SlideShare ist ein Scribd-Unternehmen logo
1 von 33
INNOVATIVE APPROACHES TOWARDS URBAN
FLOOD MANAGEMENT
PRESENTED BY
APARNA A V
TCR19CEWR02
M2 WR & HI
1
GUIDED BY
PROF. SMITHA MOHAN K
PROFFESSOR
DEPARTMENT OF CIVIL
ENGINEERING
INTRODUCTION 2
URBAN FLOODING
• Inundation of land or property in a built environment.
• Occurs when rainfall overwhelming the capacity of
drainage systems.
• Creates Excessive runoff in developed areas.
• Urbanization leads to developed catchments therefore
flooding occurs very quickly.
URBAN FLOODING 3
MAJOR CAUSES OF URBAN FLOODING
• Meteorological Factor
• Hydrological Factors
• Human Factors
4
COMMON SOLUTIONS FOR URBAN FLOODING
• Create flood plains and overflow areas for rivers
• Separating rainwater from the sewer system
• Install water infiltration and attenuation systems
• Sustainable drainage: permeable pavement, sidewalks and gardens
• Green roofs/rooftop gardens
• Create sponge city.
5
SPONG CITY CONCEPT
• The Sponge City concept aims to
• (i) improve effective control of urban peak runoff, and to temporarily store, recycle and
purify stormwater;
• (ii) to upgrade the traditional drainage systems using more flood-resilient infrastructure
• (iii) to integrate natural water-bodies and encourage multi-functional objectives within
drainage design.
6
SUSTAINABLE URBAN DRAINAGE SYSTEMS (SUDS)
• The design of urban drainage mainly focuses on catching the excess runoff and lead it
out of the cities, according to sanitary and security precepts.
SUDS Management Train (CIRIA)
7
CASE STUDY: SUSTAINABLE RAINWATER UTILIZATION AND WATER
CIRCULATION MODEL FOR GREEN CAMPUS DESIGN AT TIANJIN UNIVERSITY.
• In unplanned urban expansion & increases in impervious urban land surfaces
traditional engineering infrastructures fails.
• This approach is also unable to cope with intense rainfall events, significant loss of
lives and economic impact due to flooding.
• Water pollution is another serious problem caused by increased urban population.
8
STUDY AREA
• Located in the Jinnan District of Tianjin, Tianjin University’s Peiyang Campus covers an area
of 2.5 million m2. The total water area of Peiyang Campus is 154,000 m2, including a
central lake, river, overflow lake, and constructed wetland.
Rainwater LID layout.
9
METHODOLOGY
• Construction Concept of Rainwater Discharging System
• Storing and infiltrating rainwater for underground water on one hand and rainwater use in
an artificial water body on the other hand.
Framework of rainwater circulation and discharge system.
10
11
Rainwater LID layout
RAINWATER UTILIZATION SYSTEM AT THE CENTRAL
ISLAND RAINWATER ECO COLLECTION AREA
• The central island adopts LID practices including a vegetative swale, sunken green
space and permeable pavement to build a rainwater utilization demonstration area.
• The aim is to infiltrate and store rainwater, cut flood peaks, treat the rainwater, and
mitigate surface runoff pollution.
1) Sunken Green Space and Vegetative Swale
• Is a green LID technology
• Uses the recessed areas to store rainwater and dramatically lengthen the
rainwater infiltration time, thereby infiltrating and storing rainwater
• Elevation is lower than the road elevation.
12
13
Sunken green space and vegetative swale on Peiyang Campus.
2) Permeable Pavement
• Roads and sidewalks of the central island adopt a water-infiltration permeable pavement with
coverage of 85.8%, thus enabling rainwater infiltration.
• Central area boasts a slow traffic system and vehicle limitations.
• The central area is able to significantly cut 50% of rainwater runoff.
Permeable pavement on campus. (Source: Peng et al. ,2018)
14
WATER QUALITY CONSERVATION SYSTEM OF ARTIFICIAL
WATER BODIES
• Controlling pollutants and increasing water self-purification capacity and water circulation in
artificial water bodies.
• The integrated conservation measures of water quality are
• Pollutant-Control Measures
Done through a wastewater-treatment plant with the capacity of 1,000 m3/day.
• Ecological Revetment
The campus artificial water bodies embankments are natural revetments with water
plants, artificial riverbanks, and mixed revetments
• Aquatic Ecosystem
The complete aquatic ecosystem consists of aquatic plants, aquatic animals living at
different depths, and microorganisms that attach to the plants, aquatic animals, and silt
improve the water quality.
15
• Reoxygenation
• To facilitate circulation of the artificial water bodies and injection of oxygen into the
water.
• 34 reoxygenation machines set up around the central lake and waterfront area,11
installed at the overflow lake.
• Constructed Wetlands
• Wetlands achieve water purification through interactions among microorganisms,
plants, and other materials.
• The constructed wetland, lying to the west of the central lake, covers an area of 6,500
m2
16
RAINWATER UTILIZATION SYSTEM IN THE MIDDLE PIPELINE
RAINWATER COLLECTION AREA
• The rainwater in this area is collected by a pipeline.
• It supplements the artificial water body within the campus.
• Surplus rainwater is injected into the Weijin River through a pumping station.
Ecological revetment on Peiyang Campus.
17
RESULTS & DISCUSSION
BALANCE ANALYSIS OF AVAILABLE RAINWATER RUNOFF AND ARTIFICIAL WATER BODIES
SUPPLEMENTAL DEMAND
• Calculated the volume of rainwater, the rainfall volume on Peiyang Campus, Tianjin
University, was found to reach 621,500 m3
• Ground runoff and roofs are calculated as 80% of the rainfall volume
• River runoff is calculated as 60% of the rainfall volume, and greenbelt runoff is calculated
as 15% of the rainfall volume.
• The annual rainwater runoff for the central island rainwater eco collection area and middle
pipeline rainwater collection area of Peiyang campus is approximately 430,000 m3 before
adoption of the stormwater control measures.
• After introducing these measures, rainwater runoff dropped to an annual runoff of 328,152
m3
18
CONCLUSIONS
• Rainwater runoff of the campus dropped significantly from 430,000 m3 to 328,152 m3
• The annual rainwater volume in the rainwater collection areas is larger than the water
loss of the artificial water bodies.
• Integrated measures increased the quality of water in the artificial water body.
• The water quality of the artificial water bodies is able to meet Level IV water quality
standards.
• More research is required to build a comprehensive computerized model for Sponge
City design.
19
CASE STUDY (2) : OPTIMIZATION OF ENERGY RECOVERY IN SUDS OF A SMALL
DISTRICT AREA OF LISBON THROUGH THE USE OF LOW-HEAD HYDROPOWER
CONVERTER.
• The flood-control and drainage systems can be seen as new hydropower
opportunities.
• The integration of hydropower production in SUDS will be sensitive to total runoff
• The combination of flood control with energy generation is the novelty proposal in
this research.
20
STUDY AREA
• The studied area is a district of Lisbon located in a downtown area, near the Tagus
River and the Atlantic Ocean.
Example of flood events in Lisbon
21
SYSTEM MODELLING
• Mike Basin (MB) is a water management network model that analyses water resources
and water uses.
• It was created to solve water sharing problems and environmental issues in several
application fields.
• Rivers and channels are represented by branches on the system network and the nodes
represent confluences, diversions and water facilities such as reservoirs and hydropower
stations .
Simplified representation of a retention pond and hydropower-base system.
22
MODEL SIMULATION
MODEL CALIBRATION
• MB simulates the runoff on a catchment taking into account the hydrological cycle,
the type of soil and the provision of water, such as the over-land flow, base-flow and
inter-flow.
• The supply of water comes from rainfall and snow melt, being also affected by the
evaporation.
• The soil is divided into four inter-connected zones: surface, groundwater and snow
storage.
• Surface storage, interflow and base flows are considered negligible.
23
MODEL SIMULATION
• The pond at the starting point is considered dry.
• The rainfall is based on data belonging to the meteorological institute of Portugal,
from the station of Lisbon.
• Simulations are run for a series of daily rainfall.
• The objective is to analyse the electricity production capacity regarding the generated
power, the power deficit and the water turbine discharge.
24
METHODOLOGY
• Identifying the influence of suitable microhydro converters on the generated power
solution and water discharge.
• According to each target demand, the height of the retention pond, the reduction
factor and the output data are defined as a function of the volume.
• The selected maximum heads are 3 and 10 m.
• The size of the area under analysis is set at 1 km².
• Rainfall and runoff graphs data are inputs to the model from the meteorological
station Lisbon.
• The feasibility analysis of producing energy with a micro-hydro converter is then
analysed.
25
RESULTS & DISCUSSION
• This analysis is done by observing the evolution of the total generated power, total
power deficit and the flow discharged downstream as function of the pond volume.
Two selected power target demands for each hydropower station.
26
THE AVERAGE PER DAY OF THE TOTAL GENERATED POWER
FOR BOTH TARGETS IN A 10 M-HIGH POND
• Shows that the maximum generated power corresponds to the average per day of
the total target demand.
Average per day of generated power as function of the pond volume for two different targets and for a 10
m-high pond
27
AVERAGE PER DAY OF GENERATED POWER ANALYSIS FOR A
3 M-HIGH POND
• Shows that the maximum generated power corresponds to the average per day of the total
target demand.
• The flow has to be increased & the amount of water is not sufficient for the Target1.
• Target 2 is too low to be profitable and leads to important water losses as well
Average per day of generated power as function of the pond volume for two different targets and for a
28
IMPACT OF THE REDUCTION FACTOR
• Below a characteristic water level, called reduction level, the target demand is affected
by a reduction factor (RF) between 0 and 1.
• The generated power of 10 m-high pond is much higher than the one obtained with
the 3 m-high pond due to the low flow values It is more important.
• The reduction factor has a relevant influence on the optimization of the energy
production.
• The total generated power, the total power deficit and the directly discharged flow for
three different reduction factors (0.3, 0.5, and 0.8) for a 10 m-high pond with the Target
demand 1is drawn.
29
• The reduction factor 0.5 leads to good production of energy, low power deficit (around 40%) when compared
with the reduction factor equal to 0.8.
• The directly discharged flow in the river decreases until 0 for volumes in which there is a better production.
Generated power as function of the pond volume for Power deficit as function of the pond volume for
different reduction factors. different reduction factors.
30
CONCLUSIONS
• The purpose of this study is to produce energy from a retention pond with a new microhydro
converter.
• The higher the water level in the pond for the same volume the better the production of
energy
• A special effort of optimization is required to maximize the generated power and minimize the
power deficit.
• The case study reveals that this system could produce about 210 MW h/year (for an average
year hourly power of 800 W).
• This new water-energy prototype can be implemented in existing runoff systems or in
forthcoming urban design solutions.
31
REFERENCE 32
1. Ramos, H.M, Teyssier, Samora, I. and Schleiss, A.J. (2013). “Energy recovery in SUDS towards smart water grids:
A case study”. Journal of water resources planning and management, 62, pp.463-472.
2. Peng, S., Cui, H., and Ji, M. (2017). “Sustainable Rainwater Utilization and Water Circulation Model for Green
Campus Design at Tianjin University.” Journal of Sustainable Water in the Built Environment, ASCE, 4(1), pp. 1-
7.
3. Shunchan, F.K., Griffiths, J.A., and Higgitt, D. (2018): “Sponge City in China-A breakthrough of planning and
flood risk management in the urban context”. J. Land Use Policy, Elsevier. pp. 1-7.
4. Andoh, R.Y. and Iwugo, K.O., (2002): “Sustainable urban drainage systems: a UK perspective”.Global Solutions
for Urban Drainage, ASCE,123(5), pp.1-16.
33

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055
Jose Miguel Ruiz
 
Integrated watershed managment
Integrated watershed managmentIntegrated watershed managment
Integrated watershed managment
Janak Shah
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
International WaterCentre
 

Was ist angesagt? (20)

Hydrology 1
Hydrology 1Hydrology 1
Hydrology 1
 
Lecture 7 ce1005 Irrigation and Flood control by Rabindra Ranjan Saha,PENG, WUB
Lecture 7 ce1005 Irrigation and Flood control by Rabindra Ranjan Saha,PENG, WUBLecture 7 ce1005 Irrigation and Flood control by Rabindra Ranjan Saha,PENG, WUB
Lecture 7 ce1005 Irrigation and Flood control by Rabindra Ranjan Saha,PENG, WUB
 
Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055Presentation 2015 EN PRK 1055
Presentation 2015 EN PRK 1055
 
Water resource engineering
Water resource engineeringWater resource engineering
Water resource engineering
 
Checkdam
CheckdamCheckdam
Checkdam
 
Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...Greening water resource use: A perspective from the Vietnam National Green Gr...
Greening water resource use: A perspective from the Vietnam National Green Gr...
 
Water storage for secure water supply, Ho Chi Minh City
Water storage for secure water supply, Ho Chi Minh CityWater storage for secure water supply, Ho Chi Minh City
Water storage for secure water supply, Ho Chi Minh City
 
Integrated watershed managment
Integrated watershed managmentIntegrated watershed managment
Integrated watershed managment
 
Sources and de mand and water supply
Sources and de mand and water supplySources and de mand and water supply
Sources and de mand and water supply
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Hwre module 1
Hwre module 1Hwre module 1
Hwre module 1
 
Watershed management by remote sensing
Watershed management by remote sensingWatershed management by remote sensing
Watershed management by remote sensing
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
 
Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013
 
120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga120512 Iasi morphology part 2 - Mr Hendrik Havinga
120512 Iasi morphology part 2 - Mr Hendrik Havinga
 
Hydrogeological studies and groundwater
Hydrogeological studies and groundwaterHydrogeological studies and groundwater
Hydrogeological studies and groundwater
 
Southern Institute of Water Resources Research - Water related issues in the ...
Southern Institute of Water Resources Research - Water related issues in the ...Southern Institute of Water Resources Research - Water related issues in the ...
Southern Institute of Water Resources Research - Water related issues in the ...
 
The watershed approach
The watershed approachThe watershed approach
The watershed approach
 
Watershed management: Role of Geospatial Technology
Watershed management: Role of Geospatial TechnologyWatershed management: Role of Geospatial Technology
Watershed management: Role of Geospatial Technology
 

Ähnlich wie Seminar aparna

rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdfrainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
HockeyVishnu
 

Ähnlich wie Seminar aparna (20)

Some water management systems in Bengaluru - Principles of IUWM
Some water management systems in Bengaluru - Principles of IUWMSome water management systems in Bengaluru - Principles of IUWM
Some water management systems in Bengaluru - Principles of IUWM
 
Rainwater harvesting
Rainwater harvestingRainwater harvesting
Rainwater harvesting
 
rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdfrainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
rainwaterharvestingandwatershedmanagement-130803230007-phpapp02.pdf
 
Rainwater harvesting and watershed management
Rainwater harvesting and watershed managementRainwater harvesting and watershed management
Rainwater harvesting and watershed management
 
rain water harvesting ppt slideshare
rain water harvesting ppt slidesharerain water harvesting ppt slideshare
rain water harvesting ppt slideshare
 
Rainwater Harvesting
Rainwater HarvestingRainwater Harvesting
Rainwater Harvesting
 
Treated wastewater for Irrigation
Treated wastewater for IrrigationTreated wastewater for Irrigation
Treated wastewater for Irrigation
 
Srorm water management
Srorm water managementSrorm water management
Srorm water management
 
Sandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River UckSandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River Uck
 
ce152_TIE (1).ppt
ce152_TIE (1).pptce152_TIE (1).ppt
ce152_TIE (1).ppt
 
Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...Critical assesment of the Sustainable Urban Drainage component of the Church ...
Critical assesment of the Sustainable Urban Drainage component of the Church ...
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
METHODS AND USERS OF RAIN WATER HARVESTING
METHODS AND USERS OF RAIN WATER HARVESTING METHODS AND USERS OF RAIN WATER HARVESTING
METHODS AND USERS OF RAIN WATER HARVESTING
 
Water resource engineering
Water resource engineeringWater resource engineering
Water resource engineering
 
Water resources
Water resourcesWater resources
Water resources
 
Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
UNIT I 1.pptx
UNIT I 1.pptxUNIT I 1.pptx
UNIT I 1.pptx
 

Mehr von ANANDHU BALAN

Mehr von ANANDHU BALAN (9)

Business plan: Coconut chip company-Kerala
Business plan: Coconut chip company-Kerala Business plan: Coconut chip company-Kerala
Business plan: Coconut chip company-Kerala
 
Destination management planning
Destination management planningDestination management planning
Destination management planning
 
Business plan: Coconut chip company-Kerala
Business plan: Coconut chip company-Kerala Business plan: Coconut chip company-Kerala
Business plan: Coconut chip company-Kerala
 
Technical analysis
Technical analysisTechnical analysis
Technical analysis
 
Bank Accounts & Customers
Bank Accounts & CustomersBank Accounts & Customers
Bank Accounts & Customers
 
PLASTIC MONEY
PLASTIC MONEYPLASTIC MONEY
PLASTIC MONEY
 
Credit card its operations
Credit card  its operationsCredit card  its operations
Credit card its operations
 
ELECTRONIC FUND TRANSFER
ELECTRONIC FUND TRANSFERELECTRONIC FUND TRANSFER
ELECTRONIC FUND TRANSFER
 
ATM / Electronic Clearing Service
ATM / Electronic Clearing ServiceATM / Electronic Clearing Service
ATM / Electronic Clearing Service
 

Kürzlich hochgeladen

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 

Seminar aparna

  • 1. INNOVATIVE APPROACHES TOWARDS URBAN FLOOD MANAGEMENT PRESENTED BY APARNA A V TCR19CEWR02 M2 WR & HI 1 GUIDED BY PROF. SMITHA MOHAN K PROFFESSOR DEPARTMENT OF CIVIL ENGINEERING
  • 2. INTRODUCTION 2 URBAN FLOODING • Inundation of land or property in a built environment. • Occurs when rainfall overwhelming the capacity of drainage systems. • Creates Excessive runoff in developed areas. • Urbanization leads to developed catchments therefore flooding occurs very quickly.
  • 4. MAJOR CAUSES OF URBAN FLOODING • Meteorological Factor • Hydrological Factors • Human Factors 4
  • 5. COMMON SOLUTIONS FOR URBAN FLOODING • Create flood plains and overflow areas for rivers • Separating rainwater from the sewer system • Install water infiltration and attenuation systems • Sustainable drainage: permeable pavement, sidewalks and gardens • Green roofs/rooftop gardens • Create sponge city. 5
  • 6. SPONG CITY CONCEPT • The Sponge City concept aims to • (i) improve effective control of urban peak runoff, and to temporarily store, recycle and purify stormwater; • (ii) to upgrade the traditional drainage systems using more flood-resilient infrastructure • (iii) to integrate natural water-bodies and encourage multi-functional objectives within drainage design. 6
  • 7. SUSTAINABLE URBAN DRAINAGE SYSTEMS (SUDS) • The design of urban drainage mainly focuses on catching the excess runoff and lead it out of the cities, according to sanitary and security precepts. SUDS Management Train (CIRIA) 7
  • 8. CASE STUDY: SUSTAINABLE RAINWATER UTILIZATION AND WATER CIRCULATION MODEL FOR GREEN CAMPUS DESIGN AT TIANJIN UNIVERSITY. • In unplanned urban expansion & increases in impervious urban land surfaces traditional engineering infrastructures fails. • This approach is also unable to cope with intense rainfall events, significant loss of lives and economic impact due to flooding. • Water pollution is another serious problem caused by increased urban population. 8
  • 9. STUDY AREA • Located in the Jinnan District of Tianjin, Tianjin University’s Peiyang Campus covers an area of 2.5 million m2. The total water area of Peiyang Campus is 154,000 m2, including a central lake, river, overflow lake, and constructed wetland. Rainwater LID layout. 9
  • 10. METHODOLOGY • Construction Concept of Rainwater Discharging System • Storing and infiltrating rainwater for underground water on one hand and rainwater use in an artificial water body on the other hand. Framework of rainwater circulation and discharge system. 10
  • 12. RAINWATER UTILIZATION SYSTEM AT THE CENTRAL ISLAND RAINWATER ECO COLLECTION AREA • The central island adopts LID practices including a vegetative swale, sunken green space and permeable pavement to build a rainwater utilization demonstration area. • The aim is to infiltrate and store rainwater, cut flood peaks, treat the rainwater, and mitigate surface runoff pollution. 1) Sunken Green Space and Vegetative Swale • Is a green LID technology • Uses the recessed areas to store rainwater and dramatically lengthen the rainwater infiltration time, thereby infiltrating and storing rainwater • Elevation is lower than the road elevation. 12
  • 13. 13 Sunken green space and vegetative swale on Peiyang Campus.
  • 14. 2) Permeable Pavement • Roads and sidewalks of the central island adopt a water-infiltration permeable pavement with coverage of 85.8%, thus enabling rainwater infiltration. • Central area boasts a slow traffic system and vehicle limitations. • The central area is able to significantly cut 50% of rainwater runoff. Permeable pavement on campus. (Source: Peng et al. ,2018) 14
  • 15. WATER QUALITY CONSERVATION SYSTEM OF ARTIFICIAL WATER BODIES • Controlling pollutants and increasing water self-purification capacity and water circulation in artificial water bodies. • The integrated conservation measures of water quality are • Pollutant-Control Measures Done through a wastewater-treatment plant with the capacity of 1,000 m3/day. • Ecological Revetment The campus artificial water bodies embankments are natural revetments with water plants, artificial riverbanks, and mixed revetments • Aquatic Ecosystem The complete aquatic ecosystem consists of aquatic plants, aquatic animals living at different depths, and microorganisms that attach to the plants, aquatic animals, and silt improve the water quality. 15
  • 16. • Reoxygenation • To facilitate circulation of the artificial water bodies and injection of oxygen into the water. • 34 reoxygenation machines set up around the central lake and waterfront area,11 installed at the overflow lake. • Constructed Wetlands • Wetlands achieve water purification through interactions among microorganisms, plants, and other materials. • The constructed wetland, lying to the west of the central lake, covers an area of 6,500 m2 16
  • 17. RAINWATER UTILIZATION SYSTEM IN THE MIDDLE PIPELINE RAINWATER COLLECTION AREA • The rainwater in this area is collected by a pipeline. • It supplements the artificial water body within the campus. • Surplus rainwater is injected into the Weijin River through a pumping station. Ecological revetment on Peiyang Campus. 17
  • 18. RESULTS & DISCUSSION BALANCE ANALYSIS OF AVAILABLE RAINWATER RUNOFF AND ARTIFICIAL WATER BODIES SUPPLEMENTAL DEMAND • Calculated the volume of rainwater, the rainfall volume on Peiyang Campus, Tianjin University, was found to reach 621,500 m3 • Ground runoff and roofs are calculated as 80% of the rainfall volume • River runoff is calculated as 60% of the rainfall volume, and greenbelt runoff is calculated as 15% of the rainfall volume. • The annual rainwater runoff for the central island rainwater eco collection area and middle pipeline rainwater collection area of Peiyang campus is approximately 430,000 m3 before adoption of the stormwater control measures. • After introducing these measures, rainwater runoff dropped to an annual runoff of 328,152 m3 18
  • 19. CONCLUSIONS • Rainwater runoff of the campus dropped significantly from 430,000 m3 to 328,152 m3 • The annual rainwater volume in the rainwater collection areas is larger than the water loss of the artificial water bodies. • Integrated measures increased the quality of water in the artificial water body. • The water quality of the artificial water bodies is able to meet Level IV water quality standards. • More research is required to build a comprehensive computerized model for Sponge City design. 19
  • 20. CASE STUDY (2) : OPTIMIZATION OF ENERGY RECOVERY IN SUDS OF A SMALL DISTRICT AREA OF LISBON THROUGH THE USE OF LOW-HEAD HYDROPOWER CONVERTER. • The flood-control and drainage systems can be seen as new hydropower opportunities. • The integration of hydropower production in SUDS will be sensitive to total runoff • The combination of flood control with energy generation is the novelty proposal in this research. 20
  • 21. STUDY AREA • The studied area is a district of Lisbon located in a downtown area, near the Tagus River and the Atlantic Ocean. Example of flood events in Lisbon 21
  • 22. SYSTEM MODELLING • Mike Basin (MB) is a water management network model that analyses water resources and water uses. • It was created to solve water sharing problems and environmental issues in several application fields. • Rivers and channels are represented by branches on the system network and the nodes represent confluences, diversions and water facilities such as reservoirs and hydropower stations . Simplified representation of a retention pond and hydropower-base system. 22
  • 23. MODEL SIMULATION MODEL CALIBRATION • MB simulates the runoff on a catchment taking into account the hydrological cycle, the type of soil and the provision of water, such as the over-land flow, base-flow and inter-flow. • The supply of water comes from rainfall and snow melt, being also affected by the evaporation. • The soil is divided into four inter-connected zones: surface, groundwater and snow storage. • Surface storage, interflow and base flows are considered negligible. 23
  • 24. MODEL SIMULATION • The pond at the starting point is considered dry. • The rainfall is based on data belonging to the meteorological institute of Portugal, from the station of Lisbon. • Simulations are run for a series of daily rainfall. • The objective is to analyse the electricity production capacity regarding the generated power, the power deficit and the water turbine discharge. 24
  • 25. METHODOLOGY • Identifying the influence of suitable microhydro converters on the generated power solution and water discharge. • According to each target demand, the height of the retention pond, the reduction factor and the output data are defined as a function of the volume. • The selected maximum heads are 3 and 10 m. • The size of the area under analysis is set at 1 km². • Rainfall and runoff graphs data are inputs to the model from the meteorological station Lisbon. • The feasibility analysis of producing energy with a micro-hydro converter is then analysed. 25
  • 26. RESULTS & DISCUSSION • This analysis is done by observing the evolution of the total generated power, total power deficit and the flow discharged downstream as function of the pond volume. Two selected power target demands for each hydropower station. 26
  • 27. THE AVERAGE PER DAY OF THE TOTAL GENERATED POWER FOR BOTH TARGETS IN A 10 M-HIGH POND • Shows that the maximum generated power corresponds to the average per day of the total target demand. Average per day of generated power as function of the pond volume for two different targets and for a 10 m-high pond 27
  • 28. AVERAGE PER DAY OF GENERATED POWER ANALYSIS FOR A 3 M-HIGH POND • Shows that the maximum generated power corresponds to the average per day of the total target demand. • The flow has to be increased & the amount of water is not sufficient for the Target1. • Target 2 is too low to be profitable and leads to important water losses as well Average per day of generated power as function of the pond volume for two different targets and for a 28
  • 29. IMPACT OF THE REDUCTION FACTOR • Below a characteristic water level, called reduction level, the target demand is affected by a reduction factor (RF) between 0 and 1. • The generated power of 10 m-high pond is much higher than the one obtained with the 3 m-high pond due to the low flow values It is more important. • The reduction factor has a relevant influence on the optimization of the energy production. • The total generated power, the total power deficit and the directly discharged flow for three different reduction factors (0.3, 0.5, and 0.8) for a 10 m-high pond with the Target demand 1is drawn. 29
  • 30. • The reduction factor 0.5 leads to good production of energy, low power deficit (around 40%) when compared with the reduction factor equal to 0.8. • The directly discharged flow in the river decreases until 0 for volumes in which there is a better production. Generated power as function of the pond volume for Power deficit as function of the pond volume for different reduction factors. different reduction factors. 30
  • 31. CONCLUSIONS • The purpose of this study is to produce energy from a retention pond with a new microhydro converter. • The higher the water level in the pond for the same volume the better the production of energy • A special effort of optimization is required to maximize the generated power and minimize the power deficit. • The case study reveals that this system could produce about 210 MW h/year (for an average year hourly power of 800 W). • This new water-energy prototype can be implemented in existing runoff systems or in forthcoming urban design solutions. 31
  • 32. REFERENCE 32 1. Ramos, H.M, Teyssier, Samora, I. and Schleiss, A.J. (2013). “Energy recovery in SUDS towards smart water grids: A case study”. Journal of water resources planning and management, 62, pp.463-472. 2. Peng, S., Cui, H., and Ji, M. (2017). “Sustainable Rainwater Utilization and Water Circulation Model for Green Campus Design at Tianjin University.” Journal of Sustainable Water in the Built Environment, ASCE, 4(1), pp. 1- 7. 3. Shunchan, F.K., Griffiths, J.A., and Higgitt, D. (2018): “Sponge City in China-A breakthrough of planning and flood risk management in the urban context”. J. Land Use Policy, Elsevier. pp. 1-7. 4. Andoh, R.Y. and Iwugo, K.O., (2002): “Sustainable urban drainage systems: a UK perspective”.Global Solutions for Urban Drainage, ASCE,123(5), pp.1-16.
  • 33. 33