WHAT IS SSEMP?
The site-specific EMP shall refer to the policies, plans and
procedures for communicating Project specific environmental
protection matters within the Contractor's organization and to Sub-
Contractors entering the worksite.
OBJECTIVES OF SSEMP
• Identify the potential negative environmental impacts that can result from
the planned construction activities, and identify measures to control or
avoid these impacts within the Contractual constraints.
• Outline specific roles and responsibilities of Contractor staff related to
environmental management as defined in the Contract.
• List reporting, training, auditing, and other procedures required to ensure
appropriate site environmental management as defined in the Contract.
PROJECT PHASES
There are two phases of the project
1. PRE-CONSTRUCTION PHASE / DESIGNING PHASE
 Plaining
 Survey
 Identification of Hazards
 Mitigation Measures
2. CONSTRUCTION PHASE
 Implementation
 Monitoring
 Maintenance
WHAR IS HAZARD?
A hazard is something that can cause harm.
 TYPES OF HAZARDS
1. Physical Hazards
2. Chemical Hazards
3. Biological Hazards
4. Psychological Hazards
5. Ergonomic Hazards
PHYSICAL HAZARD
 Vibration
 Electricity
 Slip Trip
 Work at height
MITIGATION MEASURES
• Reduce the vibration at source
• Limit the duration of exposure
• Protecting the receiver
• Create a safe place
• Eliminate the hazard
• Use Safety harness
CHEMICAL HAZARD
Mitigation Measures
 Isolate the process
 Use proper PPES (Masks ,
Gloves, Goggles )
Biological Hazard
 Coronavirus
Harmful plants
Harmful Animals
Dust Particles
MITIGATION MEASURES
 Use Proper PPES (Masks , Gloves, Safety shoes).
 Worker Must be vaccinated
Psychological Hazards
 Work related stress
 Harassment
 Alcohol and Drug use
Mitigation Measures
 Preventing and managing stress in the workplace before it becomes a risk to health
and safety.
 Having senior management commitment to reducing workplace stress
 Workers should not drugs addicted.
Ergonomic Hazards
 Vibration
 Temperature
 Work Environment
 Welfare
Mitigation Measures
 Provide easy access of drinking water.
 Provide good work place ventilation.
 Provide frequent break and job rotation.
EMERGENCY RESPONSE
PLAN
Emergency Situations
Following emergencies may occur at workplaces:
• Fire
• Fuel spillage
• Gas leaks
• Injury from machinery and equipment.
• Fall, climbing accident.
• Emergency as a result of environmental conditions (e.g., heat, cold, wet, snow,
wind, lightning, bushfires, floods) emergencies.
• Hazardous substances and chemical spills
EMERGENCY RESPONSE
PLAN
• Keep heavy equipment away from trench edges.
• Keep surcharge loads at least 2 feet from trench edges.
• Know where underground utilities are located.
• Test for low oxygen, hazardous fumes and toxic gases.
• Inspect trenches at the start of each shift.
• Inspect trenches following a rainstorm.
• Equipment will be removed from the affected area.
• The nearest hospital should be informed for possible causalities
EMERGENCY RESPONSE
PLAN
 Plan for management of excavated soil/asphalt/concrete.
 Plan for traffic control.
 Excavation permits.
 First Aid kit should be present at site .
TRAFIC MANAGEMENT
PLAN
The purpose of the traffic management plan is to provide a framework describing M/s TMT
JV MAC will manage the traffic aspects of the Water Distribution Network and construction
of allied works. This traffic management plan will provide the processes to ensure that the
project maintains the appropriate control to manage the traffic in and around the project
during the construction phase of the project.
TRAFIC MANAGEMENT
PLAN
• Safety of roads while movement of construction vehicle.
• Ensure there is safe interface between construction traffic and local traffic.
• Eliminate the risk of injury to local traffic users and construction personnel.
• Minimize traffic delays and traffic issues.
• The traffic shall observe the speed limit, defensive driving shall be encouraged
and implemented
Presentation on SSEMP

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Hazard map
Hazard mapHazard map
Hazard map
 
Flood
FloodFlood
Flood
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Flood risk assessment and management
Flood risk assessment and managementFlood risk assessment and management
Flood risk assessment and management
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
 
Environmental Monitoring
Environmental MonitoringEnvironmental Monitoring
Environmental Monitoring
 
Natural Hazards, Classification and Analysis
Natural Hazards, Classification and AnalysisNatural Hazards, Classification and Analysis
Natural Hazards, Classification and Analysis
 
Lecture 5: Hazard Analysis
Lecture 5: Hazard AnalysisLecture 5: Hazard Analysis
Lecture 5: Hazard Analysis
 
Environment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote SensingEnvironment Impact Assessment Using Remote Sensing
Environment Impact Assessment Using Remote Sensing
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Biological environmental impact analysis
Biological environmental impact analysisBiological environmental impact analysis
Biological environmental impact analysis
 
Natural hazards and disaster,types,mitigation and management
Natural hazards and disaster,types,mitigation and managementNatural hazards and disaster,types,mitigation and management
Natural hazards and disaster,types,mitigation and management
 
EIA Evolution
EIA EvolutionEIA Evolution
EIA Evolution
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
EIA for Major development projects - Mining projects
EIA for Major development projects - Mining projectsEIA for Major development projects - Mining projects
EIA for Major development projects - Mining projects
 
Runoff & Flood Frequency Analysis
Runoff & Flood Frequency AnalysisRunoff & Flood Frequency Analysis
Runoff & Flood Frequency Analysis
 
Solid Waste Generation and Handling
Solid Waste Generation and HandlingSolid Waste Generation and Handling
Solid Waste Generation and Handling
 
Environmental Risk Assessment
Environmental Risk AssessmentEnvironmental Risk Assessment
Environmental Risk Assessment
 
Disaster mitigation - land slide
Disaster mitigation - land slideDisaster mitigation - land slide
Disaster mitigation - land slide
 
Flood hazards in india
Flood hazards in indiaFlood hazards in india
Flood hazards in india
 

Ähnlich wie Presentation on SSEMP

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
FARSANA26
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
IlyasKhan84634
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
AhmedIsmailmaghbashi
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JESUSBASILIOANTONIO
 

Ähnlich wie Presentation on SSEMP (20)

CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
AIR BASED HAZARDS Ehtesham.docx
AIR BASED HAZARDS Ehtesham.docxAIR BASED HAZARDS Ehtesham.docx
AIR BASED HAZARDS Ehtesham.docx
 
Iee
IeeIee
Iee
 
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptxFFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
FFBL Emergency Response Plan - Fire - Ammonia - Chlorine (10-10-2018).pptx
 
Environmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptxEnvironmental Engineering eia report italy 09.pptx
Environmental Engineering eia report italy 09.pptx
 
sci.pptx
sci.pptxsci.pptx
sci.pptx
 
Assessment and operational control of on site environmental impacts- moemen a...
Assessment and operational control of on site environmental impacts- moemen a...Assessment and operational control of on site environmental impacts- moemen a...
Assessment and operational control of on site environmental impacts- moemen a...
 
ANNEX0~1.DOC
ANNEX0~1.DOCANNEX0~1.DOC
ANNEX0~1.DOC
 
Opito bosiet safety induction
Opito bosiet safety inductionOpito bosiet safety induction
Opito bosiet safety induction
 
Topic 8
Topic 8Topic 8
Topic 8
 
Introduction to ERA by arup das
Introduction to ERA by arup dasIntroduction to ERA by arup das
Introduction to ERA by arup das
 
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Confined space – hazards –risk –control measures
Confined space – hazards –risk –control measuresConfined space – hazards –risk –control measures
Confined space – hazards –risk –control measures
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
 
Basic concept of environment safeguard
Basic concept of environment safeguardBasic concept of environment safeguard
Basic concept of environment safeguard
 
AIR BASED HAZARDS
AIR BASED HAZARDSAIR BASED HAZARDS
AIR BASED HAZARDS
 
HAZARD_IDENTIFICATION_ibadan[1].pptx
HAZARD_IDENTIFICATION_ibadan[1].pptxHAZARD_IDENTIFICATION_ibadan[1].pptx
HAZARD_IDENTIFICATION_ibadan[1].pptx
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
 
Aniket seminar ppt.pdf
Aniket seminar ppt.pdfAniket seminar ppt.pdf
Aniket seminar ppt.pdf
 

Kürzlich hochgeladen

Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
HyderabadDolls
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
 

Kürzlich hochgeladen (20)

Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
Call Girls in Tiruppur  9332606886  ust Genuine Escort Model SeviceCall Girls in Tiruppur  9332606886  ust Genuine Escort Model Sevice
Call Girls in Tiruppur 9332606886 ust Genuine Escort Model Sevice
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
Joka \ Call Girls Service Kolkata - 450+ Call Girl Cash Payment 8005736733 Ne...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 

Presentation on SSEMP

  • 2. WHAT IS SSEMP? The site-specific EMP shall refer to the policies, plans and procedures for communicating Project specific environmental protection matters within the Contractor's organization and to Sub- Contractors entering the worksite.
  • 3. OBJECTIVES OF SSEMP • Identify the potential negative environmental impacts that can result from the planned construction activities, and identify measures to control or avoid these impacts within the Contractual constraints. • Outline specific roles and responsibilities of Contractor staff related to environmental management as defined in the Contract. • List reporting, training, auditing, and other procedures required to ensure appropriate site environmental management as defined in the Contract.
  • 4. PROJECT PHASES There are two phases of the project 1. PRE-CONSTRUCTION PHASE / DESIGNING PHASE  Plaining  Survey  Identification of Hazards  Mitigation Measures
  • 5. 2. CONSTRUCTION PHASE  Implementation  Monitoring  Maintenance
  • 6. WHAR IS HAZARD? A hazard is something that can cause harm.  TYPES OF HAZARDS 1. Physical Hazards 2. Chemical Hazards 3. Biological Hazards 4. Psychological Hazards 5. Ergonomic Hazards
  • 7. PHYSICAL HAZARD  Vibration  Electricity  Slip Trip  Work at height MITIGATION MEASURES • Reduce the vibration at source • Limit the duration of exposure • Protecting the receiver • Create a safe place • Eliminate the hazard • Use Safety harness
  • 8. CHEMICAL HAZARD Mitigation Measures  Isolate the process  Use proper PPES (Masks , Gloves, Goggles )
  • 9. Biological Hazard  Coronavirus Harmful plants Harmful Animals Dust Particles MITIGATION MEASURES  Use Proper PPES (Masks , Gloves, Safety shoes).  Worker Must be vaccinated
  • 10. Psychological Hazards  Work related stress  Harassment  Alcohol and Drug use Mitigation Measures  Preventing and managing stress in the workplace before it becomes a risk to health and safety.  Having senior management commitment to reducing workplace stress  Workers should not drugs addicted.
  • 11. Ergonomic Hazards  Vibration  Temperature  Work Environment  Welfare Mitigation Measures  Provide easy access of drinking water.  Provide good work place ventilation.  Provide frequent break and job rotation.
  • 12. EMERGENCY RESPONSE PLAN Emergency Situations Following emergencies may occur at workplaces: • Fire • Fuel spillage • Gas leaks • Injury from machinery and equipment. • Fall, climbing accident. • Emergency as a result of environmental conditions (e.g., heat, cold, wet, snow, wind, lightning, bushfires, floods) emergencies. • Hazardous substances and chemical spills
  • 13. EMERGENCY RESPONSE PLAN • Keep heavy equipment away from trench edges. • Keep surcharge loads at least 2 feet from trench edges. • Know where underground utilities are located. • Test for low oxygen, hazardous fumes and toxic gases. • Inspect trenches at the start of each shift. • Inspect trenches following a rainstorm. • Equipment will be removed from the affected area. • The nearest hospital should be informed for possible causalities
  • 14. EMERGENCY RESPONSE PLAN  Plan for management of excavated soil/asphalt/concrete.  Plan for traffic control.  Excavation permits.  First Aid kit should be present at site .
  • 15. TRAFIC MANAGEMENT PLAN The purpose of the traffic management plan is to provide a framework describing M/s TMT JV MAC will manage the traffic aspects of the Water Distribution Network and construction of allied works. This traffic management plan will provide the processes to ensure that the project maintains the appropriate control to manage the traffic in and around the project during the construction phase of the project.
  • 16. TRAFIC MANAGEMENT PLAN • Safety of roads while movement of construction vehicle. • Ensure there is safe interface between construction traffic and local traffic. • Eliminate the risk of injury to local traffic users and construction personnel. • Minimize traffic delays and traffic issues. • The traffic shall observe the speed limit, defensive driving shall be encouraged and implemented