SlideShare ist ein Scribd-Unternehmen logo
1 von 9
COLD WORK PERMIT
  FORM# SAF-16


       ADNAN MUAZZAM
COLD WORK PERMIT SCOPE
REF: SECTION 6.1.1

•Generally  every work which is not specifically covered
by any other work permit.
•Opening vessels, pipes or enclosed spaces
•Where equipment requires decontamination
•Mechanical maintenance work
•Civil maintenance work
•Erection removal of scaffolding
•Insulation and painting
COLD WORK PERMIT SCOPE
REF: SECTION 6.1.1

•Equipment greasing and lubrication by the other than
owner department
•Maintenance of fire protection equipment
•Machinery monitoring including Vibration
Measurement
•Working on de energized electrical equipment
•Troubleshooting work on energized electrical
equipment between 50 V and 480 V.
COLD WORK PERMIT AUTHORIZATION
REF: TABLE # 02 SECTION 5.9

              OPERATING    NON
              AREA         OPERATING
                           AREA
PERMIT TYPE   AUTHORIZED   AUTHORIZED
              BY           BY
COLD WORK     SHIFT ENGR   SUPT/
PERMIT                     SUPERVISOR/
                           AREA
                           ENGINEER
WORK PERMIT AUTHORIZATION
REF: SECTION 5.9

   All work permit issuers and receivers are
    given authorization through competency
    based test
   UMs/SHs/ Coordination Engineers
   GTEs / Trade Apprentices
COLD WORK PERMIT DURATION
REF: SECTION 5.5

TYPE OF             DURATION             EXTEND           EXTENDABLE
PERMIT                                   WITHIN           FOR

COLD                ONE SHIFT ONE HOUR ONE MORE
WORK                (08 OR 12          SHIFT (08 OR
PERMIT              HOUR)              12 HOURS)


Valid for 08 hours in operating areas during normal plant operation (5.5.1)
Valid for 12 hours in operating areas during shutdown (5.5.1)
Valid for 12 hours in general shift units (5.5.2)
Expired if job not started within two hours of work permit issuance.
THANKYOU

Weitere ähnliche Inhalte

Was ist angesagt?

Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
IrfanAwan25
 
Work permit system
Work permit systemWork permit system
Work permit system
smithgeigle
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
Colleen True
 
Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
fqf383
 

Was ist angesagt? (20)

Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
Job Safety Analysis
Job Safety AnalysisJob Safety Analysis
Job Safety Analysis
 
Pipeline Construction Safety
Pipeline Construction SafetyPipeline Construction Safety
Pipeline Construction Safety
 
Reece scba ppt
Reece scba pptReece scba ppt
Reece scba ppt
 
Confined Space Ppt
Confined Space PptConfined Space Ppt
Confined Space Ppt
 
Machine Guarding
Machine GuardingMachine Guarding
Machine Guarding
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
Pre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdfPre commissioning and Commissioning Safety.pdf
Pre commissioning and Commissioning Safety.pdf
 
Lock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) TrainingLock-Out Tag-Out (LOTO) Training
Lock-Out Tag-Out (LOTO) Training
 
Work permit system
Work permit systemWork permit system
Work permit system
 
Hazardous Area Classification
Hazardous Area ClassificationHazardous Area Classification
Hazardous Area Classification
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
 
Step 6 hot work permit
Step 6 hot work permitStep 6 hot work permit
Step 6 hot work permit
 
MSHA Confined Spaces
MSHA Confined SpacesMSHA Confined Spaces
MSHA Confined Spaces
 
December -15 Daily Observation Report
December -15 Daily Observation ReportDecember -15 Daily Observation Report
December -15 Daily Observation Report
 
Work at height safety
Work at height safetyWork at height safety
Work at height safety
 
Confined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHAConfined Spaces Training Powerpoint by OSHA
Confined Spaces Training Powerpoint by OSHA
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 

Andere mochten auch

96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-control
Mowaten Masry
 

Andere mochten auch (11)

96000707 gas-turbine-control
96000707 gas-turbine-control96000707 gas-turbine-control
96000707 gas-turbine-control
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Piping presentation (master)
Piping presentation (master)Piping presentation (master)
Piping presentation (master)
 
Gas Turbine Operation
Gas Turbine OperationGas Turbine Operation
Gas Turbine Operation
 
Inergen
InergenInergen
Inergen
 
2.5 suppression.sprinklers.wk12a
2.5 suppression.sprinklers.wk12a2.5 suppression.sprinklers.wk12a
2.5 suppression.sprinklers.wk12a
 
Chapter 2 part 1 sprinkler
Chapter 2 part 1 sprinklerChapter 2 part 1 sprinkler
Chapter 2 part 1 sprinkler
 
Gas turbine course
Gas turbine courseGas turbine course
Gas turbine course
 
Plc Siemens Training Notes
Plc Siemens Training NotesPlc Siemens Training Notes
Plc Siemens Training Notes
 
INDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLCINDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLC
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 

Ähnlich wie Cold Work Permit

Engine testing & storage
Engine testing & storageEngine testing & storage
Engine testing & storage
Mal Mai
 
Brochure-C-small-file
Brochure-C-small-fileBrochure-C-small-file
Brochure-C-small-file
shadrak rufus
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
Ekp Reddy
 
Specification.pdf
Specification.pdfSpecification.pdf
Specification.pdf
BNayak9
 
Shahbaz CV1 -HVAC Supervisor
Shahbaz CV1 -HVAC SupervisorShahbaz CV1 -HVAC Supervisor
Shahbaz CV1 -HVAC Supervisor
Shahbaz Ali
 

Ähnlich wie Cold Work Permit (20)

Permits to work
Permits to workPermits to work
Permits to work
 
Engine testing & storage
Engine testing & storageEngine testing & storage
Engine testing & storage
 
Brochure-C-small-file
Brochure-C-small-fileBrochure-C-small-file
Brochure-C-small-file
 
ELGi EV Series Air Compressor Pitch PPT For Fortis Hospital
ELGi EV Series Air Compressor Pitch PPT For Fortis HospitalELGi EV Series Air Compressor Pitch PPT For Fortis Hospital
ELGi EV Series Air Compressor Pitch PPT For Fortis Hospital
 
EV Series PPT - Fortis Hospital..pptx
EV Series PPT - Fortis Hospital..pptxEV Series PPT - Fortis Hospital..pptx
EV Series PPT - Fortis Hospital..pptx
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
 
General guidelines for building commissioning ppt
General guidelines  for building  commissioning pptGeneral guidelines  for building  commissioning ppt
General guidelines for building commissioning ppt
 
General guidelines for building commissioning ppt.pptx
General guidelines  for building  commissioning ppt.pptxGeneral guidelines  for building  commissioning ppt.pptx
General guidelines for building commissioning ppt.pptx
 
Specification.pdf
Specification.pdfSpecification.pdf
Specification.pdf
 
Shahbaz CV1 -HVAC Supervisor
Shahbaz CV1 -HVAC SupervisorShahbaz CV1 -HVAC Supervisor
Shahbaz CV1 -HVAC Supervisor
 
Shahbaz cv1 HVAC Supervisor
Shahbaz cv1  HVAC SupervisorShahbaz cv1  HVAC Supervisor
Shahbaz cv1 HVAC Supervisor
 
RFQ -WELDING
RFQ -WELDING RFQ -WELDING
RFQ -WELDING
 
Abrasive_Flow_Machning.pptx
Abrasive_Flow_Machning.pptxAbrasive_Flow_Machning.pptx
Abrasive_Flow_Machning.pptx
 
RESUME 2014
RESUME 2014RESUME 2014
RESUME 2014
 
CURRENT CV1 2015
CURRENT CV1 2015CURRENT CV1 2015
CURRENT CV1 2015
 
Curriculum vitae simhachalam bolosetti
Curriculum vitae simhachalam bolosettiCurriculum vitae simhachalam bolosetti
Curriculum vitae simhachalam bolosetti
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
 
Fire pump-application-packet
Fire pump-application-packetFire pump-application-packet
Fire pump-application-packet
 
CV Aqeel
CV AqeelCV Aqeel
CV Aqeel
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 

Cold Work Permit

  • 1. COLD WORK PERMIT FORM# SAF-16 ADNAN MUAZZAM
  • 2. COLD WORK PERMIT SCOPE REF: SECTION 6.1.1 •Generally every work which is not specifically covered by any other work permit. •Opening vessels, pipes or enclosed spaces •Where equipment requires decontamination •Mechanical maintenance work •Civil maintenance work •Erection removal of scaffolding •Insulation and painting
  • 3. COLD WORK PERMIT SCOPE REF: SECTION 6.1.1 •Equipment greasing and lubrication by the other than owner department •Maintenance of fire protection equipment •Machinery monitoring including Vibration Measurement •Working on de energized electrical equipment •Troubleshooting work on energized electrical equipment between 50 V and 480 V.
  • 4. COLD WORK PERMIT AUTHORIZATION REF: TABLE # 02 SECTION 5.9 OPERATING NON AREA OPERATING AREA PERMIT TYPE AUTHORIZED AUTHORIZED BY BY COLD WORK SHIFT ENGR SUPT/ PERMIT SUPERVISOR/ AREA ENGINEER
  • 5. WORK PERMIT AUTHORIZATION REF: SECTION 5.9  All work permit issuers and receivers are given authorization through competency based test  UMs/SHs/ Coordination Engineers  GTEs / Trade Apprentices
  • 6. COLD WORK PERMIT DURATION REF: SECTION 5.5 TYPE OF DURATION EXTEND EXTENDABLE PERMIT WITHIN FOR COLD ONE SHIFT ONE HOUR ONE MORE WORK (08 OR 12 SHIFT (08 OR PERMIT HOUR) 12 HOURS) Valid for 08 hours in operating areas during normal plant operation (5.5.1) Valid for 12 hours in operating areas during shutdown (5.5.1) Valid for 12 hours in general shift units (5.5.2) Expired if job not started within two hours of work permit issuance.
  • 7.
  • 8.