1. NAME : ARUSHINI PADAYACHEE
IDENTITY No. : 8009010142084
COUNTRYOF BIRTH : SOUTH AFRICA
CITIZENSHIP : SOUTH AFRICAN
DRIVER’S LICENCE : YES – CODE 08
GENDER : FEMALE
CURRENT CO. : SiVEST CONSULTING ENGINEERS
CURRENT POSITION : CIVIL DESIGN TECHNOLOGIST
QUALIFICATION : BACHELOR OF TECHNOLOGY – CIVIL ENGINEERING
COMPANY: SiVEST CONSULTING ENGINEERS
DATE: JUNE 2013 - CURRENT
DESIGNATION: ENGINEERINGDESIGN TECHNOLOGIST
DEPARTMENT: CIVILS- INFRASTRUCTURE
JOB DESCRIPTION: To supportthe civil engineeringdepartmentonprojectsthroughdesign,drafting,co-
ordination,constructionsupervision,contractdocumentationandtenderdocumentation.
JOB ROLE: My jobrole isto carry out tasks indesign,drafting,administration,resource management,
constructionmanagementandfinance.
- Design: to obtainrelevantinformationfrommunicipalities,client,architects,surveyors
whichwill allowtoundertake anengineeringdesign. Adhere toMunicipal guidelines.
Carry out designsusingcomputeraided designsoftware,crosscheckingdesignsusing
formulae.
- Drafting : To produce readable drawingstobe usedforconstructionof works,issue
revisionsandcorrectionstodrawingsand prepare AsBuiltdrawings.
- Administration: To prepare detailedBillsof Quantities, performall quantity
calculationsforBillsof Quantities, Tenderdocumentation,tenderadjudicationand
contract documentation andWayleave Applications,completioncertificates.
- Resource Management: to co-ordinate meetings,tocompile correspondence,to
attendprogressmeetings,toattendsite meetingsandattendtosite queries.
- ConstructionManagement : To performsite inspections,monitoringandsupervision,
to tendto site queries.
- Finance : To provide professional feeallocationsasperECSA guidelines,tomonitor
budgetaryconstraintsonprojects,checkcontractorsclaimcertificatesforpayment,
verifyquantities,prepare PaymentCertificatesforClienttopaycontractor.
PROJECTS: (Projectslistedfromcurrent /latest)
BIOTHERM PV PANELS – STORMWATER MANAGEMENTPLAN REPORTS
THORNVALLEY ESTATE – STORMWATER RETICULATION UPGRADES
ASTRAL STORMWATER – Designand Construction (StandertonMP)
HAZELDEAN REGIONALMALL BULK SEWER – PreliminaryDesign(PretoriaGP)
HAZELDEAN LIFESTYLE ESTATE – Preliminarydesign(PretoriaGP)
ARCADIA EXTERNAL CIVIL UPGRADES – Designand construction (Pretoria,GP)
2. MAROELADAL THORNTREE DEVELOPMENT – Design and Construction(FOURWAYS,JHB)
CSIR – Roads and Stormwater Upgrades - Designand Construction (PRETORIA, GP)
TRANSNET PIPELINES – Link Sewer(BOKSBURG,JHB)
COLENSO COAL FIRED POWERSTATION - Feasibilitystudy& Costing(COLENSO,KZN)
FERNRIVER ESTATE SEWER RE-LOCATION – Designand Construction(RANDBURG,JHB)
MASSINGIRSUGARFACTORY – Tenderdesign(MOZAMBIQUE)
BLOEMHOF INDUSTRIAL PARK – FeasibilityStudy& Costing (BLOEMHOF, NW )
RAPIDWALL – FOSKOR FACTORY – Feasibilitystudyand Cost estimate (RICHARDS BAY,KZN)
GA - RANKUWAFLOOD RISK ASSESSMENT – (PRETORIA)
My dutiesandresponsibilitiesforeachof the above projectsisas follows,respectively.
1. BIOTHERM PHOTOVALTAICPANELS –STORMWATER MANAGEMENT REPORTS (FOREIA SUBMISSION)
These reportswere completedaspartof an Environmental ImpactAssessmentReport.The reports
outlinedthree differentsite options andthe stormwatermanagementforeachsite.
- Preparingandcompiling areportfor eachsite optionwhichincludedsite options,existingsite
characteristics,historical rainfall andtemperature data,surface hydrology,site topographyandpre-
developmentandpost-developmentsurface runoff calculations andthe proposedsite drainageoptions.
- Stormwaterhydrologyrunoff calculationsforpre andpost developmentreturnperiods. (Determiningthe
catchmentarea,10-85 slope,lengthof watercourse,decidingoncharacteristicsforrunoff co-efficientsfor
the stormwaterrunoff calculations.Stormwaterhydrologyrunoffcalculationsusingthe EmpiricalMethod,
KerbyMethod& the StandardDesignFloodMethod)
- Preparingthe Autocaddrawingstoshow the pre-developmentstormwatercharacteristicsandthe
proposed postdevelopmentmanagementof the stormwateronthe site.
2. THORNVALLEYESTATE – STORMWATER UPGRADES
Thisaim of thisprojectwas to provide stormwaterreticulationtoassistwithfloodingwithinthe estate.
An undergroundtankanda reticulatedstormwatersystemwasdesigned,whichdischargedintoanexisting
earthchannel.Due to the developmentdischargingintothischannel,the channel wasupgradedinsize to
suit.
- Determiningthe catchmentarea,10-85 slope,lengthof watercourse, decidingon characteristicsforrunoff
co-efficients forthe stormwaterrunoff calculations.
- Stormwaterhydrologyrunoff calculationsusingthe Emirical Method,KerbyMethod&the StandardDesign
FloodMethod
- ElectronichydraulicdesignusingTechnoCAD- pipemate aspermunicipal requirements
- Preparingdrawingsforconstructionpurposes
- Preparingandsubmitting designdrawingstolocal authoritiesforapproval
- Preparingthe Bill of Quantitiesforcontractorstoprice for construction
3. ASTRALSTORMWATER CHANNEL
Thisprojectwas to designastormwaterchannel todirectthe runoff awayfroman existingindustrial
development.The discharge fromanexistingstormwaterpipe fromthe industrialdevelopmentwas
seepingintothe adjacentparkingarealayerworks.Thuscausing the layerworksandpavingtofail.
Summaryof workcompleted:
- I calculatedand analysedthe hydrauliccomponentsof the earthchannel toensure the channels
functionalityusingthe Manningsformula.
- generatingalongsectionshowinginvertlevelswasproducedusing Technocad pipemate.
- PreparingconstructiondrawingsusingAutoCAD,whichincludesaLayoutplan,sectionsanddetailsand
longsections.
4. ARCADIA ERF414 – EXTERNALCIVILUPGRADES
Thisprojectis fora newdevelopmentadjacenttothe LoftusVersveldStadium.Due tothe size of the new
developmentanditscivil requirements,the existingcivil infrastructurerequiredupgrading.
3. The Stormwater,SewerandWaterreticulationwasupgraded.Iwasresponsible forthe designof the sewer
reticulation.
Summaryof workcompleted:
- Calculatingthe sewerinflow fromthe new developmenttobe addedtothe network as perthe municipal
requirements.
- Generatingthe longsectionusingthe designprogramPipemate
- Analysingthe hydrauliccomponentsandadjustinginputdatatomeetthe designrequirements.
- Crosscheckingthe longsectiondatawithaspreadsheetof calculationsincludingthe Colebrook-Whiteand
Manningsformula.
- PreparingconstructiondrawingsusingAutoCad,whichincludesaLayoutplan,sectionsanddetailsand
longsections.
5. HAZELDEAN REGIONAL MALL (BULK SEWER)
Thisprojectis fora mall andoffice parkdevelopmentinPretoria,Gauteng.Iwas responsible forthe design
of the sewer.
- I calculatedthe proposedsewage inflow foreach erf /propertywithin the extentof the new development
usingthe municipal guidelines.InAutoCAD,Idrew inthe horizontal alignmentforthe proposedroute of
the newbulksewerline. Usingpipemate,Iwasthenable to analyse the sewerlineand prepare
longsectionsof the bulkline.
6. HAZELDEAN LIFESTYLE ESTATE (Preliminary)
The projectconsistsof luxuryhouseswithinanestate.Sivestisappointedasthe consultingengineersto
designthe civil servicesandprovide constructionsupervisionandcontractual administration.Atpresent
thisprojectisstill inthe preliminaryandplanningstage.
Summaryof workcompleted:
- Usingthe Architectslayouttocreate the horizontal layoutof the roadnetworkwithinthe estate.
- UsingAutoturnto determine the turningmovementof vehiclestoensure adequate roadwidths,turning
circlesandbellmouths.
- Sewer:Calculatingthe sewerinflowforthe developmentusingthe Annual Average DryWeatherFlow
(AADWF) asper the Tshwane Guidleinesandthe PeakDailyDryWeatherFlow (PDDWF) usingthe Gross
Lettable Area.
- Draftingand positioningthe sewerreticulationasthe general arrangement of sewerreticulation.
- Calculatingthe cumulativeinflowswithinthe developmenttodetermine the pipe sizes.
7. MAROELADAL – THORNTREE DEVELOPMENT (phase 2)
Thisprojectwas a residentialdevelopmentforSable Homesdevelopers.Sivestwasappointedasthe
consultingcivil engineerstodesign civil servicesandprovideconstructionsupervision. Priortothis,the
firstphase of the developmentwasdesignedandconstructedsuccessfully.DuringJune 2014, SiVESTwas
officiallyappointedtocontinue withthe secondphaseof the development.The projectconstructioncost –
R3.8 million
Summaryof duties:
- Designbulkearthworkplatforms,roads,sewerreticulation,stormwaterreticulationandwater
reticulation. Iusedexistingas-builtinformationfromathe previousworkstotie-inthe newlydesigned
civil infrastructure inthe designandconstructiondrawings. IusedPipemate,Roadmate andSurfmate
to designthe civil services.
- Spreadsheetcalculationsforthe sewerpipe todetermine the hydraulicproperties of the systemto
adhere tomunicipal guidelines.
- Produce constructiondrawings,thatislayouts,longsections,sectionsanddetailsandtypical municipal
details.
- PreparingadetailedBill of Quantities.
- Calculatingthe quantitiesforBOQfortender phase.
- Site supervisionduringconstruction
4. - Site inspectionsduringconstruction
- Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters.
- Attendingprogressmeetingswiththe variousotherdisciplines.
- Verifyingcontractorsclaimcertificate.
- Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis.
- Performingsite inspectionspriortothe backfillingof pipe trenches.
- Monitoringworkon site
- Assistingwithcontractor’squeries
- Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant
utilities
- Inspectsite inorderto prepare a snag listforcontractor.
- Inspectingworkdone aftersnaggingiscompleted.
(Otherprojectsinvolvedin, relatingtoasimilarscope are LoftusPark BulkSewer,thisprojectwasrecently
submittedtocouncil forapproval.Iperformedall the designcalculationsandproducingapprovaldrawings
to be submittedtothe council)
8. CSIR – Roads andStormwaterUpgrades
Thisprojectwas forthe CSIRin Pretoria.The CSIRrequiredaRoadsand Stormwaterupgrade tobe done for
one of theirbuildings.Sivestwasappointedasthe consultingengineerstodesignandprovide construction
supervision.The projectconstructioncost –R1.0 million
Summaryof duties:
- Designa pavedaccessroad and surface stormwaterreticulation.IusedRoadmate torunthe longsection
of the road.
- Designthe road layerworksasperthe Guidelinesforthe Provisionof EngineeringServicesinResidential
Townships.(foran8 ton truck)
- Providingasolutionforpondingwateraroundthe site.Detailingthe drainage solutioninaconstruction
drawingusingAutoCAD.Providingsectionsanddetailsforconstruction.
- Produce constructiondrawings,thatislayouts,longsectionsandsectionsanddetails.
- PreparingadetailedBill of Quantities.
- Calculatingthe quantitiesforBOQfortenderphase.
- Site supervisionduringconstruction
- Site inspectionsduringconstruction
- Attendingprogressmeetingswiththe various otherdisciplines.
- Verifyingcontractorsclaimcertificate.
- Confirmingthe contractorsPaymentCertificate forthe clientona monthlybasis.
- Performingsite inspectionspriortothe backfillingof pipe trenches.
- Monitoringworkon site
- Assistingwithcontractor’squeries
- Prepare andsubmitAs-builtdrawings,breakdowncostsandcompletioncertificatestothe relevant
utilities
- Inspectsite inorderto prepare a snag listforcontractor.
- Inspectingworkdone aftersnaggingiscompleted.
- Attendingprogress meetingswiththe variousotherdisciplines.
9. TransnetPipeline Depot
5. Thisprojectwas forTransnetPipelines.Aspartof a National upgrade forthe TransnetPipeline depots,
Sivestwasappointedtoprovide aconsultingservice withregardstoStructural andCivil works.
The works includedanewguardhouse,new electricfencingalongthe perimeterof the depotyard,
additional parkingareasandgeneral civil worksaroundthe depot.The depotusedaseptictanksystemto
discharge of waste butwas requiredtoremove the tankandinstall a new outfall sewerline.
TransnetPipeline requiresanewoutfall sewerforthe depotbasedinBartlett,Boksburg.Thisareais
currentlymanagedbythe Ekurhuleni MetropolitanMunicipality.Iwasgiventhe responsibilityof
undertakingthisprojectsrequirements.
Summaryof duties:
- Site investigationtoassessexistinginfrastructure.
- Surveyingof site,creatingadigital terrainmodelforuse inthe design.
- Creatingan excel spreadsheetto calculate the full flow velocities,discharge andpipe diameter,using
the invertlevel difference betweenmanholes,lengthsbetweenmanholes,the roughnesscoefficient
and slope.
- Run the SewerlongsectionusingPipemate.
- Prepare AutoCADdrawingstosubmitforapproval tothe relevantmunicipality.
- Submissionof ‘Wayleave’application.
- Prepare a detailedBillof Quantities
- Attendprogressmeetingsforthe project.
- Weeklyvisitstoprovide the contractorwithassistance onsite.
- Monitorwork on site andprovide updatesto client.
10. Ga – RANKUWA FLOOD RISKASSESSMENT
Thisprojectwas forEskom Holdings,whoproposedan11kV powerlinefromthe Ga – RankuwaSubstation
inthe townof Ga - Rankuwa.The proposedpowerline wouldcrossthe SandRiveranda hydrological
assessmentof the contributingcatchmentwasrequired.
I was alsoresponsible forcompletingthe reporttodescribe how the analysiswasperformedtodetermine
if the projectwill be affectedbyaflood.The reportgave detail of where informationwastakenfrom,which
programswere usedforthe analysis,the outcome of the analysisandfinallythe recommendations.I
drafteda layoutdrawinginAutoCADtosupportour findingsinthe analysis.
11. RAPIDWALL– FOSKOR
Thisprojectwas fora companyinAustraliathatwantedto utilise awaste productfroma companyin
RichardsBay. The scope of the projectwasto builda factoryfor the Australiancompany,Rapidwall.
The projectwas made up of two independentsites,forthe twoindependentcompanies.Foskorrequireda
factoryof theirownand Rapidwall requiredtheirownfactory.ForRapidwall’sprocesses,Rapidwallwould
transportthe productfromFoskor.Thisproduct formFoskoris a waste productthat Rapidwall requiredfor
theirprocesses.
SiVESTwasappointedasthe Civil engineersonthisprojecttoprovide the engineeringservices(civil,
structural,electrical andmechanical).The aimof the project wasto produce a highlevel costestimate for
the constructionof civil relevantservicesrequired.
Summaryof duties:
- Site investigationtoassessexistinginfrastructure.
6. - DesignBulkEarthworksplatforms.
- Designinternal road,usingAutoturn.
- Prepare AutoCADdrawings.
- Calculate all quantities.
- Prepare a detailedBillof Quantities
- Attendprogressmeetingsforthe project.
12. BLOEMHOF INDUSTRIAL PARK
Thiswas a projectdone inthe North – West province,foradevelopmentcompany.The companyrequired
the engineeringservicesforafeasibilitystudybeingdone foranew Industrial Parkinthe townof
Bloemhof.Alongwithapreliminarydesignof civilinfrastructure services,ahighlevel costestimate was
required.The engineeringservicestobe renderedwastoprovide aServicesReportforthe proposed
Industrial Park.The servicesreportcoveredthe internal andexternal servicesforthe IndustrialPark.
My role wasto produce a conceptual designof the office parkonAutoCADdrawinglayouts,produce the
cost estimate asa Bill of Quantitiesandproduce the ServicesReports.
I prepareda Bill of Quantities,inwhichIquantifiedearthworks,roads,sanitation,watersupplyandstorm
water.I thencalculatedall quantitiesforthe above servicesinthe formof a Bill of Quantities,inwhichI
appliedrates fromourinternal database.
I preparedthe ServicesReport, inwhichall relative aspectsandservicesrequired,were discussed.
13. MASSINGIRSUGAR FACTORY
Thisprojectwas done forthe constructionof a sugarfactory inMozambique.The engineeringservicesto
be provided forwasStorm waterdrainage,Sanitation, watersupply.
Summaryof duties:
- Co-ordinate surveydrawingsforthe use inAutoCADdrawings
- Draft proposal forcivil services (stormwater,sewer,waterandroads)
- Designanddetail bulkearthworksplatforms
- Designthe road layerworks asperthe Guidelinesforthe Provisionof EngineeringServicesin
Residential Townships.
- Prepare drawingsincludingsectionsanddetails
- Prepare Billsof Quantities
- Calculationof the PeakStormwaterRunoff asperthe Drainage Manual and the ModifiedHershfield
Formula(due tothe small catchmentareas)
14. FERNRIVERESTATE – SEWER RE-LOCATION
Thisprojectwas fora residential complex inRandburg,Johannesburg.The existingsewerline requiredto
be relocateddue toconstruction purposes.Myresponsibilitywastoprepare the designfor the re-location
of the sewer.
Summaryof duties:
7. - Prepare AutoCADdrawingsfordesignpurposes,usingsurveydrawings,architecturallayoutsand
images.
- Designthe sewerpipe usingPipemate.
- SubmittingdrawingstoMunicipalityfordesignapproval.
- Draftingconstructiondrawingsforthe contractor.
- Site monitoringduringconstruction
- Site inspectionsduringconstruction
- Preparingthe AsBuiltdrawingsforJohannesburgWatersubmission,toobtainaclearance letters.
15. COLENSO– COALFIRED POWERSTATION
Thisprojectis basedinColenso,Kwa-ZuluNatal.The projectconsistsof anew Mine and a new Power
Station.The engineeringservicestobe providedwasforthe designof civil infrastructure,forWatersupply,
Sewerand Effluentdisposal,WatersupplyandRoadaccess.Requirementsforthisprojectwastoproduce
drawinglayouts,costestimates(Bill of Quantities) andanengineeringreporttosubmitforan
Environmental ImpactAssessmentstudy.
Thisprojectis still in the environmental stage,wherethree site alternativesare beingassessed.The
outcome of the EIA will be a suitable site fromthe three options.
Summaryof duties:
- Site investigationtodeterminepossiblecivil servicesroutespersite andassessexistinginfrastructure.
- PreparingaBill of Quantitiesschedule inexcel,foracost estimate,peroptionpersite.
- Preparingdrawingsrepresenting the possibleoptionspersite.
- Prepare a detailedengineeringreport, whichoutlinedall the possible options forall the required
services,persite,tobe usedinthe EIA process.
8. COMPANY: TRANSNET CAPITAL PROJECTS
PROVINCE: GAUTENG - JOHANNESBURG
DATE: FEBRUARY 2011 – JUNE 2013
DESIGNATION: ENGINEERINGTECHNICIAN
DEPARTMENT: CIVILS- WATER
JOB DESCRIPTION: Performcivil engineeringtasks ata highlevel of responsibility toproduce logical and
methodical yetfeasiblesolutions indesign developments andexecution toengineering
projects.
JOB ROLE: Preliminarydesignsforconceptual stage andproceedingtotender andconstructionstage
design. Utilisingcivilengineeringsoftware forassistanceindesigns.
PROJECTS: SOUTH DUNES LEASE SITES – FIRE WATER
RICHARDSBAY DEPOT – SEWER
CITY DEEP PAVING– STORMWATER DRAINAGEAND FIRE WATER
OGIES DIESEL ANDDEPOT – STORMWATER/SEWER DRAINAGEANDEFFLUENT DRAINAGE
ISLANDVIEW- PIPE RACKSANDFOAMMONITORS& POTABLE WATER
81 MILLION TONSPER ANNUMCOAL EXPORT
SUMMARYOF DUTIES ON PROJECTS:
- PreparingAutoCADdrawingsforconceptual design,tenderandconstructionphases.
- SANSdocumentsfordecisions,calculations, reference indrawings,specifications.
(RichardsBay DepotSewer,OgiesDiesel&Sand,IslandView –Potable Water)
- Attendingproject progress meetingswithotherdisciplines. (OgiesDiesel &Sand &
81MTPA Coal Export)
- Completingall drawingsforconstructionpurposesand forAs-Builtpurposes.
- CreatingmodelsinCivil Designerfromsite surveys,utilisingittogenerate longsections
and cross sectionsandutilisingthemtodetermine bestoptionforadesign. (CityDeep
Paving,OgiesDiesel &Sand,81MTPA Coal Export)
- Drainage – calculatinglevelsatsumps/manholesfordrainage systemtowork
correctlyand preparingdrawingstorepresentdrainagesystem.(CityDeepPaving,
OgiesDiesel &Sand)
- Drainage – designingsub-surface drainageandcalculatingandcheckingall levels
concerned.Providingall detailsrequiredforconstruction.(81MTPA Coal Export)
- Roads – designtar andgravel roads usingCivil Designer. (OgiesDiesel &Sand,81MTPA
Coal Export)
- Creatinga drawingmodel toutilise inCivil Designertodesignafire fightingsystem.
(IslandView –Potable Water)
- UtilisingEpaNETtodesigna Fire fightingsystem.Runningthe programforvariouspipe
sizesat variousinputpressurestoobtaindesiredpressure accordingtoSANS Building
codesand tabulatingresultsforadesigndecisiontorecommendtothe client.
Preparingall constructiondrawingsasperdesignrequirements.Calculatingand
preparingBill of Quantitiesforall items. (Durban:IslandView –Potable Water,
81MTPA Coal Export)
- Reinforcingonvariousdrainage structures,base slabsandcoverslabs. Reinforcing
accordingto specificationsof use of structure,detailingonAutoCADdrawings,utilising
shape codes,creatingbendingschedulesanddecidingonbestmethodof placingbar.
(OgiesDieselandSandDepot,CitydeepPaving,RichardsBayDepotSewer)
- Geometricdesignof accessroads.
9. COMPANY: ARQ CONSULTING ENGINEERS
PROVINCE: GAUTENG - PRETORIA
DATE: JUNE 2009 – FEBRUARY 2011
DESIGNATION: ENGINEERINGTECHNICIAN
DEPARTMENT: CIVIL
JOB DESCRIPTION: Performcivil engineeringtasksatan independentlevelof responsibilitytoproduce
drawingsfortender,construction& as-builtphases.
JOB ROLE: Provide assistance toseniorengineers.PreparingAutoCADdrawingsfortenderand
constructionphases.
PROJECTS:
- CHUNIESPOORTDAM, RSA
- CHANGUINOLA DAM& HEPP, PANAMA
(Dam fora 230Mw hydropowerscheme,witha?Mhighreinforced concrete damwall
US$400 million)
- BOSPOORTDAMREHABILITATION,RSA
(16m highearthdam, witha new reinforcedconcrete spillway.)
- MOLEPO DAM REHABILITATION,RSA
(16m highearth dam, witha new reinforcedconcrete spillway. R90million)
SUMMARYOF DUTIES ON PROJECTS:
- Utilisedthe programSurfmate toassistthe seniorengineerwiththe designof the dam
wall onChuniespoortDam.
- Detailingreinforcingforvariousconcrete structures,preparingbendingschedulesand
preparingconstructiondrawings.
- UsingAutoCADfor preliminarydesignpurpose ie:determinepositionsof structures
(pumphouses,chambersetc.) andelevationswithrespecttoexistinggroundetc.
- CreatingsurveyDTM’s,generatingcrosssections,calculatingearthworkvolumes,
comparinginformationonlongsectionsfromsite surveydatatocheck construction
workwithprojectdesigninformationandrequirements.
- PreparingAutoCADdrawingstoprepare tender,constructionandAs-builtdrawings
- Providingsupportandansweringsitequeries.
10. COMPANY: AURECON CONSULTING ENGINEERS
PROVINCE: CAPE TOWN
DATE: MAY 2007 – JUNE 2009
DESIGNATION: JUNIORTECHNICIAN
DEPARTMENT: CIVIL- WATER
PROJECTS:
- SISHEN SOUTH PIPELINES& PUMPSTATIONS
- RUIGTEVLEI PUMPSTATIONS
- BREEDE VALLEY MUNICIPALITy - PROJECT: UPGRADE OF BOOSTERPUMPSTATIONS
- BITOU – BULK WATER SUPPLY – BITOU MUNICIPALITY
- DASBOSCHDAM
- BITOU- OFF CHANNELDAM
- NOORDAGTER PAARLPUMPSCHEME
SUMMARYOF DUTIES ON PROJECTS:
- Responsible fordraftingof tenderdrawingsandassistingwiththe preparationof Bills
of Quantities.
- Draftingdrawingswhichindicatedpipe workfittingsforthe Beeshoek - Pumpstation
and SishenPumpstation,RuigtevleiPumpstatio,Breede ValleyMunicipaltiy –Booster
Pumpstation.
- BitouMunipality –Off Channel Dam& DaschboschDam
- ElectronicDesignof DamWall.
- Electronicsettingupmodel of Dam.
- Calculationof DamWall Volume.
- CalculatingStorage capacities.
- Draftingof drawings.
11. COMPANY: STEMELE BOSCH & ASSOCIATES & PROJECT MANAGERS
PROVINCE: KWA-ZULUNATAL - DURBAN
DATE: MARCH 2003 – MARCH 2004
REJOINEDCOMPANYIN NOVEMBER2005 – MAY 2007
DESIGNATION: JUNIORTECHNICIAN
DEPARTMENT: CIVIL- WATER
PROJECTS:
- KWADEYI WATER SUPPLY PROJECT
- ASSISSIWATERSUPPLY PROJECT
- KWAMBOTHO WATER SUPPLY PROJECT
SUMMARYOF DUTIES ON PROJECTS:
- Producingengineeringspecificdrawingsfortender,constructionandAs-builtpurposes.
- Basicsof reticulationdesign(pipelinesandwatersupply) andwasina positiontolearn
fromthe Designengineersof projects.
- Drawingsincludedlayouts,detaildrawingsandutilisingcataloguestodraw pipe
fittings.