SlideShare ist ein Scribd-Unternehmen logo
1 von 18
By,
Akshay jangid
Department:- Maintenance
Company profile
Different learning areas in JBM.
My area of interest.
My work experience with maintenance team.
Awareness training material.
Conclusion.
Appreciation.
JBM Auto Ltd. was originally set up in the year 1990, mainly to manufacture Tools,
Dies and Moulds at Faridabad. In the year 1993, the Company established a
Press Shop for manufacturing Sheet Metal Components and Welded Sub-
assemblies to meet the growing stringent quality requirements of automobile
industry. The company went for its first public issue in March 1994.
Plant Particulars
•Faridabad Plant -Press shops suitable for manufacturing components for car,
tractor and truck industry. Current product range includes BIW parts and sub-
assemblies for cars, skin panels and axles for tractors & body components,
bumpers, axles and suspension components for trucks. Components are being
also exported to various truck manufacturers in Europe.
The Company’s philosophy of corporate governance is based on integrity, respect
for the laws & compliance thereof and transparency & accountability in all facets
of its operation. The Company believes that good governance brings sustained
corporate growth and enhances returns to all its stakeholders viz. customers,
suppliers, shareholders, employees and government agencies including society
of which the Company is an integral part.
FARIDABAD JBM AUTO LIMITED, PLANT-I
GLOBAL PARTNERS
OF JBM GROUP :-
CUSTOMERS;- PRODUCTS:-
•Air tank
•BIW parts and assemblies
•Buses
•Chassis and suspension parts
•Cross car/truck beam
•Cross members
•Engineering
•Fabrication
•Fuel filter
•Fuel tanks
•LPG/CNG cylinders
•Oil sump
•Shaped blanks
•Steel fasteners
•Tailor welded blanks
•Skin panels
•Tools,jigs and fixtures
•Wheel assembly
•Tubes and tubular
manipulations
.
•Heavy Press Shop:
Components for which heavy tonnage is required for most of their processes are
worked upon in this shop. These processes include blanking, flattening, draw
operation, forming, flanging, trimming, piercing, bending etc.
•Light Press Shop
Components for which heavy tonnage is not required for most of their processes are
worked upon in this shop. These processes include flanging, trimming, piercing, bending
etc.
•Weld Shop 1:
Spot welding and MIG welding on various components are carried out in this shop
.
•Weld Shop 2:
After being worked upon in weld Shop 1, the components are sent to Weld Shop 2 for
denting, deburring, grinding, buffing, sanding etc. Besides these processes MIG
welding, Arc Welding, Spot Welding etc. are also carried out on components for some
customers, in this shop.
Tool shop is the area in which tools, dies ,jigs and fixtures. are prepared upto
finish using a series of operations. Design section is the main part in tool shop
.The process starts with the design making of which pattern is made ,this
pattern is inspected and send out for casting .After casting is brought ,it is
machined under 2d and 3d operations on CNC machines .Additional manual
operations are performed for further inspection and finishing including
grinding,drilling etc.Dies are inspected under spotting press for colour test and
pieces are made. If fine, dies are declared ready for use.
Quality department is the area where product’s quality is checked,whether
the produt has achieved its required dimensions and other physical
properties. Process of quality check is divided in to three steps namely –
•Incoming quality control
•In process quality control
•Finished product quality control
Inspite of these three, customer complaint handling is also done.
This department deals with the releasing of stock as per
customer’s requirement. As per ppm schedule the dispatch team
distribute targets to different shops . and finally the stock is
packed and dispatched as per packaging standards. Dispatch also
takes care of inventory and customer’s remarks .
Other areas include-
•Marketing(takes care of the social approach and customer’s
relations)
•Store(takes hold of the inventory and incoming vendor stock)
•HR(concerned with training and development matters and
recruitment )
•SAP(red bin analysis and product design)
WHAT IS MAINTENANCE:-
WHAT IS THE ROLE OF MAINTENANCE DEPARTMENT IN JBM:-
Their chief role is to achieve continuous sustained condition of the whole plant
whether it is a machine or some fitting work. Team maintenance includes works as
given under :-
•Mechanical job(concerned with internal functioning and fitting work of machines)
•Electrical job(concerned with plant electrical supply including fans ,ac ,compressors
etc. And panel problems related with machines )
•Plumbing work.
•Other maintenance of plant.
Sustaining the achieved result is maintenance.
OR
It is the continuous effort to keep a system in its useful condition.
Fault occurs Fault is examined
Corrective
action is
taken
Machine or
system is
brought to
sustained
working
condition .
Fault is rechecked
and assured by
the operator.
Preventive action is taken
So that the fault will not
In future.
PROCESS OF MAINTENANCE:-
573
412
17 6
0
200
400
600
800
main derive shaft
problem
mounting bolt
problem
cushion problem slide adjustment
problem
BREAKDOWN TIME VS CAUSES:-
WORKING ON PRESS 400 TON :-
Mechanical press 400 ton is one of the oldest
presses in jbm auto ltd. The press is of “H frame”
and is used for low tonnage operations mostly
hole making ,flanging etc. The machine dumped
suddenly and maintenance team was informed .
after being checked , it was found that the slide
has jammed due to improper working of gear.
The worm gear was damaged(as shown in pics )
and was need to be replaced by a new one. The
slide was opened and the damaged gear was
removed out .Proper cleaning was done . After
the new gear has brought and fixed ,the
machine was reassembled. Required oiling was
done by the fitters for proper lubrication. Up
and down movement of the slide was checked
also whether the piece was made right or not?
After it all operator and supervisor were called
for assurance.
And the machine was ready for production .
MY EXPERIENCE WITH MAINTENANCE TEAM:-
MOSTLY OCCURRED BREAKDOWN REASONS FOR PRESSES:-
•Air leakage .
•Over motion provided to the slide .
•Lack of lubrication.
•Clutch gap increment.
•Shaft damage.
•Panel problems.
SHAFT FAILURE
TPM
5 S
WHISTLEBLOWER POLICY
•The policy empowers employees to report to the management of any malpractices that are
taking place in any organization .
The person who raises a concern about a wrong doing is known as whistleblower
•Whistleblower’s identity is not revealed and is provided protection.
•The complaint can be made considering:-
Abuse of authority.
Breach of contract
Criminal offense
Manipulation of company data and records.
Wastage of company funds /assets etc.
5 ‘S’ THE BASE OF TOTAL QUALITY CONTROL:-
पहचानें और गैर
आवश्यक
वस्तुओं की
छटाई करना
SEIRI
सुव्यवस्थाSEITON
सफाईSEISO
मानकीकरणSEIKETSU
अनुशासनSHITSUKE
आवश्यक वस्तुओ
को उनके ननर्ााररत
स्थान पर व्यवस्स्थत
करना
काया क्षेत्र को
र्ुल और गंदगी से
मुक्त रखना रखना
ननयममत देखभाल द्वारा
काया क्षेत्र को
सुंदर रखना
ननयमो का
पालन करना
ननयम
2-2
छटाई
TOTAL PRODUCTIVE MAINTENANCE:-
•This policy implies effective way of maintenance in order to eliminate
loss and increase productivity.
•Having eight pillars as shown below.
Doing this summer training I come to know about many new things which I
haven’t studied in my college .I have gathered the “In field work process” of
a multi national company. Along with maintenance, i have gained
knowledge of other departments also including quality, tool shop, dispatch
etc. I have learned here what is the complete procedure on which a
production plant works. I have also learned about teamwork. And study of
numerous machines which are used in this plant has increased my technical
knowledge a lot.
I t was a great experience working with team maintenance in these
45 days . I am thankful to the company authorities for allowing me
for the training. This summer training has given me experience in my
working zone and also has increased my technical knowledge. I even
wish to work here in future .
Signature:-
•HOD (MAINTENANCE)……………..
•HR…………………………
•TRAINEE…………………….
DATE OF SUBMISSION:-

Weitere ähnliche Inhalte

Was ist angesagt?

Six Month Industrial Training Report at Milestone Gears Ltd
Six Month Industrial Training Report  at Milestone Gears LtdSix Month Industrial Training Report  at Milestone Gears Ltd
Six Month Industrial Training Report at Milestone Gears Ltdyogesh thakur
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Rahul Banerjee
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)mathanArumugam
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheetAmit Mishra
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems Nityanand Yadav
 
Single-Station Manufacturing Cells
Single-Station Manufacturing CellsSingle-Station Manufacturing Cells
Single-Station Manufacturing CellsVADLAJAGADEESHWARAAC
 
Training - Implementing a QMS.ppt
Training - Implementing a QMS.pptTraining - Implementing a QMS.ppt
Training - Implementing a QMS.pptmanojgandhi1
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryAkshay Mistri
 
Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technologyHitendrasinh Zala
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationGlobal Manager Group
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
Transfer machines
Transfer machines Transfer machines
Transfer machines Suresh Lal
 
Quality Process And Procedures PowerPoint Presentation Slide
Quality Process And Procedures PowerPoint Presentation Slide  Quality Process And Procedures PowerPoint Presentation Slide
Quality Process And Procedures PowerPoint Presentation Slide SlideTeam
 
A Quick Guide to Production Department
A Quick Guide to Production DepartmentA Quick Guide to Production Department
A Quick Guide to Production DepartmentAnanth Palaniappan
 

Was ist angesagt? (20)

Biw fixture
Biw fixtureBiw fixture
Biw fixture
 
Six Month Industrial Training Report at Milestone Gears Ltd
Six Month Industrial Training Report  at Milestone Gears LtdSix Month Industrial Training Report  at Milestone Gears Ltd
Six Month Industrial Training Report at Milestone Gears Ltd
 
Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)Industrial training presentation (mechanical engineering)
Industrial training presentation (mechanical engineering)
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheet
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Internal rejection
Internal rejectionInternal rejection
Internal rejection
 
Single-Station Manufacturing Cells
Single-Station Manufacturing CellsSingle-Station Manufacturing Cells
Single-Station Manufacturing Cells
 
VMC Machine
VMC Machine VMC Machine
VMC Machine
 
Training - Implementing a QMS.ppt
Training - Implementing a QMS.pptTraining - Implementing a QMS.ppt
Training - Implementing a QMS.ppt
 
Internship Report on Material Handling and Machinery
Internship Report on Material Handling and MachineryInternship Report on Material Handling and Machinery
Internship Report on Material Handling and Machinery
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
Cellular manufacturing group technology
Cellular manufacturing group technologyCellular manufacturing group technology
Cellular manufacturing group technology
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Winter training
Winter training Winter training
Winter training
 
Transfer machines
Transfer machines Transfer machines
Transfer machines
 
Quality Process And Procedures PowerPoint Presentation Slide
Quality Process And Procedures PowerPoint Presentation Slide  Quality Process And Procedures PowerPoint Presentation Slide
Quality Process And Procedures PowerPoint Presentation Slide
 
A Quick Guide to Production Department
A Quick Guide to Production DepartmentA Quick Guide to Production Department
A Quick Guide to Production Department
 

Ähnlich wie #PRESENTATION by AKSHAY JANGID (Trainee)

A Quick Guide to Maintenance Function
A Quick Guide to Maintenance FunctionA Quick Guide to Maintenance Function
A Quick Guide to Maintenance FunctionAnanth Palaniappan
 
Machine shop101 rev_l
Machine shop101 rev_lMachine shop101 rev_l
Machine shop101 rev_lJeremy Kermit
 
How to improve machine performance
How to improve machine performanceHow to improve machine performance
How to improve machine performanceglobalsevensteps
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control BookLearn With GeekAlign
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
A Quick Guide to Quality Management
A Quick Guide to Quality ManagementA Quick Guide to Quality Management
A Quick Guide to Quality ManagementAnanth Palaniappan
 
SUMMER INTERNSHIP.pptx
SUMMER INTERNSHIP.pptxSUMMER INTERNSHIP.pptx
SUMMER INTERNSHIP.pptxTheZaivish
 
Internship111111111111111111111111111111
Internship111111111111111111111111111111Internship111111111111111111111111111111
Internship111111111111111111111111111111rkishone4444
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...IRJET Journal
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementconsult4solutions
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Saifuddin Rakib
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmSourav Kumar
 

Ähnlich wie #PRESENTATION by AKSHAY JANGID (Trainee) (20)

A Quick Guide to Maintenance Function
A Quick Guide to Maintenance FunctionA Quick Guide to Maintenance Function
A Quick Guide to Maintenance Function
 
Machine shop101 rev_l
Machine shop101 rev_lMachine shop101 rev_l
Machine shop101 rev_l
 
Resume
ResumeResume
Resume
 
How to improve machine performance
How to improve machine performanceHow to improve machine performance
How to improve machine performance
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
Iibm organisational behaviour
Iibm organisational behaviourIibm organisational behaviour
Iibm organisational behaviour
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Tpm
TpmTpm
Tpm
 
290323internship.pptx
290323internship.pptx290323internship.pptx
290323internship.pptx
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Abhishek Kumar
Abhishek KumarAbhishek Kumar
Abhishek Kumar
 
A Quick Guide to Quality Management
A Quick Guide to Quality ManagementA Quick Guide to Quality Management
A Quick Guide to Quality Management
 
SUMMER INTERNSHIP.pptx
SUMMER INTERNSHIP.pptxSUMMER INTERNSHIP.pptx
SUMMER INTERNSHIP.pptx
 
Internship111111111111111111111111111111
Internship111111111111111111111111111111Internship111111111111111111111111111111
Internship111111111111111111111111111111
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
POM UNIT 1.pptx
POM UNIT 1.pptxPOM UNIT 1.pptx
POM UNIT 1.pptx
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)
 
A throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsmA throughput bulletin for Texport Syndicate, post vsm
A throughput bulletin for Texport Syndicate, post vsm
 

#PRESENTATION by AKSHAY JANGID (Trainee)

  • 2. Company profile Different learning areas in JBM. My area of interest. My work experience with maintenance team. Awareness training material. Conclusion. Appreciation.
  • 3. JBM Auto Ltd. was originally set up in the year 1990, mainly to manufacture Tools, Dies and Moulds at Faridabad. In the year 1993, the Company established a Press Shop for manufacturing Sheet Metal Components and Welded Sub- assemblies to meet the growing stringent quality requirements of automobile industry. The company went for its first public issue in March 1994. Plant Particulars •Faridabad Plant -Press shops suitable for manufacturing components for car, tractor and truck industry. Current product range includes BIW parts and sub- assemblies for cars, skin panels and axles for tractors & body components, bumpers, axles and suspension components for trucks. Components are being also exported to various truck manufacturers in Europe. The Company’s philosophy of corporate governance is based on integrity, respect for the laws & compliance thereof and transparency & accountability in all facets of its operation. The Company believes that good governance brings sustained corporate growth and enhances returns to all its stakeholders viz. customers, suppliers, shareholders, employees and government agencies including society of which the Company is an integral part.
  • 4. FARIDABAD JBM AUTO LIMITED, PLANT-I GLOBAL PARTNERS OF JBM GROUP :-
  • 5. CUSTOMERS;- PRODUCTS:- •Air tank •BIW parts and assemblies •Buses •Chassis and suspension parts •Cross car/truck beam •Cross members •Engineering •Fabrication •Fuel filter •Fuel tanks •LPG/CNG cylinders •Oil sump •Shaped blanks •Steel fasteners •Tailor welded blanks •Skin panels •Tools,jigs and fixtures •Wheel assembly •Tubes and tubular manipulations
  • 6.
  • 7. . •Heavy Press Shop: Components for which heavy tonnage is required for most of their processes are worked upon in this shop. These processes include blanking, flattening, draw operation, forming, flanging, trimming, piercing, bending etc. •Light Press Shop Components for which heavy tonnage is not required for most of their processes are worked upon in this shop. These processes include flanging, trimming, piercing, bending etc. •Weld Shop 1: Spot welding and MIG welding on various components are carried out in this shop . •Weld Shop 2: After being worked upon in weld Shop 1, the components are sent to Weld Shop 2 for denting, deburring, grinding, buffing, sanding etc. Besides these processes MIG welding, Arc Welding, Spot Welding etc. are also carried out on components for some customers, in this shop.
  • 8. Tool shop is the area in which tools, dies ,jigs and fixtures. are prepared upto finish using a series of operations. Design section is the main part in tool shop .The process starts with the design making of which pattern is made ,this pattern is inspected and send out for casting .After casting is brought ,it is machined under 2d and 3d operations on CNC machines .Additional manual operations are performed for further inspection and finishing including grinding,drilling etc.Dies are inspected under spotting press for colour test and pieces are made. If fine, dies are declared ready for use. Quality department is the area where product’s quality is checked,whether the produt has achieved its required dimensions and other physical properties. Process of quality check is divided in to three steps namely – •Incoming quality control •In process quality control •Finished product quality control Inspite of these three, customer complaint handling is also done.
  • 9. This department deals with the releasing of stock as per customer’s requirement. As per ppm schedule the dispatch team distribute targets to different shops . and finally the stock is packed and dispatched as per packaging standards. Dispatch also takes care of inventory and customer’s remarks . Other areas include- •Marketing(takes care of the social approach and customer’s relations) •Store(takes hold of the inventory and incoming vendor stock) •HR(concerned with training and development matters and recruitment ) •SAP(red bin analysis and product design)
  • 10. WHAT IS MAINTENANCE:- WHAT IS THE ROLE OF MAINTENANCE DEPARTMENT IN JBM:- Their chief role is to achieve continuous sustained condition of the whole plant whether it is a machine or some fitting work. Team maintenance includes works as given under :- •Mechanical job(concerned with internal functioning and fitting work of machines) •Electrical job(concerned with plant electrical supply including fans ,ac ,compressors etc. And panel problems related with machines ) •Plumbing work. •Other maintenance of plant. Sustaining the achieved result is maintenance. OR It is the continuous effort to keep a system in its useful condition.
  • 11. Fault occurs Fault is examined Corrective action is taken Machine or system is brought to sustained working condition . Fault is rechecked and assured by the operator. Preventive action is taken So that the fault will not In future. PROCESS OF MAINTENANCE:- 573 412 17 6 0 200 400 600 800 main derive shaft problem mounting bolt problem cushion problem slide adjustment problem BREAKDOWN TIME VS CAUSES:-
  • 12. WORKING ON PRESS 400 TON :- Mechanical press 400 ton is one of the oldest presses in jbm auto ltd. The press is of “H frame” and is used for low tonnage operations mostly hole making ,flanging etc. The machine dumped suddenly and maintenance team was informed . after being checked , it was found that the slide has jammed due to improper working of gear. The worm gear was damaged(as shown in pics ) and was need to be replaced by a new one. The slide was opened and the damaged gear was removed out .Proper cleaning was done . After the new gear has brought and fixed ,the machine was reassembled. Required oiling was done by the fitters for proper lubrication. Up and down movement of the slide was checked also whether the piece was made right or not? After it all operator and supervisor were called for assurance. And the machine was ready for production . MY EXPERIENCE WITH MAINTENANCE TEAM:-
  • 13. MOSTLY OCCURRED BREAKDOWN REASONS FOR PRESSES:- •Air leakage . •Over motion provided to the slide . •Lack of lubrication. •Clutch gap increment. •Shaft damage. •Panel problems. SHAFT FAILURE
  • 14. TPM 5 S WHISTLEBLOWER POLICY •The policy empowers employees to report to the management of any malpractices that are taking place in any organization . The person who raises a concern about a wrong doing is known as whistleblower •Whistleblower’s identity is not revealed and is provided protection. •The complaint can be made considering:- Abuse of authority. Breach of contract Criminal offense Manipulation of company data and records. Wastage of company funds /assets etc.
  • 15. 5 ‘S’ THE BASE OF TOTAL QUALITY CONTROL:- पहचानें और गैर आवश्यक वस्तुओं की छटाई करना SEIRI सुव्यवस्थाSEITON सफाईSEISO मानकीकरणSEIKETSU अनुशासनSHITSUKE आवश्यक वस्तुओ को उनके ननर्ााररत स्थान पर व्यवस्स्थत करना काया क्षेत्र को र्ुल और गंदगी से मुक्त रखना रखना ननयममत देखभाल द्वारा काया क्षेत्र को सुंदर रखना ननयमो का पालन करना ननयम 2-2 छटाई
  • 16. TOTAL PRODUCTIVE MAINTENANCE:- •This policy implies effective way of maintenance in order to eliminate loss and increase productivity. •Having eight pillars as shown below.
  • 17. Doing this summer training I come to know about many new things which I haven’t studied in my college .I have gathered the “In field work process” of a multi national company. Along with maintenance, i have gained knowledge of other departments also including quality, tool shop, dispatch etc. I have learned here what is the complete procedure on which a production plant works. I have also learned about teamwork. And study of numerous machines which are used in this plant has increased my technical knowledge a lot. I t was a great experience working with team maintenance in these 45 days . I am thankful to the company authorities for allowing me for the training. This summer training has given me experience in my working zone and also has increased my technical knowledge. I even wish to work here in future .