Rehab Insert Sleeves
Rehab Insert Sleeves
 Allow “Low Impact” construction methods
for wet well replacement
 Fully pre-packaged systems, ready for
pumps
 Typically sized at 8” less than inside
diameter of existing concrete structure
 Field installation of inlet hubs
 Grouted in place
 DSL for the entire life cycle of the project
Rehab Insert Sleeves
 Measure existing concrete wet well
 Measure interior diameter at multiple
locations
 Measure interior bottom elevation
 Measure top elevation
 Measure interior filet or benched
bottoms
 Measure interior inlets
 Pipe type and pipe O.D
 Measure discharge centerline elevation
 Measure interior bottom area
Rehab Insert Sleeves
2. Prepare Cad drawings of new fiberglass wet well insert for engineer approval
Rehab Insert Sleeves (Hickory Park Project)
1. Delivery of new tank. 2. Establish bypass pumping and well point dewatering.
3. Remove top slab from existing concrete wet well along with pumps, piping, and rails.
Rehab Insert Sleeves (Hickory Park Project)
4. Begin cleaning of existing station by pumping out sludge, loose mortar, bricks, and trash.
Rehab Insert Sleeves (Hickory Park Project)
5. Cut off inlet pipes flush with existing concrete wet well and chip out around existing inlet
daspipes to accept a new pipe hub.
Rehab Insert Sleeves (Hickory Park Project)
6. Insert the new FRP sleeve into the existing concrete wet well for a dry fit, insuring the .
……tank is centered in the hole.
Rehab Insert Sleeves (Hickory Park Project)
7. FTS field crew will cut openings for all inlet pipes, insert new pipe hubs through the wall,
. and structurally bond pipe stubs in place.
Rehab Insert Sleeves (Hickory Park Project)
8. Pump concrete flowable fill into interstitial space between fiberglass insert and the .
……existing concrete wet well.
Rehab Insert Sleeves (Hickory Park Project)
9. Install pumps, controls, electrical service, and other mechanical equipment as needed for
. start-up.
Rehab Insert Sleeves (Hickory Park Project)
New Tank DeliveredExisting Station
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)
Rehab Insert Sleeves (Birmingham Project)

Weitere ähnliche Inhalte

Was ist angesagt?

BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
alois multerer
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochure
Yanyan Wu
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
yudi05
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326
Danny Flett
 

Was ist angesagt? (20)

Preene Groundwater Consulting - Practice Profile
Preene Groundwater Consulting  - Practice ProfilePreene Groundwater Consulting  - Practice Profile
Preene Groundwater Consulting - Practice Profile
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structures
 
Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple Geothermal Well Drilling – Keep it Simple
Geothermal Well Drilling – Keep it Simple
 
Containerized Fire Pump house
Containerized Fire Pump houseContainerized Fire Pump house
Containerized Fire Pump house
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Shopping for a Solution
Shopping for a SolutionShopping for a Solution
Shopping for a Solution
 
BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)BANFF Presentation_v1 1 (3)
BANFF Presentation_v1 1 (3)
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
 
Finish Ball Packaging
Finish Ball PackagingFinish Ball Packaging
Finish Ball Packaging
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Shale gas presentation
Shale gas presentationShale gas presentation
Shale gas presentation
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochure
 
Traps and sewers
Traps and sewersTraps and sewers
Traps and sewers
 
Hydraulic Fracturing 101
Hydraulic Fracturing 101Hydraulic Fracturing 101
Hydraulic Fracturing 101
 
Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326BOE+Brochure+-+Rotajet+150326
BOE+Brochure+-+Rotajet+150326
 
Handbook of laying pipe sp57
Handbook of laying pipe sp57Handbook of laying pipe sp57
Handbook of laying pipe sp57
 

Ähnlich wie Rehabilitation insert presentation

CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
Dan Caouette
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
MEL3360
 
Nuflow - Project Briefings
Nuflow - Project BriefingsNuflow - Project Briefings
Nuflow - Project Briefings
ecommbus
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technology
LTDH2013
 

Ähnlich wie Rehabilitation insert presentation (20)

Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Pipe Replacement Method
Pipe Replacement MethodPipe Replacement Method
Pipe Replacement Method
 
Submarine outfalls & intakes ppt
Submarine outfalls & intakes pptSubmarine outfalls & intakes ppt
Submarine outfalls & intakes ppt
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
Rainwater Harvesting Options For Commercial Buildings - Australia
Rainwater  Harvesting Options For Commercial Buildings - Australia  Rainwater  Harvesting Options For Commercial Buildings - Australia
Rainwater Harvesting Options For Commercial Buildings - Australia
 
Nuflow - Project Briefings
Nuflow - Project BriefingsNuflow - Project Briefings
Nuflow - Project Briefings
 
Difficult Run Force Main Rehabilitation
Difficult Run Force Main RehabilitationDifficult Run Force Main Rehabilitation
Difficult Run Force Main Rehabilitation
 
J. PLANS _ SPECS.pptx
J. PLANS _ SPECS.pptxJ. PLANS _ SPECS.pptx
J. PLANS _ SPECS.pptx
 
4 Projects
4 Projects4 Projects
4 Projects
 
Fort Hunt Road Emergency Gravity Sewer Project
Fort Hunt Road Emergency Gravity Sewer ProjectFort Hunt Road Emergency Gravity Sewer Project
Fort Hunt Road Emergency Gravity Sewer Project
 
Exploitation.pptx
Exploitation.pptxExploitation.pptx
Exploitation.pptx
 
Sesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technologySesión técnica, sala KM 19, Epoxy pipeline technology
Sesión técnica, sala KM 19, Epoxy pipeline technology
 
ENGINEERING AND DESIGN PORTFOLIO
ENGINEERING AND DESIGN PORTFOLIOENGINEERING AND DESIGN PORTFOLIO
ENGINEERING AND DESIGN PORTFOLIO
 
How a Well is Drilled.pdf
How a Well is Drilled.pdfHow a Well is Drilled.pdf
How a Well is Drilled.pdf
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
044_PHPD_NOV16[1]
044_PHPD_NOV16[1]044_PHPD_NOV16[1]
044_PHPD_NOV16[1]
 
Rainwater Harvesting Experience at NIFT, Hyderabad_SMARAN_2013
Rainwater Harvesting Experience at NIFT, Hyderabad_SMARAN_2013Rainwater Harvesting Experience at NIFT, Hyderabad_SMARAN_2013
Rainwater Harvesting Experience at NIFT, Hyderabad_SMARAN_2013
 
Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 

Kürzlich hochgeladen

Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Pusat Herbal Resmi BPOM
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
CaitlinCummins3
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
jual Obat Aborsi Bandung, Wa : 085180626899 Apotik jual Obat Cytotec Di Bandung
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
brennadilys816
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
doktercalysta
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
zukhrafshabbir
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 

Kürzlich hochgeladen (20)

Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODFRATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
RATINGS OF EACH VIDEO FOR UNI PROJECT IWDSFODF
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
Apotik Jual Obat Aborsi asli Mataram, Wa : 085180626899 - Penjual obat Cytote...
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
ابو ظبي اعلان | - سايتوتك في الامارات حبوب الاجهاض للبيع ف حبوب الإجهاض ... ا...
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)Inside the Black Box of Venture Capital (VC)
Inside the Black Box of Venture Capital (VC)
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
 
zidauu _business communication.pptx /pdf
zidauu _business  communication.pptx /pdfzidauu _business  communication.pptx /pdf
zidauu _business communication.pptx /pdf
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
The Risks of Ignoring Bookkeeping in Your Business
The Risks of Ignoring Bookkeeping in Your BusinessThe Risks of Ignoring Bookkeeping in Your Business
The Risks of Ignoring Bookkeeping in Your Business
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 

Rehabilitation insert presentation

  • 2. Rehab Insert Sleeves  Allow “Low Impact” construction methods for wet well replacement  Fully pre-packaged systems, ready for pumps  Typically sized at 8” less than inside diameter of existing concrete structure  Field installation of inlet hubs  Grouted in place  DSL for the entire life cycle of the project
  • 3. Rehab Insert Sleeves  Measure existing concrete wet well  Measure interior diameter at multiple locations  Measure interior bottom elevation  Measure top elevation  Measure interior filet or benched bottoms  Measure interior inlets  Pipe type and pipe O.D  Measure discharge centerline elevation  Measure interior bottom area
  • 4. Rehab Insert Sleeves 2. Prepare Cad drawings of new fiberglass wet well insert for engineer approval
  • 5. Rehab Insert Sleeves (Hickory Park Project) 1. Delivery of new tank. 2. Establish bypass pumping and well point dewatering.
  • 6. 3. Remove top slab from existing concrete wet well along with pumps, piping, and rails. Rehab Insert Sleeves (Hickory Park Project)
  • 7. 4. Begin cleaning of existing station by pumping out sludge, loose mortar, bricks, and trash. Rehab Insert Sleeves (Hickory Park Project)
  • 8. 5. Cut off inlet pipes flush with existing concrete wet well and chip out around existing inlet daspipes to accept a new pipe hub. Rehab Insert Sleeves (Hickory Park Project)
  • 9. 6. Insert the new FRP sleeve into the existing concrete wet well for a dry fit, insuring the . ……tank is centered in the hole. Rehab Insert Sleeves (Hickory Park Project)
  • 10. 7. FTS field crew will cut openings for all inlet pipes, insert new pipe hubs through the wall, . and structurally bond pipe stubs in place. Rehab Insert Sleeves (Hickory Park Project)
  • 11. 8. Pump concrete flowable fill into interstitial space between fiberglass insert and the . ……existing concrete wet well. Rehab Insert Sleeves (Hickory Park Project)
  • 12. 9. Install pumps, controls, electrical service, and other mechanical equipment as needed for . start-up. Rehab Insert Sleeves (Hickory Park Project)
  • 13. New Tank DeliveredExisting Station Rehab Insert Sleeves (Birmingham Project)
  • 14. Rehab Insert Sleeves (Birmingham Project)
  • 15. Rehab Insert Sleeves (Birmingham Project)
  • 16. Rehab Insert Sleeves (Birmingham Project)
  • 17. Rehab Insert Sleeves (Birmingham Project)
  • 18. Rehab Insert Sleeves (Birmingham Project)
  • 19. Rehab Insert Sleeves (Birmingham Project)
  • 20. Rehab Insert Sleeves (Birmingham Project)