Employer Project Owner Contract Title Contract Value Description of Work
Tageco JSC – Terna SA J/V,
Libya
O.D.A.C. (Libyan
Organization for the
Development of
Administrative Centers)
Road, sidewalk, and street
lighting networks in the cities
of Waddan, Hun, and Sokna
$123M New urban roadwork construction,
including excavation, embankment,
granular subbase & base courses,
bituminous binder and wearing
courses, concrete curb & gutter,
sidewalks, and street lighting networks.
Relocation of underground utilities in
conflict.
AM Engineering Corp.,
Chicago, Illinois
IDOT (Illinois Department
of Transportation), ISTHA
(Illinois State Toll Highway
Authority), City of Joliet,
several other Villages in the
Greater Chicago Area
Various building demolitions,
tree removals, landscaping,
erosion control systems,
concrete curb & gutter,
sidewalks, driveways removal
and replacement
$4.5M Demolition of low income communities
in Joliet, Illinois. Removal and disposal
of regular and contaminated debris.
Installation of new erosion control
systems, and landscaping. Removal
and replacement of concrete curb &
gutter, removal & replacement of
sidewalks & driveways.
BBA, LLC, Chicago, Illinois IDOT (Illinois Department
of Transportation)
Palwaukee Executive Airport
taxiway construction
N/A New construction of doweled concrete
taxiways, excavation, PGE (porous
granular embankment) erosion control
systems, electrical & signage work,
landscaping.
BBA, LLC, Chicago, Illinois IDOT (Illinois Department
of Transportation)
Joliet Regional Airport taxiway
construction
N/A New construction of doweled concrete
taxiways, excavation, PGE (porous
granular embankment) erosion control
systems, electrical & signage work,
landscaping.
Ganna Construction Inc.,
Chicago, Illinois
CDOT (City of Chicago
Department of
Transportation)
Bridge replacement over the
North Branch of the Chicago
River
N/A Removal and disposal of existing
bridge. Installation of new precast soil
filling bridge. Pavement, and extensive
utilities work. Erosion control &
landscaping work.
Achilles Milioulis Undertaken Projects
Page 2 of 5
Employer Project Owner Contract Title Contract Value Description of Work
Ganna Construction Inc.,
Chicago, Illinois
IDOT (Illinois Department
of Transportation)
Improvement of Route 30 $22M + $7M
extensions
Route 30 widening from Theodore
Street to Western Avenue in Joliet.
MOT (maintenance of Traffic), removal
of old pavement. Installation of new
storm sewers, sanitary sewers, water
supply, trench protection from
contaminated soils. Excavation, PGE
(porous granular embankment). New
doweled concrete pavement,
bituminous courses, concrete curb &
gutter, sidewalks, and driveways. New
traffic signals, street lighting, signage,
erosion control systems, and
landscaping.
Ganna Construction Inc.,
Chicago, Illinois
IDOT (Illinois Department
of Transportation)
Stevenson Expressway 5P
(I55 – Interstate 55)
$30M Reconstruction of SB (Southbound)
lanes from Willow Springs Road to
north of Des Plaines River. MOT
(maintenance of Traffic). Removal of
existing 4 bridges, pavement, barrier
walls, and ramps. Installation of new
storm sewers, road drainage systems,
variable height concrete barrier walls, 4
new bridges, consisting of abutment
walls, piers, steel beams & new
concrete deck. PGE (porous granular
embankment), bituminous ramps,
concrete shoulders, CRC (continuous
reinforced concrete) pavement,
concrete curb & gutter, polymerized
bituminous courses, overhead signage,
street lighting, erosion control,
landscaping.
Achilles Milioulis Undertaken Projects
Page 3 of 5
Employer Project Owner Contract Title Contract Value Description of Work
Ganna Construction Inc.,
Chicago, Illinois
ISTHA (Illinois State Toll
Highway Authority)
Army Trail Toll Plaza
Extension
$33M MOT (maintenance of Traffic).
Removal of existing pavement, ramps,
barrier walls, noise walls, plaza toll
booths. Installation of new storm
sewers, road drainage systems,
concrete variable height barrier walls,
noise walls, bridge abutment & pier
extensions, steel beams, new concrete
deck, new lanes, PGE (porous granular
embankment), concrete ramps,
bituminous shoulders, concrete curb &
gutter, new doweled concrete
pavement, overhead signage, new
tollway plaza canopy & booths, street
lighting, erosion control, landscaping
Meton SA - Etep SA, Fezan,
Libya
Projects Office Sebha, a
division of G.P.C. (General
Popular Committee) of
Iskan and Utilities
Sanitary Sewage for 4 Areas
in Sebha
$16.5M Excavate and install sanitary sewer
lines, precast M/H, Catch basins &
house connections. Deep trench
protection, and ground water pumping.
Waste pumping stations.
Meton SA - Etep SA, Fezan,
Libya
Sebha Roads & Bridges
Department
Sebha – Brak Road Project,
61 km
$53M Design new alignment through desert.
Construction of service road, new high
embankment, box culverts, granular
bases, and bituminous binder &
wearing courses. Installation of
pavement markings, signage, mile
posts, cat eyes, and cleanup of sand
accumulation on pavement from
continuous eolic movement of massive
sand dunes.
Achilles Milioulis Undertaken Projects
Page 4 of 5
Employer Project Owner Contract Title Contract Value Description of Work
Meton SA - Etep SA, Fezan,
Libya
G.P.C. of Housing &
Utilities, Fezan Region
Executive Committee
Sanitary Sewage projects in
Morzuk, Traghen, Al-Qatrun,
Zwellah, Umularaneb,
Tissawah, Sabitat. Water
supply works in Tmissah-
Mugadul
$22M Excavate and install sanitary sewer
lines and precast M/H, catch basins &
house connections. Rock excavation,
deep trench protection, and ground
water pumping. Waste pumping
stations. Excavate and install ductile
iron pipes & accessories for water
supply networks. Radial irrigation
systems in Al-Qatrun.
Meton SA - Etep SA, Fezan,
Libya
G.P.C. of Housing &
Utilities, Fezan Region
Executive Committee
Building construction of 270
housing units in Al-Qatrun,
Traghen, Sabitat, Tajerhi, and
Zaitunah.
15 6-class schools, health
dispensaries, warehouses,
and distribution centers
$74M Building construction including
excavation, footings, concrete beams,
columns, and slabs, concrete block
masonry, plastering, floor tiles, wall
cladding, wood doors & windows,
electrical, water, and sanitary sewer
installations.
Meton SA - Etep SA, Fezan,
Libya
G.P.C. of Housing &
Utilities, Fezan Region
Executive Committee
Industrial Chip board factory
construction in Traghen
$6M Building construction including
excavation, footings, concrete beams,
columns, and slabs, concrete block
masonry, plastering, floor tiles, wall
cladding, steel & wood doors &
windows, electrical, water, and sanitary
sewer installations. Procurement and
installation of German origin prototype
machinery for the fabrication of
chipboards from palm tree branches.
Meton SA - Etep SA, Fezan,
Libya
Ministry of Transportation
(Muasalat of Morzuk)
Godwah – Traghen – Morzuk
Road reconstruction, 136 km
$57M Removal and disposal of existing
pavement, construction of service road,
rehabilitation of existing road
foundation, installation of granular
bases, and bituminous binder &
wearing courses. Cleanup and
expansion of existing culverts, road
signage, and mile posts.
Achilles Milioulis Undertaken Projects
Page 5 of 5
Employer Project Owner Contract Title Contract Value Description of Work
Meton SA - Etep SA, Fezan,
Libya
Ministry of Transportation
(Muasalat of Morzuk)
Construction of 5 Airstrips in
Traghen, Majdul, Umularaneb,
Morzuk, Al-Qatrun,
$1.7M Construction of airstrips to fight locust
infestation
Meton SA - Etep SA, Fezan,
Libya
Ministry of Transportation
(Muasalat of Morzuk)
Majdul – Tarboo and Zaituna
– Traghen Road construction,
43 km
$23M New construction in compromised soils
with high water table. Installation of
rock foundation, high embankments,
box culverts, granular base courses,
bituminous binder & wearing courses,
pavement markings, mile posts, cat
eyes, and signage.
Meton SA - Etep SA, Fezan,
Libya
Ministry of Transportation
(Muasalat of Morzuk)
Qatrun – Al Weigh Road
construction, 130 km
$58M New alignment, rock excavation, and
embankment work.

Weitere ähnliche Inhalte

Was ist angesagt?

Alafaya presentation 3 3-11
Alafaya presentation 3 3-11Alafaya presentation 3 3-11
Alafaya presentation 3 3-11
JennThomp
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards
ACECSDES
 
Gaskill Avenue Project (Punxsy, PA)
Gaskill Avenue Project (Punxsy, PA)Gaskill Avenue Project (Punxsy, PA)
Gaskill Avenue Project (Punxsy, PA)
guest0a0708
 
Veridian Resort Noosa p1
Veridian Resort Noosa p1Veridian Resort Noosa p1
Veridian Resort Noosa p1
Lucinda Dean
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lres
Michelle Dudson
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boards
GardinerEast
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11
VasconEngineers
 
Lynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC ProjectsLynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC Projects
Lynee Russell
 
Oakmont Initiative
Oakmont InitiativeOakmont Initiative
Oakmont Initiative
bgoggin31
 

Was ist angesagt? (20)

Portfolio-2015-02-20-15
Portfolio-2015-02-20-15Portfolio-2015-02-20-15
Portfolio-2015-02-20-15
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
Alafaya presentation 3 3-11
Alafaya presentation 3 3-11Alafaya presentation 3 3-11
Alafaya presentation 3 3-11
 
Shaggy Dog
Shaggy DogShaggy Dog
Shaggy Dog
 
Stamm
StammStamm
Stamm
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards
 
Gaskill Avenue Project (Punxsy, PA)
Gaskill Avenue Project (Punxsy, PA)Gaskill Avenue Project (Punxsy, PA)
Gaskill Avenue Project (Punxsy, PA)
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
Veridian Resort Noosa p1
Veridian Resort Noosa p1Veridian Resort Noosa p1
Veridian Resort Noosa p1
 
30945 selly oak leaflet november lres
30945 selly oak leaflet november lres30945 selly oak leaflet november lres
30945 selly oak leaflet november lres
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boards
 
James Elser Project List 2009
James Elser Project List 2009James Elser Project List 2009
James Elser Project List 2009
 
GCS PSU Pegula2
GCS PSU Pegula2GCS PSU Pegula2
GCS PSU Pegula2
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
Portfolio
PortfolioPortfolio
Portfolio
 
Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11Weikfield building B presentation 7.1.11
Weikfield building B presentation 7.1.11
 
Lynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC ProjectsLynée Russell - Previous DUDC Projects
Lynée Russell - Previous DUDC Projects
 
Oakmont Initiative
Oakmont InitiativeOakmont Initiative
Oakmont Initiative
 
Large Scale Deconstruction at the Oakland Army Base 2008 - 2014
Large Scale Deconstruction at the Oakland Army Base 2008 - 2014Large Scale Deconstruction at the Oakland Army Base 2008 - 2014
Large Scale Deconstruction at the Oakland Army Base 2008 - 2014
 
Splost Projects
Splost ProjectsSplost Projects
Splost Projects
 

Ähnlich wie AM undertaken projects

CV Suhail Sharma - II
CV Suhail Sharma - IICV Suhail Sharma - II
CV Suhail Sharma - II
Suhail Sharma
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
Michael Duffy
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
Sven Maedler
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
William J. Pehaim
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
Mark Oberschmidt
 

Ähnlich wie AM undertaken projects (20)

WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdfChain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
Chain Bridge - Eaton Place Intersection Improvements 5-11-22.pdf
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
Dart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in TunnelsDart Underground, Dublin - Light Rail Network in Tunnels
Dart Underground, Dublin - Light Rail Network in Tunnels
 
CV Suhail Sharma - II
CV Suhail Sharma - IICV Suhail Sharma - II
CV Suhail Sharma - II
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
Berwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant ApplicationBerwyn Depot District Streetscape IGI Grant Application
Berwyn Depot District Streetscape IGI Grant Application
 
My Current resume 2016
My Current resume 2016My Current resume 2016
My Current resume 2016
 
MECS Projects _28-June-2016_
MECS Projects _28-June-2016_MECS Projects _28-June-2016_
MECS Projects _28-June-2016_
 
MECS Projects _28-June-2016_
MECS Projects _28-June-2016_MECS Projects _28-June-2016_
MECS Projects _28-June-2016_
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
Yuhua 5-Year Master Plan (2016 - 2020)
Yuhua 5-Year Master Plan (2016 - 2020)Yuhua 5-Year Master Plan (2016 - 2020)
Yuhua 5-Year Master Plan (2016 - 2020)
 
Yuhua 5-Year Master Plan (2016 -2020)
Yuhua 5-Year Master Plan (2016 -2020)Yuhua 5-Year Master Plan (2016 -2020)
Yuhua 5-Year Master Plan (2016 -2020)
 
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINALPALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
PALM BAY HANDS CDBG EXPO SLIDE SHOW FINAL
 
Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021Old Colchester Road Stream Stabilization Project January 2021
Old Colchester Road Stream Stabilization Project January 2021
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 

AM undertaken projects

  • 1. Achilles Milioulis Undertaken Projects Page 1 of 5 Employer Project Owner Contract Title Contract Value Description of Work Tageco JSC – Terna SA J/V, Libya O.D.A.C. (Libyan Organization for the Development of Administrative Centers) Road, sidewalk, and street lighting networks in the cities of Waddan, Hun, and Sokna $123M New urban roadwork construction, including excavation, embankment, granular subbase & base courses, bituminous binder and wearing courses, concrete curb & gutter, sidewalks, and street lighting networks. Relocation of underground utilities in conflict. AM Engineering Corp., Chicago, Illinois IDOT (Illinois Department of Transportation), ISTHA (Illinois State Toll Highway Authority), City of Joliet, several other Villages in the Greater Chicago Area Various building demolitions, tree removals, landscaping, erosion control systems, concrete curb & gutter, sidewalks, driveways removal and replacement $4.5M Demolition of low income communities in Joliet, Illinois. Removal and disposal of regular and contaminated debris. Installation of new erosion control systems, and landscaping. Removal and replacement of concrete curb & gutter, removal & replacement of sidewalks & driveways. BBA, LLC, Chicago, Illinois IDOT (Illinois Department of Transportation) Palwaukee Executive Airport taxiway construction N/A New construction of doweled concrete taxiways, excavation, PGE (porous granular embankment) erosion control systems, electrical & signage work, landscaping. BBA, LLC, Chicago, Illinois IDOT (Illinois Department of Transportation) Joliet Regional Airport taxiway construction N/A New construction of doweled concrete taxiways, excavation, PGE (porous granular embankment) erosion control systems, electrical & signage work, landscaping. Ganna Construction Inc., Chicago, Illinois CDOT (City of Chicago Department of Transportation) Bridge replacement over the North Branch of the Chicago River N/A Removal and disposal of existing bridge. Installation of new precast soil filling bridge. Pavement, and extensive utilities work. Erosion control & landscaping work.
  • 2. Achilles Milioulis Undertaken Projects Page 2 of 5 Employer Project Owner Contract Title Contract Value Description of Work Ganna Construction Inc., Chicago, Illinois IDOT (Illinois Department of Transportation) Improvement of Route 30 $22M + $7M extensions Route 30 widening from Theodore Street to Western Avenue in Joliet. MOT (maintenance of Traffic), removal of old pavement. Installation of new storm sewers, sanitary sewers, water supply, trench protection from contaminated soils. Excavation, PGE (porous granular embankment). New doweled concrete pavement, bituminous courses, concrete curb & gutter, sidewalks, and driveways. New traffic signals, street lighting, signage, erosion control systems, and landscaping. Ganna Construction Inc., Chicago, Illinois IDOT (Illinois Department of Transportation) Stevenson Expressway 5P (I55 – Interstate 55) $30M Reconstruction of SB (Southbound) lanes from Willow Springs Road to north of Des Plaines River. MOT (maintenance of Traffic). Removal of existing 4 bridges, pavement, barrier walls, and ramps. Installation of new storm sewers, road drainage systems, variable height concrete barrier walls, 4 new bridges, consisting of abutment walls, piers, steel beams & new concrete deck. PGE (porous granular embankment), bituminous ramps, concrete shoulders, CRC (continuous reinforced concrete) pavement, concrete curb & gutter, polymerized bituminous courses, overhead signage, street lighting, erosion control, landscaping.
  • 3. Achilles Milioulis Undertaken Projects Page 3 of 5 Employer Project Owner Contract Title Contract Value Description of Work Ganna Construction Inc., Chicago, Illinois ISTHA (Illinois State Toll Highway Authority) Army Trail Toll Plaza Extension $33M MOT (maintenance of Traffic). Removal of existing pavement, ramps, barrier walls, noise walls, plaza toll booths. Installation of new storm sewers, road drainage systems, concrete variable height barrier walls, noise walls, bridge abutment & pier extensions, steel beams, new concrete deck, new lanes, PGE (porous granular embankment), concrete ramps, bituminous shoulders, concrete curb & gutter, new doweled concrete pavement, overhead signage, new tollway plaza canopy & booths, street lighting, erosion control, landscaping Meton SA - Etep SA, Fezan, Libya Projects Office Sebha, a division of G.P.C. (General Popular Committee) of Iskan and Utilities Sanitary Sewage for 4 Areas in Sebha $16.5M Excavate and install sanitary sewer lines, precast M/H, Catch basins & house connections. Deep trench protection, and ground water pumping. Waste pumping stations. Meton SA - Etep SA, Fezan, Libya Sebha Roads & Bridges Department Sebha – Brak Road Project, 61 km $53M Design new alignment through desert. Construction of service road, new high embankment, box culverts, granular bases, and bituminous binder & wearing courses. Installation of pavement markings, signage, mile posts, cat eyes, and cleanup of sand accumulation on pavement from continuous eolic movement of massive sand dunes.
  • 4. Achilles Milioulis Undertaken Projects Page 4 of 5 Employer Project Owner Contract Title Contract Value Description of Work Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Sanitary Sewage projects in Morzuk, Traghen, Al-Qatrun, Zwellah, Umularaneb, Tissawah, Sabitat. Water supply works in Tmissah- Mugadul $22M Excavate and install sanitary sewer lines and precast M/H, catch basins & house connections. Rock excavation, deep trench protection, and ground water pumping. Waste pumping stations. Excavate and install ductile iron pipes & accessories for water supply networks. Radial irrigation systems in Al-Qatrun. Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Building construction of 270 housing units in Al-Qatrun, Traghen, Sabitat, Tajerhi, and Zaitunah. 15 6-class schools, health dispensaries, warehouses, and distribution centers $74M Building construction including excavation, footings, concrete beams, columns, and slabs, concrete block masonry, plastering, floor tiles, wall cladding, wood doors & windows, electrical, water, and sanitary sewer installations. Meton SA - Etep SA, Fezan, Libya G.P.C. of Housing & Utilities, Fezan Region Executive Committee Industrial Chip board factory construction in Traghen $6M Building construction including excavation, footings, concrete beams, columns, and slabs, concrete block masonry, plastering, floor tiles, wall cladding, steel & wood doors & windows, electrical, water, and sanitary sewer installations. Procurement and installation of German origin prototype machinery for the fabrication of chipboards from palm tree branches. Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Godwah – Traghen – Morzuk Road reconstruction, 136 km $57M Removal and disposal of existing pavement, construction of service road, rehabilitation of existing road foundation, installation of granular bases, and bituminous binder & wearing courses. Cleanup and expansion of existing culverts, road signage, and mile posts.
  • 5. Achilles Milioulis Undertaken Projects Page 5 of 5 Employer Project Owner Contract Title Contract Value Description of Work Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Construction of 5 Airstrips in Traghen, Majdul, Umularaneb, Morzuk, Al-Qatrun, $1.7M Construction of airstrips to fight locust infestation Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Majdul – Tarboo and Zaituna – Traghen Road construction, 43 km $23M New construction in compromised soils with high water table. Installation of rock foundation, high embankments, box culverts, granular base courses, bituminous binder & wearing courses, pavement markings, mile posts, cat eyes, and signage. Meton SA - Etep SA, Fezan, Libya Ministry of Transportation (Muasalat of Morzuk) Qatrun – Al Weigh Road construction, 130 km $58M New alignment, rock excavation, and embankment work.