Construction Safety & Health situation
Prepared By
Engr. Ali Kamal Mostofa Rubel (Electrical)
MPH in Occupational Health & Safety
alikamalmostofa@gmail.com
+880 1682560119
+880 1911522533
1
Objectives
 Safety Condition in Bangladesh
 Construction Accidents in Bangladesh
 Existing Health & Safety legislations in practice
 Definition of Safety, accident, Hazard, & Risk
 Type of Hazards
 Types of accident
 Type of PPEs
 PTW
 Reasons and benefits to improve health and safety in
construction
 How to improve health and safety on construction sites?
2
Safety Condition in Bangladesh
The construction industry is considered as one of the most
hazardous industrial sectors wherein the construction
workers are more prone to accidents.
In developed countries such as united kingdom and united
states of America, there is strict legal enforcement of safety in
construction industry and also in the implementation
industry and also in the implementation of safety
management systems which are designed to minimize or
eliminate accidents at work places. However, occupational
safety in construction industry is very poor in developing
countries such as Bangladesh.
3
Construction Accidents in Bangladesh
Year Total
Death
Construction
Sector
Transp
ort
Sector
Transpo
rt
Sector
Garme
nts
Sector
Agricult
ure
Sector
Ship
Breakin
g Yard
Daily
Laborer
s
Fisherm
an
Others
2017 1242 179 448 52 99 28 22 103 28 221
2016 1240 147 486 88 87 23 34 69 44 200
According to OSHE (BD) report, there were a total of 1509 deaths in the
construction industry from 2008 to 2017- on average 150 deaths a year-
with 2017’s 179 is the highest number of deaths during the period.
“OSHE find out two most common reasons behind these deaths are falling
from a height and electrocution. “
4
Existing Health & Safety legislations in practice
Bangladesh Labour Act 2006
Bangladesh Labour Rule 2015
The constitution of Bangladesh adopted on 4th November 1972 recognizes productivity
as a basic need for economic development and covers the right to work and reasonable
wages, medical care and protection from disease and disablement. Thus it is assumed the
health and safety of industrial workers has been taken care of.
 Sections: There are 354 sections in 21 different chapters in the legal text.
 OSH: Special importance has been given on occupational health and safety and the
work environment. Out of the 354 clauses of the labour law, 78 happen to be about
the environment.
 Records: Maintenance and preservation of safety record books and introduction of
group insurances for the workers have been ensured
5
Existing health & safety legislations in practice Cont..
 SAFETY
 Fire
Section 62 deals with the provisions for measures to be taken by a factory to avoid
dangers and damage due to fire.
 Floors, stairs and means of access
Section 72 of the new labour law deals with the floors, stairs and means of access.
 Excessive Weights
Section 74 of the new labour code states that, no person shall be employed in any
factory to lift, carry or move any load as heavy as to be likely to cause him injury.
HEALTH AND HYGIENE
 Cleanliness : Section 51
 Drinking water: Section 58
 Overcrowding: Section 56
 Lighting : Section 57
 Latrines and urinals : Section 59
 Dust bins and spittoons : Section 60
6
OHSAS 18000 (ISO:45001)
 OHSAS 18000 is an international occupational health and safety management system specification. It comprises
two parts, 18001 and18002
 It helps: minimize risk to employees/etc; improve an existing OH&S management system; demonstrate diligence;
gain assurance; etc
 The OHSAS specification is applicable to any organization that wishes to: Establish an OH&S management
system to eliminate or minimize risk to employees and other interested parties who may be exposed to OH&S
risks associated with its activities
 PERSONAL PROTECTIVE EQUIPMENT
 FALL PROTECTION
 ELECTRICAL
 SCAFFOLDS: Each suspension rope, including connecting hardware, used on adjustable suspension, Each
platform shall be fully planked or decked between the front uprights and the guardrails at the rear of the scaffold.
 MOTOR VEHICLES AND MECHANIZED
 EQUIPMENT
 HAND AND POWER TOOLS
 FIRE PROTECTION AND PREVENTION
 SANITATION
 CONTROL OF HAZARDOUS ENERGY
7
OHSAS 18000 (ISO:45001) Cont…
 CONFINED SPACE ENTRY
 WELDING AND CUTTING
 FLOOR AND WALL OPENINGS
 EXCAVATIONS
 STAIRWAYS AND LADDERS
 MATERIALS HANDLING, STORAGE, USE, AND DISPOSAL
 SIGNS, SIGNALS, AND BARRICADES
 CRANES, DERRICKS, AND HOISTS
 DEMOLITION
 ILLUMINATION
 HOUSEKEEPING
 DIVING SAFETY
 CONTAINMENT
 CONTROL/PERMIT SYSTEMS
8
Definitions
 Safety is free from risk and danger.
 Accidents is defined as an unexpected and desirable
event resulting in damage or harm.
 Hazards is an unsafe condition or activity, that if left
uncontrolled can contribute to an accident.
 Risk is the assessment of ’probability of loss’ and
potential amount of loss’.
9
Types of hazards
Chemical
Physical
Biological
Ergonomic
10
Chemical Hazards
 Chemicals can exist in the form of
• Dusts, Fumes, Fibers (solids)
• Liquids, Mists
• Gases, Vapors
Examples of
chemical
hazards
found in
construction
work:
• Asbestos
• Lead
• Silica
• Cadmium
• Carbon monoxide
• Welding fumes
• Spray paints
• Cutting oil
mists
• Xylene vapor
• Solvents
11
Physical Hazards
Physical hazards are different types of energy which may
be hazardous to workers.
• Noise
• Vibration
• Temperature extremes
• Radiation
12
Types of accident
Death
Fatal injury (broken leg, hips, amputation)
Non-fatal injury (finger cut)
Occupational accidents (MSD, hearing loss)
Absence from work ( >1 day, > 3 days etc)
Near misses
Rate per 100 000 – number of injuries or causes of
ill health per 100 000 employees.
Working days lost – days off work due to
workplace injuries & work-related ill health
13
Personal protective equipment (PPE)
 What is PPE?
 PPE is the device designed to protect worker from
serious injuries and illness resulting from the
workplace hazard.
 It is only the tool to prevent injury from the
hazards, as it does not eliminate or remove the
hazard.
 Basic types of PPE are Work Suit, Hard Hat, Safety
Glasses, Safety Shoes.
Cause:
 All employees must be provided with appropriate
personal protective equipment (PPE)
 To prevent injuries and illnesses, supervisors
/foremen must implement and enforce the use of
personal protective equipment on all company
construction projects
14
Personal protective equipment (PPE) Cont…
Select the proper type of PPE to fit the jobs requirement.
 Head Protection
 Eye and face protection
-Safety spectacles.
-Goggles.
-Welding shields.
-Laser safety
-goggles.
-Face shields
 Foot Protection
 Hearing Protection
 Dust Protection
 Hand Protection
15
Personal protective equipment (PPE) Cont…
 Foot Protection
 Hearing Protection
 Dust Protection
 Hand Protection
 FALL PROTECTION
- Personal Fall Arrest System
- Guardrail Systems
- Safety Nets
Personal Fall Arrest System
-The three main parts
 the body belt or harness
 the lanyard/lifeline, and
 a suitable anchorage.
16
Costs of accidents – direct costs and indirect costs
Direct costs
The direct costs are insurance. These
include medical costs and others
workers’ compensation insurance
benefits as well as liability and
property-damage insurance.
Indirect costs
Below are the lists of indirect costs:
Transportation costs – include the cost of
emergency transportation, together
with the cost of other personnel that
were necessary to get to the injured
worker to proper medical facilities
17
Permit To Work (PTW)
 Objective:
The objective of the Safe Work Permit system is to identify hazards associated with a non
routine job, and to develop precautions required to control each hazard identified.
A Safe Work Permit (SWP) is a WRITTEN document which SPECIFICALLY DEFINES THE
WORK to be done AND the SPECIFIC PRECAUTIONS to be taken.
Safe Work Permit Permit #
Type: (hot work, confined space, line break, etc.... location:
Valid __/___/___ ____ __/___/___ ____ Issued to:
From: M D Y time to M D Y time
Work Description: ________________________________
____________________________________________ Supervisor’s Signature Print name
____________________________________________
____________________________________________ Work Order No.
Permits are issued:
- For a specific date and time range,
- For a specific job,
- and to specific individuals.
18
Permit To Work (PTW) Cont…
Safe Work Permit
-------------------------------------------------------
---------------
Precautions Always required:
o Emergency procedures review by:
o Emergency equipment & location review by:
o Area inherent hazards review by:
o Material Safety Data Sheet(s) review by:
Safe Work Permit
------------------------------------------------------------------------------------------
------------------------------
Special Precautions Required:
o Buddy System o Sprinklers in Service
o Cleaning of _________ o Purging of ________
o Remove materials from ___________________
o Piping o Drain o Disconnect o Blank off / Capped
o Clean o Ventilate
o Remove combustibles from other side of wall.
o Floor Swept Clean of Combustibles
o Clean area within 35 feet. o Wet down floor.
o Adjacent areas: __________________________
o Cover floor with: __________________________
o Non-combustible Tarpaulins or Metal Shields Over:
o Electrical Switches or Valves off, locked-out, and Tagged:
o Electrical Grounding of: ________________________
o Atmosphere monitored during work for: ____________
periodically: __________ continuously: __________
o Safety Monitor(s) present from _________ to _________
o Fire Watch Present during work and for 30 minutes
after...
o Respirator to be worn____ or be readily available ___
Safe Work Permit
------------------------------------------------
--------------Safety Equipment
Required
O Safety Glasses
O Hard Hat
O Face Shield
O Safety Shoes
O Fire Extinguishers - Type ___ #___ Size ___
O Fire Hose
O Supplementary Illumination
O Warning Signs
O Barricades
O Non-sparking Tools
O Explosion Proof Equipment
O Safety Harness
O Life Line
O Tripod Emergency Escape Unit
O 2-way Radio Or Phone
O Respirators
O Impervious Gloves
O Protective Clothing _____________________
O Mechanical Ventilation
O Shower & Eyewash
O Self Contained Breathing Apparatus
O Ground Fault Circuit Interrupter
O Ladder / Lift / Scaffold
O Other________________________________
19
Permit To Work (PTW) Cont…
 Deep Excavation PTW
Many companies are making excavation work and entry into trenches over 4’
(Feet) deep a safe work permitting task
 Working at Heights PTW
Many companies are making “working at heights” a safe work permitting task due
to the complexity of PFAS(s)
 Lifting PTW
Many companies are making work involving cranes and aerial lifts a safe work
permitting task. Not only do these tasks come with increased risk to the
operators, but also infrastructure (e.g. live covered processes)
 Electrical PTW
Many companies are using LOTO Permits as an additional administrative controls
for the controlling of hazardous energy sources during servicing and
maintenance.
20
Permit Validity
Permit is valid for:
 A specific activity, site, within a specific period of time.
 Only issued for a maximum of 5 consecutive calendar days.
 Applied for in advance of the work – ideally 10 working days
 Issued immediately prior to the start of the permit able work
 Renewed via the Work Clearance Form each day by Permit Holder
 Expires after 5 days regardless of the activity
Self Permits
 NO ONE IS ALLOWED TO ISSUE A PERMIT TO THEMSELVES
21
Reasons and benefits to improve health and safety in
construction
 Responsibility;
 Economic reasons;
 Impact of safety on overall performance;
 Contractor’s performance;
 Control of accident causes.
22
Responsibility
 Safety is everyone’s responsibility.
 It is a moral and legal obligation of employers to provide a
safe working place and of employees to work safely.
 Employer’s duty of care to employees as covering the
following areas:
safe system of work;
a safe place of work;
plant and machinery that is safe to use;
competent supervision and/or suitable training; and
care in the selection of fellow employees.
23
How To Improve Health And Safety On Construction Sites?
 Reactive measures
Accident recording & reporting
Accident investigations
 Proactive measures
Health & Safety policy
Health & Safety programme/plan
Health & Safety induction/training
Tool-box talk
Others
24
25

Weitere ähnliche Inhalte

Was ist angesagt?

Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyDebajit Roy
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Muizz Anibire
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_istiSYED HAIDER ABBAS
 
Cause of accident and prevention in construction industry
Cause of accident and prevention in construction industryCause of accident and prevention in construction industry
Cause of accident and prevention in construction industryYASMINE HASLAN
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety managementGERServices
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers Content Mutual
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryMuizz Anibire
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3Saleem Malik
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyFroyd Dias
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...vigneshm817927
 
Construction safety
Construction  safetyConstruction  safety
Construction safetyRanty Poddar
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterMuizz Anibire
 
Construction safety lecture-2
Construction safety  lecture-2Construction safety  lecture-2
Construction safety lecture-2Saleem Malik
 

Was ist angesagt? (20)

Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Safety Management System
Safety Management SystemSafety Management System
Safety Management System
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Staff safety hand book
Staff   safety hand bookStaff   safety hand book
Staff safety hand book
 
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
Construction Safety Training_Session 02_Excavation Works, Hazards and Controls
 
Construction hazards and_safety_by_isti
Construction hazards and_safety_by_istiConstruction hazards and_safety_by_isti
Construction hazards and_safety_by_isti
 
Health and Safety Presentation FINAL
Health and Safety Presentation FINALHealth and Safety Presentation FINAL
Health and Safety Presentation FINAL
 
Cause of accident and prevention in construction industry
Cause of accident and prevention in construction industryCause of accident and prevention in construction industry
Cause of accident and prevention in construction industry
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction Industry
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...What are the moral, legal and financial reason to manage safety in an organiz...
What are the moral, legal and financial reason to manage safety in an organiz...
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Construction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over WaterConstruction Safety Training_Session 04_Working at Heights and Over Water
Construction Safety Training_Session 04_Working at Heights and Over Water
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Construction safety lecture-2
Construction safety  lecture-2Construction safety  lecture-2
Construction safety lecture-2
 

Ähnlich wie Construction Safety & Health (Bangladesh)

FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxSnehaGhadigaonkar
 
safety and process in construction in ABE
safety and process in construction in ABEsafety and process in construction in ABE
safety and process in construction in ABEJanPatiam
 
a-11 batch intenship POOJA.docx
a-11 batch intenship POOJA.docxa-11 batch intenship POOJA.docx
a-11 batch intenship POOJA.docxPrince Pooja Reddy
 
Top 20 must-Have Industrial Safety Equipment for Every Workplace
Top 20 must-Have Industrial Safety Equipment for Every WorkplaceTop 20 must-Have Industrial Safety Equipment for Every Workplace
Top 20 must-Have Industrial Safety Equipment for Every Workplaceshriyaglobalinfo
 
Top 20 Must-Have Industrial Safety Equipment for Every Workplace
Top 20 Must-Have Industrial Safety Equipment for Every WorkplaceTop 20 Must-Have Industrial Safety Equipment for Every Workplace
Top 20 Must-Have Industrial Safety Equipment for Every Workplaceshriyaglobalinfo
 
Abse lev1 2_101-201_launch(full permission)
Abse lev1 2_101-201_launch(full permission)Abse lev1 2_101-201_launch(full permission)
Abse lev1 2_101-201_launch(full permission)wirethehouse
 
Safety signs and symbols, PPEs, ILO, OSH
Safety signs and symbols, PPEs, ILO, OSHSafety signs and symbols, PPEs, ILO, OSH
Safety signs and symbols, PPEs, ILO, OSHRevanuruSubramanyam
 
D.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptD.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptmakusogkita
 
Industrial safety engineering
Industrial safety engineeringIndustrial safety engineering
Industrial safety engineeringKenzieBosco
 
Celebrate_Safety_ARGENTINA_EEII
Celebrate_Safety_ARGENTINA_EEIICelebrate_Safety_ARGENTINA_EEII
Celebrate_Safety_ARGENTINA_EEIIAndres Galvis
 
Occupational safety and health Third Edition
Occupational safety and health Third EditionOccupational safety and health Third Edition
Occupational safety and health Third Editionssocwork2023
 
Plant Safety & Labour Laws
Plant Safety & Labour LawsPlant Safety & Labour Laws
Plant Safety & Labour LawsAbhishek Gorai
 
GROUP#20_Personal-protective-equipment
GROUP#20_Personal-protective-equipmentGROUP#20_Personal-protective-equipment
GROUP#20_Personal-protective-equipmentZaidi Zainudin
 
INDUSTRIAL SAFETY_M1.ppt
INDUSTRIAL SAFETY_M1.pptINDUSTRIAL SAFETY_M1.ppt
INDUSTRIAL SAFETY_M1.pptChethanRoy3
 
PPE training, developed 2014
PPE training, developed 2014PPE training, developed 2014
PPE training, developed 2014Eric Waidelich
 

Ähnlich wie Construction Safety & Health (Bangladesh) (20)

Summer training report
Summer training reportSummer training report
Summer training report
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
 
safety and process in construction in ABE
safety and process in construction in ABEsafety and process in construction in ABE
safety and process in construction in ABE
 
a-11 batch intenship POOJA.docx
a-11 batch intenship POOJA.docxa-11 batch intenship POOJA.docx
a-11 batch intenship POOJA.docx
 
PPE
PPEPPE
PPE
 
Top 20 must-Have Industrial Safety Equipment for Every Workplace
Top 20 must-Have Industrial Safety Equipment for Every WorkplaceTop 20 must-Have Industrial Safety Equipment for Every Workplace
Top 20 must-Have Industrial Safety Equipment for Every Workplace
 
Top 20 Must-Have Industrial Safety Equipment for Every Workplace
Top 20 Must-Have Industrial Safety Equipment for Every WorkplaceTop 20 Must-Have Industrial Safety Equipment for Every Workplace
Top 20 Must-Have Industrial Safety Equipment for Every Workplace
 
Abse lev1 2_101-201_launch(full permission)
Abse lev1 2_101-201_launch(full permission)Abse lev1 2_101-201_launch(full permission)
Abse lev1 2_101-201_launch(full permission)
 
Lecture2-PPEandTools.ppt
Lecture2-PPEandTools.pptLecture2-PPEandTools.ppt
Lecture2-PPEandTools.ppt
 
CREATIVE TECHNOLOGY 7 QI-L4
CREATIVE TECHNOLOGY 7 QI-L4CREATIVE TECHNOLOGY 7 QI-L4
CREATIVE TECHNOLOGY 7 QI-L4
 
Ppetraining
PpetrainingPpetraining
Ppetraining
 
Safety signs and symbols, PPEs, ILO, OSH
Safety signs and symbols, PPEs, ILO, OSHSafety signs and symbols, PPEs, ILO, OSH
Safety signs and symbols, PPEs, ILO, OSH
 
D.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptD.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.ppt
 
Industrial safety engineering
Industrial safety engineeringIndustrial safety engineering
Industrial safety engineering
 
Celebrate_Safety_ARGENTINA_EEII
Celebrate_Safety_ARGENTINA_EEIICelebrate_Safety_ARGENTINA_EEII
Celebrate_Safety_ARGENTINA_EEII
 
Occupational safety and health Third Edition
Occupational safety and health Third EditionOccupational safety and health Third Edition
Occupational safety and health Third Edition
 
Plant Safety & Labour Laws
Plant Safety & Labour LawsPlant Safety & Labour Laws
Plant Safety & Labour Laws
 
GROUP#20_Personal-protective-equipment
GROUP#20_Personal-protective-equipmentGROUP#20_Personal-protective-equipment
GROUP#20_Personal-protective-equipment
 
INDUSTRIAL SAFETY_M1.ppt
INDUSTRIAL SAFETY_M1.pptINDUSTRIAL SAFETY_M1.ppt
INDUSTRIAL SAFETY_M1.ppt
 
PPE training, developed 2014
PPE training, developed 2014PPE training, developed 2014
PPE training, developed 2014
 

Kürzlich hochgeladen

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Kürzlich hochgeladen (20)

NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Construction Safety & Health (Bangladesh)

  • 1. Construction Safety & Health situation Prepared By Engr. Ali Kamal Mostofa Rubel (Electrical) MPH in Occupational Health & Safety alikamalmostofa@gmail.com +880 1682560119 +880 1911522533 1
  • 2. Objectives  Safety Condition in Bangladesh  Construction Accidents in Bangladesh  Existing Health & Safety legislations in practice  Definition of Safety, accident, Hazard, & Risk  Type of Hazards  Types of accident  Type of PPEs  PTW  Reasons and benefits to improve health and safety in construction  How to improve health and safety on construction sites? 2
  • 3. Safety Condition in Bangladesh The construction industry is considered as one of the most hazardous industrial sectors wherein the construction workers are more prone to accidents. In developed countries such as united kingdom and united states of America, there is strict legal enforcement of safety in construction industry and also in the implementation industry and also in the implementation of safety management systems which are designed to minimize or eliminate accidents at work places. However, occupational safety in construction industry is very poor in developing countries such as Bangladesh. 3
  • 4. Construction Accidents in Bangladesh Year Total Death Construction Sector Transp ort Sector Transpo rt Sector Garme nts Sector Agricult ure Sector Ship Breakin g Yard Daily Laborer s Fisherm an Others 2017 1242 179 448 52 99 28 22 103 28 221 2016 1240 147 486 88 87 23 34 69 44 200 According to OSHE (BD) report, there were a total of 1509 deaths in the construction industry from 2008 to 2017- on average 150 deaths a year- with 2017’s 179 is the highest number of deaths during the period. “OSHE find out two most common reasons behind these deaths are falling from a height and electrocution. “ 4
  • 5. Existing Health & Safety legislations in practice Bangladesh Labour Act 2006 Bangladesh Labour Rule 2015 The constitution of Bangladesh adopted on 4th November 1972 recognizes productivity as a basic need for economic development and covers the right to work and reasonable wages, medical care and protection from disease and disablement. Thus it is assumed the health and safety of industrial workers has been taken care of.  Sections: There are 354 sections in 21 different chapters in the legal text.  OSH: Special importance has been given on occupational health and safety and the work environment. Out of the 354 clauses of the labour law, 78 happen to be about the environment.  Records: Maintenance and preservation of safety record books and introduction of group insurances for the workers have been ensured 5
  • 6. Existing health & safety legislations in practice Cont..  SAFETY  Fire Section 62 deals with the provisions for measures to be taken by a factory to avoid dangers and damage due to fire.  Floors, stairs and means of access Section 72 of the new labour law deals with the floors, stairs and means of access.  Excessive Weights Section 74 of the new labour code states that, no person shall be employed in any factory to lift, carry or move any load as heavy as to be likely to cause him injury. HEALTH AND HYGIENE  Cleanliness : Section 51  Drinking water: Section 58  Overcrowding: Section 56  Lighting : Section 57  Latrines and urinals : Section 59  Dust bins and spittoons : Section 60 6
  • 7. OHSAS 18000 (ISO:45001)  OHSAS 18000 is an international occupational health and safety management system specification. It comprises two parts, 18001 and18002  It helps: minimize risk to employees/etc; improve an existing OH&S management system; demonstrate diligence; gain assurance; etc  The OHSAS specification is applicable to any organization that wishes to: Establish an OH&S management system to eliminate or minimize risk to employees and other interested parties who may be exposed to OH&S risks associated with its activities  PERSONAL PROTECTIVE EQUIPMENT  FALL PROTECTION  ELECTRICAL  SCAFFOLDS: Each suspension rope, including connecting hardware, used on adjustable suspension, Each platform shall be fully planked or decked between the front uprights and the guardrails at the rear of the scaffold.  MOTOR VEHICLES AND MECHANIZED  EQUIPMENT  HAND AND POWER TOOLS  FIRE PROTECTION AND PREVENTION  SANITATION  CONTROL OF HAZARDOUS ENERGY 7
  • 8. OHSAS 18000 (ISO:45001) Cont…  CONFINED SPACE ENTRY  WELDING AND CUTTING  FLOOR AND WALL OPENINGS  EXCAVATIONS  STAIRWAYS AND LADDERS  MATERIALS HANDLING, STORAGE, USE, AND DISPOSAL  SIGNS, SIGNALS, AND BARRICADES  CRANES, DERRICKS, AND HOISTS  DEMOLITION  ILLUMINATION  HOUSEKEEPING  DIVING SAFETY  CONTAINMENT  CONTROL/PERMIT SYSTEMS 8
  • 9. Definitions  Safety is free from risk and danger.  Accidents is defined as an unexpected and desirable event resulting in damage or harm.  Hazards is an unsafe condition or activity, that if left uncontrolled can contribute to an accident.  Risk is the assessment of ’probability of loss’ and potential amount of loss’. 9
  • 11. Chemical Hazards  Chemicals can exist in the form of • Dusts, Fumes, Fibers (solids) • Liquids, Mists • Gases, Vapors Examples of chemical hazards found in construction work: • Asbestos • Lead • Silica • Cadmium • Carbon monoxide • Welding fumes • Spray paints • Cutting oil mists • Xylene vapor • Solvents 11
  • 12. Physical Hazards Physical hazards are different types of energy which may be hazardous to workers. • Noise • Vibration • Temperature extremes • Radiation 12
  • 13. Types of accident Death Fatal injury (broken leg, hips, amputation) Non-fatal injury (finger cut) Occupational accidents (MSD, hearing loss) Absence from work ( >1 day, > 3 days etc) Near misses Rate per 100 000 – number of injuries or causes of ill health per 100 000 employees. Working days lost – days off work due to workplace injuries & work-related ill health 13
  • 14. Personal protective equipment (PPE)  What is PPE?  PPE is the device designed to protect worker from serious injuries and illness resulting from the workplace hazard.  It is only the tool to prevent injury from the hazards, as it does not eliminate or remove the hazard.  Basic types of PPE are Work Suit, Hard Hat, Safety Glasses, Safety Shoes. Cause:  All employees must be provided with appropriate personal protective equipment (PPE)  To prevent injuries and illnesses, supervisors /foremen must implement and enforce the use of personal protective equipment on all company construction projects 14
  • 15. Personal protective equipment (PPE) Cont… Select the proper type of PPE to fit the jobs requirement.  Head Protection  Eye and face protection -Safety spectacles. -Goggles. -Welding shields. -Laser safety -goggles. -Face shields  Foot Protection  Hearing Protection  Dust Protection  Hand Protection 15
  • 16. Personal protective equipment (PPE) Cont…  Foot Protection  Hearing Protection  Dust Protection  Hand Protection  FALL PROTECTION - Personal Fall Arrest System - Guardrail Systems - Safety Nets Personal Fall Arrest System -The three main parts  the body belt or harness  the lanyard/lifeline, and  a suitable anchorage. 16
  • 17. Costs of accidents – direct costs and indirect costs Direct costs The direct costs are insurance. These include medical costs and others workers’ compensation insurance benefits as well as liability and property-damage insurance. Indirect costs Below are the lists of indirect costs: Transportation costs – include the cost of emergency transportation, together with the cost of other personnel that were necessary to get to the injured worker to proper medical facilities 17
  • 18. Permit To Work (PTW)  Objective: The objective of the Safe Work Permit system is to identify hazards associated with a non routine job, and to develop precautions required to control each hazard identified. A Safe Work Permit (SWP) is a WRITTEN document which SPECIFICALLY DEFINES THE WORK to be done AND the SPECIFIC PRECAUTIONS to be taken. Safe Work Permit Permit # Type: (hot work, confined space, line break, etc.... location: Valid __/___/___ ____ __/___/___ ____ Issued to: From: M D Y time to M D Y time Work Description: ________________________________ ____________________________________________ Supervisor’s Signature Print name ____________________________________________ ____________________________________________ Work Order No. Permits are issued: - For a specific date and time range, - For a specific job, - and to specific individuals. 18
  • 19. Permit To Work (PTW) Cont… Safe Work Permit ------------------------------------------------------- --------------- Precautions Always required: o Emergency procedures review by: o Emergency equipment & location review by: o Area inherent hazards review by: o Material Safety Data Sheet(s) review by: Safe Work Permit ------------------------------------------------------------------------------------------ ------------------------------ Special Precautions Required: o Buddy System o Sprinklers in Service o Cleaning of _________ o Purging of ________ o Remove materials from ___________________ o Piping o Drain o Disconnect o Blank off / Capped o Clean o Ventilate o Remove combustibles from other side of wall. o Floor Swept Clean of Combustibles o Clean area within 35 feet. o Wet down floor. o Adjacent areas: __________________________ o Cover floor with: __________________________ o Non-combustible Tarpaulins or Metal Shields Over: o Electrical Switches or Valves off, locked-out, and Tagged: o Electrical Grounding of: ________________________ o Atmosphere monitored during work for: ____________ periodically: __________ continuously: __________ o Safety Monitor(s) present from _________ to _________ o Fire Watch Present during work and for 30 minutes after... o Respirator to be worn____ or be readily available ___ Safe Work Permit ------------------------------------------------ --------------Safety Equipment Required O Safety Glasses O Hard Hat O Face Shield O Safety Shoes O Fire Extinguishers - Type ___ #___ Size ___ O Fire Hose O Supplementary Illumination O Warning Signs O Barricades O Non-sparking Tools O Explosion Proof Equipment O Safety Harness O Life Line O Tripod Emergency Escape Unit O 2-way Radio Or Phone O Respirators O Impervious Gloves O Protective Clothing _____________________ O Mechanical Ventilation O Shower & Eyewash O Self Contained Breathing Apparatus O Ground Fault Circuit Interrupter O Ladder / Lift / Scaffold O Other________________________________ 19
  • 20. Permit To Work (PTW) Cont…  Deep Excavation PTW Many companies are making excavation work and entry into trenches over 4’ (Feet) deep a safe work permitting task  Working at Heights PTW Many companies are making “working at heights” a safe work permitting task due to the complexity of PFAS(s)  Lifting PTW Many companies are making work involving cranes and aerial lifts a safe work permitting task. Not only do these tasks come with increased risk to the operators, but also infrastructure (e.g. live covered processes)  Electrical PTW Many companies are using LOTO Permits as an additional administrative controls for the controlling of hazardous energy sources during servicing and maintenance. 20
  • 21. Permit Validity Permit is valid for:  A specific activity, site, within a specific period of time.  Only issued for a maximum of 5 consecutive calendar days.  Applied for in advance of the work – ideally 10 working days  Issued immediately prior to the start of the permit able work  Renewed via the Work Clearance Form each day by Permit Holder  Expires after 5 days regardless of the activity Self Permits  NO ONE IS ALLOWED TO ISSUE A PERMIT TO THEMSELVES 21
  • 22. Reasons and benefits to improve health and safety in construction  Responsibility;  Economic reasons;  Impact of safety on overall performance;  Contractor’s performance;  Control of accident causes. 22
  • 23. Responsibility  Safety is everyone’s responsibility.  It is a moral and legal obligation of employers to provide a safe working place and of employees to work safely.  Employer’s duty of care to employees as covering the following areas: safe system of work; a safe place of work; plant and machinery that is safe to use; competent supervision and/or suitable training; and care in the selection of fellow employees. 23
  • 24. How To Improve Health And Safety On Construction Sites?  Reactive measures Accident recording & reporting Accident investigations  Proactive measures Health & Safety policy Health & Safety programme/plan Health & Safety induction/training Tool-box talk Others 24
  • 25. 25