SlideShare ist ein Scribd-Unternehmen logo
1 von 4
CURRICULUM VITAE
Khaja Afsar Mohiuddin
Mobile # +966506894931
E-mail : afsar_kam2004@yahoo.com
CAREER OBJECTIVE:-
Looking out for a challenging position in the field of Engineering as a CW FTTH | OSP Senior
Engineer/ Fiber Optic Supervisor & Telecom Inspector in an Organization which offer
recognition, development and security in exchange of dedication, maximum effort and best performance
utilizing my knowledge and experience.
SUMMARY OF EXPERIENCE:-
Total Experience in Saudi Arabia is (14) Fourteen years of experience in the field of CW Out
Side Plant (OSP) & (FTTH) Experience in Telecom/Electronic in
Telecommunication.
EXPERIENCE in Saudi Arabia:-
 Worked in Detecon Al Saudia Co. Ltd
Project Details : as Surveyor STC Mifon-5 & 4 RYD to Tabuk /Dammam
to Kuwait Boarder)
Ministry of Interior Project As FTTH –OSP- Inspector & (STC)
Closeout Incharge Jizan STC
from April-14 to June 2016.
 Worked in Future Communications Guidance International Co. (FCGI)
As OSP – FTTH , Project Coordinator
Project Details : Fiber Optic Cable & Copper MDF
from May 1st to November 7,2013.
 Worked in NOUR Communications
As CW –FTTH -Out Side Plant Senior Engineer from May 2007 to April
2013.
Experience in Major Project in Saudi Arabia:-
Worked with different Major Project in Saudi Arabia such as Telecom, Out Side Plant
(OSP) & (FTTH )Fiber Optic Project, GPT, GSM Wireless Local Loop Project,
Saudi Railway Project, Ministry of Diffence & Aviation, Ministry of Petroleum,
Aramco etc.
 Worked in Telecom Plus - (Qassim, Saudi Arabia)
As Fiber Optic Supervisor / Telecom Inspector
Project Details : SECO-Power Plant-Qassim & Copper MDF
from March 2002 to April 2007.
Page 1 of 4
C.V of Khaja Afsar Mohiuddin
JOB & RESPONSIBILITIES CW OSP PROJECT:-
 Survey the Network, Reading the Design Drawings.
 Managing the Civil Work which includes the following.
 Managing the Trenching & Cleaning the Trench.
 Laying the Ducts & Sub Ducts, Backfilling the Trench with concrete.
 Installation of Hand Holes & Manholes, Pulling the Fiber Optic Cable.
 Survey and identify the OSP routes and its potential customer connectivity.
 Supervise OSP construction activities as per construction drawings.
Project implementation as per construction standards.
 Prepare site diary as per project implementation quantity.
 Issue site instructions to subcontractor.
 Issue Site discrepancies if the contractor implement project in sub-standard manner.
 Issue and keep track of OSP materials quality on the site.
 Conduct PAT/FAT for the implemented project.
 Identify the GPS coordinates for the routes , manholes and customer location.
Work Contacts: Shall coordinates with OSP contractors.
JOB & RESPONSIBILITIES Fiber Optic / Telecom :-
 Fabricates, test, troubleshoot and repair fiber optic modules in a prototype environment
 Extensive experience in fiber optic cleaving, splicing, and module assembly.
 Ability to follow detailed work instructions and learn the use of new test equipment.
 Ability to support documentation development for process transition from prototype
development to manufacturing.
 Perform incoming inspection on components and system level tests on assemblies
 Perform routine maintenance of the test equipment and calibration.
 Motivated, detail-oriented, organized, quick-learning individual skills.
 Ability to support electronic technician activities such as soldering and cable making
 Jointing of Fiber Optic Cable, Machines Installation of LIV and LGK frame to MDF,
OTDR testing
 Works on jointing for aerial, secondary buried and primary cable of various types using
Different kinds of connectors such as 3M modular, Picabond and UY connector.
 Perform Installation/Termination on manholes, cables vaults, main distribution frame
and cross connect cabinets.
 Able to do different closing methods like UC/UCN and Raychem Closures.
 Perform Flush test after closing.
 Testing the cable integrity and insulation and executing repairs.
 Perform cut-over on both primary and secondary network and see to it that working
pairs are jointed,According to CLT and Cut-sheet assignment, Can read and Interpret
cable plans.
 Installation of assorted types of telecom peripherals like Pole Dp, Indoor Dp, Wall Dp
& Stb According to construction standards and specifications.
 Continuity testing DP to Cabinet, Cabinet C.O
 Fabricates and install krone block for DP and Cabinet.
Page 2 of 4
C.V of Khaja Afsar Mohiuddin
 Installation of multigrain Wireless Local Loop Radio Including laying of multiple cable
pairs, termination and commissioning.
 Installation of wireless Local Loop Sector zed antenna at the communication tower
including cabling, termination and orientation.
 Installation and commissioning of wireless local loop telephone subscriber.
 Splicing of fiber optic cable and testing.
 Splicing and termination of metallic cables primary and secondary.
 Responsible for Installation of Central Transfer Unit (CTRU).
 Responsible for Installation of Inverter (5KV A-10KVA).
 Responsible for installation of Battery (300 AMPS-600 AMPS).
 Responsible for installation of Subscriber Transfer Unit (STRU) and intelligent
Telephone Sockets (ITS).
 Responsible for PRE-PAT Acceptance test (PAT).
 Preparation and splicing of fiber optic cable.
 Conduct pre-installation test of fiber optic cable end to end i.e. 1310 nm and 1550 using
by optical time domain reflect meter and power meter tester.
 Supervising metallic cable installation, splicing, testing and commissioning.
 Troubleshooting and repair of crash phone emergency telephones including clearing of
line fault and restoration of faulty lines.
 Co-ordination to weekly meeting with Site Engineers & Project Manager.
 Tracking site installation progress and other availability.
 Issuing weekly reports update report, Attending internal & external project meeting.
 Able to work with basic PC applications and e-mail, General office work.
TYPICAL TASKS
 Provides lead supervision to technicians specializing in telecommunications equipment
such as PBX equipment, voice mail systems, uninterrupted power supplies, telephone
handsets, network cabling, public address, intercom, T1 circuits, optical fiber and other
related equipment and services;
 Receives trouble reports and installation project assignments;
 Makes service arrangements with user agency;
 Establishes priorities, work schedules and assigns technician(s);
 Provides instructions and guidance on anticipated problems and expected results;
 Inspects work in the field and assists technicians, on problems requiring advanced
knowledge and experience;
 Works as field supervisor on major installations; Trains new employees;
 Evaluates equipment performance and checks test equipment;
 Compares installation to initial design;
Qualifications:-
Bachelor of Commerce from Kakatiya University, Andhra Pradesh, INDIA.
Technical Qualifications:-
 Diploma in Telecommunication Engineering
 Diploma in Computer Applications, from Data-logic Institute of Technology
Andhra Pradesh, India.
Page 3 of 4
C.V of Khaja Afsar Mohiuddin
PERSONAL DETAILS:-
Name : Khaja Afsar Mohiuddin
Age : 38Years.
Nationality : Indian.
Religion : Islam.
Martial Status : Married.
Visa Status : Iqama Transferable
Place of Issue : Hyderabad (A.P.) India.
Languages Known : English, Urdu &Fluently Arabic.
Driving License : Valid Saudi Driving License
Page 4 of 4
C.V of Khaja Afsar Mohiuddin

Weitere ähnliche Inhalte

Was ist angesagt?

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...van den Dool Dick
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project EngineerFahim Mohamed
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 
Fttx planning and design
Fttx planning and designFttx planning and design
Fttx planning and designAhmed Hamdy
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeAmr Sakr
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit CertificationVishnuprasad P
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission EngineerEsrar Khan
 
Optical Network Unit - ONU
Optical Network Unit - ONUOptical Network Unit - ONU
Optical Network Unit - ONUAzam Udayar
 
Fady Victor ELV engineer
Fady Victor ELV engineerFady Victor ELV engineer
Fady Victor ELV engineerFady khier
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin Jain
 
Ahmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerAhmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerahmed nasr
 

Was ist angesagt? (20)

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
CV - ELV ENGINEER
CV - ELV ENGINEERCV - ELV ENGINEER
CV - ELV ENGINEER
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
HVAC DRAFTSMAN CV
HVAC DRAFTSMAN CVHVAC DRAFTSMAN CV
HVAC DRAFTSMAN CV
 
ELV Engineer
ELV EngineerELV Engineer
ELV Engineer
 
Fttx planning and design
Fttx planning and designFttx planning and design
Fttx planning and design
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
 
MEP Engineer with Revit Certification
MEP Engineer with Revit CertificationMEP Engineer with Revit Certification
MEP Engineer with Revit Certification
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
Optical Network Unit - ONU
Optical Network Unit - ONUOptical Network Unit - ONU
Optical Network Unit - ONU
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
CV - ELV ENGINEER
CV - ELV ENGINEERCV - ELV ENGINEER
CV - ELV ENGINEER
 
Fady Victor ELV engineer
Fady Victor ELV engineerFady Victor ELV engineer
Fady Victor ELV engineer
 
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/CloudNitin jain CV - Packet Core/EPC, Virtualization/Cloud
Nitin jain CV - Packet Core/EPC, Virtualization/Cloud
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Ahmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineerAhmed nasr - low current systems design engineer
Ahmed nasr - low current systems design engineer
 

Ähnlich wie Afsar_CW FTTH & OSP Senior Engineer-Resume

Ähnlich wie Afsar_CW FTTH & OSP Senior Engineer-Resume (20)

Obaidullah_CV
Obaidullah_CVObaidullah_CV
Obaidullah_CV
 
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
M.athar malik
M.athar malikM.athar malik
M.athar malik
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
ARSHAD cv with pic
ARSHAD cv with picARSHAD cv with pic
ARSHAD cv with pic
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Saeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CVSaeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CV
 
Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016Ananda Rao Resume 14.02.2016
Ananda Rao Resume 14.02.2016
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
Cv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunicationCv faisal mehmood-telecommunication
Cv faisal mehmood-telecommunication
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
andrew cv
andrew cvandrew cv
andrew cv
 
Telecom Radio RF Engineer
Telecom Radio RF EngineerTelecom Radio RF Engineer
Telecom Radio RF Engineer
 
Telecom Instument engineer
Telecom  Instument engineerTelecom  Instument engineer
Telecom Instument engineer
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
Haider Ali_CV
Haider Ali_CVHaider Ali_CV
Haider Ali_CV
 
MD Saddam Husen
MD Saddam HusenMD Saddam Husen
MD Saddam Husen
 
ANJUM CV-1
ANJUM CV-1ANJUM CV-1
ANJUM CV-1
 

Afsar_CW FTTH & OSP Senior Engineer-Resume

  • 1. CURRICULUM VITAE Khaja Afsar Mohiuddin Mobile # +966506894931 E-mail : afsar_kam2004@yahoo.com CAREER OBJECTIVE:- Looking out for a challenging position in the field of Engineering as a CW FTTH | OSP Senior Engineer/ Fiber Optic Supervisor & Telecom Inspector in an Organization which offer recognition, development and security in exchange of dedication, maximum effort and best performance utilizing my knowledge and experience. SUMMARY OF EXPERIENCE:- Total Experience in Saudi Arabia is (14) Fourteen years of experience in the field of CW Out Side Plant (OSP) & (FTTH) Experience in Telecom/Electronic in Telecommunication. EXPERIENCE in Saudi Arabia:-  Worked in Detecon Al Saudia Co. Ltd Project Details : as Surveyor STC Mifon-5 & 4 RYD to Tabuk /Dammam to Kuwait Boarder) Ministry of Interior Project As FTTH –OSP- Inspector & (STC) Closeout Incharge Jizan STC from April-14 to June 2016.  Worked in Future Communications Guidance International Co. (FCGI) As OSP – FTTH , Project Coordinator Project Details : Fiber Optic Cable & Copper MDF from May 1st to November 7,2013.  Worked in NOUR Communications As CW –FTTH -Out Side Plant Senior Engineer from May 2007 to April 2013. Experience in Major Project in Saudi Arabia:- Worked with different Major Project in Saudi Arabia such as Telecom, Out Side Plant (OSP) & (FTTH )Fiber Optic Project, GPT, GSM Wireless Local Loop Project, Saudi Railway Project, Ministry of Diffence & Aviation, Ministry of Petroleum, Aramco etc.  Worked in Telecom Plus - (Qassim, Saudi Arabia) As Fiber Optic Supervisor / Telecom Inspector Project Details : SECO-Power Plant-Qassim & Copper MDF from March 2002 to April 2007. Page 1 of 4 C.V of Khaja Afsar Mohiuddin
  • 2. JOB & RESPONSIBILITIES CW OSP PROJECT:-  Survey the Network, Reading the Design Drawings.  Managing the Civil Work which includes the following.  Managing the Trenching & Cleaning the Trench.  Laying the Ducts & Sub Ducts, Backfilling the Trench with concrete.  Installation of Hand Holes & Manholes, Pulling the Fiber Optic Cable.  Survey and identify the OSP routes and its potential customer connectivity.  Supervise OSP construction activities as per construction drawings. Project implementation as per construction standards.  Prepare site diary as per project implementation quantity.  Issue site instructions to subcontractor.  Issue Site discrepancies if the contractor implement project in sub-standard manner.  Issue and keep track of OSP materials quality on the site.  Conduct PAT/FAT for the implemented project.  Identify the GPS coordinates for the routes , manholes and customer location. Work Contacts: Shall coordinates with OSP contractors. JOB & RESPONSIBILITIES Fiber Optic / Telecom :-  Fabricates, test, troubleshoot and repair fiber optic modules in a prototype environment  Extensive experience in fiber optic cleaving, splicing, and module assembly.  Ability to follow detailed work instructions and learn the use of new test equipment.  Ability to support documentation development for process transition from prototype development to manufacturing.  Perform incoming inspection on components and system level tests on assemblies  Perform routine maintenance of the test equipment and calibration.  Motivated, detail-oriented, organized, quick-learning individual skills.  Ability to support electronic technician activities such as soldering and cable making  Jointing of Fiber Optic Cable, Machines Installation of LIV and LGK frame to MDF, OTDR testing  Works on jointing for aerial, secondary buried and primary cable of various types using Different kinds of connectors such as 3M modular, Picabond and UY connector.  Perform Installation/Termination on manholes, cables vaults, main distribution frame and cross connect cabinets.  Able to do different closing methods like UC/UCN and Raychem Closures.  Perform Flush test after closing.  Testing the cable integrity and insulation and executing repairs.  Perform cut-over on both primary and secondary network and see to it that working pairs are jointed,According to CLT and Cut-sheet assignment, Can read and Interpret cable plans.  Installation of assorted types of telecom peripherals like Pole Dp, Indoor Dp, Wall Dp & Stb According to construction standards and specifications.  Continuity testing DP to Cabinet, Cabinet C.O  Fabricates and install krone block for DP and Cabinet. Page 2 of 4 C.V of Khaja Afsar Mohiuddin
  • 3.  Installation of multigrain Wireless Local Loop Radio Including laying of multiple cable pairs, termination and commissioning.  Installation of wireless Local Loop Sector zed antenna at the communication tower including cabling, termination and orientation.  Installation and commissioning of wireless local loop telephone subscriber.  Splicing of fiber optic cable and testing.  Splicing and termination of metallic cables primary and secondary.  Responsible for Installation of Central Transfer Unit (CTRU).  Responsible for Installation of Inverter (5KV A-10KVA).  Responsible for installation of Battery (300 AMPS-600 AMPS).  Responsible for installation of Subscriber Transfer Unit (STRU) and intelligent Telephone Sockets (ITS).  Responsible for PRE-PAT Acceptance test (PAT).  Preparation and splicing of fiber optic cable.  Conduct pre-installation test of fiber optic cable end to end i.e. 1310 nm and 1550 using by optical time domain reflect meter and power meter tester.  Supervising metallic cable installation, splicing, testing and commissioning.  Troubleshooting and repair of crash phone emergency telephones including clearing of line fault and restoration of faulty lines.  Co-ordination to weekly meeting with Site Engineers & Project Manager.  Tracking site installation progress and other availability.  Issuing weekly reports update report, Attending internal & external project meeting.  Able to work with basic PC applications and e-mail, General office work. TYPICAL TASKS  Provides lead supervision to technicians specializing in telecommunications equipment such as PBX equipment, voice mail systems, uninterrupted power supplies, telephone handsets, network cabling, public address, intercom, T1 circuits, optical fiber and other related equipment and services;  Receives trouble reports and installation project assignments;  Makes service arrangements with user agency;  Establishes priorities, work schedules and assigns technician(s);  Provides instructions and guidance on anticipated problems and expected results;  Inspects work in the field and assists technicians, on problems requiring advanced knowledge and experience;  Works as field supervisor on major installations; Trains new employees;  Evaluates equipment performance and checks test equipment;  Compares installation to initial design; Qualifications:- Bachelor of Commerce from Kakatiya University, Andhra Pradesh, INDIA. Technical Qualifications:-  Diploma in Telecommunication Engineering  Diploma in Computer Applications, from Data-logic Institute of Technology Andhra Pradesh, India. Page 3 of 4 C.V of Khaja Afsar Mohiuddin
  • 4. PERSONAL DETAILS:- Name : Khaja Afsar Mohiuddin Age : 38Years. Nationality : Indian. Religion : Islam. Martial Status : Married. Visa Status : Iqama Transferable Place of Issue : Hyderabad (A.P.) India. Languages Known : English, Urdu &Fluently Arabic. Driving License : Valid Saudi Driving License Page 4 of 4 C.V of Khaja Afsar Mohiuddin