13. Timeline PHASE 1 Construction begins September 2010 PHASE 2 Design beginning Summer 2010 Freestanding ER Fall 2011 MOB Fall 2011
14.
15.
Hinweis der Redaktion
Synergized = the intentional fusion of Energy and Synergy.
Beginning with the end in mind we have designed the campus to allow for ongoing construction without interruption of current operations.
This is a sketch of what the hospital could look like.
What you would see walking onto the Health Campus
By designing the expansion to a full service medical facility through modular construction we are able to minimize the disruption to patients and practitioners.
Using a mountain modern design scheme we are able to construct a very aesthetically appealing building as well as integrate many energy efficient and eco friendly concepts into our facility.
Phase 1 includes the Emergency Room and MOB. Phase 2 will be funded when we achieve certain volume thresholds and when market conditions dictate.