SlideShare ist ein Scribd-Unternehmen logo
1 von 12
Cost Behavior
Cost Behavior
• Variable

• Fixed

• Mixed
Estimating Mixed Costs
• Scattergraph method
• Goal: Derive TC equation
– Hi-Low analysis
– Regression
– Multiple Regression
Interpreting Regression
LO5

Interpret the results of regression output.

F

V

Y

= Intercept
Y =

Slope
F

+ V

X

X
Interpreting Regression, Continued. . .
Correlation
coefficient

“R” measures the linear relationship between
variables. The closer R is to 1.0 the closer the
points are to the regression line. The closer R is to
zero, the poorer the regression line.

Coefficient of
determination

“R2” The square of the correlation coefficient. The
proportion of the variation in the dependent
variable (Y) explained by the independent
variable(s)(X).

T-Statistic

The t-statistic is the value of the estimated
coefficient, b, divided by its standard error.
Generally, if it is over 2, then it is considered
significant. If significant, the cost is NOT totally
fixed.
Interpreting Regression, Continued. . .
Correlation Coefficient
Coefficient of Determination

T-Statistic

.91

A linear relationship does exists between repair hours and overhead costs.

.828

82.8% of the changes in overhead costs can be explained by changes
in repair-hours.

10.7 & 7.9

Both have t-statistics that are greater than 2, so the cost is not totally
fixed.

Estimate 3C’s overhead with 520 repair hours.
Multiple Regression
Multiple Regression:

When more than one predictor (x)
is in the model.

Is repair-hours the only activity that drives
overhead costs at 3C?
Predictors:

X1: Repair-hours
X2: Parts Cost

Equation:

TC = VC(X1) + VC(X2) + FC
Multiple Regression, Continued. . .
3C Cost Information
Month

OH Costs

Repair-Hours (X1)

Parts (X2)

1

$9,891

248

$1,065

2

$9,244

248

$1,452

3

$13,200

480

$3,500

4

$10,555

284

$1,568

5

$9,054

200

$1,544

6

$10,662

380

$1,222

7

$12,883

568

$2,986

8

$10,345

344

$1,841

9

$11,217

448

$1,654

10

$13,269

544

$2,100

11

$10,830

340

$1,245

12

$12,607

412

$2,700

13

$10,871

384

$2,200

14

$12,816

404

$3,110

15

$8,464

212

$ 752
Multiple Regression Output

Interpret results and estimate total costs with 520 repair hours and
$3500 parts costs
Statistical Cost Estimation Using Regression Analysis

Statistical procedure to determine the
relationship between variables.
High-Low Method
Regression

Uses two data points.
Uses all the data points.
3C Overhead
Implementation Problems
LO6

Identify potential problems with regression data.

1. Curvilinear costs
2. Outliers
3. Spurious relations

Curvilinear costs

4. Assumptions
Identify relevant range

Analyze relevant range

Relevant
Range
ICE
Month

Customer Accts

Paychecks Proc

Acct Svc Costs

1

325

1029

63800

2

310

993

68900

3

302

1268

64000

4

213

1028

61300

5

222

984

61600

6

214

712

50800

7

131

762

51020

8

123

739

54300

9

115

708

50500

10

296

1232

64800

11

213

978

58000

12

222

929

57500

13

217

1059

62200

14

132

942

54900

15

300

1299

71530

16

315

1283

64800

3650

15945

959950

Totals
Required:

Based on customer accounts, paychecks processed
HiLo Analysis
Regression
Multiple Regression

Weitere ähnliche Inhalte

Was ist angesagt?

Business economics cost analysis
Business economics   cost analysisBusiness economics   cost analysis
Business economics cost analysis
Rachit Walia
 
break even
break evenbreak even
break even
jimsd
 

Was ist angesagt? (19)

Business economics cost analysis
Business economics   cost analysisBusiness economics   cost analysis
Business economics cost analysis
 
Topic 02
Topic 02Topic 02
Topic 02
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSIS
 
Cost analysis
Cost analysisCost analysis
Cost analysis
 
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
 
11 theory of cost
11 theory of cost11 theory of cost
11 theory of cost
 
Theory of cost
Theory of cost Theory of cost
Theory of cost
 
Theory and estimation of cost
Theory and estimation of costTheory and estimation of cost
Theory and estimation of cost
 
Cost Output Relationship; Estimation of Cost and Output
Cost Output Relationship; Estimation of Cost and OutputCost Output Relationship; Estimation of Cost and Output
Cost Output Relationship; Estimation of Cost and Output
 
Cost
CostCost
Cost
 
Inputs output costs
Inputs output costsInputs output costs
Inputs output costs
 
cost curves
cost curvescost curves
cost curves
 
Hansen aise im ch03
Hansen aise im ch03Hansen aise im ch03
Hansen aise im ch03
 
Production Cost
Production CostProduction Cost
Production Cost
 
16793 theory of_cost
16793 theory of_cost16793 theory of_cost
16793 theory of_cost
 
break even
break evenbreak even
break even
 
Economic Costs | Eonomics
Economic Costs | EonomicsEconomic Costs | Eonomics
Economic Costs | Eonomics
 
Theory of costs
Theory of costsTheory of costs
Theory of costs
 
Theory of cost
Theory of costTheory of cost
Theory of cost
 

Andere mochten auch (7)

Chapter 5 Cost Behavior: Analysis and Use
Chapter 5 Cost Behavior: Analysis and UseChapter 5 Cost Behavior: Analysis and Use
Chapter 5 Cost Behavior: Analysis and Use
 
Cost Behavior Analysis
Cost Behavior AnalysisCost Behavior Analysis
Cost Behavior Analysis
 
Managerial accounting
Managerial accountingManagerial accounting
Managerial accounting
 
Cost management
Cost managementCost management
Cost management
 
Cost management
Cost managementCost management
Cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 

Ähnlich wie Cost Behavior

Simple lin regress_inference
Simple lin regress_inferenceSimple lin regress_inference
Simple lin regress_inference
Kemal İnciroğlu
 
SupportVectorRegression
SupportVectorRegressionSupportVectorRegression
SupportVectorRegression
Daniel K
 
Chapter 15Multiple Regression and Model BuildingCo
Chapter 15Multiple Regression and Model BuildingCoChapter 15Multiple Regression and Model BuildingCo
Chapter 15Multiple Regression and Model BuildingCo
EstelaJeffery653
 

Ähnlich wie Cost Behavior (20)

Simple lin regress_inference
Simple lin regress_inferenceSimple lin regress_inference
Simple lin regress_inference
 
lanen_5e_ch05_student.ppt
lanen_5e_ch05_student.pptlanen_5e_ch05_student.ppt
lanen_5e_ch05_student.ppt
 
Correlation and Regression Analysis.pptx
Correlation and Regression Analysis.pptxCorrelation and Regression Analysis.pptx
Correlation and Regression Analysis.pptx
 
2 simple regression
2   simple regression2   simple regression
2 simple regression
 
Multiple Regression.ppt
Multiple Regression.pptMultiple Regression.ppt
Multiple Regression.ppt
 
Regression Analysis.pptx
Regression Analysis.pptxRegression Analysis.pptx
Regression Analysis.pptx
 
Regression analysis
Regression analysisRegression analysis
Regression analysis
 
Regression
RegressionRegression
Regression
 
Quantitative Analysis Homework Help
Quantitative Analysis Homework HelpQuantitative Analysis Homework Help
Quantitative Analysis Homework Help
 
Quantitative Methods for Lawyers - Class #22 - Regression Analysis - Part 1
Quantitative Methods for Lawyers - Class #22 -  Regression Analysis - Part 1Quantitative Methods for Lawyers - Class #22 -  Regression Analysis - Part 1
Quantitative Methods for Lawyers - Class #22 - Regression Analysis - Part 1
 
Quantitative Methods for Lawyers - Class #19 - Regression Analysis - Part 2
Quantitative Methods for Lawyers - Class #19 - Regression Analysis - Part 2Quantitative Methods for Lawyers - Class #19 - Regression Analysis - Part 2
Quantitative Methods for Lawyers - Class #19 - Regression Analysis - Part 2
 
Lecture - 8 MLR.pptx
Lecture - 8 MLR.pptxLecture - 8 MLR.pptx
Lecture - 8 MLR.pptx
 
Regression
RegressionRegression
Regression
 
Regression
RegressionRegression
Regression
 
Regression
Regression  Regression
Regression
 
Regression
RegressionRegression
Regression
 
SupportVectorRegression
SupportVectorRegressionSupportVectorRegression
SupportVectorRegression
 
Exploring Support Vector Regression - Signals and Systems Project
Exploring Support Vector Regression - Signals and Systems ProjectExploring Support Vector Regression - Signals and Systems Project
Exploring Support Vector Regression - Signals and Systems Project
 
Chapter 15Multiple Regression and Model BuildingCo
Chapter 15Multiple Regression and Model BuildingCoChapter 15Multiple Regression and Model BuildingCo
Chapter 15Multiple Regression and Model BuildingCo
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Correlation and Reg...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Correlation and Reg...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Correlation and Reg...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Correlation and Reg...
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Kürzlich hochgeladen (20)

Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 

Cost Behavior

  • 3. Estimating Mixed Costs • Scattergraph method • Goal: Derive TC equation – Hi-Low analysis – Regression – Multiple Regression
  • 4. Interpreting Regression LO5 Interpret the results of regression output. F V Y = Intercept Y = Slope F + V X X
  • 5. Interpreting Regression, Continued. . . Correlation coefficient “R” measures the linear relationship between variables. The closer R is to 1.0 the closer the points are to the regression line. The closer R is to zero, the poorer the regression line. Coefficient of determination “R2” The square of the correlation coefficient. The proportion of the variation in the dependent variable (Y) explained by the independent variable(s)(X). T-Statistic The t-statistic is the value of the estimated coefficient, b, divided by its standard error. Generally, if it is over 2, then it is considered significant. If significant, the cost is NOT totally fixed.
  • 6. Interpreting Regression, Continued. . . Correlation Coefficient Coefficient of Determination T-Statistic .91 A linear relationship does exists between repair hours and overhead costs. .828 82.8% of the changes in overhead costs can be explained by changes in repair-hours. 10.7 & 7.9 Both have t-statistics that are greater than 2, so the cost is not totally fixed. Estimate 3C’s overhead with 520 repair hours.
  • 7. Multiple Regression Multiple Regression: When more than one predictor (x) is in the model. Is repair-hours the only activity that drives overhead costs at 3C? Predictors: X1: Repair-hours X2: Parts Cost Equation: TC = VC(X1) + VC(X2) + FC
  • 8. Multiple Regression, Continued. . . 3C Cost Information Month OH Costs Repair-Hours (X1) Parts (X2) 1 $9,891 248 $1,065 2 $9,244 248 $1,452 3 $13,200 480 $3,500 4 $10,555 284 $1,568 5 $9,054 200 $1,544 6 $10,662 380 $1,222 7 $12,883 568 $2,986 8 $10,345 344 $1,841 9 $11,217 448 $1,654 10 $13,269 544 $2,100 11 $10,830 340 $1,245 12 $12,607 412 $2,700 13 $10,871 384 $2,200 14 $12,816 404 $3,110 15 $8,464 212 $ 752
  • 9. Multiple Regression Output Interpret results and estimate total costs with 520 repair hours and $3500 parts costs
  • 10. Statistical Cost Estimation Using Regression Analysis Statistical procedure to determine the relationship between variables. High-Low Method Regression Uses two data points. Uses all the data points. 3C Overhead
  • 11. Implementation Problems LO6 Identify potential problems with regression data. 1. Curvilinear costs 2. Outliers 3. Spurious relations Curvilinear costs 4. Assumptions Identify relevant range Analyze relevant range Relevant Range
  • 12. ICE Month Customer Accts Paychecks Proc Acct Svc Costs 1 325 1029 63800 2 310 993 68900 3 302 1268 64000 4 213 1028 61300 5 222 984 61600 6 214 712 50800 7 131 762 51020 8 123 739 54300 9 115 708 50500 10 296 1232 64800 11 213 978 58000 12 222 929 57500 13 217 1059 62200 14 132 942 54900 15 300 1299 71530 16 315 1283 64800 3650 15945 959950 Totals Required: Based on customer accounts, paychecks processed HiLo Analysis Regression Multiple Regression