Weekly Progress Report # 70
SVC
HAIL-2
PREPARED BY:
2016
AJAZ UL KABIR
Project Manager- Qassim Group
SEC ‐ EHVPD , COA , SVC Hail-2
Mobile : 054 112 2637 , Email : absheikh@se.com.sa
REVIEWED BY:
ABDULRAHMAN AL-KADI
Group Leader- Qassim
Extra High Voltage Projects Department- COA
Mobile : 050 489 6906 , Email : EVPRC-QPGL@se.com.sa
26
October
Dynamic Reactive Power Compensation at Hail-2
(9031) & Al-Jouf-2 380kV Substations
SEC CONTRACT NO. 4400003963/00
AIM/ OBJECTIVE: CONTRACT DETAILS:
SEC intends to improve rapid voltage
support at Hail-2 (9031) and Al-Jouf-2
380kV Substations of SEC network by
providing Conventional or Hybrid Static
VAR Compensator Systems (SVC).
The SVCs at Hail-2 (9031) shall be
connected to spare 380kV Breaker. CB
position for SVC at Al-Jouf-2 .380kV
Substation will be provided by Al-Jouf-2
380kV Substation Contractor.
• Project Name ……………………….. DYNAMIC REACTIVE POWER
COMPENSATION AT HAIL-2 (9031)
& AL-JOUF-2 380KV SUBSTATIONS
• Contract No ………………………… 4400003963/00
• Owner ………………………………. SAUDI ELECTRIC COMPANY - COA
• SEC Project Manager ……………… ENGR. AJAZ UL KABIR
• Contractor ………………………...... SIEMENS LTD.
• Address ……………………………... SIEMENS COMPANY LIMITED,
P.O.BOX 9510, RIYADH 11423, KSA
• Contractor Project Manager ………. ENGR. REHAN ULHAQUE
• Contract Effective Date ……………. 03-JUNE-2014
• Contract Value ……………………... SAR 463,840,000.00
PROJECT DESCRIPTION & CONTRACT INFO
SVC HAIL-2
• Technical Completion Certificate (TCC) : 02-JUNE-2016
• Preliminary Acceptance Certificate (PAC) : 02-AUGUST-2016
• Final Acceptance Certificate (FAC) : 02-NOVEMBER-2016
TIME LINE
SVC HAIL-2
Contract Signing for SVC Hail &
Al-Jouf
(03-JUNE-2014)
Kick off Meeting
(24-JUN-2014)
Site Handover (SVC HAIL & AL
JOUF)
(26-JUN-2014)
TCC
SVC Hail & Al-Jouf
(02-JUN-2016)
PAC
SVC Hail & Al-Jouf
(02-AUG-2016)
FAC
SVC Hail & Al-Jouf
(2-NOV-2016)
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
Jul-15
Aug-15
Sep-15
Oct-15
Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Apr-16
May-16
Jun-16
Jul-16
Aug-16
Sep-16
Oct-16
Nov-16
Dec-16
SVS set up
2x SVC PLUS
2x TSC
32kV
380 kV
15% at 450 MVA +/-5%
Q at 32 kV (1.0 pu)
2 x (0+143.1 Mvar) cap 2 x (-75+81.9 Mvar)
Ik=63kA
SVC PLUSSVC PLUS
TSC TSC
Installation of +450MVAr (Capacitive) & -150MVAr (Indutive) 380kV SVC System
SVC CONNECTION DIAGRAM
SVC HAIL-2
PROJECT SIGN BOARD
• Contract Signing : June 03, 2014
• Kick off Meeting : June 24, 2014
• Site Handover : June 26, 2014
• TCC: June 02, 2016
• PAC: August 02, 2016
• FAC: November 02, 2016
SVC HAIL-2
CONTROL ROOM
Protection & Control System / SAS / Alarms / Metering (SIEMENS)
 Electrical:
Progress - Slow
Witnessing with CSD Engineer started from
19/03/2016 and in progress for
• SAS OLT – 100% completed
• SCADA Closed Loop Test: Start from 18/10/2016 – 55%
completed
• SAS SAT: In Progress - 90% completed
• Kirk interlocking interlock completed.
• Final Trip Test completed.
• Snag Clearance in Progress
• Post Energization Test (to be done after Energization of
SVC Transformer & 13.8kV Auxiliary System) : Need 14
Working Days to put SVC in service
SVC HAIL-2
SVC HAIL-2
HVAC & FPS
 Electro-Mechanical:
• Testing of Fire alarm & Fire fighting with
ISD completed.
• Fire Hydrant System testing with ISD
Completed.
• HVAC installation works – 100% completed
• Internal Air balancing testing works in
progress
• Testing works for HVAC panel control room
in progress
Dynamic & Static Reactive Power Compensator at Al Jouf-2, 380kV
Substation
Contractor Date of award TCC Handed Over Ex Energize date
SIEMENS 03.06.2014 02.06.2016 26.06.2014 15/10/2016
COMMISSIONING
STATUS
(98.5 % completed)
EQUIPMENT REMARKS
(Delivery status –
100 % completed)
EXPECTED BUILDING
READINESS
BUILDINGEXP. DELIVERYSUPPLIEREQUIPMENTS/N
Witnessing with CSD –
100% completed
OLT – 100% completed
CLT – % completed
Delivered and InstalledFoundations completedOutdoor Foundations30-12-2015SIEMENSSVC Equipment's1
Witnessing with CSD –
100% completed
Delivered and InstalledFoundations completedTransformer Foundation15-12-2015SIEMENS450MVA Power Transformer's2
Witnessing with CSD –
99% completed
Delivered and Installed
Building and foundation are
ready
Control Building15-12-2015
ALFANAR, KSA &
SIEMENS
13.8kV Switchgear & RMU3
Witnessing with CSD –
100% completed
Delivered and InstalledFoundation readyTransformer Foundation15-02-2016UTEC, KSA
Auxiliary Transformer /
Grounding Transformer
4
Witnessing with CSD –
100% completed
Delivered and Installed
Building ReadyControl Building
15-01-2016TBDProtection System5
Witnessing with CSD –
100% completed
Delivered and Installed15-12-2015
HEPOCKEE &
BENNING
Battery & Battery Charger6
Witnessing with CSD –
100% completed
Delivered and Installed30-12-2015TBDAC / DC Panel7
HV Cable termination
completed
Delivered and InstalledSteel structure installed
Trench and duct bank
ready
25-10-2015TBD & LS Cable
Steel Structures, Cables and Earthing
Materials
8
THANK YOU ……

Weitere ähnliche Inhalte

Was ist angesagt?

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEERnader rizq
 
INPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRPINPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRPD. Alan Day
 
Ka Brodmeeting 110509
Ka  Brodmeeting 110509Ka  Brodmeeting 110509
Ka Brodmeeting 110509Timmy Tng
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen Barkwitch
 
Alliance Implementation on HKD 2017
Alliance Implementation on HKD 2017Alliance Implementation on HKD 2017
Alliance Implementation on HKD 2017Arshaful Hoque
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6MUHAMMAD SALEEM
 
Fall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryFall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryAsh Abel
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016Ekp Reddy
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Abdul Alim Dewan
 
Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Apolinario Fontiveros
 
Booster Pump cause of delay analysis
Booster Pump cause of delay analysisBooster Pump cause of delay analysis
Booster Pump cause of delay analysisAllan Leyte
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Contractors Performance Scoreboard_DECEMBER 2015
Contractors Performance Scoreboard_DECEMBER 2015Contractors Performance Scoreboard_DECEMBER 2015
Contractors Performance Scoreboard_DECEMBER 2015Pete Cabrera
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Rahman
 

Was ist angesagt? (19)

QA-QC ENGINEER
QA-QC ENGINEERQA-QC ENGINEER
QA-QC ENGINEER
 
INPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRPINPO Presentation - Sequoyah SGRP
INPO Presentation - Sequoyah SGRP
 
Ka Brodmeeting 110509
Ka  Brodmeeting 110509Ka  Brodmeeting 110509
Ka Brodmeeting 110509
 
Stephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioningStephen_Anthony_Barkwitch_CV_-commissioning
Stephen_Anthony_Barkwitch_CV_-commissioning
 
Alliance Implementation on HKD 2017
Alliance Implementation on HKD 2017Alliance Implementation on HKD 2017
Alliance Implementation on HKD 2017
 
QGC
QGCQGC
QGC
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
Fall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation SummaryFall 2014 Co-op Rotation Summary
Fall 2014 Co-op Rotation Summary
 
E&I QC ENGINEER
E&I QC ENGINEERE&I QC ENGINEER
E&I QC ENGINEER
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
 
Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017Resume -Abdul Alim Dewan -2017
Resume -Abdul Alim Dewan -2017
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-Fontiveros CV 2016 Instrument Technician-
Fontiveros CV 2016 Instrument Technician-
 
CV JHN 2015
CV JHN 2015CV JHN 2015
CV JHN 2015
 
Booster Pump cause of delay analysis
Booster Pump cause of delay analysisBooster Pump cause of delay analysis
Booster Pump cause of delay analysis
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
Contractors Performance Scoreboard_DECEMBER 2015
Contractors Performance Scoreboard_DECEMBER 2015Contractors Performance Scoreboard_DECEMBER 2015
Contractors Performance Scoreboard_DECEMBER 2015
 
Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017Mahfuzur Fire & Gas Tech CV -2017
Mahfuzur Fire & Gas Tech CV -2017
 
10 Common Hazardous Waste Violations
10 Common Hazardous Waste Violations10 Common Hazardous Waste Violations
10 Common Hazardous Waste Violations
 

Andere mochten auch

Los valores, una forma de trabajar
Los valores, una forma de trabajarLos valores, una forma de trabajar
Los valores, una forma de trabajarStraTgia
 
Sanoma, lianne beelen travel next borrel mens & machine de commercie
Sanoma, lianne beelen travel next borrel   mens & machine de commercieSanoma, lianne beelen travel next borrel   mens & machine de commercie
Sanoma, lianne beelen travel next borrel mens & machine de commercieLobke Elbers
 
Social Media & Disaster events
Social Media & Disaster events Social Media & Disaster events
Social Media & Disaster events Nondas Syrrakos
 
달천달천
달천달천달천달천
달천달천kimdalyo
 
Three simple ways you can improve any business with IBM Connections
Three simple ways you can improve any business with IBM ConnectionsThree simple ways you can improve any business with IBM Connections
Three simple ways you can improve any business with IBM ConnectionsLetsConnect
 
Mdma humor chick_parody1
Mdma humor chick_parody1Mdma humor chick_parody1
Mdma humor chick_parody1lab13unisa
 
Slide 15 11 13 fiera dell'innovazione_riv
Slide 15 11 13 fiera dell'innovazione_rivSlide 15 11 13 fiera dell'innovazione_riv
Slide 15 11 13 fiera dell'innovazione_rivApulian ICT Living Labs
 
Larsen Mfg. Brochure 2015
Larsen Mfg. Brochure 2015Larsen Mfg. Brochure 2015
Larsen Mfg. Brochure 2015David Larsen
 
Los objetivos, la claridad de tu visión
Los objetivos, la claridad de tu visiónLos objetivos, la claridad de tu visión
Los objetivos, la claridad de tu visiónStraTgia
 
PLC based control system
PLC based control systemPLC based control system
PLC based control systemdonga rahul
 
Costruire il proprio profilo su linkedIN (ITALIANO)
Costruire il proprio profilo su linkedIN (ITALIANO)Costruire il proprio profilo su linkedIN (ITALIANO)
Costruire il proprio profilo su linkedIN (ITALIANO)Andrea Cattaneo
 
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/GeoDivya Sharma
 
Scrivere Contenuti SEO driven
Scrivere Contenuti SEO drivenScrivere Contenuti SEO driven
Scrivere Contenuti SEO drivenLeonardo Bellini
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCInfotrex Services Pvt. Ltd.
 
Cheez Doodles Advertising Campaign Book
Cheez Doodles Advertising Campaign BookCheez Doodles Advertising Campaign Book
Cheez Doodles Advertising Campaign BookJillian Koehnken
 
environmental control of poultry farms PLC based project report
environmental control of poultry farms PLC based project reportenvironmental control of poultry farms PLC based project report
environmental control of poultry farms PLC based project reportAhsan Naeem Chaudary
 
Diseño Instruccional Y Tic Basado En Blo Gs
Diseño Instruccional Y Tic Basado En Blo GsDiseño Instruccional Y Tic Basado En Blo Gs
Diseño Instruccional Y Tic Basado En Blo Gsguestf5edca
 

Andere mochten auch (20)

Los valores, una forma de trabajar
Los valores, una forma de trabajarLos valores, una forma de trabajar
Los valores, una forma de trabajar
 
Sanoma, lianne beelen travel next borrel mens & machine de commercie
Sanoma, lianne beelen travel next borrel   mens & machine de commercieSanoma, lianne beelen travel next borrel   mens & machine de commercie
Sanoma, lianne beelen travel next borrel mens & machine de commercie
 
Social Media & Disaster events
Social Media & Disaster events Social Media & Disaster events
Social Media & Disaster events
 
달천달천
달천달천달천달천
달천달천
 
Authored items
Authored itemsAuthored items
Authored items
 
Three simple ways you can improve any business with IBM Connections
Three simple ways you can improve any business with IBM ConnectionsThree simple ways you can improve any business with IBM Connections
Three simple ways you can improve any business with IBM Connections
 
Mdma humor chick_parody1
Mdma humor chick_parody1Mdma humor chick_parody1
Mdma humor chick_parody1
 
Slide 15 11 13 fiera dell'innovazione_riv
Slide 15 11 13 fiera dell'innovazione_rivSlide 15 11 13 fiera dell'innovazione_riv
Slide 15 11 13 fiera dell'innovazione_riv
 
Larsen Mfg. Brochure 2015
Larsen Mfg. Brochure 2015Larsen Mfg. Brochure 2015
Larsen Mfg. Brochure 2015
 
Los objetivos, la claridad de tu visión
Los objetivos, la claridad de tu visiónLos objetivos, la claridad de tu visión
Los objetivos, la claridad de tu visión
 
PLC based control system
PLC based control systemPLC based control system
PLC based control system
 
Costruire il proprio profilo su linkedIN (ITALIANO)
Costruire il proprio profilo su linkedIN (ITALIANO)Costruire il proprio profilo su linkedIN (ITALIANO)
Costruire il proprio profilo su linkedIN (ITALIANO)
 
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo
3.4. soil systempptx Ajay Sharma IB DP/IGCSE ESS/Geo
 
Scrivere Contenuti SEO driven
Scrivere Contenuti SEO drivenScrivere Contenuti SEO driven
Scrivere Contenuti SEO driven
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMC
 
Cheez Doodles Advertising Campaign Book
Cheez Doodles Advertising Campaign BookCheez Doodles Advertising Campaign Book
Cheez Doodles Advertising Campaign Book
 
environmental control of poultry farms PLC based project report
environmental control of poultry farms PLC based project reportenvironmental control of poultry farms PLC based project report
environmental control of poultry farms PLC based project report
 
Diseño Instruccional Y Tic Basado En Blo Gs
Diseño Instruccional Y Tic Basado En Blo GsDiseño Instruccional Y Tic Basado En Blo Gs
Diseño Instruccional Y Tic Basado En Blo Gs
 
Vermicompost
VermicompostVermicompost
Vermicompost
 
updated CV Yacoub
updated CV Yacoubupdated CV Yacoub
updated CV Yacoub
 

Ähnlich wie Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... dated 26.10.2016

Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...ATIF HUSSAIN
 
Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Allan Leyte
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Sarthak Panigrahi
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25Tofik Nazirov, B.Sc., PhD
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016dil mus
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
BMR_July_Operations
BMR_July_OperationsBMR_July_Operations
BMR_July_OperationsMehul Shah
 

Ähnlich wie Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... dated 26.10.2016 (20)

Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016Bissa Upgrade weekly report 09May2016
Bissa Upgrade weekly report 09May2016
 
Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Presentation 95
Presentation 95Presentation 95
Presentation 95
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Satham Mohamed.A-CV..
Satham Mohamed.A-CV..Satham Mohamed.A-CV..
Satham Mohamed.A-CV..
 
WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25WO5A CS1A Construction Progress Status Report Week #25
WO5A CS1A Construction Progress Status Report Week #25
 
Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016Mushtaq Electrical_ENGINEER 2016
Mushtaq Electrical_ENGINEER 2016
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
PM Ahmed Abdelhady CV
PM Ahmed Abdelhady CVPM Ahmed Abdelhady CV
PM Ahmed Abdelhady CV
 
Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011Monthly Progress Report No.13 - September 2011
Monthly Progress Report No.13 - September 2011
 
BMR_July_Operations
BMR_July_OperationsBMR_July_Operations
BMR_July_Operations
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
WORKING PORTFOLIO - 01
WORKING PORTFOLIO - 01WORKING PORTFOLIO - 01
WORKING PORTFOLIO - 01
 
Project Quality control Progress .pptx
Project Quality control  Progress .pptxProject Quality control  Progress .pptx
Project Quality control Progress .pptx
 
Ahmed Fahmy_CV
Ahmed Fahmy_CVAhmed Fahmy_CV
Ahmed Fahmy_CV
 
Juliet Joseph
Juliet JosephJuliet Joseph
Juliet Joseph
 

Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... dated 26.10.2016

  • 2. Weekly Progress Report # 70 SVC HAIL-2 PREPARED BY: 2016 AJAZ UL KABIR Project Manager- Qassim Group SEC ‐ EHVPD , COA , SVC Hail-2 Mobile : 054 112 2637 , Email : absheikh@se.com.sa REVIEWED BY: ABDULRAHMAN AL-KADI Group Leader- Qassim Extra High Voltage Projects Department- COA Mobile : 050 489 6906 , Email : EVPRC-QPGL@se.com.sa 26 October Dynamic Reactive Power Compensation at Hail-2 (9031) & Al-Jouf-2 380kV Substations SEC CONTRACT NO. 4400003963/00
  • 3. AIM/ OBJECTIVE: CONTRACT DETAILS: SEC intends to improve rapid voltage support at Hail-2 (9031) and Al-Jouf-2 380kV Substations of SEC network by providing Conventional or Hybrid Static VAR Compensator Systems (SVC). The SVCs at Hail-2 (9031) shall be connected to spare 380kV Breaker. CB position for SVC at Al-Jouf-2 .380kV Substation will be provided by Al-Jouf-2 380kV Substation Contractor. • Project Name ……………………….. DYNAMIC REACTIVE POWER COMPENSATION AT HAIL-2 (9031) & AL-JOUF-2 380KV SUBSTATIONS • Contract No ………………………… 4400003963/00 • Owner ………………………………. SAUDI ELECTRIC COMPANY - COA • SEC Project Manager ……………… ENGR. AJAZ UL KABIR • Contractor ………………………...... SIEMENS LTD. • Address ……………………………... SIEMENS COMPANY LIMITED, P.O.BOX 9510, RIYADH 11423, KSA • Contractor Project Manager ………. ENGR. REHAN ULHAQUE • Contract Effective Date ……………. 03-JUNE-2014 • Contract Value ……………………... SAR 463,840,000.00 PROJECT DESCRIPTION & CONTRACT INFO SVC HAIL-2
  • 4. • Technical Completion Certificate (TCC) : 02-JUNE-2016 • Preliminary Acceptance Certificate (PAC) : 02-AUGUST-2016 • Final Acceptance Certificate (FAC) : 02-NOVEMBER-2016 TIME LINE SVC HAIL-2 Contract Signing for SVC Hail & Al-Jouf (03-JUNE-2014) Kick off Meeting (24-JUN-2014) Site Handover (SVC HAIL & AL JOUF) (26-JUN-2014) TCC SVC Hail & Al-Jouf (02-JUN-2016) PAC SVC Hail & Al-Jouf (02-AUG-2016) FAC SVC Hail & Al-Jouf (2-NOV-2016) Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16
  • 5. SVS set up 2x SVC PLUS 2x TSC 32kV 380 kV 15% at 450 MVA +/-5% Q at 32 kV (1.0 pu) 2 x (0+143.1 Mvar) cap 2 x (-75+81.9 Mvar) Ik=63kA SVC PLUSSVC PLUS TSC TSC Installation of +450MVAr (Capacitive) & -150MVAr (Indutive) 380kV SVC System SVC CONNECTION DIAGRAM SVC HAIL-2
  • 6. PROJECT SIGN BOARD • Contract Signing : June 03, 2014 • Kick off Meeting : June 24, 2014 • Site Handover : June 26, 2014 • TCC: June 02, 2016 • PAC: August 02, 2016 • FAC: November 02, 2016 SVC HAIL-2
  • 7. CONTROL ROOM Protection & Control System / SAS / Alarms / Metering (SIEMENS)  Electrical: Progress - Slow Witnessing with CSD Engineer started from 19/03/2016 and in progress for • SAS OLT – 100% completed • SCADA Closed Loop Test: Start from 18/10/2016 – 55% completed • SAS SAT: In Progress - 90% completed • Kirk interlocking interlock completed. • Final Trip Test completed. • Snag Clearance in Progress • Post Energization Test (to be done after Energization of SVC Transformer & 13.8kV Auxiliary System) : Need 14 Working Days to put SVC in service SVC HAIL-2
  • 8. SVC HAIL-2 HVAC & FPS  Electro-Mechanical: • Testing of Fire alarm & Fire fighting with ISD completed. • Fire Hydrant System testing with ISD Completed. • HVAC installation works – 100% completed • Internal Air balancing testing works in progress • Testing works for HVAC panel control room in progress
  • 9. Dynamic & Static Reactive Power Compensator at Al Jouf-2, 380kV Substation Contractor Date of award TCC Handed Over Ex Energize date SIEMENS 03.06.2014 02.06.2016 26.06.2014 15/10/2016 COMMISSIONING STATUS (98.5 % completed) EQUIPMENT REMARKS (Delivery status – 100 % completed) EXPECTED BUILDING READINESS BUILDINGEXP. DELIVERYSUPPLIEREQUIPMENTS/N Witnessing with CSD – 100% completed OLT – 100% completed CLT – % completed Delivered and InstalledFoundations completedOutdoor Foundations30-12-2015SIEMENSSVC Equipment's1 Witnessing with CSD – 100% completed Delivered and InstalledFoundations completedTransformer Foundation15-12-2015SIEMENS450MVA Power Transformer's2 Witnessing with CSD – 99% completed Delivered and Installed Building and foundation are ready Control Building15-12-2015 ALFANAR, KSA & SIEMENS 13.8kV Switchgear & RMU3 Witnessing with CSD – 100% completed Delivered and InstalledFoundation readyTransformer Foundation15-02-2016UTEC, KSA Auxiliary Transformer / Grounding Transformer 4 Witnessing with CSD – 100% completed Delivered and Installed Building ReadyControl Building 15-01-2016TBDProtection System5 Witnessing with CSD – 100% completed Delivered and Installed15-12-2015 HEPOCKEE & BENNING Battery & Battery Charger6 Witnessing with CSD – 100% completed Delivered and Installed30-12-2015TBDAC / DC Panel7 HV Cable termination completed Delivered and InstalledSteel structure installed Trench and duct bank ready 25-10-2015TBD & LS Cable Steel Structures, Cables and Earthing Materials 8