This document provides a summary of 9 projects the author has worked on involving design, refurbishment, fit out, and project management of office and commercial spaces. The projects range from 2 months to 3.5 months in duration and 2000 square feet to 35,000 square feet in size. Across the projects, the author gained experience in preparing due diligence reports, schedules of works, budgets, presentations to clients, and managing the entire fit out process from design to construction.
1. No Project title Client Nature Duration Project Size
Contract value
(RM)
Experience Gained/Particular role
1 Design, Refurbish, Fit Out & Build for
Convergys Malaysia
Converys, Malaysia Data Centre 4 months 12,000 sqft 3.5M Work begins from the Project Case Study. Prepared the Due Diligence report consisting all the
possibility recommendation of an existing (6years old) office to up to date art of finishes. Budgetry,
Risk Management, Staff re-location reports & coordinations.
Worked on another phase for a life office level (in operation).
2 New Fit Out, Design & Build for Fluor Daniel
International Malaysia
Fluor Daniel,
Malaysia
Oil & Gas 2 months 3800 sqft 938K Design & Build
3 Design & PM - Office Re-Orientation,
Retrofit
HoneyWell Engineering - 6000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report
4 Design & PM - New Fit Out Office Servecorp, KL Sentral Virtual Office Service
Provider
4.5 months 12,000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
5 PM for New Fit Out - Design, Bid &
Construction Process for E-Bay Inclusive 3
choise of outlet
E-Bay Online - 14,000 sqft - Working with the Client, Real Estate service provider along with Building Mgmt in producing the
comprehensive Due Diligence for every individual units. Narrow down the scope to final selection &
worked on 3-D rendering layout & presentation.
6 PM for New Fit Out - Design, Bid &
Construction Process
Google Search Engine 3 months 5000 sqft Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
7 PM for New Fit Out - Design, Bid &
Construction Proces
Menlo Logistic Logistic Service
provider
1.5 months 2000 sqft 400K Working on Project Case Study, preparing the Due Diligence, Schedule of works & Budgetry report.
Working with internal design team & prepare presetation to client & Manage the entire process of
the Fit Out
8 Project Management for Refurbishmsnt of
existing Office
Servecorp, Citibank
Tower
Virtual Office Service
Provider
2.5 months 12000 sqft 250K Was on hold
7 Imago, KK Times Square MBO Cinema Entertainment 3.5 months 35000 sqft 11.5M - Study & prepares working papers on the project requirement with Pre-Qualify Architect, M&E
Consultant, Contractor &Material Vendors. Work with Consultants on the Conceptual Design,
inclusive in Space Planning - prepares project Costing,
Preparation of tender doc & tendering proceses by performs Bidding.
- Prepared Contract document for the issued Scope of Works
- Monitor the site progress & participate in regular inspection and submit progress report for
stakeholders. Liaise with Building Management over discrepencies of base building’s provisions
Project's Undertaken / Carried-Out Portfolio