WCM BRUNEI SDN BHD
Health and Safety
• Fire alarm, assembly points and fire exits
• No smoking policy
• First aid
• PPE requirements
• Hazards present on site
• Designated walkways
• Toilets and washroom
• Manual handling
FM PROJECT ORGANIZATION
CHART
DIRECTOR
OMAR
SAFETY OFFICER
SAMSIR
JI ENGINEER
AMINUL HAKIMI
HAMZAH
JI ENGINEER
EHSAN SUFIAN
JI SUPERVISOR
MOHDAZHAR
JI SUPERVISOR
MOHD FAIZUL
JI Inspector
ILIAS
JI INSPECTOR
BAHARUDIN
JI INSPECTOR
MOHD HANIF
JI Snr. ENGINEER
AFIMANABDUL
RAHMAN
JI ENGINEER
MOHDAZIZI
JI ENGINEER
NUSRATUDDIN
NAZMI
SAFETY MOMENT
This Hub Connector passed a Nitrogen Helium Leak test but leaked 3 years
later causing an explosion. The cause -fitting a Carbon Steel Seal Ring
instead of a Stainless one.
SAFETY MOMENT
Explosion At Chevron Refinery, Mississippi
The Root Cause was Identified as Loose Bolts at Inlet Flange on PSV
Joint Integrity Philosophy
All leaks from bolted joints are avoidable
We have a moral and legal obligation to protect safety
of employees in the industry
The true cost of leaks from bolted connections is far
greater than the cost of avoiding them
We also have to minimise the impact of our activities
on the environment
Joint Integrity Solutions
"The final, essential creator of the force is the mechanic, and
the time of creation is during assembly. So it's very important for
us to understand this process".
-John Bickford, "Handbook of Bolts and Bolted Joints"
Joint Integrity Solutions (JIS) by WCM Brunei Sdn Bhd were offered to the
industry as the most comprehensive and sophisticated service to cater all
service and work related to bolted joint integrity and asset reliability. JIS is in
accordance and compliance with most recent requirements by ASME PCC-1
and 'Guidelines for The Management of The Integrity of Bolted Joint For
Pressurised System' by Energy Institute UK.
Joint Integrity Solutions
Joint Integrity Solutions (JIS) by WCM Brunei Sdn.Bhd is considered as the
key elements to achieving prime objectives of flange joint integrity which is to
assure leak-free integrity of the bolted flange joint. An integrated approach
has been adopted to ensure success of the process of joint integrity.
This process shall begin with;
i) understanding of the operating environment
ii) continues with design
iii) selection of the flange components
iv) setting of assembly specifications
v) establishment of best procedures
vi) appointment of competent personnel
vii) quality assurance traceability through complete documentation (using
sophisticated and systematic software for database)
viii)  finishes with meeting the goal of leak prevention.
Joint Integrity Solutions (JIS)
Joint Integrity Solutions (JIS)
- Controlled bolting (MTW, HTW, HBT)-Hot bolting
- On-Site Machining - Cold cutting and bavel
- Flange resurface and repair
- Thorough inspection and by competent personnel at 3 major
stages (1-preparation-material selection & purchasing, 2-
Installation- witness and inspection on site during job
execution,3- Handover -Final report and database record)
- Flange Management software
- Leak Testing (Hydrostatic, N2, Helium)
- Leak sealing.
- Real time condition based monitoring (Live monitoring on
critical joint)
- Pipeline related works
INTRODUCTIONTO FLANGE
MANAGEMENT SYSTEM
WHY do we need a Flange Management program?
The program will help improve Plant Safety and Reliability, the Cost of a Leak is enormous in terms of People, Plant
and Environment.
WHAT do we need to control?
The process used in the construction and operating environment, the components, the assembly and tightening
processes.
WHO do we need to control?
Anyone who may have an influence on a flanged joint, engineers, supervision, field operatives
HOW do we control?
Improve awareness of Best Practice, train personnel to on site based on their role on the project. Adopt best
practices for assembly and tightening of flanged joints. Implement a quality assurance database and program that
provides traceability and ensures compliance to all Project specifications.
What is Flange Management?
 The easiest comparison is to look at a welded joint, if we compare what is required for a welded joint
then its easy to see similar requirements for a flanged joint
 Materials management and controls
 Training and competency – look at what qualifications a coded welder needs
 Process and procedure
 Documentation and records
Flange Management Overview
Client
Ownership
Best Industry
Practice
Procedures
Criticality
Assessment
Rules
Training &
Competence
Management
Joint
Identification,
Tagging
Data Tracking,
Recording
Inspection
Compliance
Leak
Management
KPIs, Analyze,
Improve
Client Ownership
An owner within the Client organization must be appointed.
WCM works with all tiers in the supply chain implementing Flange Management.
WCM can assist clients to implement Flange Management throughout the organization,
through assistance with:
• Gap Analysis
• Procedures
• Risk Assessments
Best Industry Practices & Procedures
Asset Site
Implementation
Industry Standards and
Best Practice
Technical Centre
Assess Criticality, Set Rules
Determine Joint Criticalities
Risk Assessment process; consider process media, temp and pressure
Based on Leak and Loss potential as well as local factors
Joint analysis, bolt loads, rules for use of torque and tension
Leads into Risk Based Inspection
TIGHTENING METHOD BOLT DIAMETER
1 Torque tighten <1 ½”
2 Bolt tension >1 ½”
Low-risk Within alignment tolerances, existing controls are in place, eg procedures,
vendor information, competent personnel; safe to proceed
Medium-risk Additional controls need to be identified, consider the use of specialist
contractors, limit personnel in the area during testing and initial operation,
improve access, re-check after completion.
High-risk Engineering review of piping design and configuration, consider the use of a
specialist contractor or vendor.
TRAINING & COMPETANCY
SpecificTraining courses for all roles:
 WCM training schemes is based on standard training
program stated in Energy Institute – Guidelines for the
management of the integrity of bolted joints for pressurised
systems (Chapter 4).
Personnel Role Includes: Training Course
Direct/Indirect Effect on Flange Integrity FMP Awareness Course
Direct Effect on Flange Integrity Principles of Joint Integrity Course
Involved in Inspection or Assembly Flange Inspection and Assembly Course
Involved in Controlled Tightening using Torque
Equipment
Flange Controlled Torquing Course
Involved in Controlled Tightening using
Tensioning Equipment
Flange Controlled Tensioning Course.
Joint Identification &Tagging
Example Line Number, FlangePRO is configured to match the format
of the project
24”-FG-50394-AB1-NI-001
The default joint
size
The pipe spec for enabling a link
direct to joint details
The service code for risk
assessment
Bolt load
calculation
and
tightening
policy
Unique joint
number
FlangePRO Comprehensive DataTracking
• Records
• Audit
• Identification
• Interfacing
• MRO
• Metrics
• Automation
• Anomaly
• Enforcement
• QA/QC
• Compliance
• Certainty
• Simplicity
• Image plant
• Improvement
• Accuracy
• Analysis
• Prevention
Inspection Compliance
In-service Inspection of bolted joints
is an integral activity to ensure the
continued integrity of the joints and
as such should be built in to all
relevant inspection programmes.
This section looks at the possible
damage that can occur, the
inspection methods available for
detection of defects and mitigation
measures that can be put in place to
minimise such degradation.
Leak Management
“The objective of a correctly
designed and installed bolted joint is
to provide a long-term tight seal and
prevent ingress or egress of fluids
through the joint.
However, leaks can occur and
managing the investigation and
repair of the leak is essential to avoid
recurrence.
It can also provide useful data for
prevention on other projects.”
A defined process is in place for
Leak Management Investigation
shown on the right
KPI’s, Analyze, Improve
Analysis of leakage and inspection data coupled with
formal reviews of the management system should
occur at agreed intervals by the owner and users.
The results obtained from commissioning, incident
analysis and in-service inspections should be used
to generate ideas for continuous improvement.
Easily monitored but meaningful performance
standards should be put in place at launch to
quantify the contribution being made by the
management system and evaluate user satisfaction.
Feedback on good practice in integrity issues and
causes and solutions to incidents should be provided
both internally and to industry to contribute to
continuous improvement.
Collect Data
Analyse
Improve
0 100 200 300 400 500 600 700 800
0
0.25
0.5
0.75
1
Bolt Stress Relaxation from BS4882:1973 - Fig 9
100%
0
.res.B7
.res.B16
.res.B8
.res.B8M
8000 temp .B7 temp .B16 temp .B8 temp .B8M
PROJECTTRACK RECORD
Major Operators Global Projects Total No of Joints Monitor
Exxon Mobile Tapis R/MMHE 4, 030
BP BPTangghuLNG 9, 530
Woodside &
Conoco/Phillips
Cossack/Goodwyn/Laminaria 15,300
Qatar Gas South HookTerminal 7,340
Basrah Gas Plant Shutdown 9, 880
JOINT DATA MANAGEMENT
SOFTWARE
THE KEY ELEMENT OF FLANGE MANAGEMENT SOFTWARE & BENEFIT
 DATABASE SEPARATE INTO 3CATEGORIES:
 JOINT DATA MANAGEMENT
 EQUIPMENT CONTROL
 PERSONNEL COMPETENCY
 CONTROLS ALL ELEMENTS ASSOCIATED WITH BOLTEDJOINTS
 SEAMLESSLY LINKED TO BOLT LOAD CALCULATIONENGINE
 USER FRIENDLYINTERFACE
 VISUAL DISPLAY OF PROJECT / JOINTSTATUS
 SINGLE SOURCE DOCUMENTMANAGEMENT
 GENERATE JOB AND JOINT SPECIFIC EQUIPMENTLISTS
 MAINTAIN JOINT HISTORICALDATA
 ACTS AS AN ELECTRONIC DATABANK
 ENHANCE REPORTINGSKILLS
 AN ADDITIONAL VALUE ADDED DESIGNED FEATURES IS THE ABILITY OF ITS PROGRAM TO TRANSFER DATABASE FROM
FMS TO THE FOLLOWINGSERVICES:
 NITROGEN / HELIUM LEAK TESTING SERVICES
 PIPELINE COMMISSIONING SERVICES
 HOOK-UP AND PRE-COMMISSIONING AND COMMISSIONING SERVICES
JOINT DATA MANAGEMENT
SOFTWARE
WCM BRUNEI SDN BHD
Block C, Unit 3 , 1st (First) Floor,
Lot 8981-8982, Kg.Pandan,
Jalan Kerma Negara,Kuala Belait
KA1931, P.O Box 715, Seria KB1190,
Negara Brunei Darussalam.
Website: www.wcmbrunei.com CONTACT US:
Tel: +67(3) 334 2536
Fax: +67(3) 334 2536
Email: enquiry@wcmbrunei.com
CONTACT US
THANKYOU

Weitere ähnliche Inhalte

Was ist angesagt?

Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirementwael el ariny
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Madhur Mahajan
 
Piping handbook
Piping handbookPiping handbook
Piping handbookpdmsguy
 
Process piping design &amp; engineering per asme b 31.3
Process piping design &amp; engineering per asme b 31.3Process piping design &amp; engineering per asme b 31.3
Process piping design &amp; engineering per asme b 31.3Rajiv Kumar
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 
Project standards and_specifications_piping_materials_rev01web
Project standards and_specifications_piping_materials_rev01webProject standards and_specifications_piping_materials_rev01web
Project standards and_specifications_piping_materials_rev01webMartin Alvaro Ramirez Lozada
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummiesIvan Garcia
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineeringMobinVarghese8
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
 
Asme pcc 2 repair leaks
Asme pcc 2 repair leaksAsme pcc 2 repair leaks
Asme pcc 2 repair leaksGreg Kilaton
 
Guidelines for Pressure Boundary Bolted Flange Joint Assembly
Guidelines for Pressure Boundary Bolted Flange Joint AssemblyGuidelines for Pressure Boundary Bolted Flange Joint Assembly
Guidelines for Pressure Boundary Bolted Flange Joint AssemblyPGE India - PILOT Gaskets
 

Was ist angesagt? (20)

Hot Tapping Requirement
Hot Tapping RequirementHot Tapping Requirement
Hot Tapping Requirement
 
Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...Introduction to piping.......PLEASE give your valuable comments if you like t...
Introduction to piping.......PLEASE give your valuable comments if you like t...
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
Piping handbook
Piping handbookPiping handbook
Piping handbook
 
Process piping design &amp; engineering per asme b 31.3
Process piping design &amp; engineering per asme b 31.3Process piping design &amp; engineering per asme b 31.3
Process piping design &amp; engineering per asme b 31.3
 
Types of Flange.pdf
Types of Flange.pdfTypes of Flange.pdf
Types of Flange.pdf
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 
API 570 open book.pdf
API 570 open book.pdfAPI 570 open book.pdf
API 570 open book.pdf
 
Project standards and_specifications_piping_materials_rev01web
Project standards and_specifications_piping_materials_rev01webProject standards and_specifications_piping_materials_rev01web
Project standards and_specifications_piping_materials_rev01web
 
Piping Introduction
Piping IntroductionPiping Introduction
Piping Introduction
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummies
 
Basic piping
Basic pipingBasic piping
Basic piping
 
API 653 - Material preparado.ppt
API 653 - Material preparado.pptAPI 653 - Material preparado.ppt
API 653 - Material preparado.ppt
 
fundamentals of Piping engineering
fundamentals of Piping engineeringfundamentals of Piping engineering
fundamentals of Piping engineering
 
API 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory CourseAPI 570 Piping and Pipeline Inspectors Preparatory Course
API 570 Piping and Pipeline Inspectors Preparatory Course
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
Piping Design ppt.pdf
Piping Design ppt.pdfPiping Design ppt.pdf
Piping Design ppt.pdf
 
Asme pcc 2 repair leaks
Asme pcc 2 repair leaksAsme pcc 2 repair leaks
Asme pcc 2 repair leaks
 
Guidelines for Pressure Boundary Bolted Flange Joint Assembly
Guidelines for Pressure Boundary Bolted Flange Joint AssemblyGuidelines for Pressure Boundary Bolted Flange Joint Assembly
Guidelines for Pressure Boundary Bolted Flange Joint Assembly
 
Piping basics knowledge
Piping basics knowledgePiping basics knowledge
Piping basics knowledge
 

Andere mochten auch

Swe cs external 25112013 services
Swe cs external 25112013   servicesSwe cs external 25112013   services
Swe cs external 25112013 servicesAfiman Abdul Rahman
 
Basics of corrosion_control
Basics of corrosion_controlBasics of corrosion_control
Basics of corrosion_controlAhmed Hussein
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
Kurita handbook w ater treatment
Kurita handbook  w ater treatmentKurita handbook  w ater treatment
Kurita handbook w ater treatmentAhmed Hussein
 
3 cp corrosion control
3 cp corrosion control3 cp corrosion control
3 cp corrosion controlhimanshu jain
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection) Mohamed Safwat
 
생각의 구조화 마인드맵
생각의 구조화 마인드맵생각의 구조화 마인드맵
생각의 구조화 마인드맵ThinkCafe
 
The Electronic Health Record & use of the 'copy forward' function
The Electronic Health Record & use of the 'copy forward' functionThe Electronic Health Record & use of the 'copy forward' function
The Electronic Health Record & use of the 'copy forward' functionAudioEducator
 
Medicare for Eye-care: Coding and Billing Guidelines
Medicare for Eye-care: Coding and Billing GuidelinesMedicare for Eye-care: Coding and Billing Guidelines
Medicare for Eye-care: Coding and Billing GuidelinesAudioEducator
 
Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPTauseef bin Abdul Rashid
 
Abobe after effects
Abobe after effectsAbobe after effects
Abobe after effectsEmzzino
 
Manual cinema 4 d
Manual cinema 4 dManual cinema 4 d
Manual cinema 4 dVenise Melo
 
17767705 heat-treatment-oct08
17767705 heat-treatment-oct0817767705 heat-treatment-oct08
17767705 heat-treatment-oct08moh481989
 
1 Corrosion Control In Oil And Gas Industry
1  Corrosion Control In Oil And Gas Industry1  Corrosion Control In Oil And Gas Industry
1 Corrosion Control In Oil And Gas Industryemesap
 
스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상co-pen co-work company
 

Andere mochten auch (20)

Swe cs external 25112013 services
Swe cs external 25112013   servicesSwe cs external 25112013   services
Swe cs external 25112013 services
 
Corrosion arabic
Corrosion arabicCorrosion arabic
Corrosion arabic
 
Basics of corrosion_control
Basics of corrosion_controlBasics of corrosion_control
Basics of corrosion_control
 
Daily Mind Map
Daily Mind MapDaily Mind Map
Daily Mind Map
 
Galvanic cp design
Galvanic cp designGalvanic cp design
Galvanic cp design
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Hazop gide line
Hazop gide lineHazop gide line
Hazop gide line
 
Kurita handbook w ater treatment
Kurita handbook  w ater treatmentKurita handbook  w ater treatment
Kurita handbook w ater treatment
 
3 cp corrosion control
3 cp corrosion control3 cp corrosion control
3 cp corrosion control
 
(cathodic protection)
(cathodic protection) (cathodic protection)
(cathodic protection)
 
생각의 구조화 마인드맵
생각의 구조화 마인드맵생각의 구조화 마인드맵
생각의 구조화 마인드맵
 
The Electronic Health Record & use of the 'copy forward' function
The Electronic Health Record & use of the 'copy forward' functionThe Electronic Health Record & use of the 'copy forward' function
The Electronic Health Record & use of the 'copy forward' function
 
Brian manule
Brian manuleBrian manule
Brian manule
 
Medicare for Eye-care: Coding and Billing Guidelines
Medicare for Eye-care: Coding and Billing GuidelinesMedicare for Eye-care: Coding and Billing Guidelines
Medicare for Eye-care: Coding and Billing Guidelines
 
Impressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCPImpressed Current Cathodic Protection System Design ICCP
Impressed Current Cathodic Protection System Design ICCP
 
Abobe after effects
Abobe after effectsAbobe after effects
Abobe after effects
 
Manual cinema 4 d
Manual cinema 4 dManual cinema 4 d
Manual cinema 4 d
 
17767705 heat-treatment-oct08
17767705 heat-treatment-oct0817767705 heat-treatment-oct08
17767705 heat-treatment-oct08
 
1 Corrosion Control In Oil And Gas Industry
1  Corrosion Control In Oil And Gas Industry1  Corrosion Control In Oil And Gas Industry
1 Corrosion Control In Oil And Gas Industry
 
스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상스마트워크를 위한 마인드맵 세상
스마트워크를 위한 마인드맵 세상
 

Ähnlich wie WCM_PRESENTATION_Flange_Management_Rev4

The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Precast Plant Quality System Documentation Set
Precast Plant Quality System Documentation SetPrecast Plant Quality System Documentation Set
Precast Plant Quality System Documentation Setsjlines
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldDesign World
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineKsPuri
 
commissioning guideline
commissioning guidelinecommissioning guideline
commissioning guidelineMahmoud Ezz
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxstirlingvwriters
 
Significance of Rotary Shouldered Connection Calibration
Significance of Rotary Shouldered Connection CalibrationSignificance of Rotary Shouldered Connection Calibration
Significance of Rotary Shouldered Connection CalibrationThird Coast Gage & Calibration
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument EngineerKamran Saeed
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfbkbk37
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisCharlton Inao
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 

Ähnlich wie WCM_PRESENTATION_Flange_Management_Rev4 (20)

The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Precast Plant Quality System Documentation Set
Precast Plant Quality System Documentation SetPrecast Plant Quality System Documentation Set
Precast Plant Quality System Documentation Set
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
Burant, Larry resume 01_2014
Burant, Larry resume 01_2014Burant, Larry resume 01_2014
Burant, Larry resume 01_2014
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
commissioning guideline
commissioning guidelinecommissioning guideline
commissioning guideline
 
KD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docxKD4010 Magnetism And Electronics.docx
KD4010 Magnetism And Electronics.docx
 
Safety Standards
Safety Standards Safety Standards
Safety Standards
 
Significance of Rotary Shouldered Connection Calibration
Significance of Rotary Shouldered Connection CalibrationSignificance of Rotary Shouldered Connection Calibration
Significance of Rotary Shouldered Connection Calibration
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
Bryan allcock trl9 ready
Bryan allcock   trl9 readyBryan allcock   trl9 ready
Bryan allcock trl9 ready
 
kshitij_resume_Ln
kshitij_resume_Lnkshitij_resume_Ln
kshitij_resume_Ln
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Introduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdfIntroduction To manage electronics they must be monitored.pdf
Introduction To manage electronics they must be monitored.pdf
 
Unit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysisUnit v11 proactive maintenance analysis
Unit v11 proactive maintenance analysis
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Doc. RMD
Doc. RMDDoc. RMD
Doc. RMD
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 

WCM_PRESENTATION_Flange_Management_Rev4

  • 2. Health and Safety • Fire alarm, assembly points and fire exits • No smoking policy • First aid • PPE requirements • Hazards present on site • Designated walkways • Toilets and washroom • Manual handling
  • 3. FM PROJECT ORGANIZATION CHART DIRECTOR OMAR SAFETY OFFICER SAMSIR JI ENGINEER AMINUL HAKIMI HAMZAH JI ENGINEER EHSAN SUFIAN JI SUPERVISOR MOHDAZHAR JI SUPERVISOR MOHD FAIZUL JI Inspector ILIAS JI INSPECTOR BAHARUDIN JI INSPECTOR MOHD HANIF JI Snr. ENGINEER AFIMANABDUL RAHMAN JI ENGINEER MOHDAZIZI JI ENGINEER NUSRATUDDIN NAZMI
  • 4. SAFETY MOMENT This Hub Connector passed a Nitrogen Helium Leak test but leaked 3 years later causing an explosion. The cause -fitting a Carbon Steel Seal Ring instead of a Stainless one.
  • 5. SAFETY MOMENT Explosion At Chevron Refinery, Mississippi The Root Cause was Identified as Loose Bolts at Inlet Flange on PSV
  • 6. Joint Integrity Philosophy All leaks from bolted joints are avoidable We have a moral and legal obligation to protect safety of employees in the industry The true cost of leaks from bolted connections is far greater than the cost of avoiding them We also have to minimise the impact of our activities on the environment
  • 7. Joint Integrity Solutions "The final, essential creator of the force is the mechanic, and the time of creation is during assembly. So it's very important for us to understand this process". -John Bickford, "Handbook of Bolts and Bolted Joints" Joint Integrity Solutions (JIS) by WCM Brunei Sdn Bhd were offered to the industry as the most comprehensive and sophisticated service to cater all service and work related to bolted joint integrity and asset reliability. JIS is in accordance and compliance with most recent requirements by ASME PCC-1 and 'Guidelines for The Management of The Integrity of Bolted Joint For Pressurised System' by Energy Institute UK.
  • 8. Joint Integrity Solutions Joint Integrity Solutions (JIS) by WCM Brunei Sdn.Bhd is considered as the key elements to achieving prime objectives of flange joint integrity which is to assure leak-free integrity of the bolted flange joint. An integrated approach has been adopted to ensure success of the process of joint integrity. This process shall begin with; i) understanding of the operating environment ii) continues with design iii) selection of the flange components iv) setting of assembly specifications v) establishment of best procedures vi) appointment of competent personnel vii) quality assurance traceability through complete documentation (using sophisticated and systematic software for database) viii)  finishes with meeting the goal of leak prevention.
  • 9. Joint Integrity Solutions (JIS) Joint Integrity Solutions (JIS) - Controlled bolting (MTW, HTW, HBT)-Hot bolting - On-Site Machining - Cold cutting and bavel - Flange resurface and repair - Thorough inspection and by competent personnel at 3 major stages (1-preparation-material selection & purchasing, 2- Installation- witness and inspection on site during job execution,3- Handover -Final report and database record) - Flange Management software - Leak Testing (Hydrostatic, N2, Helium) - Leak sealing. - Real time condition based monitoring (Live monitoring on critical joint) - Pipeline related works
  • 10. INTRODUCTIONTO FLANGE MANAGEMENT SYSTEM WHY do we need a Flange Management program? The program will help improve Plant Safety and Reliability, the Cost of a Leak is enormous in terms of People, Plant and Environment. WHAT do we need to control? The process used in the construction and operating environment, the components, the assembly and tightening processes. WHO do we need to control? Anyone who may have an influence on a flanged joint, engineers, supervision, field operatives HOW do we control? Improve awareness of Best Practice, train personnel to on site based on their role on the project. Adopt best practices for assembly and tightening of flanged joints. Implement a quality assurance database and program that provides traceability and ensures compliance to all Project specifications.
  • 11. What is Flange Management?  The easiest comparison is to look at a welded joint, if we compare what is required for a welded joint then its easy to see similar requirements for a flanged joint  Materials management and controls  Training and competency – look at what qualifications a coded welder needs  Process and procedure  Documentation and records
  • 12. Flange Management Overview Client Ownership Best Industry Practice Procedures Criticality Assessment Rules Training & Competence Management Joint Identification, Tagging Data Tracking, Recording Inspection Compliance Leak Management KPIs, Analyze, Improve
  • 13. Client Ownership An owner within the Client organization must be appointed. WCM works with all tiers in the supply chain implementing Flange Management. WCM can assist clients to implement Flange Management throughout the organization, through assistance with: • Gap Analysis • Procedures • Risk Assessments
  • 14. Best Industry Practices & Procedures Asset Site Implementation Industry Standards and Best Practice Technical Centre
  • 15. Assess Criticality, Set Rules Determine Joint Criticalities Risk Assessment process; consider process media, temp and pressure Based on Leak and Loss potential as well as local factors Joint analysis, bolt loads, rules for use of torque and tension Leads into Risk Based Inspection TIGHTENING METHOD BOLT DIAMETER 1 Torque tighten <1 ½” 2 Bolt tension >1 ½” Low-risk Within alignment tolerances, existing controls are in place, eg procedures, vendor information, competent personnel; safe to proceed Medium-risk Additional controls need to be identified, consider the use of specialist contractors, limit personnel in the area during testing and initial operation, improve access, re-check after completion. High-risk Engineering review of piping design and configuration, consider the use of a specialist contractor or vendor.
  • 16. TRAINING & COMPETANCY SpecificTraining courses for all roles:  WCM training schemes is based on standard training program stated in Energy Institute – Guidelines for the management of the integrity of bolted joints for pressurised systems (Chapter 4). Personnel Role Includes: Training Course Direct/Indirect Effect on Flange Integrity FMP Awareness Course Direct Effect on Flange Integrity Principles of Joint Integrity Course Involved in Inspection or Assembly Flange Inspection and Assembly Course Involved in Controlled Tightening using Torque Equipment Flange Controlled Torquing Course Involved in Controlled Tightening using Tensioning Equipment Flange Controlled Tensioning Course.
  • 17. Joint Identification &Tagging Example Line Number, FlangePRO is configured to match the format of the project 24”-FG-50394-AB1-NI-001 The default joint size The pipe spec for enabling a link direct to joint details The service code for risk assessment Bolt load calculation and tightening policy Unique joint number
  • 18. FlangePRO Comprehensive DataTracking • Records • Audit • Identification • Interfacing • MRO • Metrics • Automation • Anomaly • Enforcement • QA/QC • Compliance • Certainty • Simplicity • Image plant • Improvement • Accuracy • Analysis • Prevention
  • 19. Inspection Compliance In-service Inspection of bolted joints is an integral activity to ensure the continued integrity of the joints and as such should be built in to all relevant inspection programmes. This section looks at the possible damage that can occur, the inspection methods available for detection of defects and mitigation measures that can be put in place to minimise such degradation.
  • 20. Leak Management “The objective of a correctly designed and installed bolted joint is to provide a long-term tight seal and prevent ingress or egress of fluids through the joint. However, leaks can occur and managing the investigation and repair of the leak is essential to avoid recurrence. It can also provide useful data for prevention on other projects.” A defined process is in place for Leak Management Investigation shown on the right
  • 21. KPI’s, Analyze, Improve Analysis of leakage and inspection data coupled with formal reviews of the management system should occur at agreed intervals by the owner and users. The results obtained from commissioning, incident analysis and in-service inspections should be used to generate ideas for continuous improvement. Easily monitored but meaningful performance standards should be put in place at launch to quantify the contribution being made by the management system and evaluate user satisfaction. Feedback on good practice in integrity issues and causes and solutions to incidents should be provided both internally and to industry to contribute to continuous improvement. Collect Data Analyse Improve 0 100 200 300 400 500 600 700 800 0 0.25 0.5 0.75 1 Bolt Stress Relaxation from BS4882:1973 - Fig 9 100% 0 .res.B7 .res.B16 .res.B8 .res.B8M 8000 temp .B7 temp .B16 temp .B8 temp .B8M
  • 22. PROJECTTRACK RECORD Major Operators Global Projects Total No of Joints Monitor Exxon Mobile Tapis R/MMHE 4, 030 BP BPTangghuLNG 9, 530 Woodside & Conoco/Phillips Cossack/Goodwyn/Laminaria 15,300 Qatar Gas South HookTerminal 7,340 Basrah Gas Plant Shutdown 9, 880
  • 23. JOINT DATA MANAGEMENT SOFTWARE THE KEY ELEMENT OF FLANGE MANAGEMENT SOFTWARE & BENEFIT  DATABASE SEPARATE INTO 3CATEGORIES:  JOINT DATA MANAGEMENT  EQUIPMENT CONTROL  PERSONNEL COMPETENCY  CONTROLS ALL ELEMENTS ASSOCIATED WITH BOLTEDJOINTS  SEAMLESSLY LINKED TO BOLT LOAD CALCULATIONENGINE  USER FRIENDLYINTERFACE  VISUAL DISPLAY OF PROJECT / JOINTSTATUS  SINGLE SOURCE DOCUMENTMANAGEMENT  GENERATE JOB AND JOINT SPECIFIC EQUIPMENTLISTS  MAINTAIN JOINT HISTORICALDATA  ACTS AS AN ELECTRONIC DATABANK  ENHANCE REPORTINGSKILLS  AN ADDITIONAL VALUE ADDED DESIGNED FEATURES IS THE ABILITY OF ITS PROGRAM TO TRANSFER DATABASE FROM FMS TO THE FOLLOWINGSERVICES:  NITROGEN / HELIUM LEAK TESTING SERVICES  PIPELINE COMMISSIONING SERVICES  HOOK-UP AND PRE-COMMISSIONING AND COMMISSIONING SERVICES
  • 25. WCM BRUNEI SDN BHD Block C, Unit 3 , 1st (First) Floor, Lot 8981-8982, Kg.Pandan, Jalan Kerma Negara,Kuala Belait KA1931, P.O Box 715, Seria KB1190, Negara Brunei Darussalam. Website: www.wcmbrunei.com CONTACT US: Tel: +67(3) 334 2536 Fax: +67(3) 334 2536 Email: enquiry@wcmbrunei.com CONTACT US