2
Alkane Resources Ltd
Multi Commodity Developer
Focussed in the Central West NSW
Two major projects through subsidiaries
Australian Strategic Materials Ltd (ASM)
• Dubbo Project
Technology metals
Tomingley Gold Operations Pty Ltd (TGO)
• Tomingley gold production
Cash flow generation
Active exploration programs
Significant discoveries
• Bodangora porphyry Au-Cu system
• McPhillamys 2.5Moz Gold
JV sold to Regis Resources Ltd 2012
Market capitalisation A$130M
Current cash + bullion A$33M
• Resource – 579,000oz of gold (22 Sept 2016)
• Reserve – 253,000oz (22 Sept 2016)
• Mine method – open cut W1, W3, C1 & C2
• Underground feasibility in progress
• Mine Life – 4.5 years inclusive of undergound
• Processing plant standard CIL 1.0Mtpa throughput
• 208,000oz produced to end May 2017
• FY16 – Revenue A$109.6M, TGO EBITDA A$24.6M
Profit A$6.7M
• Forward gold contracts at 31 Mar 2017 31,000oz @
A$1,704/oz
CIL Processing Plant
Caloma open cut October 2015
Resource Expansion and Exploration
• Regional aircore drilling to test multiple targets, generated intercepts to be followed up
• Re-evaluation of large gold-copper system at Peak Hill mine site
• Major subpit RC and core drilling programs in progress to expand resource/reserve base in mine environs
Tomingley Gold Operations
© 2017 Alkane Resources Ltd
3
Note: ASX announcement 22 September 2016 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore
Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed.
Internet of
Things
Transportation
Ageing
Population
Urbanisation
Clean
Energy
Sustainability
Technology drivers
• Faster • Smaller
• Stronger • Lighter
• Cleaner • Safer
Megatrends – Driving the next cycle
© 2017 Alkane Resources Ltd
4
Collection of Big Data by Sensors & Actuators
Connecting people and processes ubiquitously for Smart Systems and IoT
TantalumGold Silver
© 2017 Alkane Resources Ltd
5
“Australian Strategic Materials & Alkane
can supply up to 19 critical elements”
Clean
Energy
Zero or Low CO2 Emissions
Power
• Wind
• Solar
• Nuclear
• Wave
• Thermoelectric
Storage
• Large capacity batteries
• Ferroelectric
• Solid oxide fuel cells
• Portable batteries
• Piezoelectrics
© 2017 Alkane Resources Ltd
6
Emissions minimisation
Global wind capacity to nearly double
in next five years (2015-2020)
In 2015 – 433GW (84,868t REE)
In 2020 – 792GW (155,232t REE)
• 196kg REE used per MW power in wind
turbine NdFeB permanent magnets
• Niobium is used to strengthen and
reduce the amount of steel in stand
Dubbo Project can support 1.4GW output
© 2017 Alkane Resources Ltd
7
Rare earth permanent magnets
More than 100 magnet motors in one car*
LCD SCREEN
• Europium
• Yttrium
• Cerium
GLASS & MIRRORS
• Cerium
HYBRID NIMH BATTERY
• Lanthanum
• Neodymium
• Cerium
COMPONENT SENSORS
• Yttrium
HEADLIGHT GLASS
• Neodymium
25+ ELECTRIC MOTORS
• Neodymium magnets
ELECTRIC MOTORS
• Neodymium magnets
* Source: Adamas Research
© 2017 Alkane Resources Ltd
8
Rare earths in auto transport
449 Operating nuclear plants
60 Undergoing construction
170 Planned in China by 2050
Zirconium clads nuclear fuel rods
Hafnium is used in nuclear control rods
Zirconium niobium alloys
© 2017 Alkane Resources Ltd
9
Nuclear power demand still growing
Transportation
© 2017 Alkane Resources Ltd
10
• Zirconium & hafnium in jet engines – super alloys
• Niobium & hafnium in rocket nozzles – super alloys
• Hafnium for thermoelectric applications – electricity
generation
• Hafnium in special space batteries
• Heat shields
Next gen transport applications
Hafnium – next gen memory
Permanent Memory
Ferroelectric micro-processing using HfO2
• Ultra-fast, low-power, non-volatile
successor to flash memory (atomic
layer deposition)
• HfO2 already used in electronics and
compatible with silicon fabrication
techniques
• k-gate chips, films, ferroelectric tunnel
junctions, optoelectronic modulators,
RAM (embedded memory) and
piezoelectric transducers
© 2017 Alkane Resources Ltd
11
Dubbo Project
• 400km northwest of Sydney
• 25km from Dubbo city (pop~45,000)
• Dubbo infrastructure – roads, rail, power, gas, light
engineering, people
• Large polymetallic resource - zirconium, hafnium, niobium
(tantalum), yttrium and rare earths
• Defined resource supports 80+ year open pit operation
© 2017 Alkane Resources Ltd
12
CURRENT STATUS
• Pilot plant at ANSTO has demonstrated the flow sheet with
products for market evaluation over 8 years
• All State & Federal environment approvals
• Front End Engineering Design (FEED) +/-15% study confirmed
robust technical & financial DFS – 30% detailed design
• Outotec Finnish technology & engineering solutions
company to present a fixed price EPC
• Sumitomo Mitsui Banking Corporation financial advisors –
funding options being developed
• Staged modular design option reduces CAPEX costs, same rate
of output for lower risk – Outotec program underway
Separation Process
© 2017 Alkane Resources Ltd
13
Process of sulphuric acid leach and solvent extraction separation
and chemical refining proved and products distributed to
customers for evaluation and qualification
© 2017 Alkane Resources
Tonnage based upon recoveries developed from mass balances of the demonstration pilot plant.
DPProcessPlant
Rare earth chemical concentrate
Zirconium as ZBC (carbonate) & zirconia
Hafnium as HfO2 concentrate
Niobium as ferro-niobium
95% REO
99% ZrO2
HfO2 conc
65% Nb
6,664 tpa
(REO units)
16,374 tpa
(ZrO2 units)
50 tpa
*(Hf units)
1,967 tpa
(Nb units)
* Start up output. 200tpa potential depending upon market demand
Total output approximately 25,200 tpa of all products
Product Output
© 2017 Alkane Resources Ltd
14
Tonnage based upon recoveries developed from mass balances of the demonstration pilot plant & preliminary
solvent extraction stages on site at the DP.
Total saleable RE products from site ~1,030 tpa and off site ~ 1,675 tpa.
RareEarthConcentrates
DP REE SX
La / Ce
Pr / Nd
Sm / Eu / Gd
Tb / Dy / Ho / Er /
Tm / Yb / Lu
Y (2/3N)
Toll treatment – off site
Ho2O3
Er2O3
Tm2O3
Yb2O3
Lu2O3
Pr6O11
Nd2O3
Tb4O7
Dy2O3
Y2O3 1,031tpa
La2O3 1,441 tpa
CeO2 2,367 tpa
237tpa
921tpa
112tpa
3tpa
107tpa
22tpa
75tpa
6tpa
61tpa
3tpa
14tpa
122tpa
Sm2O3
Eu2O3
Gd2O3
Rare Earth Output
© 2017 Alkane Resources Ltd
15
Minchem – World wide zirconium product &
marketing/sales agreement.
Treibacher Industrie AG - JV to produce & market ferro-
niobium
Vietnam Rare Earth (VRE) – LOI for the production and
marketing of separated rare earth products, and down
stream value added metal alloy production
Siemens – MOU signed for supply of rare earths and
rare metals by DZP and supply of equipment and
services by Siemens
Aerospace and permanent magnet companies –
Ongoing interest and discussions with multiple end
users for separated rare earth products
Supply and JV discussions ongoing with organisations -
High purity zirconium feed for reactor grade metal and
hafnium for metal production. Recent interest in HfO2
for ferroelectric applications – next generation
microprocessors and data storage
Dubbo City
Powering the world
Marketing and Off-take
© 2017 Alkane Resources Ltd
16
Construction
2017 - 2019
Estimated cost
US$480M
---------------------
Construction
2022 - 2023
Estimated cost
US$360M
---------------------
Estimated total
Cost US$840M
Modular Design – lowers risks
© 2017 Alkane Resources Ltd
17
Detail in ASX release 28 October 2016
Dubbo Project - product revenue split
Magnet metals: Praseodymium,
Neodymium, Dysprosium, Terbium,
Samarium 25%
Hafnium 10%
Zirconium 42%
Niobium 17%
Other rare earths,
including Yttrium 5%
Diversified products – lowers risks
© 2017 Alkane Resources Ltd
18
*Stage 1 revenue US$200 - 220M Opex US$120 – 130M
*Stage 1 + 2 revenue US$400 - 440M Opex US$220 – 230M
*estimates subject to completion of
Modular Construction study
Note: ASX announcements 16 November 2011, 11 April 2013, 30 October 2013, 27 August 2015, 7 April 2016 and 28 October 2017 - the Company confirms that all material assumptions and technical parameters underpinning the estimated
Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed.
Dubbo – leading the next cycle
© 2017 Alkane Resources Ltd
19
DUBBO PROJECT IS CONSTRUCTION READY
TGO continues to generate positive cash flow – strong recovery in production and
reduction in costs following rain impacted first half (FY17)
• Progressing customer certification of products and off-take agreements
- multiple products with variable customer standards
• Targeting a minimum of 60% output committed through off-take
• Advancing financing strategy through direct investment into ASM and ECA
style debt facilities
• Water and power supply arrangements well advanced
• Outotec engineering study on modular development, including 30% detailed design
for BFS in progress and scheduled Q3 2017
• Subject to financing, final detailed design and site infrastructure scheduled to
commence in Q4 2017
EXPLORATION continues to generate new discoveries, to facilitate a strong pipeline
of developments
This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production
levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such
statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the
control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed of implied by these forward looking
statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an
offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of
United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or
incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian
Institute of Mining, and Metallurgy and Australian Institute of Geosciences.
Competent Person
Unless otherwise stated, the information in this presentation that relates to mineral exploration, mineral resources and ore reserves is based on
information compiled by Mr D I Chalmers, FAusIMM, FAIG, (director of the Company) who has sufficient experience which is relevant to the style
of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Chalmers consents to the
inclusion in the presentation of the matters based on his information in the form and context in which it appears.
Disclaimer
© 2017 Alkane Resources Ltd
20
Dubbo Project – Mineral Resources
Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO
Deposit (Mt) (%) (%) (%) (%) (%) (%)
Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75
Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75
Total 73.20 1.96 0.04 0.46 0.03 0.14 0.75
Dubbo Project – Ore Reserves
These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Alkane Chief Geologist) who is a competent person as defined in the 2012 Edition of
the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears. The full details of methodology were given in the 2004 Annual Report.
Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO
Deposit (Mt) (%) (%) (%) (%) (%) (%)
Proved 8.07 1.91 0.04 0.46 0.03 0.14 0.75
Probable 27.86 1.93 0.04 0.46 0.03 0.14 0.74
Total 35.93 1.93 0.04 0.46 0.03 0.14 0.74
These Ore Reserves are based upon information compiled by Mr Terry Ransted MAusIMM (Alkane Chief Geologist) who is a competent person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The reserves were calculated at a1.5% combined ZrO2+Nb2O5+Y2O3+REO cut off using
costs and revenues defined in the notes in ASX Announcement of 16 November 2011. Terry Ransted consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
Note: ASX announcements 16 November 2011, 11 April 2013, 30 October 2013 and 27 August 2015 - the Company confirms that all material assumptions and technical
parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and
have not materially changed.
DP Resources and Reserves
© 2017 Alkane Resources Ltd
21
Note: ASX announcements 21 September 2015 and 10 December 2015 - the Company confirms that all material
assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production
targets and the forecast financial information as disclosed continue to apply and have not materially changed.
TGO Resources and Reserves
© 2017 Alkane Resources Ltd
Note: ASX announcements 21 September 2015, 10 December 2015 and 22 September 2016 - the Company confirms that all material assumptions and technical
parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue
to apply and have not materially changed
TOMINGLEY GOLD PROJECT ORE RESERVES(as at 30 June 2016)
DEPOSIT
PROVED PROBABLE TOTAL
Total Gold
Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Reserves (cut off 0.50g/t Au)
Wyoming One 1,297 1.6 150 1.3 1,447 1.7 78
Wyoming Three 0 0 0 0 0 0 0
Caloma 116 1,7 722 1.6 838 1.6 43
Caloma Cut Back 233 1.4 251 1.1 484 1.2 19
Caloma Two - - 318 3.2 318 3.2 33
Stockpiles 700 0.8 - - 700 0.8 18
Sub Total 2,347 1.4 1,441 1.9 3,788 1.5 191
Underground Reserves (cut off 2.50g/t Au)
Wyoming One* 224 4.0 300.5 3.4 524.4 3.7 62
Sub Total 224 4.0 300.5 3.4 524.4 3.7 62
TOTAL 2,571 1.6 1,742 2.2 4,312 1.8 253
TOMINGLEY GOLD PROJECT MINERAL RESOURCES (as at 30 June 2016)
MEASURED INDICATED INFERRED TOTAL
Total Gold
DEPOSIT Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade
(Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz)
Open Pittable Resources (cut off 0.50g/t Au)
Wyoming One 1,980 1.7 416 1.6 671 1.1 3,067 1.6 153
Wyoming Three 86 2.0 16 1.3 33 1.4 135 1.7 8
Caloma 604 1.3 1,892 1.4 1,204 1.4 3,700 1.4 163
Caloma Two 1,085 2.4 704 1.3 1,789 2.0 112
Stockpiles 701 0.8 18
Sub Total 2,670 1.6 3,409 1.7 2,612 1.3 9,392 1.5 454
Underground Resources (cut off 2.50g/t Au)
Wyoming One 169 4.8 206 4.4 363 4.2 738 4.4 104
Wyoming Three 10 3.6 6 3.1 4 3.1 20 3.4 2
Caloma 1 2.9 18 2.9 19 2.9 2
Caloma Two 92 3.5 63 3.2 155 3.3 17
Sub Total 179 4.7 305 4.1 448 4.0 932 4.2 125
TOTAL 2,849 1.8 3,714 1.9 3,060 1.7 10,324 1.8 579
22

Weitere ähnliche Inhalte

Was ist angesagt?

CI Applications in the Oil and Gas Sector
CI Applications in the Oil and Gas SectorCI Applications in the Oil and Gas Sector
CI Applications in the Oil and Gas SectorCybera Inc.
 
Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013saituysal
 
MEY Investor Presentation
MEY Investor Presentation MEY Investor Presentation
MEY Investor Presentation Corey Hulls
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
CCW Fact Sheet January 29th, 2021
CCW Fact Sheet January 29th, 2021CCW Fact Sheet January 29th, 2021
CCW Fact Sheet January 29th, 2021MomentumPR
 
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...GE 94
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesTRC Companies, Inc.
 
FLNG - Offshore Assets Development , Korea 2010 Sampe Purba
FLNG   - Offshore Assets Development , Korea 2010 Sampe PurbaFLNG   - Offshore Assets Development , Korea 2010 Sampe Purba
FLNG - Offshore Assets Development , Korea 2010 Sampe PurbaSampe Purba
 
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...Ann-Marie Pamplin
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story PresentationTVI_Pacific
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015TVI_Pacific
 
Solar energy in Africa - A challenge in terms of resource use and recycling
Solar energy in Africa -  A challenge in terms of resource use and recyclingSolar energy in Africa -  A challenge in terms of resource use and recycling
Solar energy in Africa - A challenge in terms of resource use and recyclingEric PIRARD
 
Working On Australias Largest CSG to LNG Project
Working On Australias Largest CSG to LNG ProjectWorking On Australias Largest CSG to LNG Project
Working On Australias Largest CSG to LNG Projectbwlogue
 

Was ist angesagt? (20)

CI Applications in the Oil and Gas Sector
CI Applications in the Oil and Gas SectorCI Applications in the Oil and Gas Sector
CI Applications in the Oil and Gas Sector
 
Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013Syrah presentation for graphite conference November 2013
Syrah presentation for graphite conference November 2013
 
MEY Investor Presentation
MEY Investor Presentation MEY Investor Presentation
MEY Investor Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mg(OH)2 (& high-value by-products) from Serpentines & Olivines for scalable l...
Mg(OH)2 (& high-value by-products) from Serpentines & Olivines for scalable l...Mg(OH)2 (& high-value by-products) from Serpentines & Olivines for scalable l...
Mg(OH)2 (& high-value by-products) from Serpentines & Olivines for scalable l...
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
CCW Fact Sheet January 29th, 2021
CCW Fact Sheet January 29th, 2021CCW Fact Sheet January 29th, 2021
CCW Fact Sheet January 29th, 2021
 
Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...Update on CCS Activities in Canada and Possible Topics for European Collabora...
Update on CCS Activities in Canada and Possible Topics for European Collabora...
 
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
Noble Resources International Pte Limited (Noble) Sundance resource offtake a...
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and Liabilities
 
FLNG - Offshore Assets Development , Korea 2010 Sampe Purba
FLNG   - Offshore Assets Development , Korea 2010 Sampe PurbaFLNG   - Offshore Assets Development , Korea 2010 Sampe Purba
FLNG - Offshore Assets Development , Korea 2010 Sampe Purba
 
15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών
15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών
15.10.2018, Παρουσίαση ομιλία Δ. Γόντικα στο workshop του Κύκλου Ιδεών
 
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...
Alabama Graphite Corp. Announces Positive Preliminary Economic Assessment for...
 
Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 
Solar energy in Africa - A challenge in terms of resource use and recycling
Solar energy in Africa -  A challenge in terms of resource use and recyclingSolar energy in Africa -  A challenge in terms of resource use and recycling
Solar energy in Africa - A challenge in terms of resource use and recycling
 
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
White Rose CCS Project - plenary presentation by Don Reid at the UKCCSRC Card...
 
Working On Australias Largest CSG to LNG Project
Working On Australias Largest CSG to LNG ProjectWorking On Australias Largest CSG to LNG Project
Working On Australias Largest CSG to LNG Project
 
Building the Italian antimony industry
Building the Italian antimony industryBuilding the Italian antimony industry
Building the Italian antimony industry
 
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
CCS Gas and Industry Research Activities in Norway, Nils Røkke (Sintef) UK/No...
 

Ähnlich wie AMEC Convention 2017 - Driving the next cycle

AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17Charl Du Preez
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)Ruan Kukard
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)Braam Smit
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013FirstQuantum
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate PresentationFirstQuantum
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013FirstQuantum
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...OECD Environment
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013FirstQuantum
 
20150527_KrebsD_The Kvanefjeld Project_0
20150527_KrebsD_The Kvanefjeld Project_020150527_KrebsD_The Kvanefjeld Project_0
20150527_KrebsD_The Kvanefjeld Project_0Damien Krebs
 
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...Alkane Resources
 
Economics of Rare Earth Projects
Economics of Rare Earth ProjectsEconomics of Rare Earth Projects
Economics of Rare Earth ProjectsAlkane Resources
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015TVI_Pacific
 
Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor PresentationMining On Top
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSGlobal CCS Institute
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation Romelectro
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanSyrymbet JSC
 

Ähnlich wie AMEC Convention 2017 - Driving the next cycle (20)

AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17AZMET-Newsletter 2016-17
AZMET-Newsletter 2016-17
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
Corporate Presentation - November 2013
Corporate Presentation - November 2013Corporate Presentation - November 2013
Corporate Presentation - November 2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
CCXG Oct 2019 Electricity sector opportunities for more ambitious NDCs - Mand...
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
 
20150527_KrebsD_The Kvanefjeld Project_0
20150527_KrebsD_The Kvanefjeld Project_020150527_KrebsD_The Kvanefjeld Project_0
20150527_KrebsD_The Kvanefjeld Project_0
 
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
Alkane Resources - Hafnium: Cleaner power and transport, Faster, more energy ...
 
Economics of Rare Earth Projects
Economics of Rare Earth ProjectsEconomics of Rare Earth Projects
Economics of Rare Earth Projects
 
Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015Canatuan story presentation november 16 2015
Canatuan story presentation november 16 2015
 
James Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study ExamplesJames Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study Examples
 
Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor Presentation
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
2017 10-18-cp egd
2017 10-18-cp egd2017 10-18-cp egd
2017 10-18-cp egd
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation
 
World’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in KazakhstanWorld’s largest undeveloped tin deposit in Kazakhstan
World’s largest undeveloped tin deposit in Kazakhstan
 
Atlantic Council - Darren Mollot
Atlantic Council - Darren MollotAtlantic Council - Darren Mollot
Atlantic Council - Darren Mollot
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 

Kürzlich hochgeladen

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Kürzlich hochgeladen (20)

👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

AMEC Convention 2017 - Driving the next cycle

  • 2. © 2017 Alkane Resources Ltd 2 Alkane Resources Ltd Multi Commodity Developer Focussed in the Central West NSW Two major projects through subsidiaries Australian Strategic Materials Ltd (ASM) • Dubbo Project Technology metals Tomingley Gold Operations Pty Ltd (TGO) • Tomingley gold production Cash flow generation Active exploration programs Significant discoveries • Bodangora porphyry Au-Cu system • McPhillamys 2.5Moz Gold JV sold to Regis Resources Ltd 2012 Market capitalisation A$130M Current cash + bullion A$33M
  • 3. • Resource – 579,000oz of gold (22 Sept 2016) • Reserve – 253,000oz (22 Sept 2016) • Mine method – open cut W1, W3, C1 & C2 • Underground feasibility in progress • Mine Life – 4.5 years inclusive of undergound • Processing plant standard CIL 1.0Mtpa throughput • 208,000oz produced to end May 2017 • FY16 – Revenue A$109.6M, TGO EBITDA A$24.6M Profit A$6.7M • Forward gold contracts at 31 Mar 2017 31,000oz @ A$1,704/oz CIL Processing Plant Caloma open cut October 2015 Resource Expansion and Exploration • Regional aircore drilling to test multiple targets, generated intercepts to be followed up • Re-evaluation of large gold-copper system at Peak Hill mine site • Major subpit RC and core drilling programs in progress to expand resource/reserve base in mine environs Tomingley Gold Operations © 2017 Alkane Resources Ltd 3 Note: ASX announcement 22 September 2016 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed.
  • 4. Internet of Things Transportation Ageing Population Urbanisation Clean Energy Sustainability Technology drivers • Faster • Smaller • Stronger • Lighter • Cleaner • Safer Megatrends – Driving the next cycle © 2017 Alkane Resources Ltd 4
  • 5. Collection of Big Data by Sensors & Actuators Connecting people and processes ubiquitously for Smart Systems and IoT TantalumGold Silver © 2017 Alkane Resources Ltd 5 “Australian Strategic Materials & Alkane can supply up to 19 critical elements”
  • 6. Clean Energy Zero or Low CO2 Emissions Power • Wind • Solar • Nuclear • Wave • Thermoelectric Storage • Large capacity batteries • Ferroelectric • Solid oxide fuel cells • Portable batteries • Piezoelectrics © 2017 Alkane Resources Ltd 6 Emissions minimisation
  • 7. Global wind capacity to nearly double in next five years (2015-2020) In 2015 – 433GW (84,868t REE) In 2020 – 792GW (155,232t REE) • 196kg REE used per MW power in wind turbine NdFeB permanent magnets • Niobium is used to strengthen and reduce the amount of steel in stand Dubbo Project can support 1.4GW output © 2017 Alkane Resources Ltd 7 Rare earth permanent magnets
  • 8. More than 100 magnet motors in one car* LCD SCREEN • Europium • Yttrium • Cerium GLASS & MIRRORS • Cerium HYBRID NIMH BATTERY • Lanthanum • Neodymium • Cerium COMPONENT SENSORS • Yttrium HEADLIGHT GLASS • Neodymium 25+ ELECTRIC MOTORS • Neodymium magnets ELECTRIC MOTORS • Neodymium magnets * Source: Adamas Research © 2017 Alkane Resources Ltd 8 Rare earths in auto transport
  • 9. 449 Operating nuclear plants 60 Undergoing construction 170 Planned in China by 2050 Zirconium clads nuclear fuel rods Hafnium is used in nuclear control rods Zirconium niobium alloys © 2017 Alkane Resources Ltd 9 Nuclear power demand still growing
  • 10. Transportation © 2017 Alkane Resources Ltd 10 • Zirconium & hafnium in jet engines – super alloys • Niobium & hafnium in rocket nozzles – super alloys • Hafnium for thermoelectric applications – electricity generation • Hafnium in special space batteries • Heat shields Next gen transport applications
  • 11. Hafnium – next gen memory Permanent Memory Ferroelectric micro-processing using HfO2 • Ultra-fast, low-power, non-volatile successor to flash memory (atomic layer deposition) • HfO2 already used in electronics and compatible with silicon fabrication techniques • k-gate chips, films, ferroelectric tunnel junctions, optoelectronic modulators, RAM (embedded memory) and piezoelectric transducers © 2017 Alkane Resources Ltd 11
  • 12. Dubbo Project • 400km northwest of Sydney • 25km from Dubbo city (pop~45,000) • Dubbo infrastructure – roads, rail, power, gas, light engineering, people • Large polymetallic resource - zirconium, hafnium, niobium (tantalum), yttrium and rare earths • Defined resource supports 80+ year open pit operation © 2017 Alkane Resources Ltd 12 CURRENT STATUS • Pilot plant at ANSTO has demonstrated the flow sheet with products for market evaluation over 8 years • All State & Federal environment approvals • Front End Engineering Design (FEED) +/-15% study confirmed robust technical & financial DFS – 30% detailed design • Outotec Finnish technology & engineering solutions company to present a fixed price EPC • Sumitomo Mitsui Banking Corporation financial advisors – funding options being developed • Staged modular design option reduces CAPEX costs, same rate of output for lower risk – Outotec program underway
  • 13. Separation Process © 2017 Alkane Resources Ltd 13 Process of sulphuric acid leach and solvent extraction separation and chemical refining proved and products distributed to customers for evaluation and qualification
  • 14. © 2017 Alkane Resources Tonnage based upon recoveries developed from mass balances of the demonstration pilot plant. DPProcessPlant Rare earth chemical concentrate Zirconium as ZBC (carbonate) & zirconia Hafnium as HfO2 concentrate Niobium as ferro-niobium 95% REO 99% ZrO2 HfO2 conc 65% Nb 6,664 tpa (REO units) 16,374 tpa (ZrO2 units) 50 tpa *(Hf units) 1,967 tpa (Nb units) * Start up output. 200tpa potential depending upon market demand Total output approximately 25,200 tpa of all products Product Output © 2017 Alkane Resources Ltd 14
  • 15. Tonnage based upon recoveries developed from mass balances of the demonstration pilot plant & preliminary solvent extraction stages on site at the DP. Total saleable RE products from site ~1,030 tpa and off site ~ 1,675 tpa. RareEarthConcentrates DP REE SX La / Ce Pr / Nd Sm / Eu / Gd Tb / Dy / Ho / Er / Tm / Yb / Lu Y (2/3N) Toll treatment – off site Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Pr6O11 Nd2O3 Tb4O7 Dy2O3 Y2O3 1,031tpa La2O3 1,441 tpa CeO2 2,367 tpa 237tpa 921tpa 112tpa 3tpa 107tpa 22tpa 75tpa 6tpa 61tpa 3tpa 14tpa 122tpa Sm2O3 Eu2O3 Gd2O3 Rare Earth Output © 2017 Alkane Resources Ltd 15
  • 16. Minchem – World wide zirconium product & marketing/sales agreement. Treibacher Industrie AG - JV to produce & market ferro- niobium Vietnam Rare Earth (VRE) – LOI for the production and marketing of separated rare earth products, and down stream value added metal alloy production Siemens – MOU signed for supply of rare earths and rare metals by DZP and supply of equipment and services by Siemens Aerospace and permanent magnet companies – Ongoing interest and discussions with multiple end users for separated rare earth products Supply and JV discussions ongoing with organisations - High purity zirconium feed for reactor grade metal and hafnium for metal production. Recent interest in HfO2 for ferroelectric applications – next generation microprocessors and data storage Dubbo City Powering the world Marketing and Off-take © 2017 Alkane Resources Ltd 16
  • 17. Construction 2017 - 2019 Estimated cost US$480M --------------------- Construction 2022 - 2023 Estimated cost US$360M --------------------- Estimated total Cost US$840M Modular Design – lowers risks © 2017 Alkane Resources Ltd 17 Detail in ASX release 28 October 2016
  • 18. Dubbo Project - product revenue split Magnet metals: Praseodymium, Neodymium, Dysprosium, Terbium, Samarium 25% Hafnium 10% Zirconium 42% Niobium 17% Other rare earths, including Yttrium 5% Diversified products – lowers risks © 2017 Alkane Resources Ltd 18 *Stage 1 revenue US$200 - 220M Opex US$120 – 130M *Stage 1 + 2 revenue US$400 - 440M Opex US$220 – 230M *estimates subject to completion of Modular Construction study Note: ASX announcements 16 November 2011, 11 April 2013, 30 October 2013, 27 August 2015, 7 April 2016 and 28 October 2017 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed.
  • 19. Dubbo – leading the next cycle © 2017 Alkane Resources Ltd 19 DUBBO PROJECT IS CONSTRUCTION READY TGO continues to generate positive cash flow – strong recovery in production and reduction in costs following rain impacted first half (FY17) • Progressing customer certification of products and off-take agreements - multiple products with variable customer standards • Targeting a minimum of 60% output committed through off-take • Advancing financing strategy through direct investment into ASM and ECA style debt facilities • Water and power supply arrangements well advanced • Outotec engineering study on modular development, including 30% detailed design for BFS in progress and scheduled Q3 2017 • Subject to financing, final detailed design and site infrastructure scheduled to commence in Q4 2017 EXPLORATION continues to generate new discoveries, to facilitate a strong pipeline of developments
  • 20. This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Alkane Resources Ltd. Actual results and developments may differ materially from those expressed of implied by these forward looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities. This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining, and Metallurgy and Australian Institute of Geosciences. Competent Person Unless otherwise stated, the information in this presentation that relates to mineral exploration, mineral resources and ore reserves is based on information compiled by Mr D I Chalmers, FAusIMM, FAIG, (director of the Company) who has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Chalmers consents to the inclusion in the presentation of the matters based on his information in the form and context in which it appears. Disclaimer © 2017 Alkane Resources Ltd 20
  • 21. Dubbo Project – Mineral Resources Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO Deposit (Mt) (%) (%) (%) (%) (%) (%) Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 Total 73.20 1.96 0.04 0.46 0.03 0.14 0.75 Dubbo Project – Ore Reserves These Mineral Resources are based upon information compiled by Mr Terry Ransted MAusIMM (Alkane Chief Geologist) who is a competent person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The full details of methodology were given in the 2004 Annual Report. Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO Deposit (Mt) (%) (%) (%) (%) (%) (%) Proved 8.07 1.91 0.04 0.46 0.03 0.14 0.75 Probable 27.86 1.93 0.04 0.46 0.03 0.14 0.74 Total 35.93 1.93 0.04 0.46 0.03 0.14 0.74 These Ore Reserves are based upon information compiled by Mr Terry Ransted MAusIMM (Alkane Chief Geologist) who is a competent person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The reserves were calculated at a1.5% combined ZrO2+Nb2O5+Y2O3+REO cut off using costs and revenues defined in the notes in ASX Announcement of 16 November 2011. Terry Ransted consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Note: ASX announcements 16 November 2011, 11 April 2013, 30 October 2013 and 27 August 2015 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed. DP Resources and Reserves © 2017 Alkane Resources Ltd 21
  • 22. Note: ASX announcements 21 September 2015 and 10 December 2015 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed. TGO Resources and Reserves © 2017 Alkane Resources Ltd Note: ASX announcements 21 September 2015, 10 December 2015 and 22 September 2016 - the Company confirms that all material assumptions and technical parameters underpinning the estimated Mineral Resources and Ore Reserves, and production targets and the forecast financial information as disclosed continue to apply and have not materially changed TOMINGLEY GOLD PROJECT ORE RESERVES(as at 30 June 2016) DEPOSIT PROVED PROBABLE TOTAL Total Gold Tonnage Grade Tonnage Grade Tonnage Grade (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz) Open Pittable Reserves (cut off 0.50g/t Au) Wyoming One 1,297 1.6 150 1.3 1,447 1.7 78 Wyoming Three 0 0 0 0 0 0 0 Caloma 116 1,7 722 1.6 838 1.6 43 Caloma Cut Back 233 1.4 251 1.1 484 1.2 19 Caloma Two - - 318 3.2 318 3.2 33 Stockpiles 700 0.8 - - 700 0.8 18 Sub Total 2,347 1.4 1,441 1.9 3,788 1.5 191 Underground Reserves (cut off 2.50g/t Au) Wyoming One* 224 4.0 300.5 3.4 524.4 3.7 62 Sub Total 224 4.0 300.5 3.4 524.4 3.7 62 TOTAL 2,571 1.6 1,742 2.2 4,312 1.8 253 TOMINGLEY GOLD PROJECT MINERAL RESOURCES (as at 30 June 2016) MEASURED INDICATED INFERRED TOTAL Total Gold DEPOSIT Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz) Open Pittable Resources (cut off 0.50g/t Au) Wyoming One 1,980 1.7 416 1.6 671 1.1 3,067 1.6 153 Wyoming Three 86 2.0 16 1.3 33 1.4 135 1.7 8 Caloma 604 1.3 1,892 1.4 1,204 1.4 3,700 1.4 163 Caloma Two 1,085 2.4 704 1.3 1,789 2.0 112 Stockpiles 701 0.8 18 Sub Total 2,670 1.6 3,409 1.7 2,612 1.3 9,392 1.5 454 Underground Resources (cut off 2.50g/t Au) Wyoming One 169 4.8 206 4.4 363 4.2 738 4.4 104 Wyoming Three 10 3.6 6 3.1 4 3.1 20 3.4 2 Caloma 1 2.9 18 2.9 19 2.9 2 Caloma Two 92 3.5 63 3.2 155 3.3 17 Sub Total 179 4.7 305 4.1 448 4.0 932 4.2 125 TOTAL 2,849 1.8 3,714 1.9 3,060 1.7 10,324 1.8 579 22