No Project title Client Nature Duration Project Size
Contract value
(RM)
Experience Gained/Particular role
1 Design, Refurbish, Fit Out & Build for
Convergys Malaysia
Converys, Malaysia Data Centre 4 months 12,000 sqft 3.5M Work begins from the Project Case Study. Prepared the Due Diligence report consisting all the
possibility recommendation of an existing (6years old) office to up to date art of finishes. Budgetry,
Risk Management, Staff re-location reports & coordinations.
Worked on another phase for a life office level (in operation).
2 New Fit Out, Design & Build for Fluor Daniel
International Malaysia
Fluor Daniel,
Malaysia
Oil & Gas 2 months 3800 sqft 938K Design & Build
3 Design & PM - Office Re-Orientation,
Retrofit
HoneyWell Engineering - 6000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report
4 Design & PM - New Fit Out Office Servecorp, KL Sentral Virtual Office Service
Provider
4.5 months 12,000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
5 PM for New Fit Out - Design, Bid &
Construction Process for E-Bay Inclusive 3
choise of outlet
E-Bay Online - 14,000 sqft - Working with the Client, Real Estate service provider along with Building Mgmt in producing the
comprehensive Due Diligence for every individual units. Narrow down the scope to final selection &
worked on 3-D rendering layout & presentation.
6 PM for New Fit Out - Design, Bid &
Construction Process
Google Search Engine 3 months 5000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
7 PM for New Fit Out - Design, Bid &
Construction Proces
Menlo Logistic Logistic Service
provider
1.5 months 2000 sqft 400K Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
8 Project Management for Refurbishmsnt of
existing Office
Servecorp, Citibank
Tower
Virtual Office Service
Provider
2.5 months 12000 sqft 250K Was on hold
7 Imago, KK Times Square MBO Cinema Entertainment 3.5 months 35000 sqft 11.5M - Study & prepares working papers on the project requirement with Pre-Qualify Architect, M&E
Consultant, Contractor &Material Vendors. Work with Consultants on the Conceptual Design,
inclusive in Space Planning - prepares project Costing,
Preparation of tender doc & tendering proceses by performs Bidding.
- Prepared Contract document for the issued Scope of Works
- Monitor the site progress & participate in regular inspection and submit progress report for
stakeholders. Liaise with Building Management over discrepencies of base building’s provisions
Project's Undertaken / Carried-Out Portfolio

Weitere ähnliche Inhalte

Ähnlich wie PM experience across various industries

Ähnlich wie PM experience across various industries (20)

C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
Mohit Sharma C.V -
Mohit Sharma C.V - Mohit Sharma C.V -
Mohit Sharma C.V -
 
Narmadha New resume
Narmadha New resumeNarmadha New resume
Narmadha New resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
avinash chandrashekar-CV
avinash chandrashekar-CVavinash chandrashekar-CV
avinash chandrashekar-CV
 
Rihan CV
Rihan CVRihan CV
Rihan CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Henry Suguna Raj.
Henry Suguna Raj.Henry Suguna Raj.
Henry Suguna Raj.
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
PrabhatKumarCV_English
PrabhatKumarCV_EnglishPrabhatKumarCV_English
PrabhatKumarCV_English
 
Ateeqresume-INDIA
Ateeqresume-INDIAAteeqresume-INDIA
Ateeqresume-INDIA
 
Resume - Nagaraj G B
Resume - Nagaraj G BResume - Nagaraj G B
Resume - Nagaraj G B
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Lance E. King - Resume
Lance E. King - ResumeLance E. King - Resume
Lance E. King - Resume
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resume
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
CV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130aCV_PGM_G.Moat_20151130a
CV_PGM_G.Moat_20151130a
 
Resume
ResumeResume
Resume
 
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016Maged Mahmoud Hemeda - Architect Project Engineer CV  Apr. 2016
Maged Mahmoud Hemeda - Architect Project Engineer CV Apr. 2016
 
Project Management Specialist
Project Management SpecialistProject Management Specialist
Project Management Specialist
 

PM experience across various industries

  • 1. No Project title Client Nature Duration Project Size Contract value (RM) Experience Gained/Particular role 1 Design, Refurbish, Fit Out & Build for Convergys Malaysia Converys, Malaysia Data Centre 4 months 12,000 sqft 3.5M Work begins from the Project Case Study. Prepared the Due Diligence report consisting all the possibility recommendation of an existing (6years old) office to up to date art of finishes. Budgetry, Risk Management, Staff re-location reports & coordinations. Worked on another phase for a life office level (in operation). 2 New Fit Out, Design & Build for Fluor Daniel International Malaysia Fluor Daniel, Malaysia Oil & Gas 2 months 3800 sqft 938K Design & Build 3 Design & PM - Office Re-Orientation, Retrofit HoneyWell Engineering - 6000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report 4 Design & PM - New Fit Out Office Servecorp, KL Sentral Virtual Office Service Provider 4.5 months 12,000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report. Working with internal design team & prepare presetation to client & Manage the entire process of the Fit Out 5 PM for New Fit Out - Design, Bid & Construction Process for E-Bay Inclusive 3 choise of outlet E-Bay Online - 14,000 sqft - Working with the Client, Real Estate service provider along with Building Mgmt in producing the comprehensive Due Diligence for every individual units. Narrow down the scope to final selection & worked on 3-D rendering layout & presentation. 6 PM for New Fit Out - Design, Bid & Construction Process Google Search Engine 3 months 5000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report. Working with internal design team & prepare presetation to client & Manage the entire process of the Fit Out 7 PM for New Fit Out - Design, Bid & Construction Proces Menlo Logistic Logistic Service provider 1.5 months 2000 sqft 400K Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report. Working with internal design team & prepare presetation to client & Manage the entire process of the Fit Out 8 Project Management for Refurbishmsnt of existing Office Servecorp, Citibank Tower Virtual Office Service Provider 2.5 months 12000 sqft 250K Was on hold 7 Imago, KK Times Square MBO Cinema Entertainment 3.5 months 35000 sqft 11.5M - Study & prepares working papers on the project requirement with Pre-Qualify Architect, M&E Consultant, Contractor &Material Vendors. Work with Consultants on the Conceptual Design, inclusive in Space Planning - prepares project Costing, Preparation of tender doc & tendering proceses by performs Bidding. - Prepared Contract document for the issued Scope of Works - Monitor the site progress & participate in regular inspection and submit progress report for stakeholders. Liaise with Building Management over discrepencies of base building’s provisions Project's Undertaken / Carried-Out Portfolio