for this project is to create a mesocosm to gain critical data by which to base future models on.
  • 10. Hypothesis to be tested through the use of the designed facility: As sea level rises and hydroperiods change, these wetlands will shift in type and previously nontidal wetlands will become tidally influenced.
  • 11. Objectives Mission The main objective of this project is to design and model a field scale research facility to study the impact of climate change on the ecosystem services provided by wetlands, in particular, to determine the effects of sea level rise on the hydrologic regime of a freshwater tidal wetland. Specific Objectives 1. To design impoundment/control water structures and drainage 2. To develop an operational plan 3. To develop a site plan for research site
  • 12. Client Deliverables 1. Hydrogeomorphic Assessment – this is an integrated assessment of the land resource data providing a basis for the site selection a. A detailed analysis of the natural and man-made subcatchments within the floodplain that could be the mesocosms. This analysis will focus on utilizing the lidar data to delineate drainage areas and flow paths within the floodplain. b. This analysis will consider the current flow paths and hydrologic regimes. 2. Summary on the expected impacts of sea-level rise on the current hydrologic regime 3. Facility Operational Plan 4. Site Plan
  • 13. Approaches Task 1 To determine a site location Task 2 To design the facility
  • 14. Task 1: To determine a site location Sub-Tasks: ● To collect hydrological, Lidar, climate, and GIS data for the possible sites. ● To assess references, data, and similar project designs. ● To research sea-level rise modelling done by NOAA or another agency in the Charleston area. ● To explore water containment and management methods for both options. ● To determine biodiversity of local flora within each option. ● To identify size requirements and necessary site boundaries for both options. ● To choose an alternative to move forward into design.
  • 15. Approaches Site Option 1: Tidally Influenced Sub-Catchment Channel ● Put a weir in “Channel A” to divert water to “Channel B” ● Put berm at tidally influenced intersection of “Channel B” ● Use main channel water to flood “Channel B” area Site Plan Site Map
  • 16. Approaches Site Option 1: Tidally Influenced Sub-Catchment Channel A B C C A B
  • 17. Approaches Site Option 2: Non-Tidal Controlled Rice Fields ● Retrofit existing berms in rice field plot ● Install a pump from Nicholson Creek to the chosen rice field plot ● Construct a weir on the opposite site of the rice field to let water escape when necessary Site Plan Site Map
  • 18. Approaches Site Option 2: Non-Tidal Controlled Rice Fields A B C C A B
  • 19. Task 2: To design a facility Sub-Tasks: ● To evaluate site planning considerations including site access, elevation, and wetland impact. ● To examine possible methods of passive flow/filling. ● To identify needs to maintain a healthy ecosystem such as water retention rate. ● To determine what additional infrastructure such as water control structures, pipe networks, pumps, and drainage systems will be required. ● To model hydrologic regimes and design plans by utilizing CAD, HEC-RAS, and SOLIDWORKS. ● To create a design plan draft. ● To develop a final site plan. ● To formulate a facility operations plan by determining how the water control system will run. ● To assess the cost of the designed field research facility.
  • 20. Pre-/post-development modeling and structural drawings Developing tidal regime and operational plans CAD site development and plan set Task Management Team We collaborated as a group on all aspects of the project. To ensure that everything got done, each group member was assigned a different task to be in charge of: ● Hudson Adams ○ Structural Drawings using SolidWorks ● Riley Garvey ○ Pre-development modeling using Hecras* ● Mattie Rourk ○ Post-development modeling ○ Paper Format ● Alyssa Knight ○ Developing tidal regime ○ Operational Plans ● Rachel Mordavancy ○ Site development using CAD ● Alexa Schiazza ○ Plan Set
  • 21. Ecology Climate Science Engineering TFW research center Maximizing use of existing infrastructure Efficiently capturing and manipulating water flows Diverse assemblage of endemic species
  • 23. Literature Review Site Hydrology ● Most of the soils have high surface runoff and low infiltration rates. ● Average annual rainfall: 1370 mm ● The peak discharges for the Turkey Creek watershed: ○ 12.0 m3 /s--2 year return period ○ 22.9 m3 /s--5 year return period ○ 31.5 m3 /s--10 year return period ○ 42.9 m3 /s--25 year return period ○ 53.2 m3 /s--50 year return period ○ 64.2 m3 /s--100 year return period ● Vegetation: pine-hardwood forests.
  • 24. Literature Review Parameters ● Going forward with the design, the research parameters that the facility will be used for are: ○ Vegetation response ■ which will monitor changes in vegetation structure, composition, and productivity including photosynthesis and transpiration ○ Soil response ■ which will monitor changes in soil biogeochemistry such as redox conditions, greenhouse gas emissions, carbon storage, nutrient cycling, also soil microbiology ○ Hydrologic response ■ which will monitor changes in hydrology and water quality
  • 25. Literature Review Turkey Creek Water Table Data We will use Turkey Creek data in order to estimate Nicholson Creek flows off a relative size comparison since they are both type 3 streams
  • 26. Literature Review Sea Level Rise How high should the water be raised? ● The relative sea-level rise trend in Charleston, SC is about 3.32 mm/year based on monthly mean sea level data spanning from 1901 to 2019. ● This was determined to be the equivalent to a 1.09 ft sea level rise over the span of 100 years.
  • 28. Literature Review Mesocosm vs. Large-Scale Experiment Large Scale Experiment: ● Displayed an increase in temperature over time. ● An increase in dissolved oxygen over time. ● Larger scale experiments are harder to control. Mesocosm Experiment: ● Became colonized by macrophytes which caused shading. ○ Lower temperature over time. ● Mesocosms are often more optimal as they are more replicable and repeatable. Both: ● Retain nutrients. ● Showed an increase in pH.
  • 29. Literature Review Mesocosm vs. Large-Scale Experiment How does the complexity of these two set-ups compare?
  • 31. Materials and Methods Modeling ● To create location and watershed basin maps of the site using ArcGIS ● To measure site hydrologic features, specifically raised water levels, using HEC-RAS ● For site design and plan set development will be created using AutoCAD Civil3D ● To design and model hydraulic structures, such as a weir structure, using SolidWorks
  • 32. Materials and Methods Site Needs ● Existing Conditions Evaluation ● Grading Needs (Fill Soils) ● Pump ● Hydraulic Structure: Weir ● Site Access Stair ● Electrical Instrumentation (Beyond Scope of Design)
  • 35. Results Pre-Development Flow Model Utilizing HEC-RAS ● 1-year rain event ● Rice fields are naturally flooded from large storm events ○ after 3 hours of this storm, the average water depth on the site was 22 cm ● Berms are partially inundated - creating the need for increased height and proper grading
  • 37. Results Existing Berm Conditions Utilizing AutoCAD
  • 38. Results Post-Development Flow Model Utilizing HEC-RAS ● 1-year rain event ● Rice fields are naturally flooded from large storm events
  • 39. Results Berm Grading Utilizing AutoCAD ● Due to the deteriorated condition of the berms, reinforcement and a raised height is required. ● Berms will be 3’ top width with a 3:1 slope down to the existing grade.
  • 40. Results Spillway Grading Utilizing AutoCAD ● The spillway is be designed to retain the low tide tide water level while the hydraulic weir will hold the high tide. ● 3:1 slope down from berms and 2% down the spillway through the berms
  • 41. Results Pump Station Location ● Because the site is located in the Nicholson Creek flood plain, the pump cannot be placed within the wetland area. ● The station will be located off of Summerhouse Road adjacent to Nicholson Creek
  • 42. Results Pump Station Site Grading Utilizing AutoCAD ● The road grade will be extended by 15’ to provide a 15’ ⨯ 15’ flat surface in order to place the pump station. ● Graded to the existing ground at 3:1 slope
  • 43. Results Pipe Alignment Utilizing AutoCAD ● Carbon coated HDPE pipe will be utilized to pump water from Nicholson Creek to the rice field plot.
  • 44. Results Pipe Alignment Profile Utilizing AutoCAD ● In order to avoid the ecological impact of burying the pipe, it will be run over the ground on stilts supported by pylons ● Because of the warm climate of Huger, SC, temperature related deflections of the pipe are of minimal concern.
  • 45. Results Pipe Support ● The pylons will be supported with compacted fill material. ● At every turn in the pipe, an earthen berm will be placed to support the bend.
  • 46. Results Hydraulic Design Utilizing SolidWorks ● Design includes a gate on the weir that is operated by a rack and pinion system powered by a small motor ● The gate will be operated on a time schedule to simulate the coming and going of the tide each day
  • 47. Results Rack and Pinion System ● Pros: Easy to design and maintain ● Cons: If the rack is misaligned it may damage the entire gear box, Can be inaccurate if a higher quality is not bought and maintained but this is not an issue for this project.
  • 48. Results Cost Assessment-Labor Team Member: Hudson Task Hours Meetings ------- PowerPoint Solidworks Total Team Member: Riley Task Hours Meetings PowerPoint HEC-RAS Total
  • 49. Results Cost Assessment-Labor Team Member: Alyssa Task Hours Meetings ------- Statistics HEC-RAS Total Team Member: Rachel Task Hours Meetings -------- PowerPoint AutoCAD Total
  • 50. Results Cost Assessment-Labor Team Member: Mattie Task Hours Meetings -------- PowerPoint HEC-RAS Paper Total Team Member: Alexa Task Hours Meetings ---------- PowerPoint HEC-RAS Paper Total
  • 55. Recommendations ● We recommend implementing site option 2 - non-tidal controlled rice fields for the research facility, based on the criteria outlined in the results section as well as field observations ● Moving forward, we will provide more detailed recommendations for developing the facility on this site
  • 57. Acknowledgements Sincerely, Alexa, Alyssa, Hudson, Mattie, Rachel, and Riley Dr. Darnault, Thank you for guiding us throughout this project and giving us helpful feedback on our presentation and paper. Dr. Xiao, Thank you for your help throughout the project process and giving us helpful feedback about our powerpoint. Dr. Trettin, Thank you for giving us the opportunity to work alongside you to develop a field-scale research facility to observe the effects global warming, specifically sea level rise, has on bottomland hardwood forests. We hope this project helps you and the USDA Forestry service devise a plan to implement in the future. Julie, Thank you for showing us around both the tidally influenced sub-catchment channel, and the non-tidal controlled rice fields. This site visit was extremely helpful in the completion of our project design.