California Department of Transportation (Caltrans)



      Overview of P3s in California


AGC Engineering Division              October 27, 2011
    Fall Conference                   Indian Wells, CA
California Transp. System
California’s system is one of the largest
and most complex in the country
California Roadways          SHS      Local

Lane-Miles                   50,500   303,000

Total Annual VMT (billion)   177      146

% Annual VMT                 55%      45%

•Supports 37 Million…60 Million by 2050
Transp. Financing Context

• California GDP is about $1.8 trillion
• Typical Infrastructure Investment
  – Need 2-2.5% of GDP
  – $400-500 billion in next 10 years

• $13.8 billion in 2010-11 Budget
Transp. Financing in CA
• Limited Traditional Revenue Sources
  – Excise Tax (Diesel & Gasoline)
  – Sales Tax (Diesel & Gasoline)
  – Sales Tax Measures
  – Tolls
  – Developer Funds

• Bond Funds (GARVEE, Proposition 1B)
Transp. Financing in CA
   $13.8 Billion in 2010/11 Funding




                               State 24%
                               Federal 19%
                               Local 57%
Transp. Financing in CA
• Federal Hwy Trust Fund in Crisis
  – Near Insolvent & Bailed Out Several
    Times
  – Reduced Federal Funding
  – Reduced Buying Power

• Between 2008-35 Current Policies only
  meets…
  – 44% of Maintenance needs
  – 36% of Improvements needs
Current Legislation
  Senate Bill 4 (SBX2 4)
• Authorizes Caltrans and Regional
  Transportation Agencies to implement P3
  Projects
• Transportation Projects include
  Highways, Transit and Rail
• No Limit on Number of Projects
• Established Public Infrastructure Advisory
  Commission (PIAC)
• Sunsets January 1, 2017
P3 Program Update
The Department’s Goal:
Develop a program that is fully integrated as a
sustainable element of project delivery process

Objectives
  • Leverage Existing Funding
  • Accelerate Project Delivery
  • Transfer Prudent Risk to Private Sector
  • Capture Private Sector Innovation
  • Promote Life Cycle Efficiencies/Performance
  • Create Competitive Tension to Drive Value
  • Spur Economic Growth
P3 Program Activities
• Play a leadership role to enable projects
   – Create transparent standards for implementation
   – Share best practices
• Maintain close alignment with Regional
  Transportation Authorities
   – Leverage relationships for successful P3s
• Build a strong P3 organization
  – Integrated with the rest of Caltrans
• Enhance outreach and relationship building
   – Develop P3 implementation guidelines
   – P3 technical specs library & Issue Papers
Emerging Pipeline…
Consists of Projects that:
  •   meet a high-priority transportation need;
  •   enjoy significant public and political support;
  •   have or soon will have achieved sufficient environmental
      readiness;
  •   show the promise of greater value – including speed of
      delivery – than conventional procurement; and
  •   have the potential to generate revenue or enhance program
      capacity through better leverage or other means.

Categories in Pipeline – depend on the level of
progress and effort towards P3 delivery
  •   level one (low readiness) through
  •   level four (in procurement)
Pipeline P3 Projects
• I-710 Freight Corridor ($6.7 billion)
  (Add two dedicated truck lanes in each direction as well as
  one mixed flow lane in each direction, between the Ports of
  Los Angeles and Long Beach and State Route 60, near
  downtown Los Angeles. Additionally, several interchanges
  along this corridor will be improved.)

• I-710 Tunnel ($4.5 to $9 billion)
  (Gap closure to connect I-710 to I-210 and is considered
  critical to improving traffic and air quality in the area.
  Additionally, this gap closure will alleviate traffic on several
  local and interstate freeways.)

• High Desert Corridor ($2.5 billion)
  Add a four- and six-lane new freeway/highway as well as
  widen some segments to eight lanes [including one HOV
  lane in each direction].
Pipeline P3 Projects
• MTC Express Lane Network ($6 billion)
  (Expand mobility options by creating a seamless
  800-mile network of unobstructed lanes to provide a
  faster commute for travelers who use them.)

• Route 101 Doyle Drive (Presidio Parkway)
  ($954 million)
  (Replace existing Doyle Drive facility, constructed in
  1936-1937, with a new six-lane facility. The Project
  will improve the seismic, structural, and traffic
  safety of this roadway which serves over 120,000
  vehicles per day.)
Other Opportunities…

• OCTA I-405 Managed Lanes

• SANDAG SR 11 Otay Mesa

• SR 152 Freight Corridor
Presidio Parkway P3 Project
KEY DATES:
• Issued RFQ on February 2, 2010
• Shortlist Announcement on April 8, 2010
• Issued Draft RFP on May 25, 2010
• Proposals Due September 2010
• Notice of Intent to Award - October 2010
• Submission of final Agreement to PIAC and
  Legislature pursuant to Section 143(c)(5)
• Award and Execution of Agreement – Jan 3, 2011
• Financial Close Delayed by Litigation
Presidio Parkway P3 Project
Presidio Parkway P3 Project




• Replace deficient facility • New tunnels
• Wide landscaped            • New direct access to
  median                       Presidio Parkway
• Continuous shoulders
Presidio Parkway P3 Project
Example of P3s in US
North Tarrant Expressway (Dallas-FW)
 • Term of Concession agreement: 52 years
 • Existing Volumes: up to 200,000 vehicles per day

 Scope of Work:
 • Design, construct, finance, maintain, and operate
   13 miles of roadway (~169 lane-miles)

 Improvement include:
 • Reconstruction of General Purpose Lanes (GPL)
   and frontage roads
 • Addition of 2/3 Managed Lanes per direction
 • Addition of 1 GPL per direction in segment 1
Example of P3s in US
LBJ Expressway (Dallas-FW)
 • Term of Concession agreement: 52 years
 • Existing Volumes: up to 270,000 veh per day

 Scope of Work:
 • Design, construct, finance, maintain, and operate
   17 miles of roadway (~185 lane-miles)

 Improvement include:
 • Reconstruction of the IH-635 GPL & frontage roads
 • Addition of 3 below surface ML per direction on
   IH635
 • Addition of 3 elevated ML along I-35E with direct
   connectors
Example of P3s in US
                    NTE      LBJ

Total Investment:
                    $2.05b   $2.7b
Private Equity:
                    $427m    $665m
Total Debt:
                    $1.05b   $1.47b
•PABs:              $400m    $615m
•TIFIA:             $650m    $850m

Public Funds:
                    $537m    $496m
Challenges…
•Valuation of Alternative Approaches
•Appropriate Risk Transfer
•Transparency and Public Participation
•Unavoidable Complexity of Transactions
•Perceptions …needing correction
 • Non-compete clauses are always part of P3s
 • A PPP is a synonym for tolls and with that toll
   increases are inevitable…windfall profits.
 • The public sector loses total control of the
   facility
Conclusion…
• Infrastructure funding and delivery will
  continue to lag behind need
• P3s are not cure all solutions and not
  applicable to all projects
• P3s will not solve the serious lack of
  infrastructure funding
• P3s are necessary tools for infrastructure
  delivery now and in the future
Questions

Weitere ähnliche Inhalte

Was ist angesagt?

Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Actartba
 
Transit policy utsc presentation june 24 [compatibility mode]
Transit policy utsc presentation   june 24 [compatibility mode]Transit policy utsc presentation   june 24 [compatibility mode]
Transit policy utsc presentation june 24 [compatibility mode]André Darmanin
 
SMART Seminar: Governance of Integrated Infrastructure
SMART Seminar: Governance of Integrated InfrastructureSMART Seminar: Governance of Integrated Infrastructure
SMART Seminar: Governance of Integrated InfrastructureSMART Infrastructure Facility
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInSteve Richards
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA BUS
 
Caltrain hsrmo uletter
Caltrain hsrmo uletterCaltrain hsrmo uletter
Caltrain hsrmo uletterAdina Levin
 
Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15Robert Smith
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationSteven Rosenberg
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...CPWF Mekong
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentFairfax County
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Planpyoungkyova
 
Station Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanStation Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanRail~Volution
 

Was ist angesagt? (20)

GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
Artba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow ActArtba Map 21 Re-authorization VS Grow Act
Artba Map 21 Re-authorization VS Grow Act
 
DOT presentation
DOT presentationDOT presentation
DOT presentation
 
Transit policy utsc presentation june 24 [compatibility mode]
Transit policy utsc presentation   june 24 [compatibility mode]Transit policy utsc presentation   june 24 [compatibility mode]
Transit policy utsc presentation june 24 [compatibility mode]
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
SMART Seminar: Governance of Integrated Infrastructure
SMART Seminar: Governance of Integrated InfrastructureSMART Seminar: Governance of Integrated Infrastructure
SMART Seminar: Governance of Integrated Infrastructure
 
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedInAurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
Aurecon_IndII IRF Presentation Nov 2014 Expressway Development - LinkedIn
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
COTA NextGen Online Public Meeting
COTA NextGen Online Public MeetingCOTA NextGen Online Public Meeting
COTA NextGen Online Public Meeting
 
Caltrain hsrmo uletter
Caltrain hsrmo uletterCaltrain hsrmo uletter
Caltrain hsrmo uletter
 
Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15Bob Smith WEIL 7-10-15
Bob Smith WEIL 7-10-15
 
East San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentationEast San Fernando Valley Transit Corridor presentation
East San Fernando Valley Transit Corridor presentation
 
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
Efforts to apply to rsat in mekong tributary sub basins under the mrc-ish pro...
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
I-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework DocumentI-66 Inside the Beltway Framework Document
I-66 Inside the Beltway Framework Document
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
2015 March 16 ASCE TTG - I-405 Improvement Project
2015 March 16   ASCE TTG - I-405 Improvement Project 2015 March 16   ASCE TTG - I-405 Improvement Project
2015 March 16 ASCE TTG - I-405 Improvement Project
 
Hydrogen Progress, Priorities and Next Steps (Sept. 15)
Hydrogen Progress, Priorities and Next Steps (Sept. 15)Hydrogen Progress, Priorities and Next Steps (Sept. 15)
Hydrogen Progress, Priorities and Next Steps (Sept. 15)
 
WV State Freight Plan
WV State Freight PlanWV State Freight Plan
WV State Freight Plan
 
Station Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim ChanStation Area Planning: The Fundamentals by Tim Chan
Station Area Planning: The Fundamentals by Tim Chan
 

Ähnlich wie Caltrans: Overview of Public Private Partnerships (P3)

Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationAGC of California
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...Rail~Volution
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsSouth Shore Clean Cities
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Atkins
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceAGC of California
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsCharlotte Chamber
 
Further Discussion of "LEED for Bridges"
Further Discussion of "LEED for Bridges"Further Discussion of "LEED for Bridges"
Further Discussion of "LEED for Bridges"David Kanger, P.E.
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County
 
MTC core capacity transit study
MTC core capacity transit studyMTC core capacity transit study
MTC core capacity transit studyAdina Levin
 
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...Rail~Volution
 
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC @ CSUSB
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Visualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanVisualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanFairfax County
 
NJ Future Redevelopment Forum 2017 Anderson
NJ Future Redevelopment Forum 2017 AndersonNJ Future Redevelopment Forum 2017 Anderson
NJ Future Redevelopment Forum 2017 AndersonNew Jersey Future
 
Funding options presentation
Funding options presentationFunding options presentation
Funding options presentationoneregionforward
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Fairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 

Ähnlich wie Caltrans: Overview of Public Private Partnerships (P3) (20)

Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 PresentationPublic Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
Public Private Partnerships (P3) - Kome Ajese AGC 01.2011 Presentation
 
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
RV 2014: Urban Circulator Roundtable: Shaping Cities one Challenge at a Time ...
 
NIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation ProjectsNIRPC Green Fleet: Funding Process for Transportation Projects
NIRPC Green Fleet: Funding Process for Transportation Projects
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC Conference
 
07 steve healow
07 steve healow07 steve healow
07 steve healow
 
Keynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road ProjectsKeynote Part 1 - Alternative Funding of Road Projects
Keynote Part 1 - Alternative Funding of Road Projects
 
Federal transportation funding and innovations
Federal transportation funding and innovationsFederal transportation funding and innovations
Federal transportation funding and innovations
 
Further Discussion of "LEED for Bridges"
Further Discussion of "LEED for Bridges"Further Discussion of "LEED for Bridges"
Further Discussion of "LEED for Bridges"
 
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
Fairfax County Countywide Transit Network Study: Board of Supervisors Transpo...
 
MTC core capacity transit study
MTC core capacity transit studyMTC core capacity transit study
MTC core capacity transit study
 
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
 
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Visualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft PlanVisualize 2045: Highlights from the Draft Plan
Visualize 2045: Highlights from the Draft Plan
 
NJ Future Redevelopment Forum 2017 Anderson
NJ Future Redevelopment Forum 2017 AndersonNJ Future Redevelopment Forum 2017 Anderson
NJ Future Redevelopment Forum 2017 Anderson
 
Funding options presentation
Funding options presentationFunding options presentation
Funding options presentation
 
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
Board of Supervisors Transportation Committee: Proposed High Quality Transit ...
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 

Mehr von AGC of California

Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsAGC of California
 
Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2AGC of California
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1AGC of California
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessAGC of California
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsAGC of California
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.AGC of California
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestAGC of California
 
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2AGC of California
 
Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2AGC of California
 

Mehr von AGC of California (20)

Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction Projects
 
Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1
 
Safety Forum
Safety ForumSafety Forum
Safety Forum
 
Market Outlook
Market Outlook Market Outlook
Market Outlook
 
Crisis Management
Crisis ManagementCrisis Management
Crisis Management
 
Crisis Management Checklist
Crisis Management ChecklistCrisis Management Checklist
Crisis Management Checklist
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals Process
 
Workers Compensation 101
Workers Compensation 101Workers Compensation 101
Workers Compensation 101
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident Investigations
 
Skin Cancer Prevention
Skin Cancer PreventionSkin Cancer Prevention
Skin Cancer Prevention
 
Joplin Blitz Build 2012
Joplin Blitz Build 2012Joplin Blitz Build 2012
Joplin Blitz Build 2012
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
 
Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012
 
Barry Correa Outlook 2012
Barry Correa Outlook 2012Barry Correa Outlook 2012
Barry Correa Outlook 2012
 
Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2Massood Eftekhari Outlook 2012 2 of 2
Massood Eftekhari Outlook 2012 2 of 2
 
Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
Roy Fisher Outlook 2012
Roy Fisher Outlook 2012Roy Fisher Outlook 2012
Roy Fisher Outlook 2012
 

Kürzlich hochgeladen

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 

Kürzlich hochgeladen (20)

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 

Caltrans: Overview of Public Private Partnerships (P3)

  • 1. California Department of Transportation (Caltrans) Overview of P3s in California AGC Engineering Division October 27, 2011 Fall Conference Indian Wells, CA
  • 2. California Transp. System California’s system is one of the largest and most complex in the country California Roadways SHS Local Lane-Miles 50,500 303,000 Total Annual VMT (billion) 177 146 % Annual VMT 55% 45% •Supports 37 Million…60 Million by 2050
  • 3. Transp. Financing Context • California GDP is about $1.8 trillion • Typical Infrastructure Investment – Need 2-2.5% of GDP – $400-500 billion in next 10 years • $13.8 billion in 2010-11 Budget
  • 4. Transp. Financing in CA • Limited Traditional Revenue Sources – Excise Tax (Diesel & Gasoline) – Sales Tax (Diesel & Gasoline) – Sales Tax Measures – Tolls – Developer Funds • Bond Funds (GARVEE, Proposition 1B)
  • 5. Transp. Financing in CA $13.8 Billion in 2010/11 Funding State 24% Federal 19% Local 57%
  • 6. Transp. Financing in CA • Federal Hwy Trust Fund in Crisis – Near Insolvent & Bailed Out Several Times – Reduced Federal Funding – Reduced Buying Power • Between 2008-35 Current Policies only meets… – 44% of Maintenance needs – 36% of Improvements needs
  • 7. Current Legislation Senate Bill 4 (SBX2 4) • Authorizes Caltrans and Regional Transportation Agencies to implement P3 Projects • Transportation Projects include Highways, Transit and Rail • No Limit on Number of Projects • Established Public Infrastructure Advisory Commission (PIAC) • Sunsets January 1, 2017
  • 8. P3 Program Update The Department’s Goal: Develop a program that is fully integrated as a sustainable element of project delivery process Objectives • Leverage Existing Funding • Accelerate Project Delivery • Transfer Prudent Risk to Private Sector • Capture Private Sector Innovation • Promote Life Cycle Efficiencies/Performance • Create Competitive Tension to Drive Value • Spur Economic Growth
  • 9. P3 Program Activities • Play a leadership role to enable projects – Create transparent standards for implementation – Share best practices • Maintain close alignment with Regional Transportation Authorities – Leverage relationships for successful P3s • Build a strong P3 organization – Integrated with the rest of Caltrans • Enhance outreach and relationship building – Develop P3 implementation guidelines – P3 technical specs library & Issue Papers
  • 10. Emerging Pipeline… Consists of Projects that: • meet a high-priority transportation need; • enjoy significant public and political support; • have or soon will have achieved sufficient environmental readiness; • show the promise of greater value – including speed of delivery – than conventional procurement; and • have the potential to generate revenue or enhance program capacity through better leverage or other means. Categories in Pipeline – depend on the level of progress and effort towards P3 delivery • level one (low readiness) through • level four (in procurement)
  • 11. Pipeline P3 Projects • I-710 Freight Corridor ($6.7 billion) (Add two dedicated truck lanes in each direction as well as one mixed flow lane in each direction, between the Ports of Los Angeles and Long Beach and State Route 60, near downtown Los Angeles. Additionally, several interchanges along this corridor will be improved.) • I-710 Tunnel ($4.5 to $9 billion) (Gap closure to connect I-710 to I-210 and is considered critical to improving traffic and air quality in the area. Additionally, this gap closure will alleviate traffic on several local and interstate freeways.) • High Desert Corridor ($2.5 billion) Add a four- and six-lane new freeway/highway as well as widen some segments to eight lanes [including one HOV lane in each direction].
  • 12. Pipeline P3 Projects • MTC Express Lane Network ($6 billion) (Expand mobility options by creating a seamless 800-mile network of unobstructed lanes to provide a faster commute for travelers who use them.) • Route 101 Doyle Drive (Presidio Parkway) ($954 million) (Replace existing Doyle Drive facility, constructed in 1936-1937, with a new six-lane facility. The Project will improve the seismic, structural, and traffic safety of this roadway which serves over 120,000 vehicles per day.)
  • 13. Other Opportunities… • OCTA I-405 Managed Lanes • SANDAG SR 11 Otay Mesa • SR 152 Freight Corridor
  • 14. Presidio Parkway P3 Project KEY DATES: • Issued RFQ on February 2, 2010 • Shortlist Announcement on April 8, 2010 • Issued Draft RFP on May 25, 2010 • Proposals Due September 2010 • Notice of Intent to Award - October 2010 • Submission of final Agreement to PIAC and Legislature pursuant to Section 143(c)(5) • Award and Execution of Agreement – Jan 3, 2011 • Financial Close Delayed by Litigation
  • 16. Presidio Parkway P3 Project • Replace deficient facility • New tunnels • Wide landscaped • New direct access to median Presidio Parkway • Continuous shoulders
  • 18. Example of P3s in US North Tarrant Expressway (Dallas-FW) • Term of Concession agreement: 52 years • Existing Volumes: up to 200,000 vehicles per day Scope of Work: • Design, construct, finance, maintain, and operate 13 miles of roadway (~169 lane-miles) Improvement include: • Reconstruction of General Purpose Lanes (GPL) and frontage roads • Addition of 2/3 Managed Lanes per direction • Addition of 1 GPL per direction in segment 1
  • 19. Example of P3s in US LBJ Expressway (Dallas-FW) • Term of Concession agreement: 52 years • Existing Volumes: up to 270,000 veh per day Scope of Work: • Design, construct, finance, maintain, and operate 17 miles of roadway (~185 lane-miles) Improvement include: • Reconstruction of the IH-635 GPL & frontage roads • Addition of 3 below surface ML per direction on IH635 • Addition of 3 elevated ML along I-35E with direct connectors
  • 20. Example of P3s in US NTE LBJ Total Investment: $2.05b $2.7b Private Equity: $427m $665m Total Debt: $1.05b $1.47b •PABs: $400m $615m •TIFIA: $650m $850m Public Funds: $537m $496m
  • 21. Challenges… •Valuation of Alternative Approaches •Appropriate Risk Transfer •Transparency and Public Participation •Unavoidable Complexity of Transactions •Perceptions …needing correction • Non-compete clauses are always part of P3s • A PPP is a synonym for tolls and with that toll increases are inevitable…windfall profits. • The public sector loses total control of the facility
  • 22. Conclusion… • Infrastructure funding and delivery will continue to lag behind need • P3s are not cure all solutions and not applicable to all projects • P3s will not solve the serious lack of infrastructure funding • P3s are necessary tools for infrastructure delivery now and in the future